Grats Decor Interior Design & Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Jun 2026
- Last 24 months
- 2 permits filed
29 permits since 2000: 26 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 701 Vermont St | remodel guest bathroom, like for like, no walls or fixtures to be moved, new shower valves, new vanity, toilet, new fans.Details
remodel guest bathroom, like for like, no walls or fixtures to be moved, new shower valves, new vanity, toilet, new fans. | $25,000 |
| Mar 30, 2026 | Completed final sign-off May 2026 | 526 Vermont St | like for like bathroom remodel, no walls or fixtures movement, new bathtub, new vanity, new toilet, new bathtub valve with niche, wet walls, tile in bathtub enclosure and floor, new fan.Details
like for like bathroom remodel, no walls or fixtures movement, new bathtub, new vanity, new toilet, new bathtub valve with niche, wet walls, tile in bathtub enclosure and floor, new fan. | $32,000 |
| Apr 22, 2024 | Completed final sign-off Jun 2024 | 701 Vermont St | remodel bathroom. all fixtures to not be moved. new custom shower pan. new vanity top and toilet same location. new fan and switches. new tile new fixtures.Details
remodel bathroom. all fixtures to not be moved. new custom shower pan. new vanity top and toilet same location. new fan and switches. new tile new fixtures. | $30,000 |
| Jan 29, 2024 | Completed final sign-off Jan 2025 | 2562 35th Av | remodel kitchen in kind. no wall removal. replace (e) 5 skylights in kind. skylights to have safety glazing per cbc 2405.2 and 2405.3 kitchen approx. 120 sq. fft.Details
remodel kitchen in kind. no wall removal. replace (e) 5 skylights in kind. skylights to have safety glazing per cbc 2405.2 and 2405.3 kitchen approx. 120 sq. fft. | $7,500 |
| Dec 11, 2023 | Completed final sign-off Jan 2025 | 2562 35th Av | bathroom remodel convert 1 bath into 2 baths, new shower, tub, 2 w/c, 2 vanity. new non bearing wall at bedroom, new 200 amp panel @ garage. new electrical @ bath & non bearing wallDetails
bathroom remodel convert 1 bath into 2 baths, new shower, tub, 2 w/c, 2 vanity. new non bearing wall at bedroom, new 200 amp panel @ garage. new electrical @ bath & non bearing wall | $50,000 |
| Nov 20, 2023 | Completed final sign-off Feb 2024 | 2562 35th Av | make limited exploratory holes in finishes; patch back in kind.Details
make limited exploratory holes in finishes; patch back in kind. | $2,000 |
| Oct 6, 2023 | Completed final sign-off Dec 2023 | 541 Dellbrook Av | remodel bathroom down to studs, install walk-in shower instead of bathtub, move toilet to old shower location, install double vanity, plumb & route electrical, install tile & fixturesDetails
remodel bathroom down to studs, install walk-in shower instead of bathtub, move toilet to old shower location, install double vanity, plumb & route electrical, install tile & fixtures | $25,000 |
| Apr 14, 2022 | Completed final sign-off Dec 2022 | 1794 Green St | one bathroom and one kitchen remodel. 3 new windows wood sash, (2) replacement windows facing street. one new bathroom.Details
one bathroom and one kitchen remodel. 3 new windows wood sash, (2) replacement windows facing street. one new bathroom. | $50,000 |
| Apr 8, 2022 | Completed final sign-off Jun 2022 | 830 Lake St | remodel bathroom- no walls built or moved. all fixtures same location. install custom shower pan, new valve and fixtures. update panel insulate, sheetrock and tile.Details
remodel bathroom- no walls built or moved. all fixtures same location. install custom shower pan, new valve and fixtures. update panel insulate, sheetrock and tile. | $20,000 |
| Jan 11, 2022 | Completed final sign-off Feb 2024 | 887 28th Av | revert the illegal enclosed rear sunroom back to deck on 2nd floor. rear deck approved under pa#201408204292 & 201410229624. (comply to code enforcement case no. 2021-008918enf)Details
revert the illegal enclosed rear sunroom back to deck on 2nd floor. rear deck approved under pa#201408204292 & 201410229624. (comply to code enforcement case no. 2021-008918enf) | $20,000 |
| May 10, 2021 | Completed final sign-off Sep 2021 | 2 Mendosa Av | remodel bathroom. install new shower pan, reinstall all fixtures in same location. no walls or fixtures to be moved. no structural work, no framing modification.Details
remodel bathroom. install new shower pan, reinstall all fixtures in same location. no walls or fixtures to be moved. no structural work, no framing modification. | $20,000 |
| May 10, 2021 | Completed final sign-off Jul 2021 | 1839 15th St | unit 159: remodel (1) bathroom & (1) kitchen. bathroom install shower pan instead of bathtub. reinstall fixtures for same location. no walls moved. kitchen install new vabinets, new countertop, all new appliances & fixtures in same location.Details
unit 159: remodel (1) bathroom & (1) kitchen. bathroom install shower pan instead of bathtub. reinstall fixtures for same location. no walls moved. kitchen install new vabinets, new countertop, all new appliances & fixtures in same location. | $40,000 |
| May 10, 2021 | Completed final sign-off Oct 2021 | 360 Guerrero St | unit 401: remodel (1) bathroom, (1) kitchen. all appliances & fixtures to be in same location. install shower pan instead of bathtub in same location. non structuralDetails
unit 401: remodel (1) bathroom, (1) kitchen. all appliances & fixtures to be in same location. install shower pan instead of bathtub in same location. non structural | $45,000 |
| Apr 28, 2021 | Completed final sign-off Jul 2022 | 495 Chapman St | interior remodel of existing one car garage to new bedroom & new bathroom.Details
interior remodel of existing one car garage to new bedroom & new bathroom. | $45,000 |
| Mar 12, 2021 | Completed final sign-off May 2021 | 2001 Mcallister St | bathroom #1: replace shower valve, bathtub & fixtures. retile. bathroom #2: install shower valve, shower pan & fixtures in same location. reinstall tiles. kitchen: replace cabinets & countertop. all fixtures in same locations.Details
bathroom #1: replace shower valve, bathtub & fixtures. retile. bathroom #2: install shower valve, shower pan & fixtures in same location. reinstall tiles. kitchen: replace cabinets & countertop. all fixtures in same locations. | $30,000 |
| Feb 17, 2021 | Completed final sign-off Apr 2021 | 1839 15th St | unit 257: remodel bathroom. no wall or fixtures to be moved. replace bathtub with shower in same location. replace kitchen cabinets.Details
unit 257: remodel bathroom. no wall or fixtures to be moved. replace bathtub with shower in same location. replace kitchen cabinets. | $20,000 |
| Jan 25, 2021 | Completed final sign-off Mar 2021 | 2063 32nd Av | remodel bathroom. bathtub to shower. no fixtures or walls to be removed.Details
remodel bathroom. bathtub to shower. no fixtures or walls to be removed. | $12,000 |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 780 Monterey Bl | unit#301: remodel 2 bedroom apt. no wall, appliances of fixture being moved. relace new shower pan and shower faucet in bathroom, same location. replace carpet and appliances in kitchen same location.Details
unit#301: remodel 2 bedroom apt. no wall, appliances of fixture being moved. relace new shower pan and shower faucet in bathroom, same location. replace carpet and appliances in kitchen same location. | $35,000 |
| Dec 3, 2020 | Completed final sign-off Jan 2021 | 612 26th Av | replace bathtub and shower value/ faucet. refer tub enclosure.Details
replace bathtub and shower value/ faucet. refer tub enclosure. | $8,000 |
| Jul 2, 2019 | Completed final sign-off Dec 2022 | 2239 35th Av | removal of windows, doors, railing & decks, stairs on rear of bldg. replace with new windows, doors, railing, decks & stairs.Details
removal of windows, doors, railing & decks, stairs on rear of bldg. replace with new windows, doors, railing, decks & stairs. | $45,000 |
| May 3, 2019 | Never finaled issued Aug 2020, no final | 2239 35th Av | interior - removal interior partitions, doors, casework, restrooms, stairs & ceiling. replace with new replace ele/plumbing,ductwork.new interior wall demo not to exceed 75%. exterior - remove windows, doors, veneers finish, railing replace balcony. lightwell fill in,front facade,replaced in kind.Details
interior - removal interior partitions, doors, casework, restrooms, stairs & ceiling. replace with new replace ele/plumbing,ductwork.new interior wall demo not to exceed 75%. exterior - remove windows, doors, veneers finish, railing replace balcony. lightwell fill in,front facade,replaced in kind. | $200,000 |
| Feb 22, 2019 | Completed final sign-off May 2019 | 1235 Mcallister St | kichen remodel. remove kitchen cabinets. install new cabinets, new appliances, sink and counter in all existing locations. 6x8 ft kitchen.Details
kichen remodel. remove kitchen cabinets. install new cabinets, new appliances, sink and counter in all existing locations. 6x8 ft kitchen. | $15,275 |
| Nov 26, 2018 | Completed final sign-off Feb 2019 | 1271 Mcallister St | remodel of bathroom and kitchen. bathroom fixtures replacement with new shower faucet install. fixtures to remain in same location. kitchen remodel with no fixture/appliace relocation in kitchen recessed lighting upgrade per code including new cabinets flooring. sqft bath 20, kitchen 200Details
remodel of bathroom and kitchen. bathroom fixtures replacement with new shower faucet install. fixtures to remain in same location. kitchen remodel with no fixture/appliace relocation in kitchen recessed lighting upgrade per code including new cabinets flooring. sqft bath 20, kitchen 200 | $35,000 |
| Nov 13, 2018 | Completed final sign-off Sep 2020 | 563 38th Av | interior remodel to replace stairs. interior remodel of extg kitchen and bath at main level. interior remodel of bath at mezzanine level.Details
interior remodel to replace stairs. interior remodel of extg kitchen and bath at main level. interior remodel of bath at mezzanine level. | $45,000 |
| Sep 28, 2017 | Completed final sign-off Jan 2019 | 2363 Larkin St | # 31: to comply with complaint # 201707591. replace kitchen cabinets, patch & paint walls, install hardwood floor, appliances with no electrical or rough plumbing work. in bathroom replace tile & shower valve that is leaking. no fixtures or appliances movement. everything in same location.Details
# 31: to comply with complaint # 201707591. replace kitchen cabinets, patch & paint walls, install hardwood floor, appliances with no electrical or rough plumbing work. in bathroom replace tile & shower valve that is leaking. no fixtures or appliances movement. everything in same location. | $6,000 |
| Sep 6, 2017 | Completed final sign-off Nov 2017 | 181 Seal Rock Dr | bathroom fixture replacement with sheetrock installation & tile installation due to improper waterproofing around tub enclosure that was lead to leaks.Details
bathroom fixture replacement with sheetrock installation & tile installation due to improper waterproofing around tub enclosure that was lead to leaks. | $5,000 |
| Sep 20, 2016 | Completed final sign-off May 2019 | 468 Tehama St | to comply with complaint 201582711: legalization three walls as reconfigured storage rooms from (e) storage rooms. add one sprinlker head for hall way. maher naDetails
to comply with complaint 201582711: legalization three walls as reconfigured storage rooms from (e) storage rooms. add one sprinlker head for hall way. maher na | $15,000 |
| Oct 23, 2015 | Completed final sign-off Nov 2015 | 2226 Castro St | changing / re-installing new tub & new shower faucet. all fixtures are staying in the same location. re-tiling the bathroom, bathroom remodel.Details
changing / re-installing new tub & new shower faucet. all fixtures are staying in the same location. re-tiling the bathroom, bathroom remodel. | $11,000 |
| Oct 29, 2014 | Never finaled issued Oct 2014, no final | 2232 Divisadero St | remodel (e) bathroom on top floor; will not be moving fixtures or wall locations; install new shower valve, shower pan, tile, install new fan, lighting, outlets, install new fixtures in original location, repair sheetrock, painting, install shower door.Details
remodel (e) bathroom on top floor; will not be moving fixtures or wall locations; install new shower valve, shower pan, tile, install new fan, lighting, outlets, install new fixtures in original location, repair sheetrock, painting, install shower door. | $9,000 |