Charles Blank
- Listed as
- architect, designer, engineer, pmt consultant/expediter
- Firm
- C.F. Blank, Arch
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Jul 2024
74 permits since 2000 (architect on 71 permits, designer on 2 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 56 completed, 12 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 30, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7/f: health department review only for approved t.i permit 202401113849 and revision to approved deferred mep permit 202402236430.Details
7/f: health department review only for approved t.i permit 202401113849 and revision to approved deferred mep permit 202402236430. | |
| Jan 11, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7th fl.t.i. inc (n) non structural partitions (n) suspended ceilings and drywall ceilings, (n) havac & mech systems (n) plumbing fixtures (n) light fixtures, elec outlets (n) finishesDetails
7th fl.t.i. inc (n) non structural partitions (n) suspended ceilings and drywall ceilings, (n) havac & mech systems (n) plumbing fixtures (n) light fixtures, elec outlets (n) finishes | $4,500,000 |
| Oct 20, 2023 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7th fl: interior demo only: demo of non-structural partitions, ceiling tiles & grid, drywall ceilings, floor/wall finishes, toilet fixtures, lighting (non-e-gress), ductwork, piping, and/or equipment, elec outlets and/or devices. egress lighting, sprinklers & fire alarm to remain. per ab-017.Details
7th fl: interior demo only: demo of non-structural partitions, ceiling tiles & grid, drywall ceilings, floor/wall finishes, toilet fixtures, lighting (non-e-gress), ductwork, piping, and/or equipment, elec outlets and/or devices. egress lighting, sprinklers & fire alarm to remain. per ab-017. | $300,000 |
| Feb 28, 2023 | Never finaled issued Jul 2023, no final | 415 Tehama St | I S M Construction Company, Am Construction Inc | all 6 units: interior alterations, demo existing lath and plaster. replace with drywall sheetboard, partial demolition of interior partitions, new interior partitions. bathroom and kitchen renovations, window replacement in-kind. front windows facing street to be wood w/integrated ogee lugsDetails
all 6 units: interior alterations, demo existing lath and plaster. replace with drywall sheetboard, partial demolition of interior partitions, new interior partitions. bathroom and kitchen renovations, window replacement in-kind. front windows facing street to be wood w/integrated ogee lugs | $203,000 |
| Jan 24, 2023 | Completed final sign-off Mar 2025 | 415 Tehama St | Sft Construction Corp | structural strengthening of rear popout structure, to be enclosed (4 story, type 5. strengthen framing, posts, foundations. rear windows at edge to be resized,center doors to be removed/relocated. existing exterior porch studs & floor/room framing joist to remainDetails
structural strengthening of rear popout structure, to be enclosed (4 story, type 5. strengthen framing, posts, foundations. rear windows at edge to be resized,center doors to be removed/relocated. existing exterior porch studs & floor/room framing joist to remain | $68,000 |
| Dec 23, 2022 | Completed final sign-off Jun 2024 | 131 Paris St | Labor Unlimited | interior reomdel: misc repairs & improvements, minor demo of interior partitions, new interior partitions, repair of ext siding, replace exist front windows like for like, replace deck finish, bathroom remodel, replace fixtures & finishes, new dumbwaiterDetails
interior reomdel: misc repairs & improvements, minor demo of interior partitions, new interior partitions, repair of ext siding, replace exist front windows like for like, replace deck finish, bathroom remodel, replace fixtures & finishes, new dumbwaiter | $280,000 |
| Sep 30, 2022 | Never finaled issued Oct 2022, no final | 659 Merchant St | Velox Construction Inc/Velox Des & Const | revision to 202010065955: relocate business entrance. omit proposed storefront exdent to business entrance only. (submit t.i. plans for health review if this will be a retail food facility)Details
revision to 202010065955: relocate business entrance. omit proposed storefront exdent to business entrance only. (submit t.i. plans for health review if this will be a retail food facility) | |
| May 16, 2022 | Never finaled issued May 2022, no final | 750 Battery St | Vanek Construction | ste 350: interior tenant improvement only including new partitions, doors, flooring.Details
ste 350: interior tenant improvement only including new partitions, doors, flooring. | $200,000 |
| Apr 7, 2022 | Completed final sign-off Apr 2022 | 795 Folsom St | Gci, Inc | 1/f: demo only, non-structural. removal of existing partitions, doors, flooring and ceilings.Details
1/f: demo only, non-structural. removal of existing partitions, doors, flooring and ceilings. | $10,000 |
| Dec 7, 2021 | Completed final sign-off Sep 2022 | 681 Townsend St | Vk Construction | remove extg floor finishes, add new drywall partitions, floor finishes, frp wainscott, new plmg fixtures and restaurant equipment. mep work under seperate permit. fire alarm & sprinkler under seperate permit. all on ground foor.Details
remove extg floor finishes, add new drywall partitions, floor finishes, frp wainscott, new plmg fixtures and restaurant equipment. mep work under seperate permit. fire alarm & sprinkler under seperate permit. all on ground foor. | $125,000 |
| Jun 17, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Gci, Inc | 3rd fl: ti - slective interior demo, removal of existing partitions, doors & existing partitions, doors, ceiling. restroom renovations. ref pa 2016-0830-6376Details
3rd fl: ti - slective interior demo, removal of existing partitions, doors & existing partitions, doors, ceiling. restroom renovations. ref pa 2016-0830-6376 | $400,000 |
| Feb 25, 2021 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings.Details
4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings. | $250,000 |
| Feb 24, 2021 | Expired or cancelled cancelled Jan 2026 | 565 Green St | barriar removal. da checklist. accessible building entrance, sidewalk replacement, power assisted door operator.Details
barriar removal. da checklist. accessible building entrance, sidewalk replacement, power assisted door operator. | ||
| Dec 24, 2020 | Completed final sign-off Oct 2024 | 28 02nd St | Trainor Commercial Construction Inc. | 3rd fl tenant improvements. m.e.p.. included. life safety under separate permit.Details
3rd fl tenant improvements. m.e.p.. included. life safety under separate permit. | $250,000 |
| Oct 6, 2020 | Never finaled issued Oct 2021, no final | 659 Merchant St | alterations to exterior facade. new ground level entrance to replace existing and meet disabled access complianceDetails
alterations to exterior facade. new ground level entrance to replace existing and meet disabled access compliance | $80,000 | |
| Oct 6, 2020 | Expired or cancelled cancelled Jan 2026 | 454 Columbus Av | barrier removal project. alterations at primary building entranceDetails
barrier removal project. alterations at primary building entrance | $100,000 | |
| Feb 10, 2020 | Never finaled issued Sep 2021, no final | 150 Post St | suite 700; interior tenant improvement only, including new partitons, doors, flooring, ceilng and mepDetails
suite 700; interior tenant improvement only, including new partitons, doors, flooring, ceilng and mep | $500,000 | |
| Dec 27, 2019 | Completed final sign-off Dec 2020 | 447 Sutter St | Modern Construction Inc | interior architectural t.i. only. (demolition under separate permit 201911228042) hvac, eletrical, sprinkler and fire alarm designs will be sublmitted under separate permits. maher extended "no"Details
interior architectural t.i. only. (demolition under separate permit 201911228042) hvac, eletrical, sprinkler and fire alarm designs will be sublmitted under separate permits. maher extended "no" | $650,000 |
| Dec 11, 2019 | Completed final sign-off Sep 2023 | 150 Post St | Sterling Environmental Corp. | ste 700 - interiore demo only including removal of (e) partitions, door, flooring and ceiling. future tenant improvement, hvac, electrical, sprinkler and fire alarm work will be submitted under separate permits. ab-017Details
ste 700 - interiore demo only including removal of (e) partitions, door, flooring and ceiling. future tenant improvement, hvac, electrical, sprinkler and fire alarm work will be submitted under separate permits. ab-017 | $60,000 |
| Nov 22, 2019 | Completed final sign-off Dec 2020 | 447 Sutter St | Bluewater Environmentl Svc Inc | 3rd floor: interior demolition only including removal of existing partitions, doors, flooring, and ceilings. ab-017 appliesDetails
3rd floor: interior demolition only including removal of existing partitions, doors, flooring, and ceilings. ab-017 applies | $40,000 |
| Jul 18, 2018 | Completed final sign-off Apr 2021 | 795 Folsom St | Gci, Inc | demolition removal of existing partitions, doors, flooring & ceilings. construction of non structural parititons, new doors & finishes. n/a for maher.Details
demolition removal of existing partitions, doors, flooring & ceilings. construction of non structural parititons, new doors & finishes. n/a for maher. | $400,000 |
| May 18, 2018 | Completed final sign-off Oct 2018 | 795 Folsom St | Gci, Inc | 6/f: demolition and removal of exiting partitions, doors, flooring, per ab-017Details
6/f: demolition and removal of exiting partitions, doors, flooring, per ab-017 | $30,000 |
| May 18, 2018 | Expired or cancelled cancelled Sep 2019 | 795 Folsom St | Gci, Inc | 3/f: demolition for tenant improvement - existing partitions doors, floors & ceilings per ab-017. sprinkler permit 201806192196Details
3/f: demolition for tenant improvement - existing partitions doors, floors & ceilings per ab-017. sprinkler permit 201806192196 | $30,000 |
| Jan 25, 2018 | Completed final sign-off Jul 2018 | 101 Montgomery St | Peacock Construction | ground floor - replace existing main lobby ceiling. no new mechanical, electrical work deferred submittal for fire sprinkler and fire alarmDetails
ground floor - replace existing main lobby ceiling. no new mechanical, electrical work deferred submittal for fire sprinkler and fire alarm | $170,195 |
| Dec 4, 2017 | Completed final sign-off Jan 2018 | 60 Spear St | architectural work only: replace extg carpet, add low walls. no plumbing, mech, elec., sprinkler or fire alarm work. n/a for maherDetails
architectural work only: replace extg carpet, add low walls. no plumbing, mech, elec., sprinkler or fire alarm work. n/a for maher | $50,000 | |
| Oct 13, 2016 | Completed final sign-off Sep 2017 | 1800 Market St | Oliver & Company Inc. | 3/f: revision to 201603081475 to add security gate and fence at existing stairDetails
3/f: revision to 201603081475 to add security gate and fence at existing stair | $15,000 |
| Sep 8, 2016 | Completed final sign-off Jun 2019 | 60 Spear St | Premier Structures Inc | revision to ref pa 201608124896 & 201608255950 demo of non load bearing walls. remove & replace lighting & receptacles. re-distribution of hvac duct. new finishes maher naDetails
revision to ref pa 201608124896 & 201608255950 demo of non load bearing walls. remove & replace lighting & receptacles. re-distribution of hvac duct. new finishes maher na | $10,000 |
| Aug 12, 2016 | Completed final sign-off Jun 2019 | 60 Spear St | Premier Structures Inc | 2nd floor: ti-including demo, new walls and finishes. redistribution of hvac. elect, sprinklers, fire alarm under spe permit maher naDetails
2nd floor: ti-including demo, new walls and finishes. redistribution of hvac. elect, sprinklers, fire alarm under spe permit maher na | $150,000 |
| Jan 26, 2016 | Never finaled issued Jan 2016, no final | 60 Spear St | Premier Structures Inc | 6th floor: replace existing carpet, add low walls. n/a ordinance #155-13Details
6th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $20,000 |
| Jan 26, 2016 | Never finaled issued Jan 2016, no final | 60 Spear St | Premier Structures Inc | 5th floor: replace existing carpet, add low walls. n/a ordinance #155-13Details
5th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $50,000 |
| Nov 23, 2015 | Expired or cancelled cancelled May 2019 | 444 De Haro St | site plan: increase mezzanine area to form new 2/f, add windows to match existing. lower g/f elevation 12"Details
site plan: increase mezzanine area to form new 2/f, add windows to match existing. lower g/f elevation 12" | $1,000,000 | |
| Jan 5, 2015 | Never finaled issued Jan 2015, no final | 60 Spear St | Premier Structures Inc | interior demo only. removeal of existing partitions, doors, flooring, ceiling. per ab-017. future ti, hvac ele, sprinkler, fire alarm under separate permit. n/a maher ordinanceDetails
interior demo only. removeal of existing partitions, doors, flooring, ceiling. per ab-017. future ti, hvac ele, sprinkler, fire alarm under separate permit. n/a maher ordinance | $50,000 |
| Sep 15, 2014 | Completed final sign-off Aug 2025 | 505 Montgomery St | Rossi Builders Inc. | revision to 201405024807. remove partition elevation keys to provide assited listening devices in all conference rooms per 118-219, n/a ordinance #155-13.Details
revision to 201405024807. remove partition elevation keys to provide assited listening devices in all conference rooms per 118-219, n/a ordinance #155-13. | |
| Jun 25, 2014 | Completed final sign-off May 2015 | 444 De Haro St | Premier Structures Inc | g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13Details
g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13 | $1,400,000 |
| Jun 9, 2014 | Never finaled issued Jun 2014, no final | 60 Spear St | Thyssenkrupp Elevator Corp. | upgrade of elevator system to destination based elevator dispatching. all work & operation complies with sf administrative bulletin 090. all public signage for elevators complies with s.f. ab-090. n/a ordinance #155-13.Details
upgrade of elevator system to destination based elevator dispatching. all work & operation complies with sf administrative bulletin 090. all public signage for elevators complies with s.f. ab-090. n/a ordinance #155-13. | $35,000 |
| May 14, 2014 | Completed final sign-off May 2015 | 444 De Haro St | Premier Structures Inc | new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13.Details
new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13. | $80,000 |
| May 2, 2014 | Completed final sign-off Oct 2014 | 505 Montgomery St | Rossi Builders Inc. | ti: remove existing wall partitions and portion of drywall below to accomodate new glazing for offices. cabinet repair, flooring, base, new door, paint.Details
ti: remove existing wall partitions and portion of drywall below to accomodate new glazing for offices. cabinet repair, flooring, base, new door, paint. | $50,000 |
| May 1, 2014 | Completed final sign-off Feb 2016 | 219 09th St | Battery Street Construction | create accessible entrance & toilet room. hvac, elec, & fire alarm will be under separate permits. compliance with ordinance #155-13 not requiredDetails
create accessible entrance & toilet room. hvac, elec, & fire alarm will be under separate permits. compliance with ordinance #155-13 not required | $40,000 |
| Apr 21, 2014 | Never finaled issued Apr 2014, no final | 2810 Bush St | remove existing deteriorated exterior deck, stairs, guardrails and supporting structure, replace with new to match existing like/kind except that structural connections will be upgraded to current codes.Details
remove existing deteriorated exterior deck, stairs, guardrails and supporting structure, replace with new to match existing like/kind except that structural connections will be upgraded to current codes. | $22,000 | |
| Dec 9, 2013 | Completed final sign-off May 2014 | 600 Montgomery St | Skyline Construction | suite 501 & 502 tenant improvment to include minor demolition, new walls/doors & new ceilings lights, hvac & electrical.Details
suite 501 & 502 tenant improvment to include minor demolition, new walls/doors & new ceilings lights, hvac & electrical. | $500,000 |
| Sep 19, 2013 | Completed final sign-off Mar 2014 | 60 Spear St | Skyline Construction | 7th flr: tenant improvement including interior partitions and ceilings, adding conference rooms, it room,-mep and life safety under separate permitDetails
7th flr: tenant improvement including interior partitions and ceilings, adding conference rooms, it room,-mep and life safety under separate permit | $750,000 |
| Aug 29, 2013 | Completed final sign-off Dec 2013 | 60 Spear St | Skyline Construction | 7/f- interior demo only to consist of removal of existing partitions, doors, flooring & ceiling ab0.17Details
7/f- interior demo only to consist of removal of existing partitions, doors, flooring & ceiling ab0.17 | $15,000 |
| Aug 19, 2013 | Completed final sign-off Jul 2014 | 60 Spear St | Hathaway Dinwiddie Co. | 6/f- install decorative trophy case.Details
6/f- install decorative trophy case. | $30,000 |
| May 10, 2013 | Completed final sign-off Jun 2014 | 600 Montgomery St | Hathaway Dinwiddie Co. | 8th floor-tenant improvement including upgrades to restrooms. life safety & fire sprinkler under seperate permit.Details
8th floor-tenant improvement including upgrades to restrooms. life safety & fire sprinkler under seperate permit. | $950,000 |
| May 10, 2013 | Completed final sign-off Jun 2014 | 600 Montgomery St | Hathaway Dinwiddie Co. | 7th floor-tenant improvement including upgrades to restrooms and a occupancy area. life safety & fire sprinkler under seperate permit.Details
7th floor-tenant improvement including upgrades to restrooms and a occupancy area. life safety & fire sprinkler under seperate permit. | $950,000 |
| Apr 18, 2013 | Completed final sign-off May 2013 | 505 Sansome St | Field Construction Inc. | 8th floor interior alterations only including demolitoin of (e) partitions, constructing of new partitions & doors, new ceilings & lighting, mechnaical, plumbing & electrical. sprinkler & fire alarm under separate permit.Details
8th floor interior alterations only including demolitoin of (e) partitions, constructing of new partitions & doors, new ceilings & lighting, mechnaical, plumbing & electrical. sprinkler & fire alarm under separate permit. | $100,000 |
| Apr 1, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Hathaway Dinwiddie Co. | revision to permit application# 201302190480. including misc ceiling notes and partition notes.Details
revision to permit application# 201302190480. including misc ceiling notes and partition notes. | |
| Mar 7, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Hathaway Dinwiddie Co. | 6th fl t.i. new partitions, doors, lighting, pantry. hvac, electrical, sprinkler, fire alarm & evacuation signs under separate permit.Details
6th fl t.i. new partitions, doors, lighting, pantry. hvac, electrical, sprinkler, fire alarm & evacuation signs under separate permit. | $600,000 |
| Feb 19, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Hathaway Dinwiddie Co. | 2nd floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit.Details
2nd floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit. | $260,000 |
| Feb 19, 2013 | Completed final sign-off Jan 2014 | 60 Spear St | Hathaway Dinwiddie Co. | 4th floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit.Details
4th floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit. | $440,000 |
| Jan 23, 2013 | Completed final sign-off Jul 2014 | 60 Spear St | Hathaway Dinwiddie Co. | 3rd/4th/5th/6th floors-interior stair development including new floor openings & new stair compenents (floors 3 thru 6)Details
3rd/4th/5th/6th floors-interior stair development including new floor openings & new stair compenents (floors 3 thru 6) | $200,000 |
| Jan 15, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Hathaway Dinwiddie Co. | 2nd thru 6th floors- demo of (e) partitions ceiling & millwork in prepartion for ti bldgout under separate permit per ab-017 remains vacant.Details
2nd thru 6th floors- demo of (e) partitions ceiling & millwork in prepartion for ti bldgout under separate permit per ab-017 remains vacant. | $125,000 |
| Nov 26, 2012 | Completed final sign-off Jul 2013 | 60 Spear St | Skyline Construction | interior t.i. including minor demolition, new partitions,new doors and finishes on floors 2 through 6Details
interior t.i. including minor demolition, new partitions,new doors and finishes on floors 2 through 6 | $200,000 |
| Oct 29, 2012 | Completed final sign-off Sep 2019 | 818 Jackson St | Ward Alan Emery Construction Inc. | disabled access barrier removal including demo of existing entrance stair and construction of new stair and wheelchair lift.Details
disabled access barrier removal including demo of existing entrance stair and construction of new stair and wheelchair lift. | $35,000 |
| Jun 29, 2012 | Completed final sign-off Dec 2012 | 505 Sansome St | Swinerton Builders | 6th fl elevator lobby alterations. interior alterations only including demo, new paritions and doors, new ceiling and lights, mep inlcudedDetails
6th fl elevator lobby alterations. interior alterations only including demo, new paritions and doors, new ceiling and lights, mep inlcuded | $60,000 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 600 Montgomery St | Skyline Construction | revision to appl #2012.03.21.6583 (18th floor): defer drinking fountain installation to future t.i.Details
revision to appl #2012.03.21.6583 (18th floor): defer drinking fountain installation to future t.i. | |
| Apr 2, 2012 | Completed final sign-off Oct 2013 | 60 Spear St | Skyline Construction | building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8Details
building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8 | $322,382 |
| Feb 15, 2012 | Never finaled issued Feb 2012, no final | 60 Spear St | Skyline Construction | revision to 201111289630. add sheet a2.1 existing roof plan and new equipment curb detail. also to verify correct story count from 12 to 11 stories.Details
revision to 201111289630. add sheet a2.1 existing roof plan and new equipment curb detail. also to verify correct story count from 12 to 11 stories. | $1,000 |
| Nov 22, 2011 | Completed final sign-off Mar 2012 | 60 Spear St | Skyline Construction | 10th floor-interior tenant improvement including demolition, new partitions, doors, ceilings & finishes.Details
10th floor-interior tenant improvement including demolition, new partitions, doors, ceilings & finishes. | $550,000 |
| Oct 28, 2011 | Completed final sign-off Dec 2011 | 545 Sansome St | Field Construction Inc. | 6th floor-add 3 office to open floor area plus 20%, disabled access upgrades (6th floor only).Details
6th floor-add 3 office to open floor area plus 20%, disabled access upgrades (6th floor only). | $50,000 |
| Oct 3, 2011 | Completed final sign-off Mar 2012 | 60 Spear St | Skyline Construction | 10th/11th floors-interior non structural demolition per ab-017Details
10th/11th floors-interior non structural demolition per ab-017 | $8,000 |
| Jun 28, 2011 | Completed final sign-off Oct 2012 | 2 Bryant St | minor interior alterations including demolition of (e) partition, construction of new partitions & doors, moving lights & new electrical outlets. hvac, electrical, sprinkler & fire alarm work will be under seperate permit applicationsDetails
minor interior alterations including demolition of (e) partition, construction of new partitions & doors, moving lights & new electrical outlets. hvac, electrical, sprinkler & fire alarm work will be under seperate permit applications | $15,000 | |
| Aug 12, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | R B C General Contractors Inc. | add new accessible toilet rooms. renovate main bar. miscellaneous structural repair / strengthening. upgrade basement foundation walls / replace floor slab. mep by trade permits. sprinkler & fire alarm under separate permits.Details
add new accessible toilet rooms. renovate main bar. miscellaneous structural repair / strengthening. upgrade basement foundation walls / replace floor slab. mep by trade permits. sprinkler & fire alarm under separate permits. | $200,000 |
| Apr 16, 2010 | Completed final sign-off Feb 2011 | 191 Valencia St | demolish (e) storage structures consisting of two 120 sq. ft (approx) wood structures. this permit does not include adjacent deck/roof structure which is addressed under sep permit app#201004160455. (all work exterior) this is not an occ load verification permit.Details
demolish (e) storage structures consisting of two 120 sq. ft (approx) wood structures. this permit does not include adjacent deck/roof structure which is addressed under sep permit app#201004160455. (all work exterior) this is not an occ load verification permit. | $2,000 | |
| Apr 16, 2010 | Completed final sign-off Sep 2011 | 191 Valencia St | legalize (e) deck & shed roof above, upgrade (e) ramp included, legalize & beer cooler. refer to permit app no. 201004160449 for other demo work on this lot.Details
legalize (e) deck & shed roof above, upgrade (e) ramp included, legalize & beer cooler. refer to permit app no. 201004160449 for other demo work on this lot. | $25,000 | |
| Apr 8, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | to comply with fire dept. nov# 5688 of 8/12/09 incl. new kitchen exhaust hood and reconfigure fire supression, new disabled access entrance and upgrade existing main entry, reconfigure required exits. public assembly permit. associated work to be performed on 201004160449 and 201004160455Details
to comply with fire dept. nov# 5688 of 8/12/09 incl. new kitchen exhaust hood and reconfigure fire supression, new disabled access entrance and upgrade existing main entry, reconfigure required exits. public assembly permit. associated work to be performed on 201004160449 and 201004160455 | $40,000 | |
| May 11, 2009 | Completed final sign-off Jul 2009 | 180 Howard St | Richlen Construction | renew pa# 2008/07/18/7062 to obtain final inspection. all work has been completed.Details
renew pa# 2008/07/18/7062 to obtain final inspection. all work has been completed. | |
| Jul 18, 2008 | Expired or cancelled expired Jul 2009 | 180 Howard St | suite g3:interior alterations including demolition, new door & partition and new sink. all mechanical & electrical will be under seperate permit. all fire alarm & sprinkler will be under seperate permit.Details
suite g3:interior alterations including demolition, new door & partition and new sink. all mechanical & electrical will be under seperate permit. all fire alarm & sprinkler will be under seperate permit. | $15,000 | |
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 215 Fremont St | add one wall and one door to existing basement to create new tool room. women and mens stall door change direction of door swing.Details
add one wall and one door to existing basement to create new tool room. women and mens stall door change direction of door swing. | $5,000 | |
| Feb 1, 2008 | Completed final sign-off May 2008 | 215 Fremont St | Richlen Construction | 1st floor: revision to appl #200711097805 to include construction of additional front corridor, rate partition and new door. no hvac required, lighting to be relocated from building stock.Details
1st floor: revision to appl #200711097805 to include construction of additional front corridor, rate partition and new door. no hvac required, lighting to be relocated from building stock. | $20,000 |
| Nov 9, 2007 | Completed final sign-off May 2008 | 215 Fremont St | Richlen Construction | construct 1 new office and 1 new gym room, convert of existin gadjacent retail space for gym expansion. demo front end of existing exercise facility. mechanical, electrical, fire sprinkler & fire alarm under seperate permit.Details
construct 1 new office and 1 new gym room, convert of existin gadjacent retail space for gym expansion. demo front end of existing exercise facility. mechanical, electrical, fire sprinkler & fire alarm under seperate permit. | $60,000 |
| Oct 24, 2005 | Expired or cancelled expired Feb 2007 | 83 Natoma St | relocate entrance doors to achieve proper exit separation,upgrade 2 restroom doors with power door operators. assembly fire code permit required.Details
relocate entrance doors to achieve proper exit separation,upgrade 2 restroom doors with power door operators. assembly fire code permit required. | $7,500 | |
| Oct 3, 2005 | Completed final sign-off Dec 2005 | 88 King St | Richlen Construction | add structural slab infill; demolish some interior partitions; add new interior partitions, plumbing fixtures, lighting & kitchen island.Details
add structural slab infill; demolish some interior partitions; add new interior partitions, plumbing fixtures, lighting & kitchen island. | $25,000 |
| Aug 29, 2005 | Completed final sign-off Nov 2006 | 5 Embarcadero Center | accessible bathroom upgrades in 9 guestrooms,ceiling,repair for new sprinkler system.Details
accessible bathroom upgrades in 9 guestrooms,ceiling,repair for new sprinkler system. | $250,000 |