Roger Wong
- Listed as
- architect, designer
- Firm
- Live Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Nov 2025
42 permits since 2000 (architect on 41 permits, designer on 1 permit): 33 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2025 | In progress issued Jul 2026 | 1260 32nd Av | J P E Construction | new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. revision to scope of work to supercede pa#202408269463 & 202404029153.Details
new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. revision to scope of work to supercede pa#202408269463 & 202404029153. | $525,000 |
| Oct 16, 2025 | In progress issued May 2026 | 2533 24th Av | Earth Development | new state adu - 2 beds,2 baths on g/f including rear extension. remodel of (e) main unit to inlcude 3rd floor addition and rear extension.Details
new state adu - 2 beds,2 baths on g/f including rear extension. remodel of (e) main unit to inlcude 3rd floor addition and rear extension. | $565,000 |
| Jun 13, 2025 | Completed final sign-off Feb 2026 | 163 Brighton Av | Dennis Construction & Painting Inc | permit to address notice fo violation #201723901. permit to remove non-permitted garden shed, canopy structure, storage space and legalize stair. no new living area.Details
permit to address notice fo violation #201723901. permit to remove non-permitted garden shed, canopy structure, storage space and legalize stair. no new living area. | $7,500 |
| May 14, 2025 | Expired or cancelled cancelled May 2025 | 2533 24th Av | new state adu- 2 bedroom and 2 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension.Details
new state adu- 2 bedroom and 2 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. | $565,000 | |
| May 9, 2025 | Expired or cancelled cancelled May 2025 | 1260 32nd Av | new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension.Details
new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. | ||
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 1018 Pacheco St | revision 202411185182- after hrr replace stucco and upper wood siding with (n) intergral colored cement plaster remove dry rotted planter shelf. see report # 2024-010941 hrr (reduce scope)Details
revision 202411185182- after hrr replace stucco and upper wood siding with (n) intergral colored cement plaster remove dry rotted planter shelf. see report # 2024-010941 hrr (reduce scope) | ||
| Nov 18, 2024 | Completed final sign-off Apr 2025 | 1018 Pacheco St | re-stucco the front of the house, replacing wood siding, and replacing balconette in kindDetails
re-stucco the front of the house, replacing wood siding, and replacing balconette in kind | $12,500 | |
| Mar 4, 2024 | Completed final sign-off Apr 2025 | 1018 Pacheco St | Wei Li Construction | 2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the buildingDetails
2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the building | $95,000 |
| Sep 14, 2023 | Completed final sign-off Oct 2023 | 81 Keystone Wy | J. Ho Construction Inc | repair of (e) cantilevered second floor rear deck in kind over 50%. permit to address complaint #202312798. drawing update and revision to permit #202308315749.Details
repair of (e) cantilevered second floor rear deck in kind over 50%. permit to address complaint #202312798. drawing update and revision to permit #202308315749. | |
| Apr 7, 2023 | Completed final sign-off Mar 2025 | 1468 36th Av | Wei Li Construction | interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath.Details
interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath. | $125,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2024 | 239 Lakeshore Dr | Wei Li Construction | interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind.Details
interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind. | $150,000 |
| Oct 18, 2022 | Never finaled issued Oct 2022, no final | 243 Montgomery St | R.M.R. Construction Company | ref pa 202206025449. add health to routingDetails
ref pa 202206025449. add health to routing | |
| Oct 13, 2022 | Completed final sign-off Aug 2023 | 2340 12th Av | Dennis Construction & Painting Inc | interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind.Details
interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind. | $126,000 |
| Jun 2, 2022 | Completed final sign-off Oct 2022 | 243 Montgomery St | R.M.R. Construction Company | tenant improvement to install (n) sales counter, (n) refrigerated cases, and merchandise displays. install new powered door operator. (e) mech to remain. (e) hvac & electrical systems to remain.Details
tenant improvement to install (n) sales counter, (n) refrigerated cases, and merchandise displays. install new powered door operator. (e) mech to remain. (e) hvac & electrical systems to remain. | $40,000 |
| May 2, 2022 | Completed final sign-off Jun 2023 | 1359 41st Av | Wei Li Construction | remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space.Details
remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space. | $125,000 |
| Aug 5, 2021 | Completed final sign-off Mar 2023 | 277 Andover St | Edri Construction Inc *See Notes* | interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder roomDetails
interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder room | $160,000 |
| Jul 30, 2021 | Completed final sign-off Mar 2023 | 5333 California St | C H Burnham Inc | interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroomDetails
interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroom | $115,000 |
| Apr 28, 2021 | Completed final sign-off May 2022 | 1879 16th Av | Dennis Construction & Painting Inc | interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509Details
interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509 | $165,000 |
| Apr 28, 2021 | Completed final sign-off Jul 2022 | 495 Chapman St | Grats Decor Interior Design & Build Inc | interior remodel of existing one car garage to new bedroom & new bathroom.Details
interior remodel of existing one car garage to new bedroom & new bathroom. | $45,000 |
| Feb 4, 2021 | Completed final sign-off Apr 2026 | 2031 45th Av | interior remodel. g/f bath, bedroom, laundry & family room. upstairs remodel to include removing wall between kitchen/living/dining rooms, kitchen remodel, 2 bathrooms & new open stairs to connect ground & 2nd floors.Details
interior remodel. g/f bath, bedroom, laundry & family room. upstairs remodel to include removing wall between kitchen/living/dining rooms, kitchen remodel, 2 bathrooms & new open stairs to connect ground & 2nd floors. | $60,000 | |
| Oct 30, 2020 | Completed final sign-off Aug 2022 | 136 Lunado Wy | revision to pa 201709279674 s1. delta 3. (n) west window & rear south window-not visible from public way. (n) stairs to provide required head height. front entry landing repaired in-kind for dry rot. concrete wall extended. no changes to fixture count. no work in public row.Details
revision to pa 201709279674 s1. delta 3. (n) west window & rear south window-not visible from public way. (n) stairs to provide required head height. front entry landing repaired in-kind for dry rot. concrete wall extended. no changes to fixture count. no work in public row. | $15,000 | |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 3655 Folsom St | Wei Li Construction | interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr.Details
interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr. | $90,000 |
| Jul 2, 2020 | Completed final sign-off Dec 2020 | 4104 California St | Bay Area Window Pros | replacing 6 non-original, aluminum single pane window with marvin ultimate wood-clad.Details
replacing 6 non-original, aluminum single pane window with marvin ultimate wood-clad. | $10,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2021 | 3364 19th St | Dennis Construction & Painting Inc | accessible business entrance program per ordinance 51-16. install power door operator.Details
accessible business entrance program per ordinance 51-16. install power door operator. | $2,000 |
| Feb 25, 2020 | Never finaled issued May 2021, no final | 4652 Geary Bl | J L General Construction Inc, Pinnacle Remodeling Construction | accessible business entrance program per ordinance 51-16. replace door, install power door operator. maher naDetails
accessible business entrance program per ordinance 51-16. replace door, install power door operator. maher na | $2,500 |
| Feb 25, 2020 | Never finaled issued Apr 2021, no final | 388 11th Av | J L General Construction Inc | accessible business entrance program per ordinance 51-16. replace door, install power doo operator.Details
accessible business entrance program per ordinance 51-16. replace door, install power doo operator. | $2,500 |
| Nov 21, 2019 | Never finaled issued Mar 2021, no final | 263 18th Av | J L General Construction Inc | accessory dwelling unit w/ 1 bedroom, 2 bathrooms and 1 office, program per ordinance 162-16.Details
accessory dwelling unit w/ 1 bedroom, 2 bathrooms and 1 office, program per ordinance 162-16. | $60,000 |
| Nov 4, 2019 | Completed final sign-off Dec 2020 | 4720 Geary Bl | install existing awning/canopy - a sign "shiatsu massage"Details
install existing awning/canopy - a sign "shiatsu massage" | $500 | |
| Nov 4, 2019 | Completed final sign-off Dec 2020 | 4720 Geary Bl | conditional use appliation from (e) beauty salon with acessory massage to massage with accessory beauty use. (e) business & facilities to remain. no new construction required.Details
conditional use appliation from (e) beauty salon with acessory massage to massage with accessory beauty use. (e) business & facilities to remain. no new construction required. | ||
| Oct 1, 2019 | Completed final sign-off Jul 2020 | 672 Missouri St | A Plus Builders | remodel extg kitchen and 2 bathrooms. install some new energy efficient lights.Details
remodel extg kitchen and 2 bathrooms. install some new energy efficient lights. | $43,000 |
| Feb 1, 2019 | Completed final sign-off Jun 2020 | 2074 45th Av | Cej Construction Llc | interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor.Details
interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor. | $90,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 137 Detroit St | Wei Li Construction | 9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room.Details
9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room. | $195,000 |
| Jun 4, 2018 | Completed final sign-off Aug 2019 | 871 26th Av | Dennis Construction & Painting Inc | remodel kitchen and baths and new bedroom upstairs. new bedroom, bath, laundry at garage level.Details
remodel kitchen and baths and new bedroom upstairs. new bedroom, bath, laundry at garage level. | $95,000 |
| Feb 12, 2018 | Completed final sign-off Oct 2018 | 100 01st St | Field Construction Inc. | ste 145. install new exam room in exsisting un-used space of exsisting optometry office.Details
ste 145. install new exam room in exsisting un-used space of exsisting optometry office. | $25,000 |
| Sep 27, 2017 | Completed final sign-off Aug 2022 | 136 Lunado Wy | Cahill Contractors Llc. | horizontal addition to existing residence at ground, add 1 bath and 1 bed. and second level- 1 bedroom only. conversion of existing basement for additional living space.Details
horizontal addition to existing residence at ground, add 1 bath and 1 bed. and second level- 1 bedroom only. conversion of existing basement for additional living space. | $150,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 847 42nd Av | remodel kitchen install new lights, replace exhaust hood & sink. new finishesDetails
remodel kitchen install new lights, replace exhaust hood & sink. new finishes | $15,000 | |
| Jul 21, 2016 | Completed final sign-off Mar 2025 | 4104 California St | Wei Li Construction | to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stairDetails
to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stair | $50,000 |
| Feb 24, 2014 | Completed final sign-off Nov 2014 | 432 Magellan Av | Argueta Construction | remodel extg kitchen to include relocation of cook top, new millwork, new lighting, and new finishes.Details
remodel extg kitchen to include relocation of cook top, new millwork, new lighting, and new finishes. | $20,500 |
| Jun 19, 2013 | Completed final sign-off Dec 2013 | 425 California St | Cahill Contractors Inc | demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits.Details
demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits. | $365,000 |
| Jun 12, 2013 | Expired or cancelled withdrawn Jun 2015 | 112 07th St | interior remodel of restaurant and ground levels. mep under seperate permit. fire sprinkler & fire alarm under separate permit. awing & canopy to sumbmitted under separate permit for structures.Details
interior remodel of restaurant and ground levels. mep under seperate permit. fire sprinkler & fire alarm under separate permit. awing & canopy to sumbmitted under separate permit for structures. | $300,000 | |
| Jun 7, 2013 | Completed final sign-off Sep 2014 | 806 27th Av | Aero Construction Inc | remodel of existing 2nd floor at existing residence: work include kitchen remodel, two new study rooms and two bathrooms. no remodel of garage level, except that as required per code.Details
remodel of existing 2nd floor at existing residence: work include kitchen remodel, two new study rooms and two bathrooms. no remodel of garage level, except that as required per code. | $75,500 |
| May 13, 2010 | Completed final sign-off Apr 2011 | 847 42nd Av | Acorn Stairlifts, Inc. | install stair lift @ entry stairs.Details
install stair lift @ entry stairs. | $3,800 |