Steven David Stept
- Listed as
- architect, authorized agent-others
- Firm
- Feldman Architecture
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Jun 2026
22 permits since 2000 (architect on 21 permits, authorized agent-others on 1 permit): 12 completed, 5 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jul 2026 | 3936 21st St | Ket Construction Inc. | interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated.Details
interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated. | $100,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 614 Elizabeth St | Cameron Builders Sf | replacement of windows at front facade-10 total windos to be replaced. no changes in size or placement. level 2 - new aluminum clad wood windows to replace (e) wood window 3 double hung and 2 fixed windows to be replaced. level3 - 4 double hung windows to be replaced. level 4, 1 double hung windowDetails
replacement of windows at front facade-10 total windos to be replaced. no changes in size or placement. level 2 - new aluminum clad wood windows to replace (e) wood window 3 double hung and 2 fixed windows to be replaced. level3 - 4 double hung windows to be replaced. level 4, 1 double hung window | $15,300 |
| Sep 29, 2025 | Completed final sign-off Apr 2026 | 227 Church St | Current Construction | ref 201909232411 and revision to pa 2024012244348 (altered site) and 202410253820 (revision to altered site) to update emergency lighting plan and illuminate calcs, title 24 revision to reflect fenestration specification change. no architectural and structural changesDetails
ref 201909232411 and revision to pa 2024012244348 (altered site) and 202410253820 (revision to altered site) to update emergency lighting plan and illuminate calcs, title 24 revision to reflect fenestration specification change. no architectural and structural changes | |
| Jul 13, 2025 | In progress issued Feb 2026 | 614 Elizabeth St | Cameron Builders Sf | revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.Details
revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant. | $155,100 |
| Jun 23, 2025 | Completed final sign-off Apr 2026 | 227 Church St | Current Construction | revision 202401224348 s1 repair compromised front foundation and reinforce facade wall framing due to field conditionsDetails
revision 202401224348 s1 repair compromised front foundation and reinforce facade wall framing due to field conditions | $12,000 |
| Oct 25, 2024 | Expired or cancelled expired Apr 2026 | 227 Church St | Current Construction | revision to permit 202401224348-s1 to include mech t24 sheets.Details
revision to permit 202401224348-s1 to include mech t24 sheets. | |
| Oct 4, 2024 | In progress issued Apr 2025 | 614 Elizabeth St | Cameron Builders Sf | convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout.Details
convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout. | $921,596 |
| May 2, 2024 | In progress issued May 2024 | 211 Hugo St | Current Construction | painted sign(tiny haven yoga)Details
painted sign(tiny haven yoga) | $1,500 |
| Aug 18, 2023 | Completed final sign-off Mar 2024 | 730 Polk St | Pineda Construction Inc | 4/f: t.i., office space w/new exam rooms,no structural partitions at 4th floor of 4 story building.Details
4/f: t.i., office space w/new exam rooms,no structural partitions at 4th floor of 4 story building. | $35,000 |
| Jan 24, 2023 | Completed final sign-off Mar 2023 | 1460 Pine St | Pineda Construction Inc | tenant improvements to an existing ground floor lvl space minor demolition and construction of interior wall partition and electrical work. (e) hvac system to remain. existing light to remain the same.Details
tenant improvements to an existing ground floor lvl space minor demolition and construction of interior wall partition and electrical work. (e) hvac system to remain. existing light to remain the same. | $12,000 |
| Aug 4, 2022 | Completed final sign-off Jun 2023 | 415 Mission St | Skyline Construction | 55/f: non-structural glass partition removal. mep's, ls, spr deferred if needed, submitted separately.Details
55/f: non-structural glass partition removal. mep's, ls, spr deferred if needed, submitted separately. | $80,000 |
| Nov 19, 2021 | Completed final sign-off Jun 2023 | 3464 Clay St | Box Canyon Builders Dba The Englander | demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs.Details
demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs. | $125,000 |
| Sep 12, 2020 | Completed final sign-off Sep 2021 | 558 Alvarado St | Ben Hardy & Company | remodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework.Details
remodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework. | $110,000 |
| Mar 6, 2020 | Completed final sign-off Jul 2022 | 730 Polk St | Pineda Construction Inc | tenant improvement of (e) office space, new non-structural partitions & electrical work for offices, conference room, copy room, and break room at 4th fl. n/a maherDetails
tenant improvement of (e) office space, new non-structural partitions & electrical work for offices, conference room, copy room, and break room at 4th fl. n/a maher | $145,000 |
| Jan 19, 2018 | Never finaled issued Feb 2018, no final | 400 Pacific Av | Mw General Contracting | rev to pa#201711033030: addition of 3 (n) offices on level 3. addition of dishwasher in the kitchen on level 3. add sink and dishwasher in kitchen on level 2. maher n/a.Details
rev to pa#201711033030: addition of 3 (n) offices on level 3. addition of dishwasher in the kitchen on level 3. add sink and dishwasher in kitchen on level 2. maher n/a. | |
| Jul 18, 2017 | Expired or cancelled cancelled Jan 2026 | 400 Pacific Av | 2/f, 3/f- tenant improvement of (e) office space with new electrical, plumbing & non structural partitions for office cubicles at 2nd & 3rd story of 3 story building. n/a ordinance #155-13Details
2/f, 3/f- tenant improvement of (e) office space with new electrical, plumbing & non structural partitions for office cubicles at 2nd & 3rd story of 3 story building. n/a ordinance #155-13 | $51,254 | |
| Apr 4, 2016 | Expired or cancelled cancelled Feb 2020 | 21 Laidley St | existing garden cottage in rear yare to be converted to an acessory dwelling unit, interior renovation to include new bathroom and kitchen, new alumium french doors a bedroom and new alumirum window at bathroom.Details
existing garden cottage in rear yare to be converted to an acessory dwelling unit, interior renovation to include new bathroom and kitchen, new alumium french doors a bedroom and new alumirum window at bathroom. | $40,000 | |
| Jun 27, 2014 | Completed final sign-off Aug 2017 | 21 Laidley St | Blair Burke General Contractors Inc | horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garageDetails
horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garage | $575,000 |
| Aug 19, 2011 | Completed final sign-off Nov 2011 | 650 02nd St | Van Der Sterre Construction | revision to pa# 2011-0114-8403-reduce scope of work, change in wall between study & storage room. no skylight replacement.Details
revision to pa# 2011-0114-8403-reduce scope of work, change in wall between study & storage room. no skylight replacement. | |
| Mar 16, 2007 | Completed final sign-off Apr 2007 | 55 Grant Av | Harrow Construction Corporation | interior tenant improvement of vacant office space.Details
interior tenant improvement of vacant office space. | $13,500 |
| Jan 18, 2006 | Completed final sign-off Mar 2006 | 855 Battery St | Ward Alan Emery Construction Inc. | drywall,finishes,new partitions, glass. mech. plum. & electrical on seperate permit.Details
drywall,finishes,new partitions, glass. mech. plum. & electrical on seperate permit. | $22,000 |
| May 24, 2001 | Expired or cancelled expired Sep 2005 | 88 02nd St | tenant improvements including partitions, door, electrical and plumbing & accessbility upgrades (2 tDetails
tenant improvements including partitions, door, electrical and plumbing & accessbility upgrades (2 t | $50,000 |