Warren R. Pottebaum
- Listed as
- engineer
- Firm
- Thornton Tomasetti Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Jul 2023
7 permits since 2000 (engineer on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2023 | Completed final sign-off Apr 2024 | 900 Pennsylvania Av | Truebeck Construction | alteration of (e) large refrigeration/freezer spaces, demo of (e) u nits & (e) slabs ongrade under units, install of new insulated slab, new refrigeration/freezer units w/high piled storage racks, & associated mep. revision apn#202006138695Details
alteration of (e) large refrigeration/freezer spaces, demo of (e) u nits & (e) slabs ongrade under units, install of new insulated slab, new refrigeration/freezer units w/high piled storage racks, & associated mep. revision apn#202006138695 | $925,000 |
| Aug 16, 2022 | Completed final sign-off May 2024 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on.Details
room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on. | $305,000 |
| Dec 8, 2020 | Completed final sign-off Aug 2023 | 900 Pennsylvania Av | Truebeck Construction | sf marin food bank: warehouse renovations. (1) limited t.i. including upgrades to (e) office restrooms and break areas. (2) site improvements including a new accessible entrance and accessible parking serving the site. (3) remove portion of roof overhang. (4) new mechanical equipment pad at gradeDetails
sf marin food bank: warehouse renovations. (1) limited t.i. including upgrades to (e) office restrooms and break areas. (2) site improvements including a new accessible entrance and accessible parking serving the site. (3) remove portion of roof overhang. (4) new mechanical equipment pad at grade | $195,000 |
| Aug 24, 2020 | Completed final sign-off Jan 2023 | 1600 Owens St | Turner Construction Co | project area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work.Details
project area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work. | $4,400,000 |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 1100 Van Ness Av | Rudolph And Sletten Inc | modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.Details
modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2. | $620,000 |
| Apr 1, 2014 | Completed final sign-off Dec 2014 | 160 Folsom St | Skyline Construction | install new partitions, ceiling, doors and finishes to create sales center on g/f, install new model unit within the g/f space, expand existing entrance doorway including demolition opening and remove existing coiling door, install new enterance. n/a ordinance #155-13Details
install new partitions, ceiling, doors and finishes to create sales center on g/f, install new model unit within the g/f space, expand existing entrance doorway including demolition opening and remove existing coiling door, install new enterance. n/a ordinance #155-13 | $200,000 |
| Sep 3, 2013 | Never finaled issued Oct 2013, no final | 1 Bush St | Gci, Inc | structural work to remove slab between 9th and 10th fl. install inter connecting stairs to servie tenant space. ref 201308013346 and 201308013349 for ti workDetails
structural work to remove slab between 9th and 10th fl. install inter connecting stairs to servie tenant space. ref 201308013346 and 201308013349 for ti work | $120,000 |