Kaiser Foundation Health Plan Inc
- Based in
- Anaheim
- On San Francisco permits
- Mar 2004 to Sep 2026
- Last 24 months
- 19 permits filed
224 permits since 2000: 175 completed, 18 in progress, 24 never finaled, 7 expired or cancelled.
Of the 24 never-finaled permits, 2 are 5 to 10 years old, 22 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 224.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 2238 Geary Bl | 1st floor:main lobby next to open stair area with relocated vending machine- wall finish treatment behind existing atm & existing parking payment machines, corridor 1w001 to receive acoustic wall finish treatment & seating casework in alcoves. 2nd fl: waitng area 2e00b to receive wall & ceilingDetails
1st floor:main lobby next to open stair area with relocated vending machine- wall finish treatment behind existing atm & existing parking payment machines, corridor 1w001 to receive acoustic wall finish treatment & seating casework in alcoves. 2nd fl: waitng area 2e00b to receive wall & ceiling | $300,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 2238 Geary Bl | revision to 202505237164 to support mammography partial upgrade to support the relocated ultrasound room (#3w472) patial upgrade will align w future nurse call upgrade for the entire department in future project. minor casework modification.Details
revision to 202505237164 to support mammography partial upgrade to support the relocated ultrasound room (#3w472) patial upgrade will align w future nurse call upgrade for the entire department in future project. minor casework modification. | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 2238 Geary Bl | remodel existing radiology imaging room on the 3rd fl at 2238 geary. kaiser sf. architectural, structural, mechanical, plumbing, and electrical modification to provide imaging room.Details
remodel existing radiology imaging room on the 3rd fl at 2238 geary. kaiser sf. architectural, structural, mechanical, plumbing, and electrical modification to provide imaging room. | $620,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 2238 Geary Bl | replace e) dock leveler in loading dock 1w121, w/ n) guardrails, replace e) intercom devices to n) video device, replece e) trash rm 1w131 door closer w/ a hold open function door closet, capping e) floor drain at lower platform of the trash rm 1w131, and apply non slippery epoxy coatingDetails
replace e) dock leveler in loading dock 1w121, w/ n) guardrails, replace e) intercom devices to n) video device, replece e) trash rm 1w131 door closer w/ a hold open function door closet, capping e) floor drain at lower platform of the trash rm 1w131, and apply non slippery epoxy coating | $50,000 |
| May 28, 2026 | In progress filed May 2026, not yet issued | 2190 Ofarrell St | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,623,126 |
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 2241 Geary Bl | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,356,955 |
| Apr 13, 2026 | In progress issued Apr 2026 | 2238 Geary Bl | replacement of mammogram equiptment and expansion to mamogram no 2 modification to existing mamogram room 2 small dressing roomsDetails
replacement of mammogram equiptment and expansion to mamogram no 2 modification to existing mamogram room 2 small dressing rooms | $500,000 |
| Apr 7, 2026 | In progress issued Aug 2026 | 4131 Geary Bl | card readers added to elevator modernization project under pa202505015606 and required coordiante of (e) security system.Details
card readers added to elevator modernization project under pa202505015606 and required coordiante of (e) security system. | $20,000 |
| Oct 23, 2025 | In progress issued Jul 2026 | 4131 Geary Bl | replacement of emergency generator equipment at medical office building.Details
replacement of emergency generator equipment at medical office building. | $250,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 4131 Geary Bl | rev to pa# 2025-0501-5606: elevator machinery anchorage revised after summory of existing conditions. revised calcuations also provided structural onlyDetails
rev to pa# 2025-0501-5606: elevator machinery anchorage revised after summory of existing conditions. revised calcuations also provided structural only | |
| Oct 6, 2025 | Completed final sign-off Sep 2026 | 4131 Geary Bl | relocate nitrogen starage tank & asscociated components from rm 355 3rd/f to rm 1112b 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1112b 1st/f to install nitrogen tank & associated componentDetails
relocate nitrogen starage tank & asscociated components from rm 355 3rd/f to rm 1112b 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1112b 1st/f to install nitrogen tank & associated component | $50,000 |
| Oct 6, 2025 | Completed final sign-off Sep 2026 | 2238 Geary Bl | relocate nitrogen starage tank & asscociated components from rm 4w265 4th/f, 02w262 5th/f, & 06e262 6th/f to rm 1w135 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1w135 1st/f to install nitrogen tank & associated componentDetails
relocate nitrogen starage tank & asscociated components from rm 4w265 4th/f, 02w262 5th/f, & 06e262 6th/f to rm 1w135 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1w135 1st/f to install nitrogen tank & associated component | $50,000 |
| Oct 6, 2025 | In progress issued Dec 2025 | 1600 Owens St | relocate nitrogen starage tank & asscociated components from rm 4564 4th/f & 9080 9th/f to rm 1106 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1106 1st/f to install nitrogen tank & associated componentDetails
relocate nitrogen starage tank & asscociated components from rm 4564 4th/f & 9080 9th/f to rm 1106 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1106 1st/f to install nitrogen tank & associated component | $50,000 |
| Sep 25, 2025 | In progress issued Jul 2026 | 2238 Geary Bl | remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate...Details
remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate... | $6,000,000 |
| May 23, 2025 | In progress issued Jun 2025 | 2238 Geary Bl | mammography equipment replacement and expansion, the adjacent e ulta sound room (3w472) relocated accross the hallway. this scope will take over part of the e digital imaging library 3w405 and provider offices (3w4881386), approx 320 sf. scope includes arch,struc,mech, elec,plumb modification.Details
mammography equipment replacement and expansion, the adjacent e ulta sound room (3w472) relocated accross the hallway. this scope will take over part of the e digital imaging library 3w405 and provider offices (3w4881386), approx 320 sf. scope includes arch,struc,mech, elec,plumb modification. | $500,000 |
| May 1, 2025 | In progress issued Jul 2025 | 4131 Geary Bl | modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room.Details
modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room. | $1,800,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2025 | 601 Van Ness Av | 2/fl-suite 2002-remove the (e)ductwork will be leased separtely. a (n)air intake and exterior louver will be installed in teh area of an (e)window. this scope will be accomodated in an expanded mech room. the project will also be adding a closet in the unoccupied space. fsd's not to be touched.Details
2/fl-suite 2002-remove the (e)ductwork will be leased separtely. a (n)air intake and exterior louver will be installed in teh area of an (e)window. this scope will be accomodated in an expanded mech room. the project will also be adding a closet in the unoccupied space. fsd's not to be touched. | $180,000 |
| Jan 10, 2025 | In progress issued Apr 2025 | 2238 Geary Bl | 2/f: revision to bpa# 202404119785, reduction of previous scope on 2/f. updated changes to rooms 2w284 and 2w282 only. removal of casework and upper cabinets, and ultarasonic washer in room 2w284. removal of casework and endoscope cabinet in room 2w282. new flooring in both rooms.Details
2/f: revision to bpa# 202404119785, reduction of previous scope on 2/f. updated changes to rooms 2w284 and 2w282 only. removal of casework and upper cabinets, and ultarasonic washer in room 2w284. removal of casework and endoscope cabinet in room 2w282. new flooring in both rooms. | |
| Dec 30, 2024 | Completed final sign-off Aug 2025 | 601 Van Ness Av | ste 2002-refeeding (e) /branch circuits from 2 (e) 120/208v panelboards to a (n) 120/208v panel board as make ready work to separate leasable space for a future tenantDetails
ste 2002-refeeding (e) /branch circuits from 2 (e) 120/208v panelboards to a (n) 120/208v panel board as make ready work to separate leasable space for a future tenant | $7,500 |
| Sep 25, 2024 | In progress issued Apr 2026 | 1635 Divisadero St | #625: interior finishes: administrative office space- replace existing lighting fixtures with new led- add power outlets- card readers at entry doors. replace existing plumbing fixtures- upgrade finishes in public corridor and new entry door-configure waiting room in 650.Details
#625: interior finishes: administrative office space- replace existing lighting fixtures with new led- add power outlets- card readers at entry doors. replace existing plumbing fixtures- upgrade finishes in public corridor and new entry door-configure waiting room in 650. | $100,000 |
| Apr 11, 2024 | In progress issued May 2024 | 2238 Geary Bl | 2nd floor: remodel and install new scope washers, sinks and wall mounted computers. (no change to extg fire alarm or sprinklers). 7th floor: remove and infill extg door at utility room and install new mounted computers.Details
2nd floor: remodel and install new scope washers, sinks and wall mounted computers. (no change to extg fire alarm or sprinklers). 7th floor: remove and infill extg door at utility room and install new mounted computers. | $50,000 |
| Nov 20, 2023 | In progress issued May 2026 | 2238 Geary Bl | refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldgDetails
refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg | $50,000 |
| Sep 1, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | revision to pa202305087274. 1st fl adult family medicine-urgent care. remove/demo 6 audible visual appliance. add 5 audible visual appliances, 13 visual appliances 1 dual sync module.Details
revision to pa202305087274. 1st fl adult family medicine-urgent care. remove/demo 6 audible visual appliance. add 5 audible visual appliances, 13 visual appliances 1 dual sync module. | |
| Jun 30, 2023 | Completed final sign-off Jul 2023 | 450 06th Av | revision to 202305026868 to update form c of da checklist and path of travel upgrades. codes 2023 cbcDetails
revision to 202305026868 to update form c of da checklist and path of travel upgrades. codes 2023 cbc | |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 450 06th Av | install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinksDetails
install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinks | $50,000 |
| May 8, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishesDetails
room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes | $300,000 |
| May 8, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | 1st flor fire alarm phase 2. adult family medicine/urgent careDetails
1st flor fire alarm phase 2. adult family medicine/urgent care | $50,000 |
| May 2, 2023 | Completed final sign-off Jul 2023 | 450 06th Av | 5/f-exam rms 55065/55063: remove casework counters/install modular casework counter w/sink (ref bpa#202012181345). no changes to (e)ceilings/wall locations/f/a devices, fire protection devices, mechanical systems or electrical. this space will remain a non-oshpd clinic.Details
5/f-exam rms 55065/55063: remove casework counters/install modular casework counter w/sink (ref bpa#202012181345). no changes to (e)ceilings/wall locations/f/a devices, fire protection devices, mechanical systems or electrical. this space will remain a non-oshpd clinic. | $50,000 |
| Mar 28, 2023 | Completed final sign-off Feb 2026 | 2238 Geary Bl | 1st fl tenant improvement, adult family medicine, upgrade create exam rooms, reception areaDetails
1st fl tenant improvement, adult family medicine, upgrade create exam rooms, reception area | $673,000 |
| Feb 23, 2023 | Completed final sign-off Mar 2026 | 2238 Geary Bl | 1st fl: remodel the existing outpatient pharmacy point of sales and waiting area. no added square footage to building.Details
1st fl: remodel the existing outpatient pharmacy point of sales and waiting area. no added square footage to building. | $620,000 |
| Aug 16, 2022 | Completed final sign-off May 2024 | 2238 Geary Bl | room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on.Details
room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on. | $305,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 4131 Geary Bl | renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy.Details
renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy. | $300,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 4141 Geary Bl | upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remainDetails
upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remain | $180,000 |
| Feb 16, 2022 | Completed final sign-off Oct 2022 | 450 06th Av | upgrade/refresh restrooms located 3rd fl, room 3324t, 4th fl room 4424ta 5th fl room 5500j- sinks, toilets, accessories, flooring, wall finishesDetails
upgrade/refresh restrooms located 3rd fl, room 3324t, 4th fl room 4424ta 5th fl room 5500j- sinks, toilets, accessories, flooring, wall finishes | $89,000 |
| Feb 16, 2022 | Completed final sign-off Apr 2022 | 2238 Geary Bl | install trash compactor & associated "rpu" power unit.Details
install trash compactor & associated "rpu" power unit. | $30,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2025 | 2425 Geary Bl | new radiator enclosure on the parking deck above the mechanical/electrical equipment building - radiators (3) each with cooling fan installed inside the enclosure with security and visual screen - generators (3) to supply power to emergency room & hospital.oshpd req local planning & sffd review andDetails
new radiator enclosure on the parking deck above the mechanical/electrical equipment building - radiators (3) each with cooling fan installed inside the enclosure with security and visual screen - generators (3) to supply power to emergency room & hospital.oshpd req local planning & sffd review and | |
| Jan 14, 2022 | Completed final sign-off Oct 2022 | 939 Ellis St | project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7.Details
project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7. | $15,000 |
| Dec 1, 2021 | Completed final sign-off Mar 2022 | 2238 Geary Bl | 8/f: installation of partial height modular partitions by dirtt in an (e) medical office building.Details
8/f: installation of partial height modular partitions by dirtt in an (e) medical office building. | $32,000 |
| Nov 18, 2021 | Completed final sign-off Mar 2022 | 2238 Geary Bl | to comply with nov#202182972. replace garage door like for likeDetails
to comply with nov#202182972. replace garage door like for like | $45,000 |
| May 10, 2021 | Completed final sign-off Sep 2022 | 2238 Geary Bl | 6th fl: remodel the southwest lobby of 6th fl to an injection/blood draw clinic.Details
6th fl: remodel the southwest lobby of 6th fl to an injection/blood draw clinic. | $479,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2021 | 450 06th Av | replace & refresh interior finishes floor and walls for orthopedics podiatry, perioperative medicine and rehab depts. replace caseworks relocation of sinks - no changes to ceilings, walls, locations fire alarm devices, fire protection, mechanical or electrical system.Details
replace & refresh interior finishes floor and walls for orthopedics podiatry, perioperative medicine and rehab depts. replace caseworks relocation of sinks - no changes to ceilings, walls, locations fire alarm devices, fire protection, mechanical or electrical system. | $100,000 |
| Nov 25, 2020 | Completed final sign-off Aug 2021 | 4131 Geary Bl | replacement of 3 low temp sterilizer with 2 new low temp terilizer to support surgical space in the basement room #0183. removal of a roll-up shutter on the south wall of the room & closure.Details
replacement of 3 low temp sterilizer with 2 new low temp terilizer to support surgical space in the basement room #0183. removal of a roll-up shutter on the south wall of the room & closure. | $62,000 |
| Nov 17, 2020 | Never finaled issued Feb 2021, no final | 2238 Geary Bl | room 3w162 - removal of (e) sonogram image eqt - installation of new hologic selenia mamography eqt - casework - sinkDetails
room 3w162 - removal of (e) sonogram image eqt - installation of new hologic selenia mamography eqt - casework - sink | $194,780 |
| Oct 22, 2020 | Completed final sign-off Jan 2022 | 4131 Geary Bl | renovation of (e) office into an unclassified segregated hazardous compounding pharmacy.Details
renovation of (e) office into an unclassified segregated hazardous compounding pharmacy. | $160,000 |
| Oct 22, 2020 | Completed final sign-off Apr 2022 | 350 Saint Josephs Av | upgrade site lighting - outdoorsDetails
upgrade site lighting - outdoors | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 4141 Geary Bl | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2241 Geary Bl | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 450 06th Av | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2190 Ofarrell St | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 4131 Geary Bl | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 2, 2020 | Completed final sign-off Apr 2021 | 2238 Geary Bl | project replaces medical equip, with new model paint room, new flooring, new casework and sink to replace similar, replace 2 ceiling diffusers project is one room at 185 sqftDetails
project replaces medical equip, with new model paint room, new flooring, new casework and sink to replace similar, replace 2 ceiling diffusers project is one room at 185 sqft | $60,000 |
| Aug 24, 2020 | Completed final sign-off Nov 2020 | 1600 Owens St | mri- rf shielding remediation - installation of cinemavision system on 2nd floor.Details
mri- rf shielding remediation - installation of cinemavision system on 2nd floor. | $500,000 |
| Aug 13, 2020 | Completed final sign-off Feb 2022 | 2238 Geary Bl | floors 2-8: toilet room refresh & accessibility upgrades. remodel and upgrade for accessibility existing men's & women's public toilet rooms on floors 2-8.Details
floors 2-8: toilet room refresh & accessibility upgrades. remodel and upgrade for accessibility existing men's & women's public toilet rooms on floors 2-8. | $1,000,000 |
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 2238 Geary Bl | 4/f: rev to pa#201908057836: partial height drywall partition added to reduce the span of a rprefabricated storefront wall.Details
4/f: rev to pa#201908057836: partial height drywall partition added to reduce the span of a rprefabricated storefront wall. | |
| Dec 10, 2019 | Completed final sign-off Jun 2021 | 2238 Geary Bl | remove 28 extg doors and install 28 new doors with card readers at same location. doors are located from 2nd through 8th floor. the scope includes architectural, electrical, & security only.Details
remove 28 extg doors and install 28 new doors with card readers at same location. doors are located from 2nd through 8th floor. the scope includes architectural, electrical, & security only. | $400,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 2241 Geary Bl | installation of hub parking pay machine equipementDetails
installation of hub parking pay machine equipement | $50,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 4131 Geary Bl | installation of hub parking pay machine equpment at 4131 & 4141 geary mob's and the french campus parking garageDetails
installation of hub parking pay machine equpment at 4131 & 4141 geary mob's and the french campus parking garage | $50,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2021 | 2190 Ofarrell St | installation hub parking pay machine equipment n/a maherDetails
installation hub parking pay machine equipment n/a maher | $30,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2021 | 2238 Geary Bl | installation hub parking pay machineDetails
installation hub parking pay machine | $50,000 |
| Aug 5, 2019 | Completed final sign-off May 2020 | 2238 Geary Bl | 4th fl ti- walls, millwork, finishes fire/life safety/mech under sep permitDetails
4th fl ti- walls, millwork, finishes fire/life safety/mech under sep permit | $100,000 |
| Jul 15, 2019 | Completed final sign-off Jun 2020 | 4141 Geary Bl | electrical work only. mep deferredDetails
electrical work only. mep deferred | $1,000 |
| Jun 28, 2019 | Completed final sign-off Nov 2020 | 1635 Divisadero St | 3rd and 4th floors - replace corridor flooring, paint corridor, replace corridor signage, replace corridor light fixtures, replace corridor ceiling tilesDetails
3rd and 4th floors - replace corridor flooring, paint corridor, replace corridor signage, replace corridor light fixtures, replace corridor ceiling tiles | $40,000 |
| Jun 18, 2019 | Completed final sign-off Jun 2020 | 4141 Geary Bl | install a pre-fab audiology testing booth in room g14 on 1st floor. n/a for maherDetails
install a pre-fab audiology testing booth in room g14 on 1st floor. n/a for maher | $85,000 |
| Mar 18, 2019 | Completed final sign-off Jan 2022 | 2241 Geary Bl | replace roof mounted cooling tower, replace roof mounted hydronic boiler, replace 2 water hydronic pumps, replace hydronic components, replace heat pumps, fan coil units. replace control systemDetails
replace roof mounted cooling tower, replace roof mounted hydronic boiler, replace 2 water hydronic pumps, replace hydronic components, replace heat pumps, fan coil units. replace control system | $200,000 |
| Jan 15, 2019 | Completed final sign-off Sep 2019 | 2238 Geary Bl | room remodel due to replacement of mammography equipment in e mammo room kaiser medical offices sfDetails
room remodel due to replacement of mammography equipment in e mammo room kaiser medical offices sf | $266,906 |
| Jan 14, 2019 | Completed final sign-off Jan 2020 | 1635 Divisadero St | 1st fl remodel e optometry space to health education room, 3rd fl remodel e health education room to expand exercise rehab and 2 new physical therapy treatment rooms. remodel e office space to 2 physical therapy roomsDetails
1st fl remodel e optometry space to health education room, 3rd fl remodel e health education room to expand exercise rehab and 2 new physical therapy treatment rooms. remodel e office space to 2 physical therapy rooms | $1,042,000 |
| Nov 7, 2018 | Expired or cancelled cancelled Jan 2026 | 2238 Geary Bl | replacement of existing boiler on the penthouse roof of the medical office building.Details
replacement of existing boiler on the penthouse roof of the medical office building. | $50,000 |
| Sep 21, 2018 | Completed final sign-off May 2019 | 2241 Geary Bl | revision to app#201708215444 to revise structural changes to freight elevator modernization. n/a for maherDetails
revision to app#201708215444 to revise structural changes to freight elevator modernization. n/a for maher | |
| Jul 26, 2018 | Completed final sign-off Jul 2019 | 4141 Geary Bl | elevator modernizationDetails
elevator modernization | $80,000 |
| Apr 26, 2018 | Completed final sign-off Sep 2019 | 4131 Geary Bl | replacement of (e) air unit (auu # 12) & exhaust fan (ef#12) located on the basement level including new pipe run from the roof to the air handling unit. the scope includes a wall enclosure to provide an extension of the (e) air intake shalft located @ grade level that serves ahu #12Details
replacement of (e) air unit (auu # 12) & exhaust fan (ef#12) located on the basement level including new pipe run from the roof to the air handling unit. the scope includes a wall enclosure to provide an extension of the (e) air intake shalft located @ grade level that serves ahu #12 | $425,000 |
| Mar 27, 2018 | Completed final sign-off Sep 2018 | 2238 Geary Bl | 3rd flr ti- 90 minutes roll over frill at reception, millwork, finishes, mep under sep permitDetails
3rd flr ti- 90 minutes roll over frill at reception, millwork, finishes, mep under sep permit | $50,000 |
| Feb 26, 2018 | Expired or cancelled cancelled Jan 2026 | 2238 Geary Bl | 7th flr-revision #201712085937 - new steel support structure above ceilinh. remove "disconnect and remove (e) procedure light, 192va, 12ov. safe off circuit in j-box. provide continued operation of circuit" from scope of work. new amico mira-led fixtureDetails
7th flr-revision #201712085937 - new steel support structure above ceilinh. remove "disconnect and remove (e) procedure light, 192va, 12ov. safe off circuit in j-box. provide continued operation of circuit" from scope of work. new amico mira-led fixture | |
| Dec 8, 2017 | Completed final sign-off Sep 2018 | 2238 Geary Bl | floors 2,3,5,6,7 & 8 replace existing procedure light fixtures with new procedure light fixturesDetails
floors 2,3,5,6,7 & 8 replace existing procedure light fixtures with new procedure light fixtures | $110,000 |
| Nov 9, 2017 | Expired or cancelled cancelled Feb 2024 | 1600 Owens St | interior constructio for in-fill of 1500 sq-ft of shell space to accommodate pet scan imaging and support services. scope includes mechanical, plumbing and electrical work.Details
interior constructio for in-fill of 1500 sq-ft of shell space to accommodate pet scan imaging and support services. scope includes mechanical, plumbing and electrical work. | $375,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2018 | 2200 Ofarrell St | power feeder and panel for imaging trailers at 2200 ofarrell.Details
power feeder and panel for imaging trailers at 2200 ofarrell. | $90,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 350 Saint Josephs Av | rerouting of emergency power for 350 st. joseph's ave. n/a maher ordinanceDetails
rerouting of emergency power for 350 st. joseph's ave. n/a maher ordinance | $79,750 |
| Aug 23, 2017 | Completed final sign-off Mar 2021 | 2200 Ofarrell St | improvement after demo. previously occupied by multi-story medical offices - exterior lanscaping - market plaza. reference to demo appln #201705227277Details
improvement after demo. previously occupied by multi-story medical offices - exterior lanscaping - market plaza. reference to demo appln #201705227277 | $903,100 |
| Aug 21, 2017 | Completed final sign-off May 2019 | 2241 Geary Bl | modernization of freight elevator controls and machinery , widening one existing door; n/a maherDetails
modernization of freight elevator controls and machinery , widening one existing door; n/a maher | $80,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2019 | 4131 Geary Bl | t.i. of corridor and elevator lobbies on basement and 1st floor. paint, carpet, light fixtures replacement.Details
t.i. of corridor and elevator lobbies on basement and 1st floor. paint, carpet, light fixtures replacement. | $118,000 |
| Jun 20, 2017 | Completed final sign-off Aug 2019 | 350 Saint Josephs Av | construction of 1 two story infill wall @ 350 saint joseph st. disconect build 2200 o'farrell @ 350 saint joseph st.Details
construction of 1 two story infill wall @ 350 saint joseph st. disconect build 2200 o'farrell @ 350 saint joseph st. | $40,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2017 | 4131 Geary Bl | installation of nre concrete pads and regarding portion of exterior lot - to accomodate trailerDetails
installation of nre concrete pads and regarding portion of exterior lot - to accomodate trailer | $80,000 |
| Jun 9, 2017 | Completed final sign-off Jan 2019 | 4141 Geary Bl | basement, 1/f, 2/f- t.i. of corridors & elevator lobbies on 3 floors, paint, carpet, ceiling tiles, light fixtures replacements & signage. n/a ordinance 155-13Details
basement, 1/f, 2/f- t.i. of corridors & elevator lobbies on 3 floors, paint, carpet, ceiling tiles, light fixtures replacements & signage. n/a ordinance 155-13 | $136,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 2238 Geary Bl | 1st fl pharmacy. add layer of security mesh & gyp.bp to existing perimeter walls where existing mesh does not occur. add security steel grill to windows. replace existing pharmacy perimeter doors&frames w/new metal doors&welded framed. 6th fl pharmacy-replace existing perimeter doors & frames w/newDetails
1st fl pharmacy. add layer of security mesh & gyp.bp to existing perimeter walls where existing mesh does not occur. add security steel grill to windows. replace existing pharmacy perimeter doors&frames w/new metal doors&welded framed. 6th fl pharmacy-replace existing perimeter doors & frames w/new | $117,338 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 4141 Geary Bl | 1st floor pharmacy. add layer of security mesh & gyp.bp to existing pharmacy perimeter walls. add security metal grills to existing windows. replace existing pharmacy perimeter doors & frames w/new metal doors & welded frames.Details
1st floor pharmacy. add layer of security mesh & gyp.bp to existing pharmacy perimeter walls. add security metal grills to existing windows. replace existing pharmacy perimeter doors & frames w/new metal doors & welded frames. | $287,338 |
| May 17, 2017 | Never finaled issued Jun 2017, no final | 1600 Owens St | 1st fl pharmacy. add layer of security mesh & gyp.bp to existing perimeter walls. add security steel grill at perimeter windows. replace existing pharmacy perimeter doors & frames w/new metal doors & welded framed. add new roll-down security door at lobby entry of pharmacy (not a required exit)Details
1st fl pharmacy. add layer of security mesh & gyp.bp to existing perimeter walls. add security steel grill at perimeter windows. replace existing pharmacy perimeter doors & frames w/new metal doors & welded framed. add new roll-down security door at lobby entry of pharmacy (not a required exit) | $320,231 |
| Mar 22, 2017 | Completed final sign-off Jul 2019 | 4141 Geary Bl | modernization of elevator controls and machinery partially per plan.Details
modernization of elevator controls and machinery partially per plan. | $200,000 |
| Mar 7, 2017 | Completed final sign-off Dec 2017 | 350 Saint Josephs Av | roof installation of new chiller and mechanical screen maher naDetails
roof installation of new chiller and mechanical screen maher na | $1,200,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2018 | 2241 Geary Bl | renovation of (e) retail and office space at 2241 geary blvd. to include: new millwork reception desk and work station, fixture display cases. lighting, new finishes and furniture. n/a maherDetails
renovation of (e) retail and office space at 2241 geary blvd. to include: new millwork reception desk and work station, fixture display cases. lighting, new finishes and furniture. n/a maher | $425,000 |
| Nov 4, 2016 | Completed final sign-off Dec 2017 | 1635 Divisadero St | 6th flr: renovation to include consult rms in 2 suites approx 5583 gross sf at 1635 divisadero st. arch scope: millwork, furniture, medical equip, interior finishes, mech, ele, plumb & structural includedDetails
6th flr: renovation to include consult rms in 2 suites approx 5583 gross sf at 1635 divisadero st. arch scope: millwork, furniture, medical equip, interior finishes, mech, ele, plumb & structural included | $850,000 |
| Oct 14, 2016 | Completed final sign-off Apr 2018 | 2238 Geary Bl | remodel (e) nurse's station, medical assistant station, storage & partial infusion area in the oncology department on the northeast wing of the 8th floor. alarm/sprinklers deferred.Details
remodel (e) nurse's station, medical assistant station, storage & partial infusion area in the oncology department on the northeast wing of the 8th floor. alarm/sprinklers deferred. | $310,000 |
| Apr 12, 2016 | Completed final sign-off Feb 2017 | 2241 Geary Bl | basement level - upgrade restrooms for accessibility per cbc section 11b-202-4 & install new finish floors, walls, countertops, toilet, partitions in the (e) men's & women's restrooms. compliance with maher ordinance no 155-13 not required.Details
basement level - upgrade restrooms for accessibility per cbc section 11b-202-4 & install new finish floors, walls, countertops, toilet, partitions in the (e) men's & women's restrooms. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Mar 31, 2016 | Completed final sign-off Dec 2016 | 4131 Geary Bl | per plumbing inspector request for app#201510169910, replace fixture in-kind in bathroomDetails
per plumbing inspector request for app#201510169910, replace fixture in-kind in bathroom | |
| Mar 30, 2016 | Completed final sign-off Apr 2016 | 4131 Geary Bl | revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage.Details
revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage. | $650,000 |
| Feb 10, 2016 | Completed final sign-off May 2017 | 350 Saint Josephs Av | install new platform lift (barrier removal) between floor 1 & 2, structural & electrical work as required. maher naDetails
install new platform lift (barrier removal) between floor 1 & 2, structural & electrical work as required. maher na | $350,000 |
| Jan 4, 2016 | Completed final sign-off Jun 2017 | 2238 Geary Bl | misc renovations to 4th, 5th, 6th, & 8th floors. interior non structural walls, glazing, ceiling, and finishes.Details
misc renovations to 4th, 5th, 6th, & 8th floors. interior non structural walls, glazing, ceiling, and finishes. | $1,200,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2017 | 350 Saint Josephs Av | ti - interior walls, doors, interior glazing, ceilings and finishes maher not reqDetails
ti - interior walls, doors, interior glazing, ceilings and finishes maher not req | $800,000 |
| Dec 16, 2015 | Completed final sign-off Jun 2017 | 2238 Geary Bl | modification of interior walls, doors, glazing and finishes and modification of mepDetails
modification of interior walls, doors, glazing and finishes and modification of mep | $200,000 |
| Sep 21, 2015 | Completed final sign-off Sep 2016 | 4131 Geary Bl | 1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers.Details
1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers. | $650,000 |
| May 27, 2015 | Completed final sign-off Oct 2015 | 450 06th Av | 2/f -minor alterations at the extg head and neck department on 2nd floor. work includes addition of power and data outlets, some modifications to extg casework and the conversion of an unused shower room into a small storage closet.Details
2/f -minor alterations at the extg head and neck department on 2nd floor. work includes addition of power and data outlets, some modifications to extg casework and the conversion of an unused shower room into a small storage closet. | $10,000 |
| Apr 30, 2015 | Completed final sign-off Dec 2016 | 2238 Geary Bl | revision to 201504022600: removal of notes by sffd for adding a smoke detector shutdown for the supply fans sf-7 and sf-10.Details
revision to 201504022600: removal of notes by sffd for adding a smoke detector shutdown for the supply fans sf-7 and sf-10. |