Theodore G. Garcia
- Listed as
- architect, attorney, designer, engineer
- Firm
- Bay City Mechanical Inc.
- Based in
- Richmond
- On San Francisco permits
- Mar 2005 to Aug 2021
60 permits since 2000 (engineer on 54 permits, architect on 4 permits, attorney on 1 permit, designer on 1 permit): 46 completed, 12 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2021 | Never finaled issued Feb 2022, no final | 1050 Ofarrell St | Related California Construction Llc | first time t.i. ref pa 201607142409. proposed salon located at current vacant retail space on level 2 including 1 ada restroom. architectural work only. no structural work. hair and nail services only, no massage. bldg occupancy classification = r2.1Details
first time t.i. ref pa 201607142409. proposed salon located at current vacant retail space on level 2 including 1 ada restroom. architectural work only. no structural work. hair and nail services only, no massage. bldg occupancy classification = r2.1 | $251,000 |
| Oct 8, 2019 | Completed final sign-off Feb 2021 | 390 01st St | Swinerton Builders | revision to pa# 2016/01/27/8125-s3 (arch / mep). mechanical - smoke control. ** maher: n/a **Details
revision to pa# 2016/01/27/8125-s3 (arch / mep). mechanical - smoke control. ** maher: n/a ** | |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 32 03rd St | Bay City Mechanical Inc | install new water source heat pump. ref pa #201905130389. maher naDetails
install new water source heat pump. ref pa #201905130389. maher na | $52,710 |
| Jul 31, 2019 | Completed final sign-off Aug 2020 | 210 Arkansas St | Gene Laico Construction Dba Gl Builders | revision to #2016-0301-0904 s3 (mep). addition of air conditioning @all units; ducting for units per stc/non-stc ext wall rating designations & use of natural ventilation in lieu of ducted osa where allowable. add 2-ducts at stc units that don't have feasible dusted osa routing. add fresh-100'sDetails
revision to #2016-0301-0904 s3 (mep). addition of air conditioning @all units; ducting for units per stc/non-stc ext wall rating designations & use of natural ventilation in lieu of ducted osa where allowable. add 2-ducts at stc units that don't have feasible dusted osa routing. add fresh-100's | $3,600,000 |
| May 13, 2019 | Completed final sign-off Nov 2019 | 246 01st St | Bcci Construction Company | basement, 1st, 2nd fl - new power & data, new breakrooms, new lighting & controls.Details
basement, 1st, 2nd fl - new power & data, new breakrooms, new lighting & controls. | $30,000 |
| May 13, 2019 | Completed final sign-off Jun 2019 | 246 01st St | Bcci Construction Company | 3rd, 4th, 5th, 6th fl - mechanical, electrical, plumbing, permit to install new fancoil system, branch selector, supply & return diffusers. new power, data, new lighting & controls. ref pa #201905080099.Details
3rd, 4th, 5th, 6th fl - mechanical, electrical, plumbing, permit to install new fancoil system, branch selector, supply & return diffusers. new power, data, new lighting & controls. ref pa #201905080099. | $85,000 |
| May 13, 2019 | Completed final sign-off Nov 2019 | 246 01st St | Bcci Construction Company | basement, 1st & 2nd fl - install new vrv fancoil system, new branch selector box, new supply and return diffusers. ref pa #201905080110.Details
basement, 1st & 2nd fl - install new vrv fancoil system, new branch selector box, new supply and return diffusers. ref pa #201905080110. | $85,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2021 | 1601 Mariposa St | revision to pa# 2016/03/03/1058-s3 (mech). addition of air conditioning to all apartments, reconfigure corridor vertilation in bldg# 1 & # 2 and trash room in bldg# 2. ventilation changes in non-stc areas from forced ventilation to natural. revision to arch drawing ** maher: n/a **Details
revision to pa# 2016/03/03/1058-s3 (mech). addition of air conditioning to all apartments, reconfigure corridor vertilation in bldg# 1 & # 2 and trash room in bldg# 2. ventilation changes in non-stc areas from forced ventilation to natural. revision to arch drawing ** maher: n/a ** | $5,940,000 | |
| Dec 4, 2018 | Completed final sign-off Aug 2019 | 973 Mission St | Guzman Construction Group Inc. | revision to pa #201803194050. mechanical work only. add 2 fsds #4 & #5. installation of methane detectors at basement level for wet lab. installation of interlock gas supply solenoid valve with exhaust fan.Details
revision to pa #201803194050. mechanical work only. add 2 fsds #4 & #5. installation of methane detectors at basement level for wet lab. installation of interlock gas supply solenoid valve with exhaust fan. | |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 110 Channel | Bay City Mechanical Inc | furnish and install 2 fsd's. install new ductwork from louver to fsd's. installation of duct smoke detectors under searate application.Details
furnish and install 2 fsd's. install new ductwork from louver to fsd's. installation of duct smoke detectors under searate application. | $6,320 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 973 Mission St | Guzman Construction Group Inc. | revision to pa #201703272457 & 2018-05-31-0678. amended mechanical.Details
revision to pa #201703272457 & 2018-05-31-0678. amended mechanical. | |
| Apr 10, 2018 | Completed final sign-off Jun 2018 | 101 California St | Skender Construction Llc | 39th fl: demolition of extg non-load bearing partitions. removal of extg ceiling tiles, drs, light fixutres & finishes. nw construction includes nw non-rated partitions, doors, ceiling tiles & finishes. asbestos containment & any hazardous materials abatement, if any, to be under seperate permit.Details
39th fl: demolition of extg non-load bearing partitions. removal of extg ceiling tiles, drs, light fixutres & finishes. nw construction includes nw non-rated partitions, doors, ceiling tiles & finishes. asbestos containment & any hazardous materials abatement, if any, to be under seperate permit. | $200,000 |
| Dec 19, 2017 | Completed final sign-off Jan 2018 | 20 California St | Bay City Mechanical Inc | 5/f: mech: install new toilet exhaust fan and ductwork. ref arch #201710252184.Details
5/f: mech: install new toilet exhaust fan and ductwork. ref arch #201710252184. | $6,450 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 851 Beach St | Bay City Mechanical Inc | extend ductwork from (e) vav box to new office and balance two zones. ref pa #201708316597. maher naDetails
extend ductwork from (e) vav box to new office and balance two zones. ref pa #201708316597. maher na | $9,400 |
| Nov 1, 2017 | Never finaled issued Jan 2018, no final | 855 Brannan St | Bay City Mechanical Inc | furnish & install (14) fourteen split heat pumps.shell & core only work under separet permit ref pa #201309045886& 201710131253 n/a maher ordinanceDetails
furnish & install (14) fourteen split heat pumps.shell & core only work under separet permit ref pa #201309045886& 201710131253 n/a maher ordinance | $390,000 |
| Oct 11, 2017 | Completed final sign-off Apr 2021 | 2800 Turk Bl | Cahill Contractors Llc. | interior renovation of (e)dinning hall within (e)education bldg; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walkingDetails
interior renovation of (e)dinning hall within (e)education bldg; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walking | $4,431,584 |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 110 Channel | Lend Lease (Us) Construction Inc | revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 1000 03rd St | Lend Lease (Us) Construction Inc | revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Apr 26, 2017 | Never finaled issued May 2017, no final | 525 Market St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | 28/f- title 24 compliance and mechanical work for t.i. pa#201701257920Details
28/f- title 24 compliance and mechanical work for t.i. pa#201701257920 | |
| Apr 25, 2017 | Completed final sign-off Jun 2017 | 353 Sacramento St | Bay City Mechanical Inc, Novo Construction Inc | 22nd floor - mechanical work for ti on ref pa 2016-1207-4362Details
22nd floor - mechanical work for ti on ref pa 2016-1207-4362 | $22,000 |
| Feb 22, 2017 | Never finaled issued Feb 2017, no final | 1 Embarcadero Center | Bay City Mechanical Inc | 1/f- fan coil installation with heating and cooling coils, furnish and install new supply and return ductwork. coordinate smoke detector shutdown for systems over 2000 cfm - fire alarm under separate permit ref pa 2016-1216-5141Details
1/f- fan coil installation with heating and cooling coils, furnish and install new supply and return ductwork. coordinate smoke detector shutdown for systems over 2000 cfm - fire alarm under separate permit ref pa 2016-1216-5141 | $70,000 |
| Jan 20, 2017 | Completed final sign-off Mar 2017 | 475 Sansome St | Sc Builders, Inc | 12th floor - mechanical & electrical for pa #201612064229. maher ord 155-13 naDetails
12th floor - mechanical & electrical for pa #201612064229. maher ord 155-13 na | $100,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2017 | 475 Sansome St | Sc Builders, Inc | 14/f- mechanical and electrical for 201611082216. n/a ordinance #155-13Details
14/f- mechanical and electrical for 201611082216. n/a ordinance #155-13 | $30,000 |
| Nov 16, 2016 | Completed final sign-off Oct 2017 | 1025 Sansome St | Gci, Inc | 1st floor - mechanical & elelctrical work - reference #201610119863.Details
1st floor - mechanical & elelctrical work - reference #201610119863. | $200,000 |
| Nov 15, 2016 | Never finaled issued Dec 2016, no final | 185 Berry St | Sc Builders, Inc | 6th fl: mechanical and electrical for project 201611021673. maher not reqDetails
6th fl: mechanical and electrical for project 201611021673. maher not req | $27,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829Details
15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829Details
14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829Details
16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829 | $124,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829Details
5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829 | $124,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2016 | 475 Sansome St | Sc Builders, Inc | 11th floor: mechanical and electrial for ref pa 2016 0706 1675 maher naDetails
11th floor: mechanical and electrial for ref pa 2016 0706 1675 maher na | $150,000 |
| Mar 23, 2016 | Completed final sign-off Apr 2019 | 2 South Park | Sc Builders, Inc | mep 2nd fl for 201601076539Details
mep 2nd fl for 201601076539 | $180,000 |
| Mar 15, 2016 | Completed final sign-off Jul 2016 | 199 Fremont St | Charles Pankow Builders Ltd | interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13Details
interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13 | $2,160,000 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 144 Townsend St | Bay City Mechanical Inc | 1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balancing. ref #201509116761. n/a maher ordinanceDetails
1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balancing. ref #201509116761. n/a maher ordinance | $200,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 595 Market St | Bay City Mechanical Inc | 27th floor - modify exisitng (3) vav zones, install new ductwork & diffusers, insulation as required by title 24, independent air & water balancing ddc ocntrols. ref #201509025959.Details
27th floor - modify exisitng (3) vav zones, install new ductwork & diffusers, insulation as required by title 24, independent air & water balancing ddc ocntrols. ref #201509025959. | $19,810 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 1 Embarcadero Center | Bay City Mechanical Inc | #1550- new supply ductwork, replace (e) pneumatic control valves for (e) perimeter induction units, replace (6) existing vav boxes, replace pneumatic vav box controls with ddc, replace all existing pneumatic t-stats with ddc. n/a ordinance #155-13Details
#1550- new supply ductwork, replace (e) pneumatic control valves for (e) perimeter induction units, replace (6) existing vav boxes, replace pneumatic vav box controls with ddc, replace all existing pneumatic t-stats with ddc. n/a ordinance #155-13 | $180,000 |
| Sep 25, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 13th floor: furnish and install 5 new hot water fancoils. furnish and install new suuply. return and exhaust ductwork.Details
13th floor: furnish and install 5 new hot water fancoils. furnish and install new suuply. return and exhaust ductwork. | $5,000 |
| Sep 25, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 17th floor: furnish and install 5 new hot water fancoils. furnish and install new supply. return and exhaust ductwork.Details
17th floor: furnish and install 5 new hot water fancoils. furnish and install new supply. return and exhaust ductwork. | $5,000 |
| Sep 22, 2015 | Completed final sign-off May 2017 | 30 03rd St | C C I Commercial Construction & Improv | ***previous address 26 03rd street***arch permit 201503050030 *** fabricate & install: new outside air ductwork, new condensor water risers insulation air water balancingDetails
***previous address 26 03rd street***arch permit 201503050030 *** fabricate & install: new outside air ductwork, new condensor water risers insulation air water balancing | $230,000 |
| Aug 4, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454Details
furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454 | $200,000 |
| Jul 31, 2015 | Completed final sign-off Feb 2016 | 1045 Bryant St | Bcci Construction Company | mechanical associated with pa#201507242382. n/a ordinance #155-13Details
mechanical associated with pa#201507242382. n/a ordinance #155-13 | $155,960 |
| May 14, 2015 | Completed final sign-off Aug 2015 | 2000 Post St | Bay City Mechanical Inc | install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625.Details
install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625. | $675,000 |
| Feb 23, 2015 | Expired or cancelled withdrawn Sep 2015 | 1000 Sansome St | replace eleven (11) rooftop hvac units (1) one boiler, (1) one cooling tower. install (1) one new outside air supply fan & toilet exhaust fan. parent permit 2014-0617-8678Details
replace eleven (11) rooftop hvac units (1) one boiler, (1) one cooling tower. install (1) one new outside air supply fan & toilet exhaust fan. parent permit 2014-0617-8678 | $165,000 | |
| Jan 16, 2014 | Completed final sign-off Oct 2014 | 1045 Bryant St | Bcci Construction Company | change note 1 on m0.1, change furnace schedule on m0.2, changes bubbles o n m2.1. all mechanical revision to pa#201310310824. compliance with ordinance 155-13 not required.Details
change note 1 on m0.1, change furnace schedule on m0.2, changes bubbles o n m2.1. all mechanical revision to pa#201310310824. compliance with ordinance 155-13 not required. | $1,500 |
| Feb 13, 2012 | Expired or cancelled expired Dec 2013 | 595 Market St | Cannon Constructors North Inc | 27th floor suite 2700 - demolish linear slot at the perimeter and install 2'x2' ceiling diffusers, replace five vav boxes, and air and water balancing. reference #2012.01.18.2406.Details
27th floor suite 2700 - demolish linear slot at the perimeter and install 2'x2' ceiling diffusers, replace five vav boxes, and air and water balancing. reference #2012.01.18.2406. | $62,400 |
| Dec 14, 2011 | Completed final sign-off Dec 2011 | 275 Battery St | Allied Heating & Air Conditioning | suite #1375-install 2 ton water source heat pump, minor duct revisions, controls & balancing. refer to arch pa# 2011-1123-9495Details
suite #1375-install 2 ton water source heat pump, minor duct revisions, controls & balancing. refer to arch pa# 2011-1123-9495 | $16,950 |
| Aug 19, 2011 | Never finaled issued Nov 2011, no final | 375 Sutter St | Hathaway Dinwiddie Co. | interior remodel all floors new ada rr stairs & elevator. voluntary structural upgrades.Details
interior remodel all floors new ada rr stairs & elevator. voluntary structural upgrades. | $8,534,270 |
| Sep 24, 2009 | Completed final sign-off Jan 2010 | 333 Ofarrell St | Allied Heating & Air Conditioning | mechanical replacement of supply & return fan motors, hot water coils, chilled water coils, control dampers, electrical disconnect reconnect, reinstall smoke duct detectors, air & water balance to original design (location @ 12th. flr. penthouse).Details
mechanical replacement of supply & return fan motors, hot water coils, chilled water coils, control dampers, electrical disconnect reconnect, reinstall smoke duct detectors, air & water balance to original design (location @ 12th. flr. penthouse). | $435,000 |
| Apr 20, 2009 | Completed final sign-off Apr 2009 | 303 02nd St | Swinerton Builders | revision to appl #200902252772 to provide rated wall, door, smoke damper, etc at electrical room.Details
revision to appl #200902252772 to provide rated wall, door, smoke damper, etc at electrical room. | $10,000 |
| Apr 13, 2009 | Never finaled issued May 2009, no final | 303 02nd St | Allied Heating & Air Conditioning | 9th & 10th floor relocate (e) liebert crac units hvac & associated alternations to plumbing.Details
9th & 10th floor relocate (e) liebert crac units hvac & associated alternations to plumbing. | $98,000 |
| Dec 15, 2008 | Completed final sign-off Feb 2009 | 1690 Union St | Anleu Construction | ventilation for 4 rooms in pilates/yoga studio, gas furnace for heat in yoga room, ref #200809020569.Details
ventilation for 4 rooms in pilates/yoga studio, gas furnace for heat in yoga room, ref #200809020569. | $6,500 |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 303 02nd St | Allied Heating & Air Conditioning | 5th floor-new hvac for remodel, new mechanical installation. refer to pa# 2008-0813-9028 (architectural bldg permit)Details
5th floor-new hvac for remodel, new mechanical installation. refer to pa# 2008-0813-9028 (architectural bldg permit) | $70,500 |
| Sep 29, 2008 | Completed final sign-off Nov 2008 | 303 02nd St | Allied Heating & Air Conditioning | 8th floor partial tenant improvement hvac mechanical permit (bldg app#200807227228)Details
8th floor partial tenant improvement hvac mechanical permit (bldg app#200807227228) | $35,000 |
| Sep 24, 2007 | Completed final sign-off Jul 2008 | 500 Sansome St | Allied Heating & Air Conditioning | demolish (e) air handler on 6th fl. install (n) airhandler and connect to the (e)chilled water. install (n) steam to hot water heat exchanger. install (n) ductwork and piping, see pa# 2007.06.01.2773 for 6th fl upgrades.Details
demolish (e) air handler on 6th fl. install (n) airhandler and connect to the (e)chilled water. install (n) steam to hot water heat exchanger. install (n) ductwork and piping, see pa# 2007.06.01.2773 for 6th fl upgrades. | $145,000 |
| Aug 10, 2007 | Never finaled issued Aug 2007, no final | 500 Sansome St | Allied Heating & Air Conditioning | isntall 13 new vav boxes new distribution ductwork and new diffusers ref ap #200706042883 work on 6th floorDetails
isntall 13 new vav boxes new distribution ductwork and new diffusers ref ap #200706042883 work on 6th floor | $42,500 |
| Jan 2, 2007 | Completed final sign-off Mar 2007 | 649 Front St | Allied Heating & Air Conditioning | install 2 new roof top package heat pumps and convert to (e) duct work. sd's for each heat pump will be insulated on seperate permit application.Details
install 2 new roof top package heat pumps and convert to (e) duct work. sd's for each heat pump will be insulated on seperate permit application. | $16,480 |
| Sep 11, 2006 | Completed final sign-off Oct 2007 | 1025 Battery St | Allied Heating & Air Conditioning | install 3 fancoil units and 3 roof mounted condensing units ref drawings 2006/05/31/2825Details
install 3 fancoil units and 3 roof mounted condensing units ref drawings 2006/05/31/2825 | $114,000 |
| Sep 16, 2005 | Completed final sign-off Oct 2005 | 235 02nd St | Allied Heating & Air Conditioning | install 2 new vav boxes & reconfigure distribution per appl#200507278736Details
install 2 new vav boxes & reconfigure distribution per appl#200507278736 | $20,000 |
| Jul 21, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Allied Heating & Air Conditioning | hvac tenant improvement in basement. install 3 new vav zones and ductwork. install 2 new smoke/fireDetails
hvac tenant improvement in basement. install 3 new vav zones and ductwork. install 2 new smoke/fire | $38,000 |
| Apr 6, 2005 | Completed final sign-off Apr 2005 | 1118 Harrison St | Allied Heating & Air Conditioning | provide and install 3-ton dudless split heat pump.Details
provide and install 3-ton dudless split heat pump. | $10,000 |
| Mar 3, 2005 | Completed final sign-off Jun 2005 | 555 California St | Allied Heating & Air Conditioning | relocate supply & return diffusers & add new supply runs. install 4 new transfer fans #3/f onlyDetails
relocate supply & return diffusers & add new supply runs. install 4 new transfer fans #3/f only | $100,000 |