Related California Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Aug 2026
- Last 24 months
- 14 permits filed
29 permits since 2000: 13 completed, 12 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 150 Oak St | evacuation for signage for phase 2. no associated increase to student population.Details
evacuation for signage for phase 2. no associated increase to student population. | $55,600 |
| Jun 29, 2026 | In progress issued Jul 2026 | 150 Oak St | evacuation signage for phase 1b.no associated increase to student populationDetails
evacuation signage for phase 1b.no associated increase to student population | $40,573 |
| Apr 7, 2026 | In progress issued Sep 2026 | 2415 Pierce St | (e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking.Details
(e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking. | $274,150 |
| Mar 6, 2026 | In progress issued Apr 2026 | 150 Oak St | mechanical energy compliance update to issued pa# 2025-09-09-4851. previously, the project pursued the prescriptive approach & has switched gears to performance approach for mechanical title-24 building energy compliance. no associated increase to student population.Details
mechanical energy compliance update to issued pa# 2025-09-09-4851. previously, the project pursued the prescriptive approach & has switched gears to performance approach for mechanical title-24 building energy compliance. no associated increase to student population. | |
| Mar 4, 2026 | Completed final sign-off Aug 2026 | 150 Oak St | install a complete emergency responder radio coverage system (errcs) in accordance with 2022 calfire code ss510 and nfpa 1225-2022 edition.Details
install a complete emergency responder radio coverage system (errcs) in accordance with 2022 calfire code ss510 and nfpa 1225-2022 edition. | $50,000 |
| Feb 25, 2026 | In progress issued Jun 2026 | 150 Oak St | ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req.Details
ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req. | $750,000 |
| Feb 20, 2026 | In progress issued Apr 2026 | 150 Oak St | ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip.Details
ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip. | $16,200,000 |
| Dec 29, 2025 | In progress issued May 2026 | 150 Oak St | ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty willDetails
ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty will | $180,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 150 Oak St | rev to reconcile architectural floor plans re-issue pa#: 202503172389 (1b) and 202509094851 (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with minor interior partition plan adjustments. work isDetails
rev to reconcile architectural floor plans re-issue pa#: 202503172389 (1b) and 202509094851 (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with minor interior partition plan adjustments. work is | |
| Nov 26, 2025 | In progress issued May 2026 | 150 Oak St | phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen.Details
phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen. | $15,000,000 |
| Oct 20, 2025 | In progress issued Oct 2025 | 150 Oak St | 300 (e) window replacement - replace (e) steel sash, single-light, non-tempered w/ high performing aluminum windows deisgn w/ tempered, insulated glass & low-e energy efficient coating. same window divisions as (e) but greater energy efficieny & bldg code req.in size opening & safety glazing.Details
300 (e) window replacement - replace (e) steel sash, single-light, non-tempered w/ high performing aluminum windows deisgn w/ tempered, insulated glass & low-e energy efficient coating. same window divisions as (e) but greater energy efficieny & bldg code req.in size opening & safety glazing. | $3,600,000 |
| Sep 24, 2025 | In progress issued Dec 2025 | 150 Oak St | ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population.Details
ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population. | $13,500,000 |
| Sep 8, 2025 | In progress issued Oct 2025 | 588 Mission Bay Blvd North Bl | excavate and shore tunnels underneath the pile supported podium slab so that the plumbing maintrunk lines can be replaced and the branch linerepaired or replaced as required. access to the underside of the pile supported podium slab will be made through openings in the podium slab floor & exteriorDetails
excavate and shore tunnels underneath the pile supported podium slab so that the plumbing maintrunk lines can be replaced and the branch linerepaired or replaced as required. access to the underside of the pile supported podium slab will be made through openings in the podium slab floor & exterior | $8,000,000 |
| Mar 17, 2025 | In progress issued Jun 2025 | 150 Oak St | ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f.Details
ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f. | $1,200,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2021 | 1500 Mission St | doors shall be provided in 2 locations to comply with cbc 11b-404.3.2 maneuvering clearance exception. provide uninterruptible power supply that operates door to open position in building power-loss event.Details
doors shall be provided in 2 locations to comply with cbc 11b-404.3.2 maneuvering clearance exception. provide uninterruptible power supply that operates door to open position in building power-loss event. | $5,000 |
| Sep 8, 2021 | Completed final sign-off Jan 2023 | 1001 Van Ness Av | revision to the issued s2 (arch/mep) ref pa 201607142409. to add clouded noted stating "employee use only bbq kitchen" for outdoors on levels 5, 11 & roof on architectural sheets of residential care facility for elderly. no other work done. bldg occupancy class r2.1Details
revision to the issued s2 (arch/mep) ref pa 201607142409. to add clouded noted stating "employee use only bbq kitchen" for outdoors on levels 5, 11 & roof on architectural sheets of residential care facility for elderly. no other work done. bldg occupancy class r2.1 | |
| Sep 1, 2021 | Completed final sign-off Jan 2023 | 1001 Van Ness Av | mech only rev to pa201607142409-s2: delete sev 6in fire smoke dampers/transfer ducts that act as trans air from telecom/elec room to housekeeping/jan closets on 6-14/fl.delete ceiling fsd located in level 1fsae elevator lobby. bldg occupancy r2.1Details
mech only rev to pa201607142409-s2: delete sev 6in fire smoke dampers/transfer ducts that act as trans air from telecom/elec room to housekeeping/jan closets on 6-14/fl.delete ceiling fsd located in level 1fsae elevator lobby. bldg occupancy r2.1 | |
| Aug 24, 2021 | Completed final sign-off Aug 2022 | 1500 Mission St | revision to pa#202009114000: change type iib to va; int work: bsmt thru 2/f, minor int demo, fl openings at stair & duct shafts, n partitions, stair, ceiling, casewk, finishes & restrms within e shell. mep on sep permit. ext work: n occupied roof deck & landscaping added to e east roof deck,etcDetails
revision to pa#202009114000: change type iib to va; int work: bsmt thru 2/f, minor int demo, fl openings at stair & duct shafts, n partitions, stair, ceiling, casewk, finishes & restrms within e shell. mep on sep permit. ext work: n occupied roof deck & landscaping added to e east roof deck,etc | |
| Aug 4, 2021 | Never finaled issued Feb 2022, no final | 1050 Ofarrell St | first time t.i. ref pa 201607142409. proposed salon located at current vacant retail space on level 2 including 1 ada restroom. architectural work only. no structural work. hair and nail services only, no massage. bldg occupancy classification = r2.1Details
first time t.i. ref pa 201607142409. proposed salon located at current vacant retail space on level 2 including 1 ada restroom. architectural work only. no structural work. hair and nail services only, no massage. bldg occupancy classification = r2.1 | $251,000 |
| Feb 19, 2021 | Completed final sign-off Nov 2022 | 430 Folsom St | accessible restroom upgrade for current vacant tenant space. t.i. under seperate future permit. mechanical, electrical, plumbing to be design build under seperate permit.Details
accessible restroom upgrade for current vacant tenant space. t.i. under seperate future permit. mechanical, electrical, plumbing to be design build under seperate permit. | $15,000 |
| Feb 17, 2021 | Completed final sign-off Dec 2021 | 1560 Mission St | adminstrative permit to update pa# 201905039670 to corect address 1560 mission s, previously assigned to 1500 mission st. permit is for 33,000 sqft tenant improvement for equinox gym.Details
adminstrative permit to update pa# 201905039670 to corect address 1560 mission s, previously assigned to 1500 mission st. permit is for 33,000 sqft tenant improvement for equinox gym. | |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a **Details
security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a ** | $2,000 |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a **Details
garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a ** | $100,000 |
| Dec 3, 2020 | Completed final sign-off Aug 2022 | 1500 Mission St | deferred submittal for mep, fire alarms & fire sprinklers only. all arch & strl, planning, dbi, bsm, puc, & dfcu scopes submitted under pa#2020-0911-4000 & 2021-0824-7070.Details
deferred submittal for mep, fire alarms & fire sprinklers only. all arch & strl, planning, dbi, bsm, puc, & dfcu scopes submitted under pa#2020-0911-4000 & 2021-0824-7070. | $250,000 |
| Oct 25, 2020 | Expired or cancelled withdrawn Sep 2021 | 1500 Mission St | tenant improvement. exterior work: (n) landscaped roof & deck, modified openings at level 2, roof-top mechanical equipment. no. exterior signage. all interior work is being submitted under a separate permit.Details
tenant improvement. exterior work: (n) landscaped roof & deck, modified openings at level 2, roof-top mechanical equipment. no. exterior signage. all interior work is being submitted under a separate permit. | $400,000 |
| Sep 11, 2020 | Completed final sign-off Aug 2022 | 1500 Mission St | change of use from office to health services on basement and first(ground) flr. basement-2/f-minor interior demo, floor openings @ stair & duct shaft, new partitions, stair ceilings, casework, finishes, restrooms within (e) shell. ref bpa#201805169291. mep/sprinklers/alarm under separate permit.Details
change of use from office to health services on basement and first(ground) flr. basement-2/f-minor interior demo, floor openings @ stair & duct shaft, new partitions, stair ceilings, casework, finishes, restrooms within (e) shell. ref bpa#201805169291. mep/sprinklers/alarm under separate permit. | $1,396,000 |
| Aug 7, 2020 | Completed final sign-off Feb 2023 | 1001 Van Ness Av | for record purposes only re: approved pa #2016-0714-2409 s: unit count change from 215 to 208. clarifiy building occupancy classification as r-2.1.Details
for record purposes only re: approved pa #2016-0714-2409 s: unit count change from 215 to 208. clarifiy building occupancy classification as r-2.1. | |
| May 3, 2019 | Completed final sign-off Dec 2021 | 1500 Mission St | proposed fitness club on basement, 1st and 2nd floors within (e) building. first time t.i., includes structural, non structural partitions, ceilings, doors, flooring, fixtures, ele/plm/etc **maher n/a**Details
proposed fitness club on basement, 1st and 2nd floors within (e) building. first time t.i., includes structural, non structural partitions, ceilings, doors, flooring, fixtures, ele/plm/etc **maher n/a** | $1,350,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2023 | 1001 Van Ness Av | to erect 13 stories, no basement, type 1-a, 215 units residential care facility for the elderly, retail, parking building.Details
to erect 13 stories, no basement, type 1-a, 215 units residential care facility for the elderly, retail, parking building. | $93,600,000 |