Vintage Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2005 to Feb 2026
- Last 24 months
- 10 permits filed
48 permits since 2000: 45 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Apr 2026 | 943 Cole St | new accessible toilet room at existing restaurant. new toilet room triggers some reorganization of kitchen and back of house space. meps deferred.Details
new accessible toilet room at existing restaurant. new toilet room triggers some reorganization of kitchen and back of house space. meps deferred. | $45,000 |
| Oct 20, 2025 | Completed final sign-off Oct 2025 | 274 Montana St | replace garage door. in kindDetails
replace garage door. in kind | $2,500 |
| Aug 14, 2025 | Completed final sign-off Nov 2025 | 1903 Eddy St | kitchen remodel, replace kitchen cabinet, sink & countertopDetails
kitchen remodel, replace kitchen cabinet, sink & countertop | $16,500 |
| Aug 14, 2025 | Completed final sign-off Feb 2026 | 131 Morningside Dr | kitchen remodel. 2/f master bath and wic. 2/f bath remodel. garage bathroom to be remodeled like for like. powder room to be remodeled like for like.Details
kitchen remodel. 2/f master bath and wic. 2/f bath remodel. garage bathroom to be remodeled like for like. powder room to be remodeled like for like. | $90,000 |
| Jul 16, 2025 | Completed final sign-off Oct 2025 | 274 Montana St | revision to pa # 202412168924: delete kitchen island,enclose (e) skylight in kitchen. replace partial (e) stuccow/ new in front of house (40 sq ft). replace (e) siding w/ new at rear & side (410 sq ft).Details
revision to pa # 202412168924: delete kitchen island,enclose (e) skylight in kitchen. replace partial (e) stuccow/ new in front of house (40 sq ft). replace (e) siding w/ new at rear & side (410 sq ft). | $25,000 |
| Apr 28, 2025 | Completed final sign-off Jul 2025 | 131 Morningside Dr | legalize work done without a permit described in nov #202535062 remodel main fl kitchen. remodel top fl baths; install 14 windows; remodel 1 ground fl bedroom and addition of one bath. installation of ground fl furnace. electrical and plumbing work without permit. new construction in area btwnDetails
legalize work done without a permit described in nov #202535062 remodel main fl kitchen. remodel top fl baths; install 14 windows; remodel 1 ground fl bedroom and addition of one bath. installation of ground fl furnace. electrical and plumbing work without permit. new construction in area btwn | $60,000 |
| Apr 24, 2025 | Completed final sign-off Jul 2025 | 1913 Eddy St | 2 bathroom renovation. master bath, keep the tub, replace wall tile,s shower control , toielet, vanity and floor tiles. hallway bath. replace the tiles for the shower pan, wall tiles, vanity. toilet and floor tiles.Details
2 bathroom renovation. master bath, keep the tub, replace wall tile,s shower control , toielet, vanity and floor tiles. hallway bath. replace the tiles for the shower pan, wall tiles, vanity. toilet and floor tiles. | $31,000 |
| Mar 18, 2025 | Completed final sign-off Jul 2025 | 1424 Alabama St | 2/f: in kind bathroom remodel at the rear, 50 sqft. in kind laundry room remodel connected to the bathroom at the rear, 60 sqft.Details
2/f: in kind bathroom remodel at the rear, 50 sqft. in kind laundry room remodel connected to the bathroom at the rear, 60 sqft. | $15,000 |
| Dec 16, 2024 | Completed final sign-off Oct 2025 | 274 Montana St | remodel (e) 2nd floor kitchen, 3 bathroom & replace (e) sheetrock w/ new at 2/f. legalize rooms down - 1 bedroom, 1 full bath, & media room at g/f.Details
remodel (e) 2nd floor kitchen, 3 bathroom & replace (e) sheetrock w/ new at 2/f. legalize rooms down - 1 bedroom, 1 full bath, & media room at g/f. | $286,000 |
| Oct 16, 2024 | Completed final sign-off Nov 2024 | 47 Kronquist Ct | install sheetrock on one side of garage (interior only). 5/8" type "x".Details
install sheetrock on one side of garage (interior only). 5/8" type "x". | $3,000 |
| Sep 18, 2024 | In progress issued Sep 2024 | 211 Liberty St | unit #1: 1 kitchen & 1 bathroom remodel in-kindDetails
unit #1: 1 kitchen & 1 bathroom remodel in-kind | $50,000 |
| Oct 10, 2023 | Completed final sign-off Dec 2023 | 211 Liberty St | unit # 9: to make correction for the kitchen and bathroom remodel per bid inspector mauricio hernandez. need plumbing and building permits. kitchen remodel + 1 bathroom remodel.Details
unit # 9: to make correction for the kitchen and bathroom remodel per bid inspector mauricio hernandez. need plumbing and building permits. kitchen remodel + 1 bathroom remodel. | $5,500 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 1995 Turk St | kitchen remodel like for like. no structural work - no wall/framing modification.Details
kitchen remodel like for like. no structural work - no wall/framing modification. | $25,000 |
| Feb 24, 2023 | Completed final sign-off Apr 2023 | 170 Peralta Av | kitchen remodel, add electrical subpanel. non structral..Details
kitchen remodel, add electrical subpanel. non structral.. | $29,600 |
| Nov 10, 2022 | Completed final sign-off Nov 2022 | 801 Wisconsin St | deck repairs per nov # 202297526. less than 50% repair.Details
deck repairs per nov # 202297526. less than 50% repair. | $6,500 |
| Oct 4, 2022 | Completed final sign-off Nov 2022 | 220 Teresita Bl | comply iwth nov#202294951, legalize sink and counter in bedrrom #5.Details
comply iwth nov#202294951, legalize sink and counter in bedrrom #5. | $500 |
| Jan 6, 2022 | Completed final sign-off Mar 2022 | 235 19th Av | kitchen & (1) bathroom remodel. replace two windows facing backyard.Details
kitchen & (1) bathroom remodel. replace two windows facing backyard. | $25,000 |
| Sep 17, 2021 | Completed final sign-off Mar 2022 | 142 Victoria St | replace the enitre stucco in the front of the house in kind.Details
replace the enitre stucco in the front of the house in kind. | $8,500 |
| Aug 10, 2021 | Completed final sign-off Feb 2022 | 1706 26th Av | to comply with nov202071439: legalize remodel at g/f : bathroom,hallway, remove wet bar, change lay room to media room.Details
to comply with nov202071439: legalize remodel at g/f : bathroom,hallway, remove wet bar, change lay room to media room. | $15,000 |
| Jun 29, 2021 | Completed final sign-off Nov 2021 | 211 Liberty St | to replace 23 windows facing the street with same type of winodws.Details
to replace 23 windows facing the street with same type of winodws. | $20,300 |
| Jun 28, 2021 | Completed final sign-off May 2022 | 601 Van Ness Av | #350 -kitchen and one bedroom remodel, add 4 recessed lights in the bedroom. no removal wall, and no new openings.Details
#350 -kitchen and one bedroom remodel, add 4 recessed lights in the bedroom. no removal wall, and no new openings. | $49,500 |
| Jun 22, 2021 | Never finaled issued Jul 2021, no final | 159 Sadowa St | comply w/ nov# 202174425. 2nd floor - remodel kitchen and bath. add one (n) bathm change pantry room to office room.Details
comply w/ nov# 202174425. 2nd floor - remodel kitchen and bath. add one (n) bathm change pantry room to office room. | $80,000 |
| Sep 18, 2020 | Completed final sign-off Nov 2020 | 211 Liberty St | replace 25 windows in rear of bldg. non st visible. all vinyl windows.Details
replace 25 windows in rear of bldg. non st visible. all vinyl windows. | $9,800 |
| Nov 5, 2019 | Completed final sign-off Jan 2020 | 1337 Felton St | seismic upgrade in accordance with standard plan set a. sfbc ab 108 cebc app a3. volunatary structural strenthening barace and boltDetails
seismic upgrade in accordance with standard plan set a. sfbc ab 108 cebc app a3. volunatary structural strenthening barace and bolt | $5,500 |
| Nov 1, 2019 | Completed final sign-off Feb 2020 | 219 Monterey Bl | in accordance with voluntary seismic retrofit stanard plan (set a) in a crawl space. bolt & brace per cebc appendix a3.Details
in accordance with voluntary seismic retrofit stanard plan (set a) in a crawl space. bolt & brace per cebc appendix a3. | $6,000 |
| Aug 21, 2019 | Completed final sign-off Apr 2021 | 131 16th Av | to comply with complaint #201973451, 2/f bathroom remodel in-kindDetails
to comply with complaint #201973451, 2/f bathroom remodel in-kind | $12,000 |
| Aug 21, 2019 | Completed final sign-off Sep 2019 | 1382 28th Av | repair water damaged rear wall of hte house. all repair in kind.Details
repair water damaged rear wall of hte house. all repair in kind. | $10,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 275 Nevada St | replace the siding for the wall (one wall) facing south. not facing the streetDetails
replace the siding for the wall (one wall) facing south. not facing the street | $7,000 |
| May 29, 2019 | Completed final sign-off Sep 2019 | 2666 21st Av | revision to app#201711073380 to change 3x8 joists to 5 1/4 x 5 1/4 pslDetails
revision to app#201711073380 to change 3x8 joists to 5 1/4 x 5 1/4 psl | $10,000 |
| May 21, 2019 | Completed final sign-off Aug 2019 | 1913 Eddy St | kitchen remodel, rpelace cabinet, countertops, upgrade electrical - adding 4 recessed lights. no wall changes.Details
kitchen remodel, rpelace cabinet, countertops, upgrade electrical - adding 4 recessed lights. no wall changes. | $25,000 |
| Jan 24, 2019 | Completed final sign-off Sep 2019 | 2666 21st Av | to obtain final inspection for work approved under pa#201711073380. all work is completeDetails
to obtain final inspection for work approved under pa#201711073380. all work is complete | |
| Dec 1, 2017 | Completed final sign-off Nov 2020 | 1724 Taraval St | retail: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
retail: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Dec 1, 2017 | Completed final sign-off Nov 2020 | 1724 Taraval St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $40,000 |
| Nov 7, 2017 | Completed final sign-off Sep 2019 | 2666 21st Av | revision to pa #201512225777 - replace ktichen cabient, revised skylights & windows, re-configure backyard lower patio, raised sill on north side, framing clarification at bedroom #1, foundation & framing coordination at bedroom #3 addition. excavation less than 10 cubic yard and less than 4 feetDetails
revision to pa #201512225777 - replace ktichen cabient, revised skylights & windows, re-configure backyard lower patio, raised sill on north side, framing clarification at bedroom #1, foundation & framing coordination at bedroom #3 addition. excavation less than 10 cubic yard and less than 4 feet | $35,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 743 Paris St | work in accordance with chapter a-3 brace & bolt voluntary.Details
work in accordance with chapter a-3 brace & bolt voluntary. | $5,500 |
| Aug 28, 2017 | Completed final sign-off May 2018 | 1968 Quint St | first flr:partition bedrm&familyrm, 2 bath.replace windows at rear. 2nd flr: alter bathrm to 2 bath, conver diningrm to bedroom. change windows at rear, new deck, new skylight over (e) stairwell.Details
first flr:partition bedrm&familyrm, 2 bath.replace windows at rear. 2nd flr: alter bathrm to 2 bath, conver diningrm to bedroom. change windows at rear, new deck, new skylight over (e) stairwell. | $100,000 |
| Aug 23, 2017 | Completed final sign-off Sep 2019 | 2666 21st Av | chemical grout under the (e) foundation. ref pa#201512225777.Details
chemical grout under the (e) foundation. ref pa#201512225777. | $6,900 |
| Oct 24, 2016 | Completed final sign-off May 2017 | 86 Whittier St | renovate 1(e) kitchen and 2(e) bathrooms including (n) fixtures, finishes, cabinetry and associated plumbing and electrical. install (n) dryer and forced air furnace & assoicated plumbing & electrical; repair and reinstall (e) water damaged windows & exterior sidingDetails
renovate 1(e) kitchen and 2(e) bathrooms including (n) fixtures, finishes, cabinetry and associated plumbing and electrical. install (n) dryer and forced air furnace & assoicated plumbing & electrical; repair and reinstall (e) water damaged windows & exterior siding | $95,000 |
| May 9, 2016 | Completed final sign-off Oct 2016 | 1901 Eddy St | kitchen remodel, (2) bathrooms, upgrade subpanelDetails
kitchen remodel, (2) bathrooms, upgrade subpanel | $25,000 |
| Mar 29, 2016 | Completed final sign-off Jul 2019 | 522 11th Av | rear addition to expand master suite, kitchen, develop storage area adjacent garage to office and relocate kitchen and (n) bathrm. rear addition to expand fam rm on 2/f. relocate bathrm on 2/f and power room on .00Details
rear addition to expand master suite, kitchen, develop storage area adjacent garage to office and relocate kitchen and (n) bathrm. rear addition to expand fam rm on 2/f. relocate bathrm on 2/f and power room on .00 | $150,000 |
| Feb 25, 2016 | Completed final sign-off Sep 2016 | 527 Randolph St | to add two bedrooms and one full bath in existing ground floor.Details
to add two bedrooms and one full bath in existing ground floor. | $50,000 |
| Dec 22, 2015 | Completed final sign-off Sep 2019 | 2666 21st Av | horizontal back addition & reconigure the interiors from 2 bedrooms, 1 bath to 4 bedrooms, 3 baths. add fully sprinklered.Details
horizontal back addition & reconigure the interiors from 2 bedrooms, 1 bath to 4 bedrooms, 3 baths. add fully sprinklered. | $250,000 |
| Apr 3, 2015 | Completed final sign-off May 2015 | 9 Rio Ct | water damaged drywall replacement in 2 bedrooms and hallway.Details
water damaged drywall replacement in 2 bedrooms and hallway. | $5,500 |
| Dec 31, 2013 | Completed final sign-off Aug 2014 | 226 Bocana St | add family room and bathroom on 1st floor of single family dwellingDetails
add family room and bathroom on 1st floor of single family dwelling | $40,000 |
| Dec 5, 2013 | Completed final sign-off Jan 2014 | 1903 Eddy St | kitchen remodel, replace kitchen cabinets & counter tops, unit 431Details
kitchen remodel, replace kitchen cabinets & counter tops, unit 431 | $12,000 |
| Nov 1, 2013 | Completed final sign-off Jun 2014 | 1905 Eddy St | unit #1: kitchen remodel- replace floor, cabinets, countertops, install new lights.Details
unit #1: kitchen remodel- replace floor, cabinets, countertops, install new lights. | $10,000 |
| May 24, 2013 | Completed final sign-off Aug 2013 | 3735 Cesar Chavez St | bathroom remodel, replace tub, tiles, vanity cabinet, toilet.Details
bathroom remodel, replace tub, tiles, vanity cabinet, toilet. | $6,500 |
| Oct 25, 2005 | Completed final sign-off Jan 2006 | 2632 Diamond St | kitchen remodel, install insulation on 1 ext wall, replace shtrk,cabinets,cntrtps. bath remodel, replace tub, toilet, vanity top, install tile on shower wall and floorDetails
kitchen remodel, install insulation on 1 ext wall, replace shtrk,cabinets,cntrtps. bath remodel, replace tub, toilet, vanity top, install tile on shower wall and floor | $18,000 |