Steve Dejesse
- Listed as
- architect, engineer
- Firm
- Ingraham Dejesse Associates
- Based in
- Oakland
- On San Francisco permits
- Mar 2005 to Dec 2023
21 permits since 2000 (engineer on 20 permits, architect on 1 permit): 11 completed, 1 in progress, 4 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2023 | In progress issued Oct 2025 | 1055 Ellis St | Guzman Construction Group Inc. | alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator.Details
alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator. | $1,600,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide 2 new conference rooms in (e) lobby space.Details
provide 2 new conference rooms in (e) lobby space. | $186,000 |
| Jun 2, 2023 | Completed final sign-off Jan 2024 | 2567 Mission St | Truebeck Construction | revision to 202212168551: to infill (e) glass block in 2 locations on the sidewalkDetails
revision to 202212168551: to infill (e) glass block in 2 locations on the sidewalk | |
| Feb 7, 2023 | Completed final sign-off Aug 2025 | 1000 Sutter St | Bbi - Con Inc | revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofcDetails
revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc | $30,000 |
| Sep 13, 2021 | Completed final sign-off Aug 2025 | 1000 Sutter St | Bbi - Con Inc | 100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.Details
100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms. | $23,303,869 |
| Jun 10, 2021 | Never finaled issued Jul 2021, no final | 2615 Larkin St | New Dimension Builders Inc., Buck O'neill Builders Inc. | new foundation for swin spa. structural only.Details
new foundation for swin spa. structural only. | $20,000 |
| Oct 30, 2020 | Never finaled issued Aug 2021, no final | 2615 Larkin St | New Dimension Builders Inc., Buck O'neill Builders Inc. | new deck at rear of level 1. replace existing windowsDetails
new deck at rear of level 1. replace existing windows | $20,000 |
| Aug 20, 2020 | Never finaled filed Aug 2020, never issued | 599 Skyline Bl | Terra Nova Industries | new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical.Details
new service elevator & control room within building footprint serving ground & basement levels. associated structural, mechanical, electrical. | $100,000 |
| Aug 18, 2017 | Expired or cancelled cancelled Nov 2022 | 513 Valencia St | storefront restoration, including new glazing, tile bulkheads, wood doors, and transoms based on original plans. barrier removal including new elevator, new storefront doors. interior work. tenants meet use size controls. no expansion in building footprint; 311 not required.Details
storefront restoration, including new glazing, tile bulkheads, wood doors, and transoms based on original plans. barrier removal including new elevator, new storefront doors. interior work. tenants meet use size controls. no expansion in building footprint; 311 not required. | $760,000 | |
| Dec 15, 2016 | Completed final sign-off May 2019 | 905 California St | Hathaway Dinwiddie Co. | renovation of public areas of (e) hotel. interior work @ (e) lobby, dining & bar includes demo, new partitions, casework, wall, ceiling & floor finishes. elec, plumb work per plans. (e) hvac system to reamin. (e) diffusers may be relocated as required by work. exterior work include new glazed entryDetails
renovation of public areas of (e) hotel. interior work @ (e) lobby, dining & bar includes demo, new partitions, casework, wall, ceiling & floor finishes. elec, plumb work per plans. (e) hvac system to reamin. (e) diffusers may be relocated as required by work. exterior work include new glazed entry | $2,003,538 |
| Oct 24, 2016 | Completed final sign-off May 2017 | 86 Whittier St | Vintage Construction | renovate 1(e) kitchen and 2(e) bathrooms including (n) fixtures, finishes, cabinetry and associated plumbing and electrical. install (n) dryer and forced air furnace & assoicated plumbing & electrical; repair and reinstall (e) water damaged windows & exterior sidingDetails
renovate 1(e) kitchen and 2(e) bathrooms including (n) fixtures, finishes, cabinetry and associated plumbing and electrical. install (n) dryer and forced air furnace & assoicated plumbing & electrical; repair and reinstall (e) water damaged windows & exterior siding | $95,000 |
| Aug 31, 2016 | Expired or cancelled withdrawn Dec 2016 | 655 Stockton St | soft story seismic retrofit per sfbc chapter 34b. (n) pw shear walls w crawl space & (n) moment frame.per 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13Details
soft story seismic retrofit per sfbc chapter 34b. (n) pw shear walls w crawl space & (n) moment frame.per 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13 | $100,000 | |
| Jul 11, 2016 | Never finaled issued Aug 2016, no final | 15 25th North Av | Quality General Construction Co Inc | revision to pa#201408154000, lower roof at nw portion at rear, reframe ceiling/floor above garage.Details
revision to pa#201408154000, lower roof at nw portion at rear, reframe ceiling/floor above garage. | |
| Mar 24, 2016 | Expired or cancelled cancelled Aug 2022 | 621 Stockton St | soft story seismic retrofit of (e) crawl spaces per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinanceDetails
soft story seismic retrofit of (e) crawl spaces per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinance | $200,000 | |
| Jan 7, 2016 | Expired or cancelled expired Dec 2018 | 42 Waller St | Mc Nely Construction Company | new 50 sq.ft. addition for communicating opening to adjacent (administrative building) n/a for maher. 2-hr fire wall/barrier with 2-90 min fire doors with fusible links connected to fa system (fa under separate permit).Details
new 50 sq.ft. addition for communicating opening to adjacent (administrative building) n/a for maher. 2-hr fire wall/barrier with 2-90 min fire doors with fusible links connected to fa system (fa under separate permit). | $50,000 |
| Dec 8, 2015 | Completed final sign-off Aug 2017 | 660 Indiana St | Palisade Builders Inc | revision to superstructure addendum 201312244989 s1. changing wood beam types within building. compliance with maher ordinance no 155-13 not required.Details
revision to superstructure addendum 201312244989 s1. changing wood beam types within building. compliance with maher ordinance no 155-13 not required. | |
| Nov 14, 2014 | Completed final sign-off Jul 2017 | 600 Indiana St | Granite Excavation & Demolition Inc | temporary shoring to accomodate construction of new building at 660-680 indiana st. maher ordinanceDetails
temporary shoring to accomodate construction of new building at 660-680 indiana st. maher ordinance | $100,000 |
| Aug 6, 2014 | Completed final sign-off May 2019 | 680 Indiana St | Granite Excavation & Demolition Inc | shoring to accomodate construction. site permit are 201312244992 & 201312244989. demo permit is 201406138365. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
shoring to accomodate construction. site permit are 201312244992 & 201312244989. demo permit is 201406138365. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $70,000 |
| Sep 28, 2005 | Completed final sign-off Apr 2009 | 2949 18th St | James E Roberts-Obayashi Corporation | to erect 5 story 117 dwelling/commercial building.Details
to erect 5 story 117 dwelling/commercial building. | |
| Apr 4, 2005 | Expired or cancelled expired Sep 2007 | 532 30th St | voluntary struct. upgrade including partial froundation replacement,tie downs,grade beam/shear wallDetails
voluntary struct. upgrade including partial froundation replacement,tie downs,grade beam/shear wall | $15,000 | |
| Mar 22, 2005 | Completed final sign-off Jan 2006 | 2 Stockton St | Swinerton Builders | build out empty tenant basement & street level for new book store.space previously was a restaurant-Details
build out empty tenant basement & street level for new book store.space previously was a restaurant- | $500,000 |