Bay City Mechanical Inc
- Based in
- Richmond
- On San Francisco permits
- Jun 2001 to Nov 2025
- Last 24 months
- 1 permit filed
37 permits since 2000: 20 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 10 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2025 | Completed final sign-off Mar 2026 | 2 Embarcadero Center | 3rd floor: hvac work including installation of 4 fan coil units and 1 supply for the atrium area(front) of the 3rd floor. this will include new electrical under different permit/contrators) not moving existing walls, no seismic retrofit, accessible entrance and legalizing a unit.ref# 202403188032Details
3rd floor: hvac work including installation of 4 fan coil units and 1 supply for the atrium area(front) of the 3rd floor. this will include new electrical under different permit/contrators) not moving existing walls, no seismic retrofit, accessible entrance and legalizing a unit.ref# 202403188032 | $55,009 |
| Oct 17, 2023 | Completed final sign-off Aug 2025 | 180 Sansome St | replacing fusible link smoke dampers with new automated fire smoke dampers.Details
replacing fusible link smoke dampers with new automated fire smoke dampers. | $369,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 32 03rd St | install new water source heat pump. ref pa #201905130389. maher naDetails
install new water source heat pump. ref pa #201905130389. maher na | $52,710 |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 705 Market St | g/f: install new water source heat pump and inline supply fan for future tenant developement. ref app#201903155299Details
g/f: install new water source heat pump and inline supply fan for future tenant developement. ref app#201903155299 | $83,400 |
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 735 Market St | duct modifications to 2 fancoils distribution, controls, insulation and air balancingDetails
duct modifications to 2 fancoils distribution, controls, insulation and air balancing | $21,300 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 110 Channel | furnish and install 2 fsd's. install new ductwork from louver to fsd's. installation of duct smoke detectors under searate application.Details
furnish and install 2 fsd's. install new ductwork from louver to fsd's. installation of duct smoke detectors under searate application. | $6,320 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | minor ductwork demolition. furnish and install 4 water sorce heat pumps. new ductwork and diffusers, controls and balancing. ref app#201804186646Details
minor ductwork demolition. furnish and install 4 water sorce heat pumps. new ductwork and diffusers, controls and balancing. ref app#201804186646 | $122,400 |
| Dec 19, 2017 | Completed final sign-off Jan 2018 | 20 California St | 5/f: mech: install new toilet exhaust fan and ductwork. ref arch #201710252184.Details
5/f: mech: install new toilet exhaust fan and ductwork. ref arch #201710252184. | $6,450 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 851 Beach St | extend ductwork from (e) vav box to new office and balance two zones. ref pa #201708316597. maher naDetails
extend ductwork from (e) vav box to new office and balance two zones. ref pa #201708316597. maher na | $9,400 |
| Nov 1, 2017 | Never finaled issued Jan 2018, no final | 855 Brannan St | furnish & install (14) fourteen split heat pumps.shell & core only work under separet permit ref pa #201309045886& 201710131253 n/a maher ordinanceDetails
furnish & install (14) fourteen split heat pumps.shell & core only work under separet permit ref pa #201309045886& 201710131253 n/a maher ordinance | $390,000 |
| Apr 25, 2017 | Completed final sign-off Jun 2017 | 353 Sacramento St | 22nd floor - mechanical work for ti on ref pa 2016-1207-4362Details
22nd floor - mechanical work for ti on ref pa 2016-1207-4362 | $22,000 |
| Apr 13, 2017 | Never finaled issued Apr 2017, no final | 201 Spear St | 2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher naDetails
2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher na | $23,180 |
| Apr 13, 2017 | Never finaled issued Apr 2017, no final | 201 Spear St | 2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690Details
2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690 | $8,000 |
| Feb 22, 2017 | Never finaled issued Feb 2017, no final | 1 Embarcadero Center | 1/f- fan coil installation with heating and cooling coils, furnish and install new supply and return ductwork. coordinate smoke detector shutdown for systems over 2000 cfm - fire alarm under separate permit ref pa 2016-1216-5141Details
1/f- fan coil installation with heating and cooling coils, furnish and install new supply and return ductwork. coordinate smoke detector shutdown for systems over 2000 cfm - fire alarm under separate permit ref pa 2016-1216-5141 | $70,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | 15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829Details
15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | 5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829Details
5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829 | $124,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | 14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829Details
14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | 16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829Details
16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829 | $124,000 |
| Jun 13, 2016 | Completed final sign-off Jul 2017 | 939 Ellis St | demolition of extg hvac equipment. refurbish extg air handling unit and boiler. provide co monitoring of garage. install 6 package uints and new vrv system with 12 fan coils, 5 condensing units with controls.provide 6 new exhaust fans. n/a for maher.Details
demolition of extg hvac equipment. refurbish extg air handling unit and boiler. provide co monitoring of garage. install 6 package uints and new vrv system with 12 fan coils, 5 condensing units with controls.provide 6 new exhaust fans. n/a for maher. | $850,000 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 1 Embarcadero Center | #1550- new supply ductwork, replace (e) pneumatic control valves for (e) perimeter induction units, replace (6) existing vav boxes, replace pneumatic vav box controls with ddc, replace all existing pneumatic t-stats with ddc. n/a ordinance #155-13Details
#1550- new supply ductwork, replace (e) pneumatic control valves for (e) perimeter induction units, replace (6) existing vav boxes, replace pneumatic vav box controls with ddc, replace all existing pneumatic t-stats with ddc. n/a ordinance #155-13 | $180,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 595 Market St | 27th floor - modify exisitng (3) vav zones, install new ductwork & diffusers, insulation as required by title 24, independent air & water balancing ddc ocntrols. ref #201509025959.Details
27th floor - modify exisitng (3) vav zones, install new ductwork & diffusers, insulation as required by title 24, independent air & water balancing ddc ocntrols. ref #201509025959. | $19,810 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 144 Townsend St | 1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balancing. ref #201509116761. n/a maher ordinanceDetails
1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balancing. ref #201509116761. n/a maher ordinance | $200,000 |
| Oct 2, 2015 | Completed final sign-off Apr 2016 | 181 03rd St | 2nd floor: replace ceiling diffuser. air balancingDetails
2nd floor: replace ceiling diffuser. air balancing | $26,000 |
| Sep 16, 2015 | Completed final sign-off May 2016 | 144 Townsend St | limited demo of (e) ductwork modification of (e) ductwork, insulation as reqd by t-24. furnish & install 7 new vrv fancoils independent a18 balancingDetails
limited demo of (e) ductwork modification of (e) ductwork, insulation as reqd by t-24. furnish & install 7 new vrv fancoils independent a18 balancing | $78,000 |
| Sep 8, 2015 | Completed final sign-off Jun 2016 | 144 Townsend St | modify (e) supply ductwork. install 7 new fancoils and 1 exhaust fan. insulation and air balancingDetails
modify (e) supply ductwork. install 7 new fancoils and 1 exhaust fan. insulation and air balancing | $78,000 |
| May 14, 2015 | Completed final sign-off Aug 2015 | 2000 Post St | install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625.Details
install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625. | $675,000 |
| May 23, 2014 | Expired or cancelled withdrawn Dec 2014 | 1280 Laguna St | install exhaust fans, (1) fire smoke dampers, fan coil unit, duct work. ref #2013.0118.8333.Details
install exhaust fans, (1) fire smoke dampers, fan coil unit, duct work. ref #2013.0118.8333. | $235,000 |
| Jan 30, 2014 | Expired or cancelled cancelled Jan 2026 | 2225 03rd St | replace 100 feet of extg duct work. relocate 12 registers. n/a for the maher ordinance #155-13Details
replace 100 feet of extg duct work. relocate 12 registers. n/a for the maher ordinance #155-13 | $20,000 |
| Oct 10, 2013 | Completed final sign-off Aug 2014 | 3741 Buchanan St | revision to app#201309056068. no auto shut off per cmc code 609.0exception #2Details
revision to app#201309056068. no auto shut off per cmc code 609.0exception #2 | |
| Sep 5, 2013 | Completed final sign-off Aug 2014 | 3741 Buchanan St | 1st & 2nd floors-maintenance & repair hvac equipmentDetails
1st & 2nd floors-maintenance & repair hvac equipment | $100,000 |
| May 24, 2013 | Completed final sign-off May 2014 | 185 Channel St | install 80' 16ga grease duct in two hour shaft or wrapped in 3 m product from 1st floor to roof for future use. 2 hour with 90 minute rated doors provided on each floor. exhaust hood under seperate permitDetails
install 80' 16ga grease duct in two hour shaft or wrapped in 3 m product from 1st floor to roof for future use. 2 hour with 90 minute rated doors provided on each floor. exhaust hood under seperate permit | $10,000 |
| May 15, 2013 | Never finaled issued May 2013, no final | 869 Jamestown Av | bldg 11: install exhaust system for all dryer units. per approved plans #201303122025Details
bldg 11: install exhaust system for all dryer units. per approved plans #201303122025 | $25,000 |
| Aug 31, 2012 | Completed final sign-off Dec 2013 | 25 Essex St | revision to appl #2010.0315.8191 - delete fire dampers in outside air duct, entering each apartment ending in o2 on floors 2 and 8.Details
revision to appl #2010.0315.8191 - delete fire dampers in outside air duct, entering each apartment ending in o2 on floors 2 and 8. | |
| Feb 12, 2010 | Completed final sign-off Aug 2010 | 625 02nd St | revise (e) duct work & air distributor & add 6 ac systems, floors 2, 3, 4. arch pa# 2009/10/20/9332.Details
revise (e) duct work & air distributor & add 6 ac systems, floors 2, 3, 4. arch pa# 2009/10/20/9332. | $120,000 |
| May 3, 2006 | Expired or cancelled expired Apr 2007 | 141 Eddy St | renew 200506235862 for final inspectionDetails
renew 200506235862 for final inspection | |
| Jul 20, 2001 | Expired or cancelled expired Nov 2003 | 100 Spear St | add supplimental cooling to server room on 21st floor, (mini split)Details
add supplimental cooling to server room on 21st floor, (mini split) | $18,000 |
| Jun 5, 2001 | Expired or cancelled cancelled Aug 2002 | 360 Spear St | oti-2 2nd floor (mech, sp)Details
oti-2 2nd floor (mech, sp) | $22,000 |