Skender Construction Llc
- Based in
- Chicago
- On San Francisco permits
- Mar 2016 to Feb 2019
- Last 24 months
- 0 permits filed
39 permits since 2000: 36 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2019 | Completed final sign-off Mar 2019 | 50 Beale St | revision to ti #201807063865. existing building does not have 2-way communication in place and has release button for egress, removing 2-way communication call out. unable to comply with cbc 1010.1.9.12 - disable card readers and unlock doors until 2 way comm is installed under separate permit.Details
revision to ti #201807063865. existing building does not have 2-way communication in place and has release button for egress, removing 2-way communication call out. unable to comply with cbc 1010.1.9.12 - disable card readers and unlock doors until 2 way comm is installed under separate permit. | |
| Feb 7, 2019 | Never finaled issued Feb 2019, no final | 75 Hawthorne St | installing 4 evac sign plaques on the 5th fl.Details
installing 4 evac sign plaques on the 5th fl. | $3,600 |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 560 Mission St | 26th floor: revision to app#201804136286. revise exiting from elevator lobby. n/a for maherDetails
26th floor: revision to app#201804136286. revise exiting from elevator lobby. n/a for maher | |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 560 Mission St | 25th floor: revision to app#201804136280. revise exiting from elevator lobby. n/a for maherDetails
25th floor: revision to app#201804136280. revise exiting from elevator lobby. n/a for maher | |
| Oct 31, 2018 | Expired or cancelled cancelled Mar 2019 | 101 Mission St | ste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferredDetails
ste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferred | $550,000 |
| Sep 28, 2018 | Completed final sign-off Jun 2019 | 75 Hawthorne St | the scope of work is for tenant improvement on the partial 5th floor of 75 hawthorne.includes demolition & construction of non structural partitions, doors, interioe glazing, ceiling light fixtures, millwork & finishes no change in occupancy life safety mech,electrical & plumbing under seperate permDetails
the scope of work is for tenant improvement on the partial 5th floor of 75 hawthorne.includes demolition & construction of non structural partitions, doors, interioe glazing, ceiling light fixtures, millwork & finishes no change in occupancy life safety mech,electrical & plumbing under seperate perm | $818,837 |
| Sep 18, 2018 | Completed final sign-off Jul 2020 | 1625 Post St | ground floor mep t.i. for restaurant. ref pa 201806252835Details
ground floor mep t.i. for restaurant. ref pa 201806252835 | $750,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | 9th flr - 5 evac maps. 2018.0706.3865 maher naDetails
9th flr - 5 evac maps. 2018.0706.3865 maher na | $500 |
| Sep 14, 2018 | Completed final sign-off Oct 2018 | 580 California St | 18th fl - evacuation maps. ref pa 2018-0627-3154Details
18th fl - evacuation maps. ref pa 2018-0627-3154 | $1,000 |
| Jul 6, 2018 | Completed final sign-off Mar 2019 | 50 Beale St | 9th flr- light demo. int ti - new wall construction, lighting, finishes. restrooms, ada accessibility upgradesDetails
9th flr- light demo. int ti - new wall construction, lighting, finishes. restrooms, ada accessibility upgrades | $3,000,000 |
| Jun 27, 2018 | Completed final sign-off Oct 2018 | 580 California St | 18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community roomDetails
18th flr - commercial ti - demo and install walls, doors, refinish tile at elevator lobby, install new carpet to wall covering throughout community room. new power and data for community room conference rooms. new lighting and controls for community room | $500,000 |
| Jun 25, 2018 | Completed final sign-off Sep 2019 | 1625 Post St | interior remodel of an (e) restaurant, new configuration of mezz & 1st floor with occupant loads, new type i hood and fan, new teak wood rated class b and new stairwell to mezz. sffd assembly permit req.ul300, sprinklers, fire alarm sep/permit.Details
interior remodel of an (e) restaurant, new configuration of mezz & 1st floor with occupant loads, new type i hood and fan, new teak wood rated class b and new stairwell to mezz. sffd assembly permit req.ul300, sprinklers, fire alarm sep/permit. | $2,500,000 |
| Jun 19, 2018 | Completed final sign-off Oct 2018 | 100 Montgomery St | 6th floor: mep only in ref app#201805239908. redistribute ductwork. install 1 transfer fan at pantry. new power and data for confrence rooms and pantry area. new lighting and controls. install ada fixtures.n/a for maherDetails
6th floor: mep only in ref app#201805239908. redistribute ductwork. install 1 transfer fan at pantry. new power and data for confrence rooms and pantry area. new lighting and controls. install ada fixtures.n/a for maher | |
| May 23, 2018 | Completed final sign-off May 2019 | 100 Montgomery St | #600: partial renovation of existing tenant space including improvements to reception and the replacement of existing office space with new pantry and employee break area. no structural work. mep & life safety deferredDetails
#600: partial renovation of existing tenant space including improvements to reception and the replacement of existing office space with new pantry and employee break area. no structural work. mep & life safety deferred | $450,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2019 | 560 Mission St | 26th fl full floor interior ti, non structural amep included, includes elevator core, lobbies, and restrooms. fire under separate permits (sprinklers, alarm, two-way communication)Details
26th fl full floor interior ti, non structural amep included, includes elevator core, lobbies, and restrooms. fire under separate permits (sprinklers, alarm, two-way communication) | $2,470,776 |
| Apr 13, 2018 | Completed final sign-off Aug 2019 | 560 Mission St | 25th fl full floor tenant improvement. amep included, 1-hr idf rooms, demo to elevator lobby doors. new controll egress and two fire smoke dampers. sprinklers, two communication and fire alarm separate permits.Details
25th fl full floor tenant improvement. amep included, 1-hr idf rooms, demo to elevator lobby doors. new controll egress and two fire smoke dampers. sprinklers, two communication and fire alarm separate permits. | $2,462,856 |
| Apr 10, 2018 | Completed final sign-off Oct 2018 | 450 Bryant St | structural work on fixed seating assembly area in reference to permit #201803153757. maher naDetails
structural work on fixed seating assembly area in reference to permit #201803153757. maher na | $45,000 |
| Apr 10, 2018 | Completed final sign-off Jun 2018 | 101 California St | 39th fl: demolition of extg non-load bearing partitions. removal of extg ceiling tiles, drs, light fixutres & finishes. nw construction includes nw non-rated partitions, doors, ceiling tiles & finishes. asbestos containment & any hazardous materials abatement, if any, to be under seperate permit.Details
39th fl: demolition of extg non-load bearing partitions. removal of extg ceiling tiles, drs, light fixutres & finishes. nw construction includes nw non-rated partitions, doors, ceiling tiles & finishes. asbestos containment & any hazardous materials abatement, if any, to be under seperate permit. | $200,000 |
| Apr 5, 2018 | Completed final sign-off Oct 2018 | 450 Bryant St | 1st/2nd flr - mep work for ref 201803153757 install new supply grilles, low pressure ductworl. provide new lighting & branch circuiting to (e) panel, maintaned (e) power/signal outlets and provide new power branch circuiting and delivery systems as reqDetails
1st/2nd flr - mep work for ref 201803153757 install new supply grilles, low pressure ductworl. provide new lighting & branch circuiting to (e) panel, maintaned (e) power/signal outlets and provide new power branch circuiting and delivery systems as req | |
| Apr 2, 2018 | Completed final sign-off Apr 2018 | 160 Spear St | ground flr. minimal ceiling demolition. demolition of gyp soffit, turning sprinkler heads up. safetying off electrical elements and painting new exposed ceiling to match existing. ref. sprinkler permit #201803264548Details
ground flr. minimal ceiling demolition. demolition of gyp soffit, turning sprinkler heads up. safetying off electrical elements and painting new exposed ceiling to match existing. ref. sprinkler permit #201803264548 | $25,000 |
| Apr 2, 2018 | Completed final sign-off Jul 2020 | 1625 Post St | relocate exterior door at post st. entrance from north facade at post st to west face of restaurant (separate ti) near valet entrance of hotel. relocate door would eleminate 18" of grade change from post st to interior of restaurant creating more accessible entrance. separate structural submittal.Details
relocate exterior door at post st. entrance from north facade at post st to west face of restaurant (separate ti) near valet entrance of hotel. relocate door would eleminate 18" of grade change from post st to interior of restaurant creating more accessible entrance. separate structural submittal. | $50,000 |
| Mar 30, 2018 | Completed final sign-off Apr 2018 | 167 Jessie St | attache vinyl sign to interior of window/doorDetails
attache vinyl sign to interior of window/door | |
| Mar 28, 2018 | Completed final sign-off Jun 2018 | 760 Market St | minor interior demo of millwork, drop ceiling, and paint in order to white box the space for the landlord maher na. ab-017.Details
minor interior demo of millwork, drop ceiling, and paint in order to white box the space for the landlord maher na. ab-017. | $20,000 |
| Mar 19, 2018 | Completed final sign-off Aug 2018 | 167 Jessie St | revision to 201612286096/r1 - lock sets for restroom, kitchen outlets, ele for ada buttons and adding assistaove listening device, ele panel relocationDetails
revision to 201612286096/r1 - lock sets for restroom, kitchen outlets, ele for ada buttons and adding assistaove listening device, ele panel relocation | |
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 450 Bryant St | general renovation of finishes, lighting addition of new reception and seating staircase between 1" and 2nd fllor - mep defered maher na. assembly & storage area under separate permit.Details
general renovation of finishes, lighting addition of new reception and seating staircase between 1" and 2nd fllor - mep defered maher na. assembly & storage area under separate permit. | $550,000 |
| Feb 20, 2018 | Completed final sign-off Oct 2018 | 450 Bryant St | mep for 201802090869Details
mep for 201802090869 | |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 450 Bryant St | 3rd floor - refresh finishes, remodel of (e) pantry, addition of new small rooms. including "non structural framing, drywall ceiling, addition of drinking fountain. no change in use in occupancy count. no change in egressDetails
3rd floor - refresh finishes, remodel of (e) pantry, addition of new small rooms. including "non structural framing, drywall ceiling, addition of drinking fountain. no change in use in occupancy count. no change in egress | $700,000 |
| Dec 1, 2017 | Completed final sign-off Aug 2018 | 167 Jessie St | revision to app#201612286096: change pocket to swing doors, shifting location of walls, minor millwork and furring of wall around pipe. n/a for maher.Details
revision to app#201612286096: change pocket to swing doors, shifting location of walls, minor millwork and furring of wall around pipe. n/a for maher. | |
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 550 Kearny St | demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lightingDetails
demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting | $220,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 101 Mission St | 3/f: electrical upgrades to existing office space. title 24 compliance.Details
3/f: electrical upgrades to existing office space. title 24 compliance. | $70,000 |
| Oct 27, 2017 | Completed final sign-off Apr 2018 | 50 California St | demo ductwork, install ductwork, install new exhaust fan, relocate thermostat. provide new lighting and branch circuiting to exist panel. maintained some of the ex power and signal outlets and provide additonal new power branch circuiting and raceway systems as required to new power and signal outleDetails
demo ductwork, install ductwork, install new exhaust fan, relocate thermostat. provide new lighting and branch circuiting to exist panel. maintained some of the ex power and signal outlets and provide additonal new power branch circuiting and raceway systems as required to new power and signal outle | $50,000 |
| Oct 6, 2017 | Completed final sign-off Jan 2018 | 550 Kearny St | 7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a.Details
7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a. | $260,520 |
| Sep 14, 2017 | Completed final sign-off Apr 2018 | 50 California St | 23rd fl/suite 2300: ti include demo of non-structural partitions and build back of (n) partitions. all (n) or revised meps life safety and sprinklers will be design build if needed and submitted separately. bldg is fully sprinklered. maher naDetails
23rd fl/suite 2300: ti include demo of non-structural partitions and build back of (n) partitions. all (n) or revised meps life safety and sprinklers will be design build if needed and submitted separately. bldg is fully sprinklered. maher na | $78,000 |
| Jun 30, 2017 | Completed final sign-off Mar 2018 | 1 Front St | new type 2 kitchen hood, makeup air unit and associated duct work, piping air outlets and controlsDetails
new type 2 kitchen hood, makeup air unit and associated duct work, piping air outlets and controls | $150,000 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 201 03rd St | revision to pa 2016-1031-1523 installation of doors in game room for noise reduction.Details
revision to pa 2016-1031-1523 installation of doors in game room for noise reduction. | $40,000 |
| Dec 28, 2016 | Completed final sign-off Aug 2018 | 167 Jessie St | ti- portion of 3rd & 4th flr including: a) tie into (e) bld systems for plumb, ele & hvac. b) construction of offices, storage space, meeting rooms, staff kitchenette. c) construct ada bathrooms. d) install ff&e ground floor entry & 3rd/4th flr offices maher naDetails
ti- portion of 3rd & 4th flr including: a) tie into (e) bld systems for plumb, ele & hvac. b) construction of offices, storage space, meeting rooms, staff kitchenette. c) construct ada bathrooms. d) install ff&e ground floor entry & 3rd/4th flr offices maher na | $950,000 |
| Dec 6, 2016 | Completed final sign-off Feb 2017 | 417 Montgomery St | 4th floor, suite 400 ti new open office space area and new private office. electrical includedDetails
4th floor, suite 400 ti new open office space area and new private office. electrical included | $22,000 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 201 03rd St | 7th fl: minor intrerior ti on a single tenant floor including selective demo, partitions, ceiling and finish, mech and elec work. life safety deferred.Details
7th fl: minor intrerior ti on a single tenant floor including selective demo, partitions, ceiling and finish, mech and elec work. life safety deferred. | $250,000 |
| Mar 10, 2016 | Completed final sign-off Jun 2016 | 101 Mission St | on 3rd floor - suite #320- new conference, new break area. n/a ordinance #155-13 work includes arch and mepDetails
on 3rd floor - suite #320- new conference, new break area. n/a ordinance #155-13 work includes arch and mep | $169,993 |