Cahill-Nibbi Joint Venture
- Based in
- S.F
- On San Francisco permits
- Mar 2002 to Sep 2020
- Last 24 months
- 0 permits filed
103 permits since 2000: 96 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2020 | Never finaled issued Apr 2022, no final | 201 West Point Rd | site grading for lot development & public road infrastructure. the john steward company in partnership with hope sf provides this grading permit submittal for the hunters view phase 3 public housing complex in the bayview hunters pt neighborhood. the site is located on the eastern side of middle ptDetails
site grading for lot development & public road infrastructure. the john steward company in partnership with hope sf provides this grading permit submittal for the hunters view phase 3 public housing complex in the bayview hunters pt neighborhood. the site is located on the eastern side of middle pt | $1,400,000 |
| Jun 16, 2017 | Completed final sign-off Jun 2017 | 140 Middle Point Rd | bldg 7a- rev. to 20130820204720 - administrative purpose only - to change number of units of building 7a from 50 to 28Details
bldg 7a- rev. to 20130820204720 - administrative purpose only - to change number of units of building 7a from 50 to 28 | |
| Mar 22, 2017 | Completed final sign-off Dec 2017 | 146 West Point Rd | revision to 201406279737-s2-r1. revisions pertain to interiors of childcare center at wing - b level. add door b141 at corridor, add casework to classrooms, offices, staff loughe & kitchen. second we added to classroom b103-1, bottle washing station added to classroom b10-1Details
revision to 201406279737-s2-r1. revisions pertain to interiors of childcare center at wing - b level. add door b141 at corridor, add casework to classrooms, offices, staff loughe & kitchen. second we added to classroom b103-1, bottle washing station added to classroom b10-1 | $90,000 |
| Feb 6, 2017 | Completed final sign-off Dec 2017 | 188 West Point Rd | revision to proposed improvements in creation of new provate park (part of hunters view hope sf project, phase ii) revisions to two light fixtures ref pa 201504204029Details
revision to proposed improvements in creation of new provate park (part of hunters view hope sf project, phase ii) revisions to two light fixtures ref pa 201504204029 | |
| Jan 12, 2017 | Completed final sign-off Dec 2017 | 146 West Point Rd | revision to 201406279737 s2 to include elevator hoistway smoke detection access hatch & cage.Details
revision to 201406279737 s2 to include elevator hoistway smoke detection access hatch & cage. | |
| Dec 19, 2016 | Completed final sign-off May 2017 | 140 Middle Point Rd | revision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirementsDetails
revision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirements | |
| Dec 19, 2016 | Completed final sign-off May 2017 | 142 West Point Rd | revision to 201308204717 addenda 2 to add access panel and smoke detector to elevator shaft per fire alarm review requirementsDetails
revision to 201308204717 addenda 2 to add access panel and smoke detector to elevator shaft per fire alarm review requirements | |
| Mar 1, 2016 | Completed final sign-off Jun 2017 | 140 Middle Point Rd | revision to 2013908204720. addendum 1 (foundation, superstructure, structural wood framing) to revise anchor tiedown ats schedule (17/58.2)Details
revision to 2013908204720. addendum 1 (foundation, superstructure, structural wood framing) to revise anchor tiedown ats schedule (17/58.2) | |
| Apr 20, 2015 | Completed final sign-off Dec 2017 | 188 West Point Rd | construction of benches, paved areas and play area for use as a park facility. (phase i final map established block/lot 4624/031 to include this area. the phase ii final map #7545 establishes this lot as 4624/056).Details
construction of benches, paved areas and play area for use as a park facility. (phase i final map established block/lot 4624/031 to include this area. the phase ii final map #7545 establishes this lot as 4624/056). | $450,000 |
| Feb 12, 2015 | Completed final sign-off Sep 2017 | 146 West Point Rd | temporary shoring (bldg soil nail wall) for future new bldg. permanent retaining wall (adjacent to temp shoring). pad grading for future bldg.Details
temporary shoring (bldg soil nail wall) for future new bldg. permanent retaining wall (adjacent to temp shoring). pad grading for future bldg. | $900,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2017 | 146 West Point Rd | to erect 5 stories, no basement, 72 dwelling units residential multi-family, commercial, mixed use bldg.Details
to erect 5 stories, no basement, 72 dwelling units residential multi-family, commercial, mixed use bldg. | $25,073,500 |
| Oct 10, 2013 | Completed final sign-off Apr 2017 | 148 Middle Point Rd | grading the site (along with block 4624/lots 29 & 32) to create building pads & streets in the redevelopent of hunter view housing (phase 2)Details
grading the site (along with block 4624/lots 29 & 32) to create building pads & streets in the redevelopent of hunter view housing (phase 2) | $129,500 |
| Oct 10, 2013 | Completed final sign-off Apr 2017 | 201 West Point Rd | grading the site (along with block #4624/lots 29 & 31) to create a temporary access to west point road from middle point & a fire truck turn around for the redevelopmnet of hunter view housing (phase 2).Details
grading the site (along with block #4624/lots 29 & 31) to create a temporary access to west point road from middle point & a fire truck turn around for the redevelopmnet of hunter view housing (phase 2). | $2,000 |
| Oct 10, 2013 | Completed final sign-off Apr 2017 | 96 Middle Point Rd | grading the site (along with block# 4624/ lots# 31 & 32) to create building pads & streets in the redevelopmnet of hunter view housing (phase 2).Details
grading the site (along with block# 4624/ lots# 31 & 32) to create building pads & streets in the redevelopmnet of hunter view housing (phase 2). | $43,500 |
| Sep 10, 2013 | Completed final sign-off Apr 2017 | 148 Middle Point Rd | construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances.Details
construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances. | $20,000 |
| Sep 10, 2013 | Completed final sign-off Apr 2017 | 96 Middle Point Rd | construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances.Details
construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances. | $50,000 |
| Sep 10, 2013 | Completed final sign-off Apr 2017 | 201 West Point Rd | construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances.Details
construction placement of a perimeter temporary construction fence 10'-0" high for construction of hunters view phase 3 per plan. locks to be provided at street gate entrances. | $10,000 |
| Aug 20, 2013 | Completed final sign-off Jun 2017 | 112 West Point Rd | to erect 3-story, type 5, no basement, 7 dwelling units building.Details
to erect 3-story, type 5, no basement, 7 dwelling units building. | $3,000,000 |
| Aug 20, 2013 | Completed final sign-off Jun 2017 | 140 Middle Point Rd | erect 5-story, type 3, 1 basement/garage, 50 dwelling units building.Details
erect 5-story, type 3, 1 basement/garage, 50 dwelling units building. | $11,100,000 |
| Aug 20, 2013 | Completed final sign-off Apr 2017 | 148 Middle Point Rd | to erect 3-story, type 5, no basement, 7 dwelling units building.Details
to erect 3-story, type 5, no basement, 7 dwelling units building. | $3,000,000 |
| Aug 20, 2013 | Completed final sign-off Jun 2017 | 110 Middle Point Rd | to erect 3-story, type 5, no basement, 8 dwelling units building.Details
to erect 3-story, type 5, no basement, 8 dwelling units building. | $3,400,000 |
| Aug 20, 2013 | Completed final sign-off Jun 2017 | 120 Middle Point Rd | erect 3-story, type 5, no basement, 7 dwelling units building.Details
erect 3-story, type 5, no basement, 7 dwelling units building. | $3,000,000 |
| Aug 20, 2013 | Completed final sign-off May 2017 | 142 West Point Rd | erect 5-story, type 3, no basement, 50 dwelling units building.Details
erect 5-story, type 3, no basement, 50 dwelling units building. | $17,600,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 178 West Point Rd | bldg 19 - demolish 2-story, type 5, residential apartment building.Details
bldg 19 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 154 West Point Rd | bldg 17 - demolish 2-story, type 5, 4 units residential apartment building.Details
bldg 17 - demolish 2-story, type 5, 4 units residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 125 West Point Rd | bldg 32 - demolish 1-story, type 5, community laundry building.Details
bldg 32 - demolish 1-story, type 5, community laundry building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 148 Middle Point Rd | bldg 24 - demolish 2-story, type 5, residential apartment building.Details
bldg 24 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 112 West Point Rd | bldg 12 - demolish 2-story, type 5, residential apartment building.Details
bldg 12 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 142 West Point Rd | bldg 15 - demolish 2-story, type 5, residential apartment building.Details
bldg 15 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 130 West Point Rd | bldg 14 - demolish 3-story, type 5, residential apartment building.Details
bldg 14 - demolish 3-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 110 Middle Point Rd | bldg 22 - demolish 2-story, type 5, residential apartment building.Details
bldg 22 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 201 West Point Rd | bldg 53 - demolish 2-story, type 5, residential apartment building.Details
bldg 53 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 140 Middle Point Rd | bldg 23 - demolish 2-story, type 5, residential apartment building.Details
bldg 23 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 120 West Point Rd | bldg 13 - demolish 2-story, type 5, residential apartment building.Details
bldg 13 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 162 West Point Rd | bldg 18 - demolish 3-story, type 5, residential apartment building.Details
bldg 18 - demolish 3-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 146 West Point Rd | bldg 16 - demolish 2-story, type 5, 4 units residential apartment building.Details
bldg 16 - demolish 2-story, type 5, 4 units residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 174 West Point Rd | bldg 20 - demolish 2-story, type 5, residential apartment building.Details
bldg 20 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Jul 22, 2013 | Completed final sign-off Apr 2014 | 120 Middle Point Rd | bldg 21 - demolish 2-story, type 5, residential apartment building.Details
bldg 21 - demolish 2-story, type 5, residential apartment building. | $10,000 |
| Feb 28, 2013 | Completed final sign-off Apr 2014 | 52 Middle Point Rd | revision to grading permit to document existence of fill on a portion of the site. original pa# 2010/07/22/7178. revision pa# 2011/03/02/1200.Details
revision to grading permit to document existence of fill on a portion of the site. original pa# 2010/07/22/7178. revision pa# 2011/03/02/1200. | |
| Oct 3, 2012 | Completed final sign-off Apr 2014 | 160 Acacia Av | to document the change in lot number from 4624/004 to 4624/028 for purposes of grading permit signoff. original grading application 201007227178 and grading apps 201103021200.Details
to document the change in lot number from 4624/004 to 4624/028 for purposes of grading permit signoff. original grading application 201007227178 and grading apps 201103021200. | |
| Oct 3, 2012 | Completed final sign-off Apr 2014 | 1101 Fairfax Av | to document the change in lot number from 4624/009 to 4624/026 for purposes of grading permit signoff. original grading application 201007227184 and revision 201103021205.Details
to document the change in lot number from 4624/009 to 4624/026 for purposes of grading permit signoff. original grading application 201007227184 and revision 201103021205. | |
| Oct 3, 2012 | Completed final sign-off Apr 2014 | 250 Acacia Av | to document the change in lot number from 4624/004 to 4624/027 for purposes of grading permit sign off. original grading app 201007227178 and revision 201103021200Details
to document the change in lot number from 4624/004 to 4624/027 for purposes of grading permit sign off. original grading app 201007227178 and revision 201103021200 | |
| Sep 11, 2012 | Completed final sign-off Apr 2014 | 60 West Point Rd | revision to appl #2011.0302.1205 (original appl #2010.0722.7184): replace gabion walls (retaining) with keystone walls in grading for a new private park, no structural changes.Details
revision to appl #2011.0302.1205 (original appl #2010.0722.7184): replace gabion walls (retaining) with keystone walls in grading for a new private park, no structural changes. | |
| Jul 25, 2012 | Completed final sign-off Feb 2014 | 60 West Point Rd | holdown alternate to permit #200912223723Details
holdown alternate to permit #200912223723 | |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1151 Fairfax Av | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $1,000,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1190 Fairfax Av | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $100,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1195 Fairfax Av | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $400,000 |
| Mar 8, 2012 | Completed final sign-off Apr 2014 | 519 Keith St | revision to pa #201103021206 - to allow construction of an additional mse wall.Details
revision to pa #201103021206 - to allow construction of an additional mse wall. | $20,000 |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 11 West Point Rd | 24 all thread tie down system is being proposed for use on this project. pa #200912223718Details
24 all thread tie down system is being proposed for use on this project. pa #200912223718 | |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 61 West Point Rd | 24 all thread tie down system is being proposed for use on this project (pa #200912223714)Details
24 all thread tie down system is being proposed for use on this project (pa #200912223714) | |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 63 West Point Rd | 24 all thread tie down system is being proposed for use on this project. (pa #200912223711)Details
24 all thread tie down system is being proposed for use on this project. (pa #200912223711) | |
| Dec 22, 2011 | Never finaled issued Feb 2012, no final | 52 Middle Point Rd | az all thread tie down system is being proposed for use on the project cal & plans to review by dbi to allow z4 system to be used by constractor. ref. to pa #200912223722.Details
az all thread tie down system is being proposed for use on the project cal & plans to review by dbi to allow z4 system to be used by constractor. ref. to pa #200912223722. | $80,000 |
| Oct 12, 2011 | Never finaled issued Oct 2011, no final | 11 West Point Rd | revision to app#2011-08-30-3529. new temporary earth shoring to accomodate foundation construction. add tiebacks to shoring beams.Details
revision to app#2011-08-30-3529. new temporary earth shoring to accomodate foundation construction. add tiebacks to shoring beams. | $100,000 |
| Aug 30, 2011 | Expired or cancelled withdrawn Nov 2012 | 11 West Point Rd | temporary shoring for proposed foundation construction.Details
temporary shoring for proposed foundation construction. | $25,000 |
| Aug 30, 2011 | Completed final sign-off Jun 2012 | 63 West Point Rd | temporary shoring for proposed foundation construction.Details
temporary shoring for proposed foundation construction. | $200,000 |
| Mar 2, 2011 | Completed final sign-off May 2014 | 60 West Point Rd | revision to grading permit pa#201007227184.Details
revision to grading permit pa#201007227184. | |
| Mar 2, 2011 | Completed final sign-off May 2014 | 52 Middle Point Rd | revision to grading permit pa#201007227178.Details
revision to grading permit pa#201007227178. | |
| Mar 2, 2011 | Completed final sign-off May 2014 | 519 Keith St | revision to grading permit pa#201007227185.Details
revision to grading permit pa#201007227185. | |
| Feb 3, 2011 | Completed final sign-off Feb 2014 | 52 Middle Point Rd | permit for administrative purposes only to correct unit count approved under 200912223722's. unit count 13 incorrect, final unit count as reflected in approved drawings is 12Details
permit for administrative purposes only to correct unit count approved under 200912223722's. unit count 13 incorrect, final unit count as reflected in approved drawings is 12 | |
| Feb 3, 2011 | Completed final sign-off Feb 2014 | 11 West Point Rd | permit for administrative purposes only to correct unit count approved under 200912223718-s. unit count 11 incorrect, final count as reflected in plans 13 correctDetails
permit for administrative purposes only to correct unit count approved under 200912223718-s. unit count 11 incorrect, final count as reflected in plans 13 correct | |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 1 Cashmere St | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 1 Cashmere St | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 98 West Point Rd | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |
| Jul 22, 2010 | Completed final sign-off Apr 2014 | 52 Middle Point Rd | hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4720/27).Details
hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4720/27). | $300,000 |
| Jul 22, 2010 | Completed final sign-off Apr 2014 | 519 Keith St | hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4624/004).Details
hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4624/004). | $250,000 |
| Jul 22, 2010 | Completed final sign-off Apr 2014 | 60 West Point Rd | hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 4 & 4720/27).Details
hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 4 & 4720/27). | $300,000 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 66 Middle Point Rd | bldg# 35 - demolition of 3-story 8 residential units. (#66 - 80 middle point rd.)Details
bldg# 35 - demolition of 3-story 8 residential units. (#66 - 80 middle point rd.) | $17,896 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 52 West Point Rd | bldg# 4 - demolition of 2-story 4 residential units. (52, 54, 56, 58 west point rd.)Details
bldg# 4 - demolition of 2-story 4 residential units. (52, 54, 56, 58 west point rd.) | $11,009 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 30 Middle Point Rd | bldg# 25 - demolition of 3-story 7 residential units. (#30 - 42 middle point rd.)Details
bldg# 25 - demolition of 3-story 7 residential units. (#30 - 42 middle point rd.) | $15,759 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 71 West Point Rd | bldg# 29 - demolition of 2-story 4 residential units. (71, 73, 75, 77 west point rd.)Details
bldg# 29 - demolition of 2-story 4 residential units. (71, 73, 75, 77 west point rd.) | $9,902 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 100 West Point Rd | bldg# 10 - demolition of 2-story 4 residential units. (#100 - 106 west point rd.)Details
bldg# 10 - demolition of 2-story 4 residential units. (#100 - 106 west point rd.) | $10,500 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 108 West Point Rd | bldg# 11 - demolition of 3-story 2 residential units. (#108 - 110 west point rd.)Details
bldg# 11 - demolition of 3-story 2 residential units. (#108 - 110 west point rd.) | $4,903 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 82 West Point Rd | bldg# 8 - demolition of 2-story 4 residential units. (82, 84, 86, 88 west point rd.)Details
bldg# 8 - demolition of 2-story 4 residential units. (82, 84, 86, 88 west point rd.) | $10,500 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 70 West Point Rd | bldg# 5 - demolition of 3-story 10 residential units. (#70 west point rd.)Details
bldg# 5 - demolition of 3-story 10 residential units. (#70 west point rd.) | $24,479 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 6 West Point Rd | bldg# 2 - demolition of 3-story 11 residential units. (6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26 west point rd.)Details
bldg# 2 - demolition of 3-story 11 residential units. (6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26 west point rd.) | $22,732 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 58 Middle Point Rd | bldg# 34 - demolition of 2-story 4 residential units. (58, 60, 62, 64 middle point rd.)Details
bldg# 34 - demolition of 2-story 4 residential units. (58, 60, 62, 64 middle point rd.) | $11,009 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 11 West Point Rd | bldg 27 - demolition of 2-story 4 residential units. (#11, 13, 15, & 17 west point rd.)Details
bldg 27 - demolition of 2-story 4 residential units. (#11, 13, 15, & 17 west point rd.) | $11,009 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 61 West Point Rd | to erect 4 stories, 13 units residential building.Details
to erect 4 stories, 13 units residential building. | $5,100,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 11 West Point Rd | to erect 4 stories, 11 units residential building.Details
to erect 4 stories, 11 units residential building. | $4,700,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 63 West Point Rd | to erect 4 stories, 15 units residential building.Details
to erect 4 stories, 15 units residential building. | $6,000,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 52 Middle Point Rd | to erect 4 stories, 13 units residential building.Details
to erect 4 stories, 13 units residential building. | $4,900,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 60 West Point Rd | to erect 4 storis of 54 units residential mixed use building.Details
to erect 4 storis of 54 units residential mixed use building. | $21,700,000 |
| May 10, 2005 | Completed final sign-off Jun 2005 | 501 Bay St | rev. to site permit #2002/03/06/0755-s3 to revise the parking configuration at the underground garagDetails
rev. to site permit #2002/03/06/0755-s3 to revise the parking configuration at the underground garag | $5,000 |
| Aug 22, 2003 | Expired or cancelled expired Mar 2009 | 567 Bay St | install 1 facp/1 digital communictor/6 horn strobe booster/1 annonciator/41 smoke detectors/5 heatDetails
install 1 facp/1 digital communictor/6 horn strobe booster/1 annonciator/41 smoke detectors/5 heat | $49,580 |
| Aug 22, 2003 | Never finaled issued Oct 2003, no final | 411 Bay St | install 1 facp/1digital communicator/8 hornstrobe booster panel/19 smoke detector/4 door holdersDetails
install 1 facp/1digital communicator/8 hornstrobe booster panel/19 smoke detector/4 door holders | $43,920 |
| Dec 16, 2002 | Never finaled issued Dec 2002, no final | 411 Bay St | revision to temp. shoring app#200210290285Details
revision to temp. shoring app#200210290285 | $2,000 |
| Oct 29, 2002 | Completed final sign-off Apr 2003 | 411 Bay St | temporary shoring for the installation of the foundation for the housing & retail dev. pa 2002030607Details
temporary shoring for the installation of the foundation for the housing & retail dev. pa 2002030607 | $20,000 |
| Jun 27, 2002 | Completed final sign-off Sep 2002 | 500 Francisco St | indicator pile program:15 concrete piles to be installed to confirm depths of piles to be installeDetails
indicator pile program:15 concrete piles to be installed to confirm depths of piles to be installe | $35,000 |
| Mar 6, 2002 | Completed final sign-off Oct 2004 | 620 Francisco St | erect 4 story 20-unit apartment buildingDetails
erect 4 story 20-unit apartment building | $2,524,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 530 Francisco St | erect 3 story 14-unit apartment buildingDetails
erect 3 story 14-unit apartment building | $1,927,000 |
| Mar 6, 2002 | Completed final sign-off Apr 2005 | 1150 Columbus Av | erect 4 s tory 48-unit apartment buildingDetails
erect 4 s tory 48-unit apartment building | $3,550,000 |
| Mar 6, 2002 | Completed final sign-off Jun 2005 | 501 Bay St | erect 1 story parking & comunity retail spac3Details
erect 1 story parking & comunity retail spac3 | $4,478,000 |
| Mar 6, 2002 | Completed final sign-off Mar 2005 | 411 Bay St | erect one story building parking & community retail spaceDetails
erect one story building parking & community retail space | $6,716,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 640 Francisco St | erect 3 story 12-unit apartment buildingDetails
erect 3 story 12-unit apartment building | $1,648,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 520 Francisco St | erect 4 story 34- unit apartment buildingDetails
erect 4 story 34- unit apartment building | $4,520,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 455 Bay St | erect 3 story 52 dwelling apartment buildingDetails
erect 3 story 52 dwelling apartment building | $4,882,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 640 Francisco St | erect 3 story 14-unit apartment buildingDetails
erect 3 story 14-unit apartment building | $1,927,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 2411 Taylor St | erect 4 story 27-unit apartment buildingDetails
erect 4 story 27-unit apartment building | $3,444,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 2321 Mason St | erect 4 story 27 unit apartment buildingDetails
erect 4 story 27 unit apartment building | $3,297,000 |
| Mar 6, 2002 | Completed final sign-off Sep 2004 | 567 Bay St | erect 3 story 42-unit apartment buildingDetails
erect 3 story 42-unit apartment building | $4,046,000 |