Rudolph And Sletten Inc

Contractor license
198069
State license record
Based in
San Francisco
On San Francisco permits
Apr 2000 to Nov 2024
Last 24 months
1 permit filed

141 permits since 2000: 116 completed, 17 never finaled, 8 expired or cancelled.

Of the 17 never-finaled permits, 7 are 5 to 10 years old, 10 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 2Kitchen remodel 1

Showing the 100 most recent of 141.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 13, 2024Completed
final sign-off Jun 2025
555 San Jose Avproject scope includes replacement of (e) glazed door/sidelite w/ a (n) gate in existing person/chair lift to make osha compliant. no work visible from street.
Details
Permit
202411134952
Status
complete
Filed
Nov 13, 2024
Permit issued
Feb 21, 2025
Final sign-off
Jun 9, 2025
Declared cost
$25,000
Address
555 San Jose Av

project scope includes replacement of (e) glazed door/sidelite w/ a (n) gate in existing person/chair lift to make osha compliant. no work visible from street.

Open the permit page

$25,000
Dec 4, 2023Completed
final sign-off Jul 2024
2645 Ocean Av3/f: commercial interior tenant improvement to convert 2 exam rooms into 1 ultrasound room with 1 probe processing room.
Details
Permit
202312041880
Status
complete
Filed
Dec 4, 2023
Permit issued
Jan 12, 2024
Final sign-off
Jul 3, 2024
Declared cost
$115,209
Address
2645 Ocean Av

3/f: commercial interior tenant improvement to convert 2 exam rooms into 1 ultrasound room with 1 probe processing room.

Open the permit page

$115,209
Aug 24, 2020Completed
final sign-off Dec 2020
1100 Van Ness Avmodification of existing hardware on levels 4, 5 and 6
Details
Permit
202008242523
Status
complete
Filed
Aug 24, 2020
Permit issued
Oct 8, 2020
Final sign-off
Dec 29, 2020
Declared cost
$160,000
Address
1100 Van Ness Av

modification of existing hardware on levels 4, 5 and 6

Open the permit page

$160,000
Aug 22, 2020Completed
final sign-off Dec 2020
1100 Van Ness Avmodification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher
Details
Permit
202008222373
Status
complete
Filed
Aug 22, 2020
Permit issued
Oct 7, 2020
Final sign-off
Dec 29, 2020
Declared cost
$160,000
Address
1100 Van Ness Av

modification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher

Open the permit page

$160,000
Jun 29, 2020Never finaled
issued Jul 2020, no final
3555 Cesar Chavez Stconstruction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793
Details
Permit
202006299287
Status
issued
Filed
Jun 29, 2020
Permit issued
Jul 27, 2020
Declared cost
$65,000
Address
3555 Cesar Chavez St

construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793

Open the permit page

$65,000
Mar 3, 2020Completed
final sign-off Aug 2020
1100 Van Ness Avmodify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.
Details
Permit
202003036058
Status
complete
Filed
Mar 3, 2020
Permit issued
Mar 12, 2020
Final sign-off
Aug 11, 2020
Declared cost
$620,000
Address
1100 Van Ness Av

modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.

Open the permit page

$620,000
Feb 27, 2020Completed
final sign-off Sep 2020
3555 Cesar Chavez Stinfill opening in west elevation
Details
Permit
202002275589
Status
complete
Filed
Feb 27, 2020
Permit issued
Mar 6, 2020
Final sign-off
Sep 3, 2020
Declared cost
$37,000
Address
3555 Cesar Chavez St

infill opening in west elevation

Open the permit page

$37,000
Jan 14, 2020Expired or cancelled
cancelled Jan 2026
555 San Jose Avrevision to 201807255526, civil sheet to address connection points between city utilities and new utilities in hartzel building
Details
Permit
202001141879
Status
cancelled
Filed
Jan 14, 2020
Address
555 San Jose Av

revision to 201807255526, civil sheet to address connection points between city utilities and new utilities in hartzel building

Open the permit page

Nov 13, 2019Never finaled
issued Nov 2019, no final
3555 Cesar Chavez Ststreet space
Details
Permit
M1165907
Status
issued
Filed
Nov 13, 2019
Permit issued
Nov 27, 2019
Address
3555 Cesar Chavez St

street space

Open the permit page

Oct 25, 2019Completed
final sign-off Mar 2020
1580 Valencia Stupgrade (e) hvac system to suite 103, 1st fl
Details
Permit
201910255626
Status
complete
Filed
Oct 25, 2019
Permit issued
Nov 13, 2019
Final sign-off
Mar 30, 2020
Declared cost
$55,000
Address
1580 Valencia St

upgrade (e) hvac system to suite 103, 1st fl

Open the permit page

$55,000
Aug 19, 2019Completed
final sign-off Dec 2020
2645 Ocean Avinterior remodel of the 3rd flr accessibility upgrades to the stairwell, handrail, lighting & exit signage and updating a curb ramp at (e) rear exit door. mep/fire/life safety under permit
Details
Permit
201908199152
Status
complete
Filed
Aug 19, 2019
Permit issued
May 28, 2020
Final sign-off
Dec 16, 2020
Declared cost
$165,000
Address
2645 Ocean Av

interior remodel of the 3rd flr accessibility upgrades to the stairwell, handrail, lighting & exit signage and updating a curb ramp at (e) rear exit door. mep/fire/life safety under permit

Open the permit page

$165,000
Aug 1, 2019Completed
final sign-off Oct 2019
1100 Van Ness Av2/f: water leak repairs-drywall removal/reinstallation in-kind, 1 flush valve replacement, ceiling tile replacement, electrical repairs, flooring removal/reinstall, medical equipment installation, modular tile replacement. all work on 2/f.
Details
Permit
201908017590
Status
complete
Filed
Aug 1, 2019
Permit issued
Aug 5, 2019
Final sign-off
Oct 16, 2019
Declared cost
$2,500,000
Address
1100 Van Ness Av

2/f: water leak repairs-drywall removal/reinstallation in-kind, 1 flush valve replacement, ceiling tile replacement, electrical repairs, flooring removal/reinstall, medical equipment installation, modular tile replacement. all work on 2/f.

Open the permit page

$2,500,000
Jul 22, 2019Completed
final sign-off Mar 2021
3555 Cesar Chavez Stinstall new packaged heat pump on the roof of (e) 1957 bld stairwell to connect the (e) supply and return duct mains providing air to the ofc spaces in the 1912 bld. these space are currently condition by a fan in the 1957 bld. which is to be demolished
Details
Permit
201907226534
Status
complete
Filed
Jul 22, 2019
Permit issued
Sep 26, 2019
Final sign-off
Mar 25, 2021
Declared cost
$25,000
Address
3555 Cesar Chavez St

install new packaged heat pump on the roof of (e) 1957 bld stairwell to connect the (e) supply and return duct mains providing air to the ofc spaces in the 1912 bld. these space are currently condition by a fan in the 1957 bld. which is to be demolished

Open the permit page

$25,000
Jun 24, 2019Never finaled
issued Jul 2019, no final
2645 Ocean Avstreet space
Details
Permit
M1099987
Status
issued
Filed
Jun 24, 2019
Permit issued
Jul 8, 2019
Address
2645 Ocean Av

street space

Open the permit page

Jun 13, 2019Completed
final sign-off Jan 2021
2645 Ocean Avthe scope of the project includes accessibility upgrades to the 2nd and 3rd floor public restrooms in an extg b-occupancy medical building
Details
Permit
201906133334
Status
complete
Filed
Jun 13, 2019
Permit issued
Aug 11, 2020
Final sign-off
Jan 21, 2021
Declared cost
$165,000
Address
2645 Ocean Av

the scope of the project includes accessibility upgrades to the 2nd and 3rd floor public restrooms in an extg b-occupancy medical building

Open the permit page

$165,000
May 21, 2019Completed
final sign-off Nov 2020
2645 Ocean Av3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep.
Details
Permit
201905211263
Status
complete
Filed
May 21, 2019
Permit issued
Aug 29, 2019
Final sign-off
Nov 16, 2020
Declared cost
$1,878,580
Address
2645 Ocean Av

3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep.

Open the permit page

$1,878,580
May 21, 2019Completed
final sign-off Nov 2020
2645 Ocean Avground fl ti: new partitions, finishes, doors, ceilings, casework, and mep.
Details
Permit
201905211268
Status
complete
Filed
May 21, 2019
Permit issued
Aug 5, 2019
Final sign-off
Nov 16, 2020
Declared cost
$442,174
Address
2645 Ocean Av

ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep.

Open the permit page

$442,174
Apr 24, 2019Completed
final sign-off May 2021
3555 Cesar Chavez Stmajor alteration project consist of partial structural removel of a 4 story 31,274 sq foot (e) 1957 building and recladding of the remaining 1859 square foot stairwell
Details
Permit
201904248793
Status
complete
Filed
Apr 24, 2019
Permit issued
Oct 9, 2019
Final sign-off
May 28, 2021
Declared cost
$4,200,000
Address
3555 Cesar Chavez St

major alteration project consist of partial structural removel of a 4 story 31,274 sq foot (e) 1957 building and recladding of the remaining 1859 square foot stairwell

Open the permit page

$4,200,000
Apr 22, 2019Completed
final sign-off Nov 2020
2645 Ocean Av1st fl per ab-017 soft demo of walls, casework finishes, ceilings, lighitng. only partial floor soft demo
Details
Permit
201904228613
Status
complete
Filed
Apr 22, 2019
Permit issued
May 17, 2019
Final sign-off
Nov 20, 2020
Declared cost
$20,000
Address
2645 Ocean Av

1st fl per ab-017 soft demo of walls, casework finishes, ceilings, lighitng. only partial floor soft demo

Open the permit page

$20,000
Mar 20, 2019Completed
final sign-off Sep 2020
2100 Webster St5th flr selective demo and partial ti. work includes new accessible toilet room, new partitions, ceilings, and finishes and hvac and elec
Details
Permit
201903205781
Status
complete
Filed
Mar 20, 2019
Permit issued
Jul 2, 2019
Final sign-off
Sep 30, 2020
Declared cost
$1,416,303
Address
2100 Webster St

5th flr selective demo and partial ti. work includes new accessible toilet room, new partitions, ceilings, and finishes and hvac and elec

Open the permit page

$1,416,303
Mar 19, 2019Completed
final sign-off Sep 2020
2351 Clay Stfloors 1, 4 & 5 - selective demo minor ti work on portions of floors. new non-bearing partitions, ceilings, finishes. floors 2 & 3 limited hardware changes. barrier removal under pa #201511182992. new accessible toilets. mep included.
Details
Permit
201903195641
Status
complete
Filed
Mar 19, 2019
Permit issued
Jul 8, 2019
Final sign-off
Sep 3, 2020
Declared cost
$425,000
Address
2351 Clay St

floors 1, 4 & 5 - selective demo minor ti work on portions of floors. new non-bearing partitions, ceilings, finishes. floors 2 & 3 limited hardware changes. barrier removal under pa #201511182992. new accessible toilets. mep included.

Open the permit page

$425,000
Mar 19, 2019Completed
final sign-off Sep 2022
2351 Clay St5th floor: t.i. of cosmetic srgery/ breast surgery clinic. work included new accessible toilet rooms. idf room, partitions, ceiling and finishes, new power data, lighting and hvac.
Details
Permit
201903195657
Status
complete
Filed
Mar 19, 2019
Permit issued
Jul 8, 2019
Final sign-off
Sep 13, 2022
Declared cost
$350,000
Address
2351 Clay St

5th floor: t.i. of cosmetic srgery/ breast surgery clinic. work included new accessible toilet rooms. idf room, partitions, ceiling and finishes, new power data, lighting and hvac.

Open the permit page

$350,000
Mar 18, 2019Never finaled
issued Mar 2019, no final
1580 Valencia Sttemp water heater installation level 1 of 1912 bld 1580 valencia
Details
Permit
201903185495
Status
issued
Filed
Mar 18, 2019
Permit issued
Mar 22, 2019
Declared cost
$20,000
Address
1580 Valencia St

temp water heater installation level 1 of 1912 bld 1580 valencia

Open the permit page

$20,000
Feb 13, 2019Never finaled
issued Jul 2019, no final
1375 Sutter St2nd fl - selective demo and partial ti work. work includes new accessible toilet, new accessible toilet, new partitions, ceilings and finishes and associated mep
Details
Permit
201902132842
Status
issued
Filed
Feb 13, 2019
Permit issued
Jul 9, 2019
Declared cost
$200,000
Address
1375 Sutter St

2nd fl - selective demo and partial ti work. work includes new accessible toilet, new accessible toilet, new partitions, ceilings and finishes and associated mep

Open the permit page

$200,000
Feb 6, 2019Completed
final sign-off Apr 2019
1100 Van Ness Av5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details
Details
Permit
201902062178
Status
complete
Filed
Feb 6, 2019
Permit issued
Mar 27, 2019
Final sign-off
Apr 11, 2019
Address
1100 Van Ness Av

5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details

Open the permit page

Feb 6, 2019Completed
final sign-off Apr 2019
1100 Van Ness Av2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details
Details
Permit
201902062176
Status
complete
Filed
Feb 6, 2019
Permit issued
Mar 27, 2019
Final sign-off
Apr 8, 2019
Address
1100 Van Ness Av

2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details

Open the permit page

Jan 17, 2019Completed
final sign-off Dec 2020
1580 Valencia Stmission bernal campus decant & demo project & utilities trence acress the court yard between the 1912 building and the hartzell building to tie the bldg utilities and fire alarm together
Details
Permit
201901170599
Status
complete
Filed
Jan 17, 2019
Permit issued
Mar 22, 2019
Final sign-off
Dec 18, 2020
Address
1580 Valencia St

mission bernal campus decant & demo project & utilities trence acress the court yard between the 1912 building and the hartzell building to tie the bldg utilities and fire alarm together

Open the permit page

Dec 12, 2018Completed
final sign-off Dec 2020
555 San Jose Avbasement: demo of all existing tanks, feed water system, demestic hot water tanks., fulton thermal fluid, how water boiler, piping, ductwork, conduits and plumbing in mezzanime level and basement level. build back scope under separate permit.
Details
Permit
201812128100
Status
complete
Filed
Dec 12, 2018
Permit issued
Feb 12, 2019
Final sign-off
Dec 30, 2020
Declared cost
$31,500
Address
555 San Jose Av

basement: demo of all existing tanks, feed water system, demestic hot water tanks., fulton thermal fluid, how water boiler, piping, ductwork, conduits and plumbing in mezzanime level and basement level. build back scope under separate permit.

Open the permit page

$31,500
Dec 10, 2018Completed
final sign-off Apr 2021
3555 Cesar Chavez Stto demolish a type 1-b, 12-story hospital with one basement.
Details
Permit
201812107902
Status
complete
Filed
Dec 10, 2018
Permit issued
Oct 9, 2019
Final sign-off
Apr 14, 2021
Declared cost
$4,000,000
Address
3555 Cesar Chavez St

to demolish a type 1-b, 12-story hospital with one basement.

Open the permit page

$4,000,000
Nov 15, 2018Completed
final sign-off May 2019
1100 Van Ness Av7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf
Details
Permit
201811155965
Status
complete
Filed
Nov 15, 2018
Permit issued
Jan 8, 2019
Final sign-off
May 1, 2019
Address
1100 Van Ness Av

7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf

Open the permit page

Nov 14, 2018Completed
final sign-off Apr 2019
1580 Valencia Stlevel 3, 3208 & 3209. new demising wall and door at rooms
Details
Permit
201811145783
Status
complete
Filed
Nov 14, 2018
Permit issued
Jan 8, 2019
Final sign-off
Apr 5, 2019
Declared cost
$10,000
Address
1580 Valencia St

level 3, 3208 & 3209. new demising wall and door at rooms

Open the permit page

$10,000
Oct 29, 2018Completed
final sign-off Feb 2019
640 Sacramento St1st fl: rev to pa# 201806131753 revision to restroom background to current design. maher n/a.
Details
Permit
201810294454
Status
complete
Filed
Oct 29, 2018
Permit issued
Nov 14, 2018
Final sign-off
Feb 14, 2019
Address
640 Sacramento St

1st fl: rev to pa# 201806131753 revision to restroom background to current design. maher n/a.

Open the permit page

Oct 26, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't reack the deck above.
Details
Permit
201810264220
Status
complete
Filed
Oct 26, 2018
Permit issued
Oct 29, 2018
Final sign-off
Apr 19, 2019
Address
1100 Van Ness Av

2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't reack the deck above.

Open the permit page

Oct 24, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details
Details
Permit
201810243977
Status
complete
Filed
Oct 24, 2018
Permit issued
Mar 27, 2019
Final sign-off
Apr 8, 2019
Address
1100 Van Ness Av

6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details

Open the permit page

Oct 24, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details
Details
Permit
201810243985
Status
complete
Filed
Oct 24, 2018
Permit issued
Mar 27, 2019
Final sign-off
Apr 4, 2019
Address
1100 Van Ness Av

4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details

Open the permit page

Oct 16, 2018Completed
final sign-off Dec 2020
555 San Jose Avnew concrete pads for pge transformer to tie into untilities and new switchboard. utilities trench up san jose ave for future tie in to hartzell distribution panel
Details
Permit
201810163250
Status
complete
Filed
Oct 16, 2018
Permit issued
Feb 20, 2019
Final sign-off
Dec 28, 2020
Address
555 San Jose Av

new concrete pads for pge transformer to tie into untilities and new switchboard. utilities trench up san jose ave for future tie in to hartzell distribution panel

Open the permit page

Oct 16, 2018Completed
final sign-off May 2020
555 San Jose Avbasement selective demo of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in.
Details
Permit
201810163255
Status
complete
Filed
Oct 16, 2018
Permit issued
Jan 8, 2019
Final sign-off
May 28, 2020
Declared cost
$240,000
Address
555 San Jose Av

basement selective demo of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in.

Open the permit page

$240,000
Oct 11, 2018Completed
final sign-off Oct 2018
240 Stockton St4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record
Details
Permit
201810112883
Status
complete
Filed
Oct 11, 2018
Permit issued
Oct 12, 2018
Final sign-off
Oct 19, 2018
Address
240 Stockton St

4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record

Open the permit page

Oct 11, 2018Completed
final sign-off Nov 2020
3555 Cesar Chavez Stupturn sprinkler heads to prepare space for soft demo under 201810032115 maher not req
Details
Permit
201810112956
Status
complete
Filed
Oct 11, 2018
Permit issued
Oct 29, 2018
Final sign-off
Nov 9, 2020
Declared cost
$100,000
Address
3555 Cesar Chavez St

upturn sprinkler heads to prepare space for soft demo under 201810032115 maher not req

Open the permit page

$100,000
Oct 3, 2018Completed
final sign-off Nov 2020
555 San Jose Av1st, 2nd and roof - interior and exterior selective demo for hartzell ti project ti under separate permit.
Details
Permit
201810032092
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 12, 2018
Final sign-off
Nov 19, 2020
Declared cost
$600,000
Address
555 San Jose Av

1st, 2nd and roof - interior and exterior selective demo for hartzell ti project ti under separate permit.

Open the permit page

$600,000
Oct 3, 2018Completed
final sign-off Jan 2021
3555 Cesar Chavez Stthe project consists of a non-structural interior demo of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demo of a 31,724 sf, 4 story bldg. the 1970 bldg interior demo scope includes 200,000 sf 12 story bldg with a basment. soft demo will commence upon
Details
Permit
201810032115
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 29, 2018
Final sign-off
Jan 4, 2021
Declared cost
$750,000
Address
3555 Cesar Chavez St

the project consists of a non-structural interior demo of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demo of a 31,724 sf, 4 story bldg. the 1970 bldg interior demo scope includes 200,000 sf 12 story bldg with a basment. soft demo will commence upon

Open the permit page

$750,000
Sep 24, 2018Completed
final sign-off Feb 2019
640 Sacramento St1/f: mep ti for ref pa# 201806131753. maher n/a.
Details
Permit
201809241127
Status
complete
Filed
Sep 24, 2018
Permit issued
Nov 14, 2018
Final sign-off
Feb 14, 2019
Declared cost
$380,000
Address
640 Sacramento St

1/f: mep ti for ref pa# 201806131753. maher n/a.

Open the permit page

$380,000
Aug 31, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av2nd/3rd fl: a/mep revision & adding work to #201710201778. revision are minor, new mri adding sq ft to the whole scope (project is oshpd 3), cryovent for liquid helium, inert
Details
Permit
201808318917
Status
complete
Filed
Aug 31, 2018
Permit issued
Nov 28, 2018
Final sign-off
Apr 19, 2019
Declared cost
$35,000
Address
1100 Van Ness Av

2nd/3rd fl: a/mep revision & adding work to #201710201778. revision are minor, new mri adding sq ft to the whole scope (project is oshpd 3), cryovent for liquid helium, inert

Open the permit page

$35,000
Jul 25, 2018Completed
final sign-off Dec 2020
555 San Jose Av(1st floor-central courtyard): (n) disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, (n) hardware to elevator lobbies. maher n/a.
Details
Permit
201807255521
Status
complete
Filed
Jul 25, 2018
Permit issued
Nov 14, 2018
Final sign-off
Dec 17, 2020
Address
555 San Jose Av

(1st floor-central courtyard): (n) disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, (n) hardware to elevator lobbies. maher n/a.

Open the permit page

Jul 25, 2018Completed
final sign-off Jan 2021
555 San Jose Av1st and 2nd floor. interior demo on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural.
Details
Permit
201807255526
Status
complete
Filed
Jul 25, 2018
Permit issued
May 13, 2019
Final sign-off
Jan 14, 2021
Declared cost
$8,000,000
Address
555 San Jose Av

1st and 2nd floor. interior demo on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural.

Open the permit page

$8,000,000
Jun 29, 2018Completed
final sign-off Sep 2018
640 Sacramento St1st fl.- demo only associated with project 2018-0613-1753.
Details
Permit
201806293339
Status
complete
Filed
Jun 29, 2018
Permit issued
Jun 29, 2018
Final sign-off
Sep 4, 2018
Address
640 Sacramento St

1st fl.- demo only associated with project 2018-0613-1753.

Open the permit page

Jun 11, 2018Completed
final sign-off Oct 2018
240 Stockton St4th, suite 400 - mechanical and electrical for 201803204096
Details
Permit
201806111500
Status
complete
Filed
Jun 11, 2018
Permit issued
Jun 12, 2018
Final sign-off
Oct 17, 2018
Declared cost
$76,000
Address
240 Stockton St

4th, suite 400 - mechanical and electrical for 201803204096

Open the permit page

$76,000
May 17, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages
Details
Permit
201805179347
Status
complete
Filed
May 17, 2018
Permit issued
Jun 12, 2018
Final sign-off
Apr 11, 2019
Address
1100 Van Ness Av

5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages

Open the permit page

Apr 30, 2018Completed
final sign-off Sep 2018
1580 Valencia Stconvert existing blood draw room into a fluid processing room, adding a pass thru cabinet in an (e) accessible toilet and adding a wall mount for an (e) monitor in an (e) soiled utility room
Details
Permit
201804307750
Status
complete
Filed
Apr 30, 2018
Permit issued
Jun 12, 2018
Final sign-off
Sep 19, 2018
Declared cost
$32,000
Address
1580 Valencia St

convert existing blood draw room into a fluid processing room, adding a pass thru cabinet in an (e) accessible toilet and adding a wall mount for an (e) monitor in an (e) soiled utility room

Open the permit page

$32,000
Apr 17, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av6th fl - meps and structural for project pa 2017-0927-9722
Details
Permit
201804176546
Status
complete
Filed
Apr 17, 2018
Permit issued
May 16, 2018
Final sign-off
Apr 11, 2019
Declared cost
$4,000,000
Address
1100 Van Ness Av

6th fl - meps and structural for project pa 2017-0927-9722

Open the permit page

$4,000,000
Apr 16, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av5th floor, meps and structural for project pa# 201709279716. maher na
Details
Permit
201804166404
Status
complete
Filed
Apr 16, 2018
Permit issued
Apr 24, 2018
Final sign-off
Apr 11, 2019
Declared cost
$4,000,000
Address
1100 Van Ness Av

5th floor, meps and structural for project pa# 201709279716. maher na

Open the permit page

$4,000,000
Apr 16, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av4th floor mep's and structural for project pa# 201708175144. n/a for maher
Details
Permit
201804166398
Status
complete
Filed
Apr 16, 2018
Permit issued
Apr 24, 2018
Final sign-off
Apr 11, 2019
Declared cost
$4,000,000
Address
1100 Van Ness Av

4th floor mep's and structural for project pa# 201708175144. n/a for maher

Open the permit page

$4,000,000
Apr 10, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av1st floor: meps and structural for ti 20171013164.
Details
Permit
201804105909
Status
complete
Filed
Apr 10, 2018
Permit issued
May 16, 2018
Final sign-off
Apr 11, 2019
Declared cost
$254,744
Address
1100 Van Ness Av

1st floor: meps and structural for ti 20171013164.

Open the permit page

$254,744
Mar 20, 2018Completed
final sign-off Oct 2018
240 Stockton Stfull floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travel
Details
Permit
201803204096
Status
complete
Filed
Mar 20, 2018
Permit issued
Apr 30, 2018
Final sign-off
Oct 19, 2018
Declared cost
$500,000
Address
240 Stockton St

full floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travel

Open the permit page

$500,000
Mar 15, 2018Completed
final sign-off May 2018
901 Van Ness Avto erect electrical sign at the interior wall on 2nd floor. n/a for maher
Details
Permit
201803153714
Status
complete
Filed
Mar 15, 2018
Permit issued
Mar 20, 2018
Final sign-off
May 31, 2018
Declared cost
$3,000
Address
901 Van Ness Av

to erect electrical sign at the interior wall on 2nd floor. n/a for maher

Open the permit page

$3,000
Mar 12, 2018Completed
final sign-off Apr 2019
1100 Van Ness Av7th fl - mechanical, electrical & plumbing & structural for pa 2017-1013-1168. maher na
Details
Permit
201803123379
Status
complete
Filed
Mar 12, 2018
Permit issued
Apr 24, 2018
Final sign-off
Apr 11, 2019
Declared cost
$3,000,000
Address
1100 Van Ness Av

7th fl - mechanical, electrical & plumbing & structural for pa 2017-1013-1168. maher na

Open the permit page

$3,000,000
Feb 27, 2018Completed
final sign-off Sep 2018
1580 Valencia St1st and basement floors: fire review was missed on 201711174274. fire dept/ requested a full arch. set. re-review for the same project to put it in record. revision to 2017-1117-4274.
Details
Permit
201802272318
Status
complete
Filed
Feb 27, 2018
Permit issued
Mar 20, 2018
Final sign-off
Sep 19, 2018
Address
1580 Valencia St

1st and basement floors: fire review was missed on 201711174274. fire dept/ requested a full arch. set. re-review for the same project to put it in record. revision to 2017-1117-4274.

Open the permit page

Jan 24, 2018Completed
final sign-off Sep 2018
1580 Valencia Stbasement/1st floor: mep for 201711174274
Details
Permit
201801249358
Status
complete
Filed
Jan 24, 2018
Permit issued
Mar 20, 2018
Final sign-off
Sep 19, 2018
Address
1580 Valencia St

basement/1st floor: mep for 201711174274

Open the permit page

Dec 12, 2017Completed
final sign-off Jan 2018
201 Spear St9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na
Details
Permit
201712126173
Status
complete
Filed
Dec 12, 2017
Permit issued
Dec 19, 2017
Final sign-off
Jan 19, 2018
Address
201 Spear St

9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na

Open the permit page

Nov 17, 2017Completed
final sign-off Dec 2020
3555 Cesar Chavez St1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher
Details
Permit
201711174273
Status
complete
Filed
Nov 17, 2017
Permit issued
May 14, 2018
Final sign-off
Dec 11, 2020
Declared cost
$1,129,102
Address
3555 Cesar Chavez St

1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher

Open the permit page

$1,129,102
Nov 17, 2017Completed
final sign-off May 2018
901 Van Ness Av2nd fl - mechanical and electrical for arch pa #2017-0816-5042. maher n/a
Details
Permit
201711174209
Status
complete
Filed
Nov 17, 2017
Permit issued
Nov 28, 2017
Final sign-off
May 31, 2018
Declared cost
$100,000
Address
901 Van Ness Av

2nd fl - mechanical and electrical for arch pa #2017-0816-5042. maher n/a

Open the permit page

$100,000
Nov 17, 2017Completed
final sign-off Sep 2018
1580 Valencia Stbasement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demo pender 201707182106)mechanical & electrical under separate permit. n/a for maher
Details
Permit
201711174274
Status
complete
Filed
Nov 17, 2017
Permit issued
Jan 23, 2018
Final sign-off
Sep 19, 2018
Declared cost
$462,202
Address
1580 Valencia St

basement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demo pender 201707182106)mechanical & electrical under separate permit. n/a for maher

Open the permit page

$462,202
Nov 8, 2017Completed
final sign-off Feb 2018
525 Market St36th fl. minor ti non structural demo of storage and pantry. new construction to include partitions etc. meps sprinkler and life safety under sep permit
Details
Permit
201711083515
Status
complete
Filed
Nov 8, 2017
Permit issued
Nov 28, 2017
Final sign-off
Feb 8, 2018
Declared cost
$207,162
Address
525 Market St

36th fl. minor ti non structural demo of storage and pantry. new construction to include partitions etc. meps sprinkler and life safety under sep permit

Open the permit page

$207,162
Oct 30, 2017Completed
final sign-off Jan 2018
201 Spear St9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13
Details
Permit
201710302554
Status
complete
Filed
Oct 30, 2017
Permit issued
Nov 2, 2017
Final sign-off
Jan 19, 2018
Declared cost
$15,000
Address
201 Spear St

9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13

Open the permit page

$15,000
Oct 20, 2017Completed
final sign-off Apr 2019
1100 Van Ness Av(2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit)
Details
Permit
201710201778
Status
complete
Filed
Oct 20, 2017
Permit issued
Sep 7, 2018
Final sign-off
Apr 5, 2019
Declared cost
$7,285,102
Address
1100 Van Ness Av

(2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit)

Open the permit page

$7,285,102
Oct 13, 2017Never finaled
issued Feb 2018, no final
1100 Van Ness Av1st floor: t.i medical office building (clinic outpatient)first time build out. meps, life safety and sprinkler submitted separately
Details
Permit
201710131164
Status
issued
Filed
Oct 13, 2017
Permit issued
Feb 23, 2018
Declared cost
$237,337
Address
1100 Van Ness Av

1st floor: t.i medical office building (clinic outpatient)first time build out. meps, life safety and sprinkler submitted separately

Open the permit page

$237,337
Oct 13, 2017Completed
final sign-off Apr 2019
1100 Van Ness Av7th floor: full floor medical office building (clinical outpatient) t.i. 1st time build out, single floor. mep, lifesafety and sprinklers under separate permits.
Details
Permit
201710131168
Status
complete
Filed
Oct 13, 2017
Permit issued
Feb 23, 2018
Final sign-off
Apr 19, 2019
Declared cost
$4,954,864
Address
1100 Van Ness Av

7th floor: full floor medical office building (clinical outpatient) t.i. 1st time build out, single floor. mep, lifesafety and sprinklers under separate permits.

Open the permit page

$4,954,864
Sep 27, 2017Completed
final sign-off Apr 2019
1100 Van Ness Av(6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a.
Details
Permit
201709279722
Status
complete
Filed
Sep 27, 2017
Permit issued
Mar 28, 2018
Final sign-off
Apr 19, 2019
Declared cost
$4,393,775
Address
1100 Van Ness Av

(6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a.

Open the permit page

$4,393,775
Sep 27, 2017Completed
final sign-off Apr 2019
1100 Van Ness Av(5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit)
Details
Permit
201709279716
Status
complete
Filed
Sep 27, 2017
Permit issued
Mar 20, 2018
Final sign-off
Apr 11, 2019
Declared cost
$4,641,551
Address
1100 Van Ness Av

(5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit)

Open the permit page

$4,641,551
Sep 8, 2017Completed
final sign-off Feb 2018
201 Mission Stsuite 560: t.i. demo of (e) walls and construction of new walls & glazing configuration, minor ceiling and powe/data work, finishes. (e) fire life saftey & sprinkler mods under sep permit. maher n/a.
Details
Permit
201709087343
Status
complete
Filed
Sep 8, 2017
Permit issued
Sep 19, 2017
Final sign-off
Feb 16, 2018
Declared cost
$200,000
Address
201 Mission St

suite 560: t.i. demo of (e) walls and construction of new walls & glazing configuration, minor ceiling and powe/data work, finishes. (e) fire life saftey & sprinkler mods under sep permit. maher n/a.

Open the permit page

$200,000
Sep 8, 2017Completed
final sign-off Feb 2018
201 Mission Stsuite 1450: a/mep t.i. demo of (e) walls and glazing and ceiling, construction of new walls & glazing configuration, (n) ceiling and power/data work, finishes. fire life safety & sprinkler mod is under sep permit. maher n/a.
Details
Permit
201709087352
Status
complete
Filed
Sep 8, 2017
Permit issued
Sep 19, 2017
Final sign-off
Feb 16, 2018
Declared cost
$650,000
Address
201 Mission St

suite 1450: a/mep t.i. demo of (e) walls and glazing and ceiling, construction of new walls & glazing configuration, (n) ceiling and power/data work, finishes. fire life safety & sprinkler mod is under sep permit. maher n/a.

Open the permit page

$650,000
Aug 17, 2017Completed
final sign-off Apr 2019
1100 Van Ness Av4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13
Details
Permit
201708175144
Status
complete
Filed
Aug 17, 2017
Permit issued
Mar 28, 2018
Final sign-off
Apr 19, 2019
Declared cost
$4,854,717
Address
1100 Van Ness Av

4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13

Open the permit page

$4,854,717
Aug 16, 2017Completed
final sign-off May 2018
901 Van Ness Avrevision to app#201706068547:interior remodel of extg boutiqes & extg restroom on 2nd fl. no change of use. nw fixtures & finishes to restroom for continued use as auto sales facility & arch features associated with these area. nw drawings for structural revisions.n/a for maher
Details
Permit
201708165042
Status
complete
Filed
Aug 16, 2017
Permit issued
Sep 7, 2017
Final sign-off
May 31, 2018
Declared cost
$140,000
Address
901 Van Ness Av

revision to app#201706068547:interior remodel of extg boutiqes & extg restroom on 2nd fl. no change of use. nw fixtures & finishes to restroom for continued use as auto sales facility & arch features associated with these area. nw drawings for structural revisions.n/a for maher

Open the permit page

$140,000
Aug 10, 2017Completed
final sign-off May 2018
901 Van Ness Av2/f: mechanical and electrical for architectual permit #201706068547. maher na
Details
Permit
201708104426
Status
complete
Filed
Aug 10, 2017
Permit issued
Aug 16, 2017
Final sign-off
May 31, 2018
Declared cost
$115,000
Address
901 Van Ness Av

2/f: mechanical and electrical for architectual permit #201706068547. maher na

Open the permit page

$115,000
Jul 18, 2017Completed
final sign-off Aug 2017
3555 Cesar Chavez Stbasement & ground floor - demolition of tenant improvement spaces in preparation of future tenant improvement under separate permit. n/a maher ordinance
Details
Permit
201707182106
Status
complete
Filed
Jul 18, 2017
Permit issued
Aug 2, 2017
Final sign-off
Aug 25, 2017
Declared cost
$74,000
Address
3555 Cesar Chavez St

basement & ground floor - demolition of tenant improvement spaces in preparation of future tenant improvement under separate permit. n/a maher ordinance

Open the permit page

$74,000
Jun 22, 2017Completed
final sign-off Feb 2018
201 Mission Stsuite 510: t.i. on multi-tenant floor: build-=out consist of demo of (e) walls & construction of (n) wall and glazing configuration, celing and minor power/data work and finishes. life safety and spinklers under sep permit. maher n/a.
Details
Permit
201706220129
Status
complete
Filed
Jun 22, 2017
Permit issued
Sep 19, 2017
Final sign-off
Feb 16, 2018
Declared cost
$200,000
Address
201 Mission St

suite 510: t.i. on multi-tenant floor: build-=out consist of demo of (e) walls & construction of (n) wall and glazing configuration, celing and minor power/data work and finishes. life safety and spinklers under sep permit. maher n/a.

Open the permit page

$200,000
Jun 6, 2017Completed
final sign-off May 2018
901 Van Ness Avre 1/a.001 project entails t.i. int. remodel for extg auto sales facility. work is limited to the 2nd floor only and does not entail any change of use. 1)scope includes but not limited to construction of new showroom, cutomer service areas for cont use as auto sales facility. 2) partitions, finishes
Details
Permit
201706068547
Status
complete
Filed
Jun 6, 2017
Permit issued
Jul 13, 2017
Final sign-off
May 31, 2018
Declared cost
$149,000
Address
901 Van Ness Av

re 1/a.001 project entails t.i. int. remodel for extg auto sales facility. work is limited to the 2nd floor only and does not entail any change of use. 1)scope includes but not limited to construction of new showroom, cutomer service areas for cont use as auto sales facility. 2) partitions, finishes

Open the permit page

$149,000
May 17, 2017Completed
final sign-off Nov 2017
901 Van Ness Av1st floor: mechanical and electrical for app#201611031922
Details
Permit
201705176804
Status
complete
Filed
May 17, 2017
Permit issued
Jun 7, 2017
Final sign-off
Nov 1, 2017
Address
901 Van Ness Av

1st floor: mechanical and electrical for app#201611031922

Open the permit page

Jan 4, 2017Completed
final sign-off Mar 2017
333 Bush St29th floor: mechanical and electrical for ref app#201611011636.
Details
Permit
201701046456
Status
complete
Filed
Jan 4, 2017
Permit issued
Jan 5, 2017
Final sign-off
Mar 1, 2017
Declared cost
$130,000
Address
333 Bush St

29th floor: mechanical and electrical for ref app#201611011636.

Open the permit page

$130,000
Nov 15, 2016Never finaled
issued Nov 2016, no final
180 Sansome St(aka 160 sansome st.) 3rd fl mechanical and electrical for 201610170683 maher not req. n/a maher
Details
Permit
201611152678
Status
issued
Filed
Nov 15, 2016
Permit issued
Nov 22, 2016
Declared cost
$20,000
Address
180 Sansome St

(aka 160 sansome st.) 3rd fl mechanical and electrical for 201610170683 maher not req. n/a maher

Open the permit page

$20,000
Nov 3, 2016Completed
final sign-off May 2018
901 Van Ness Av1st flr: ti- remodel (e) auto sales facility. no change of use. scope includes b.n.l.t: demo of (e) conf & sales offices, constr of new offices, customer areas and accessory storage rms, partitions, finishes & fixtures associated, millwork & path of travel. accessibility upgrades restrooms. maher na
Details
Permit
201611031922
Status
complete
Filed
Nov 3, 2016
Permit issued
Jan 30, 2017
Final sign-off
May 31, 2018
Declared cost
$534,000
Address
901 Van Ness Av

1st flr: ti- remodel (e) auto sales facility. no change of use. scope includes b.n.l.t: demo of (e) conf & sales offices, constr of new offices, customer areas and accessory storage rms, partitions, finishes & fixtures associated, millwork & path of travel. accessibility upgrades restrooms. maher na

Open the permit page

$534,000
Nov 3, 2016Completed
final sign-off Nov 2017
901 Van Ness Avrevision to pa 2016-0525-8349. expansion of pagani showroom (rm 214) with (n) finishes, partition types & lighting fixtures. maher ord 155-13 na
Details
Permit
201611031925
Status
complete
Filed
Nov 3, 2016
Permit issued
Dec 21, 2016
Final sign-off
Nov 1, 2017
Declared cost
$125,000
Address
901 Van Ness Av

revision to pa 2016-0525-8349. expansion of pagani showroom (rm 214) with (n) finishes, partition types & lighting fixtures. maher ord 155-13 na

Open the permit page

$125,000
Nov 1, 2016Completed
final sign-off Mar 2017
333 Bush Stflrs: 27,29,30 & 31: interior tenant improvement to add card readers on an (e)communicating stair door. construction of new offices on floor 29. no structural work.
Details
Permit
201611011636
Status
complete
Filed
Nov 1, 2016
Permit issued
Nov 7, 2016
Final sign-off
Mar 1, 2017
Declared cost
$330,000
Address
333 Bush St

flrs: 27,29,30 & 31: interior tenant improvement to add card readers on an (e)communicating stair door. construction of new offices on floor 29. no structural work.

Open the permit page

$330,000
Oct 19, 2016Completed
final sign-off Dec 2016
180 Sansome St3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13
Details
Permit
201610190683
Status
complete
Filed
Oct 19, 2016
Permit issued
Oct 31, 2016
Final sign-off
Dec 9, 2016
Declared cost
$342,244
Address
180 Sansome St

3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13

Open the permit page

$342,244
Oct 11, 2016Completed
final sign-off Nov 2017
901 Van Ness Avmechanical and electrical for 201605258349
Details
Permit
201610119971
Status
complete
Filed
Oct 11, 2016
Permit issued
Apr 25, 2017
Final sign-off
Nov 1, 2017
Declared cost
$397,474
Address
901 Van Ness Av

mechanical and electrical for 201605258349

Open the permit page

$397,474
Sep 1, 2016Completed
final sign-off Mar 2017
301 Howard St13th floor: revision to ref pa 201604144810. new scope: ti to suite 1300 - demo of (e) wall partitions & new finishes. maher na
Details
Permit
201609016630
Status
complete
Filed
Sep 1, 2016
Permit issued
Sep 27, 2016
Final sign-off
Mar 21, 2017
Declared cost
$60,000
Address
301 Howard St

13th floor: revision to ref pa 201604144810. new scope: ti to suite 1300 - demo of (e) wall partitions & new finishes. maher na

Open the permit page

$60,000
Aug 5, 2016Never finaled
issued Aug 2016, no final
100 Pine Sta/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maher
Details
Permit
201608054288
Status
issued
Filed
Aug 5, 2016
Permit issued
Aug 17, 2016
Declared cost
$123,960
Address
100 Pine St

a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maher

Open the permit page

$123,960
Aug 5, 2016Completed
final sign-off Sep 2016
100 Pine Sta/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maher
Details
Permit
201608054284
Status
complete
Filed
Aug 5, 2016
Permit issued
Aug 17, 2016
Final sign-off
Sep 30, 2016
Declared cost
$1,215,000
Address
100 Pine St

a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maher

Open the permit page

$1,215,000
Jun 6, 2016Never finaled
issued Jun 2016, no final
180 Sansome Stsuite 200 -electrical permit for pa #201604124595 - additoinal outlets & power distribution. n/a maher ordinance
Details
Permit
201606069209
Status
issued
Filed
Jun 6, 2016
Permit issued
Jun 6, 2016
Declared cost
$12,464
Address
180 Sansome St

suite 200 -electrical permit for pa #201604124595 - additoinal outlets & power distribution. n/a maher ordinance

Open the permit page

$12,464
May 27, 2016Completed
final sign-off Jun 2016
180 Sansome St2nd fl: revision to ref pa 2016-0412-4595: ti to include minor removal of non structural partitions, new millwork in pantry and restrooms, paint & carpet; maher n/a
Details
Permit
201605278601
Status
complete
Filed
May 27, 2016
Permit issued
Jun 6, 2016
Final sign-off
Jun 9, 2016
Declared cost
$250
Address
180 Sansome St

2nd fl: revision to ref pa 2016-0412-4595: ti to include minor removal of non structural partitions, new millwork in pantry and restrooms, paint & carpet; maher n/a

Open the permit page

$250
May 25, 2016Completed
final sign-off Nov 2017
901 Van Ness Avti remodel (e)auto sales facility. work at 2/f only. no change of use. includes but not limited to demo (e)storage & customer service areas on 2/f, new offices, customer services areas & accessory storage.
Details
Permit
201605258349
Status
complete
Filed
May 25, 2016
Permit issued
Jul 18, 2016
Final sign-off
Nov 1, 2017
Declared cost
$140,000
Address
901 Van Ness Av

ti remodel (e)auto sales facility. work at 2/f only. no change of use. includes but not limited to demo (e)storage & customer service areas on 2/f, new offices, customer services areas & accessory storage.

Open the permit page

$140,000
May 16, 2016Completed
final sign-off Jun 2016
3 Embarcadero Centerlobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931
Details
Permit
201605167537
Status
complete
Filed
May 16, 2016
Permit issued
May 16, 2016
Final sign-off
Jun 1, 2016
Address
3 Embarcadero Center

lobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931

Open the permit page

May 9, 2016Completed
final sign-off Jun 2016
3 Embarcadero Centerlobby level: electrical lighting for ref pa 2016 0422 5477 (mech) and 2016 0315 2018 (arch)
Details
Permit
201605096931
Status
complete
Filed
May 9, 2016
Permit issued
May 13, 2016
Final sign-off
Jun 1, 2016
Address
3 Embarcadero Center

lobby level: electrical lighting for ref pa 2016 0422 5477 (mech) and 2016 0315 2018 (arch)

Open the permit page

May 2, 2016Completed
final sign-off Jul 2017
901 Van Ness Avdeferred electrical permit for 201603172342
Details
Permit
201605026335
Status
complete
Filed
May 2, 2016
Permit issued
May 13, 2016
Final sign-off
Jul 28, 2017
Declared cost
$34,000
Address
901 Van Ness Av

deferred electrical permit for 201603172342

Open the permit page

$34,000
Apr 22, 2016Completed
final sign-off Jun 2016
3 Embarcadero Centerlobby level: mechanical permit for pa 2016-0315-2018. minor modification to (e) system distribution for new roomss, x-ray rooms physicist letter and details.
Details
Permit
201604225477
Status
complete
Filed
Apr 22, 2016
Permit issued
Apr 22, 2016
Final sign-off
Jun 1, 2016
Declared cost
$37,001
Address
3 Embarcadero Center

lobby level: mechanical permit for pa 2016-0315-2018. minor modification to (e) system distribution for new roomss, x-ray rooms physicist letter and details.

Open the permit page

$37,001
Apr 14, 2016Completed
final sign-off Mar 2017
301 Howard St13th floor, ste 1300: ti at suite 1300 in a 22 story bldg build out consisting of demo to existing partitions, construction of new wall, glazing, ceiling, and power/data, finishes. n/a maher ord. # 155-13
Details
Permit
201604144810
Status
complete
Filed
Apr 14, 2016
Permit issued
Apr 20, 2016
Final sign-off
Mar 21, 2017
Declared cost
$60,000
Address
301 Howard St

13th floor, ste 1300: ti at suite 1300 in a 22 story bldg build out consisting of demo to existing partitions, construction of new wall, glazing, ceiling, and power/data, finishes. n/a maher ord. # 155-13

Open the permit page

$60,000
Apr 12, 2016Completed
final sign-off Jun 2016
180 Sansome Stste #200: scope of modifications for tenant improvements are minimal:removal of non-structural partitions,floor finishes,kitchen cabinetry. minor modifications to 9e) ada restroom to bring room into full compliance.new kitchen cabinets & sink, carpet and paint; maher n/a. life safety deferred.
Details
Permit
201604124595
Status
complete
Filed
Apr 12, 2016
Permit issued
May 6, 2016
Final sign-off
Jun 9, 2016
Declared cost
$100,000
Address
180 Sansome St

ste #200: scope of modifications for tenant improvements are minimal:removal of non-structural partitions,floor finishes,kitchen cabinetry. minor modifications to 9e) ada restroom to bring room into full compliance.new kitchen cabinets & sink, carpet and paint; maher n/a. life safety deferred.

Open the permit page

$100,000
Apr 4, 2016Completed
final sign-off May 2016
999 Van Ness Avmechanical and electrical deferred ap 201601076565
Details
Permit
201604043868
Status
complete
Filed
Apr 4, 2016
Permit issued
Apr 4, 2016
Final sign-off
May 9, 2016
Declared cost
$16,000
Address
999 Van Ness Av

mechanical and electrical deferred ap 201601076565

Open the permit page

$16,000
Mar 17, 2016Completed
final sign-off Jul 2016
901 Van Ness Av4th fl:tenant improvement interior remodel for (e) auto sales customer facility. does not entail any change of use. demo (e) to parts store area offices, finishes customer service areas, accessory storage, accessibility upgrades. n/a ordinance #155-13
Details
Permit
201603172342
Status
complete
Filed
Mar 17, 2016
Permit issued
Apr 4, 2016
Final sign-off
Jul 12, 2016
Declared cost
$115,000
Address
901 Van Ness Av

4th fl:tenant improvement interior remodel for (e) auto sales customer facility. does not entail any change of use. demo (e) to parts store area offices, finishes customer service areas, accessory storage, accessibility upgrades. n/a ordinance #155-13

Open the permit page

$115,000
Mar 15, 2016Completed
final sign-off Jun 2016
3 Embarcadero Center2/f lobby level- non structural demo, (n) non structural partitions, doors, millwork, finishes. no change in area, occupancy or use. mep under separate permit. n/a ordinance #155-13
Details
Permit
201603152018
Status
complete
Filed
Mar 15, 2016
Permit issued
Apr 7, 2016
Final sign-off
Jun 1, 2016
Declared cost
$384,461
Address
3 Embarcadero Center

2/f lobby level- non structural demo, (n) non structural partitions, doors, millwork, finishes. no change in area, occupancy or use. mep under separate permit. n/a ordinance #155-13

Open the permit page

$384,461