A Plus Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Dec 2019
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2019 | Completed final sign-off Jun 2021 | 747 32nd Av | sfd remodel - 1st fl bedroom, bathroom remoel. 2nd fl kitchen remodel. 3rd fl bathrooms remodel.Details
sfd remodel - 1st fl bedroom, bathroom remoel. 2nd fl kitchen remodel. 3rd fl bathrooms remodel. | $100,000 |
| Oct 1, 2019 | Completed final sign-off Jul 2020 | 672 Missouri St | remodel extg kitchen and 2 bathrooms. install some new energy efficient lights.Details
remodel extg kitchen and 2 bathrooms. install some new energy efficient lights. | $43,000 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 3201 Mission St | add (n) ada bathroom to souther unit of previously demised space; build (n) platform at rear (above bathroom) to allow for future storage/mechanical equipment needsDetails
add (n) ada bathroom to souther unit of previously demised space; build (n) platform at rear (above bathroom) to allow for future storage/mechanical equipment needs | $5,000 |
| Jul 3, 2019 | Completed final sign-off Jul 2020 | 79 Clipper St | rev to pa# 201903084827; to memorialize structureal changes made in field and to accurately represent all (e) windowsDetails
rev to pa# 201903084827; to memorialize structureal changes made in field and to accurately represent all (e) windows | |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 1919 San Jose Av | rebuilt dry rot front stairs to the building - in-kind replacement within same footprint all within buildable area of the lot. df structure, pt plywood, water proofing, finish slate tileDetails
rebuilt dry rot front stairs to the building - in-kind replacement within same footprint all within buildable area of the lot. df structure, pt plywood, water proofing, finish slate tile | $7,000 |
| Mar 8, 2019 | Never finaled issued May 2019, no final | 79 Clipper St | interior renovation of an (e) two story residence, work includes kitchen, bath remodel, master closet, master bath & misc other interior improvements (n) sliding door at ground fl. rear facade n/a maherDetails
interior renovation of an (e) two story residence, work includes kitchen, bath remodel, master closet, master bath & misc other interior improvements (n) sliding door at ground fl. rear facade n/a maher | $112,000 |
| Mar 12, 2018 | Completed final sign-off Feb 2019 | 44 Prospect Av | to remodel an extg sitting room to a new bedroom. to create a new bathroom. to replace a window on the front facade in kind.Details
to remodel an extg sitting room to a new bedroom. to create a new bathroom. to replace a window on the front facade in kind. | $12,000 |
| Mar 2, 2018 | Completed final sign-off Oct 2021 | 1922 23rd St | rear horizontal addition and interior improvements. back of house to be replaced with new bdrm, kitchen,bath. reconfigure existing bldg to add 1 bath and linen closet, front deck replaced/changed and roof deckDetails
rear horizontal addition and interior improvements. back of house to be replaced with new bdrm, kitchen,bath. reconfigure existing bldg to add 1 bath and linen closet, front deck replaced/changed and roof deck | $250,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2019 | 35 Riverton Dr | remodel existing bathroom, (e) kitchen on 2nd fl. add new powder room and full bathroom on 2nd fl. move (e) bathroom on 1st fl. add new laundry room, family room, & enclose part of existing foyer to 1st & 2nd fl.Details
remodel existing bathroom, (e) kitchen on 2nd fl. add new powder room and full bathroom on 2nd fl. move (e) bathroom on 1st fl. add new laundry room, family room, & enclose part of existing foyer to 1st & 2nd fl. | $80,000 |
| Oct 4, 2017 | Completed final sign-off Jan 2019 | 335 21st Av | renovate bathroom:change vanity tub to shower, retile,change fan, change lights.Details
renovate bathroom:change vanity tub to shower, retile,change fan, change lights. | $20,000 |
| Sep 6, 2017 | Completed final sign-off Aug 2019 | 1871 08th Av | remove damaged stucco siding, replace sheething/restucco to match (e) condition, half of front facade on left.Details
remove damaged stucco siding, replace sheething/restucco to match (e) condition, half of front facade on left. | $20,000 |
| Jun 8, 2017 | Completed final sign-off Aug 2019 | 1664 Washington St | unit #7, ground floor - convert half of existing unit to storage and move kitchen to the frontDetails
unit #7, ground floor - convert half of existing unit to storage and move kitchen to the front | $61,000 |
| May 16, 2017 | Completed final sign-off Jul 2017 | 1230 Pacific Av | revision to 201511051922. provide radiant heat instead of force air provide gas boiler for radiant heat systemDetails
revision to 201511051922. provide radiant heat instead of force air provide gas boiler for radiant heat system | |
| May 12, 2017 | Completed final sign-off May 2017 | 1230 Pacific Av | as built fire permit to connet and replace combo fire/service lines of 1-1/2" type "l" copper piping unerground. ref for sprinkler pa #201603172375.Details
as built fire permit to connet and replace combo fire/service lines of 1-1/2" type "l" copper piping unerground. ref for sprinkler pa #201603172375. | $3,900 |
| May 2, 2017 | Completed final sign-off Aug 2017 | 1230 Pacific Av | to clear complaint number 201771601 install weather shield wood windows in kind. wood with true divided lites 8 over 1 in the center and 6 over 1 on the side window openings.Details
to clear complaint number 201771601 install weather shield wood windows in kind. wood with true divided lites 8 over 1 in the center and 6 over 1 on the side window openings. | |
| Apr 21, 2017 | Completed final sign-off Jul 2017 | 1230 Pacific Av | revision to pa 2016-0129-8316, revise structural for stairsDetails
revision to pa 2016-0129-8316, revise structural for stairs | |
| Nov 7, 2016 | Completed final sign-off Jul 2017 | 1230 Pacific Av | repair dryrot & stucco at front of bldg.Details
repair dryrot & stucco at front of bldg. | $2,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 87 Pinehurst Wy | demo stucco, repair dryrot, restucco and paint. front and south side, repair in kind.Details
demo stucco, repair dryrot, restucco and paint. front and south side, repair in kind. | $20,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2016 | 471 03rd Av | revision to pa 2016-0516-7498, change in kitchen beam location. add skylight details to approved plansDetails
revision to pa 2016-0516-7498, change in kitchen beam location. add skylight details to approved plans | |
| Jun 14, 2016 | Completed final sign-off Jul 2017 | 1230 Pacific Av | revision to 201511051922 to add change originally approved full bath to a 1/2 bath at basement and add full bath at closet, revise 1st fl bath, delete skylightsDetails
revision to 201511051922 to add change originally approved full bath to a 1/2 bath at basement and add full bath at closet, revise 1st fl bath, delete skylights | $5,000 |
| May 16, 2016 | Completed final sign-off Sep 2016 | 471 03rd Av | interior remodel of the upper unit in a 2 story bldg. relocation of kitchen and bathroom, new master bathroom, new interior wall and ceiling finishes. 2 new skylights above stair and kitchen.Details
interior remodel of the upper unit in a 2 story bldg. relocation of kitchen and bathroom, new master bathroom, new interior wall and ceiling finishes. 2 new skylights above stair and kitchen. | $75,000 |
| Feb 29, 2016 | Completed final sign-off Jul 2017 | 1230 Pacific Av | revision to pa 2015 1105 1922: convert storage room at 1st floor front to garage with car lift to basement. provide new front entry. replace 2nd floor front windows in kind.Details
revision to pa 2015 1105 1922: convert storage room at 1st floor front to garage with car lift to basement. provide new front entry. replace 2nd floor front windows in kind. | $30,000 |
| Jan 29, 2016 | Completed final sign-off Jul 2017 | 1230 Pacific Av | revision to pa 2015-1105-1922 provide new roof deck above 3rd floor. exterior stair from 2nd floor to 3rd floor.Details
revision to pa 2015-1105-1922 provide new roof deck above 3rd floor. exterior stair from 2nd floor to 3rd floor. | $5,000 |