Wei Li Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
- Last 24 months
- 5 permits filed
42 permits since 2000: 35 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 1935 Webster St | revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to codeDetails
revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to code | $15,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 1935 Webster St | revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced.Details
revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced. | $18,000 |
| Feb 6, 2026 | In progress issued Jul 2026 | 3342 Fulton St | additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Details
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. | $230,000 |
| Jul 10, 2025 | In progress issued Dec 2025 | 1935 Webster St | rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades.Details
rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades. | $750,000 |
| Oct 28, 2024 | In progress issued Mar 2025 | 571 34th Av | 1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade.Details
1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade. | $176,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2026 | 3595 Folsom St | interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapetDetails
interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapet | $240,000 |
| Mar 4, 2024 | Completed final sign-off Apr 2025 | 1018 Pacheco St | 2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the buildingDetails
2nd fl kitchen remodel, wall removal & (n) bath. 1st fl remodel to include (n) bedroom, (n) bath, (n) laundry room & expanded foyer inside covered entry. replace windows front and back of the building | $95,000 |
| Apr 18, 2023 | Completed final sign-off Nov 2024 | 1635 Bush St | unit #8: replace 1-living room "greenhouse" window and 1-bedroom window facing fern st. replace 1-bedroom window and 1-sliding glass door facing interior courtyard.Details
unit #8: replace 1-living room "greenhouse" window and 1-bedroom window facing fern st. replace 1-bedroom window and 1-sliding glass door facing interior courtyard. | $35,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2025 | 1468 36th Av | interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath.Details
interior remodel of existing spaces to include ground flr/1st flr family rm, bedroom, bath, internal open stairs & 2nd flr. open kitchen, full bath & half bath. | $125,000 |
| Mar 31, 2023 | Completed final sign-off Dec 2024 | 1635 Bush St | unit 12: replace (1) greenhouse window and 1 bedroom window facing fern st and rpelce 1 window facing interior courtyardDetails
unit 12: replace (1) greenhouse window and 1 bedroom window facing fern st and rpelce 1 window facing interior courtyard | $32,000 |
| Mar 31, 2023 | Completed final sign-off Nov 2024 | 1635 Bush St | unit 1: replace front facdae "green house" window facing bush st. existing 3-sliders to be replaced w/ a fixed middle unit and flanking double casement windows.Details
unit 1: replace front facdae "green house" window facing bush st. existing 3-sliders to be replaced w/ a fixed middle unit and flanking double casement windows. | $25,000 |
| Dec 16, 2022 | Completed final sign-off Apr 2024 | 239 Lakeshore Dr | interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind.Details
interior remodel of (e) sfr, to include (n) g/f family room, bedroom, powder room, laundry and bath, and 2/f open kitchen, (n) open stairs, full bath and 1/2 bath. windows to be replace in kind. | $150,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2024 | 619 11th Av | remodel 2 bathrooms at 3rd fl. add a laundry closet.Details
remodel 2 bathrooms at 3rd fl. add a laundry closet. | $30,000 |
| May 2, 2022 | Completed final sign-off Jun 2023 | 1359 41st Av | remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space.Details
remodel g/f rec room, new bedroom, new bar, new bath, new laundry, new open interior stairs, & remodel of 2/f kitchen, open living space. | $125,000 |
| Apr 21, 2021 | Completed final sign-off Nov 2022 | 127 Skyview Wy | non load bearing wall removal, kitchen remodel. w/ island at 2nd floor. new hardwood flooring at 2nd floor area of work replacement of kitchen window.Details
non load bearing wall removal, kitchen remodel. w/ island at 2nd floor. new hardwood flooring at 2nd floor area of work replacement of kitchen window. | $20,000 |
| Apr 16, 2021 | Completed final sign-off Sep 2021 | 539 09th Av | kitchen and two bathroom remodel with same layout no wall will be movedDetails
kitchen and two bathroom remodel with same layout no wall will be moved | $45,000 |
| Apr 16, 2021 | Completed final sign-off Feb 2022 | 445 Arguello Bl | kitchen and two bathrom remodel with the same layout new cabinets new counter top and new title no wall will be removedDetails
kitchen and two bathrom remodel with the same layout new cabinets new counter top and new title no wall will be removed | $40,000 |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 3655 Folsom St | interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr.Details
interior remodel to incl kitchen, switching location of dinining rm & bedrm on ground flr, upgrading stairs to upper flr, new bathrm & closets on upper flr. | $90,000 |
| Jul 21, 2020 | Completed final sign-off Sep 2021 | 619 11th Av | construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yardDetails
construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yard | $6,000 |
| May 26, 2020 | Never finaled issued May 2020, no final | 190 Bridgeview Dr | remodel kitchen and one bathroom on main floor. remove and replace countertop, cabinet, and flooring in kitchen. remove and replace tub, toilet and vanity in the bathroom. no alteration to partition walls. non-structural work only. all work in-kind.Details
remodel kitchen and one bathroom on main floor. remove and replace countertop, cabinet, and flooring in kitchen. remove and replace tub, toilet and vanity in the bathroom. no alteration to partition walls. non-structural work only. all work in-kind. | $30,000 |
| Jan 28, 2020 | Completed final sign-off Aug 2020 | 2425 21st Av | remodel kitchen, one bathroom and a half bathroom in kind. same layout. update electrical wiring for kitchen and bathroom. new kitchen cabinets, counter top. new plumbing fixtures.comply with cec 150(k) 3 and 5.Details
remodel kitchen, one bathroom and a half bathroom in kind. same layout. update electrical wiring for kitchen and bathroom. new kitchen cabinets, counter top. new plumbing fixtures.comply with cec 150(k) 3 and 5. | $49,500 |
| Oct 15, 2019 | Completed final sign-off Feb 2020 | 689 Noe St | unit # 3: remodel kitchen with new cabinets. new counter top. update electrical wiring. installkitchen sink, faucet, dishwasher. garbage disposal.Details
unit # 3: remodel kitchen with new cabinets. new counter top. update electrical wiring. installkitchen sink, faucet, dishwasher. garbage disposal. | $31,000 |
| Jun 19, 2019 | Completed final sign-off Aug 2020 | 343 Arlington St | remodel at both levels. remodel e kitchen at 2nd fl. bath remodel and new habitable space at gr flDetails
remodel at both levels. remodel e kitchen at 2nd fl. bath remodel and new habitable space at gr fl | $95,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 137 Detroit St | 9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room.Details
9'-2" horizontal rear addition, interior remodel of kitchen, bath, new half bath at upper level. interior remodel of garage level to include new bedroom, laundry room & family room. | $195,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2019 | 1007 Carolina St | kitchen and bathrooms remodel with the same layout. replace the new cabinets. new countertop, faucets, sinks, new tile, new toilet, new vanities. new bathtub one shower.Details
kitchen and bathrooms remodel with the same layout. replace the new cabinets. new countertop, faucets, sinks, new tile, new toilet, new vanities. new bathtub one shower. | $42,500 |
| Apr 3, 2018 | Completed final sign-off Sep 2018 | 2018 Bancroft Av | legalize two bedrooms, one full bath, add laundry & front side door at 1st fl per plan.Details
legalize two bedrooms, one full bath, add laundry & front side door at 1st fl per plan. | $36,000 |
| Feb 9, 2018 | Completed final sign-off Jul 2018 | 3900 California St | kitchen baht remodel with same layout. new cabinets, tile, countertop. no rough framingDetails
kitchen baht remodel with same layout. new cabinets, tile, countertop. no rough framing | $35,000 |
| Feb 7, 2018 | Expired or cancelled cancelled Jan 2026 | 3900 California St | unit 3. kitchen and two bathrooms remodel with the same layout. new cabinets, new tile, new counter tops. no rough framing. maher naDetails
unit 3. kitchen and two bathrooms remodel with the same layout. new cabinets, new tile, new counter tops. no rough framing. maher na | |
| Jan 26, 2018 | Completed final sign-off Aug 2018 | 134 Naples St | 1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed.Details
1st floor: add 1 bedroom, 1 family rm, 1 full bath. new stairs at rear. remove attached shed. | $50,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2018 | 1220 Naples St | construct three bedrooms, two full bathrooms & laundry area at ground floor. relcoate (e) ktichen, convert (e) ktichen space to new bedroom & convert one (e) bathroom to two bathroom at 2nd floor. replace 7 windows with (e) vinyl windows not street visible.Details
construct three bedrooms, two full bathrooms & laundry area at ground floor. relcoate (e) ktichen, convert (e) ktichen space to new bedroom & convert one (e) bathroom to two bathroom at 2nd floor. replace 7 windows with (e) vinyl windows not street visible. | $72,000 |
| Sep 22, 2017 | Completed final sign-off Nov 2017 | 1635 Bush St | 3rd floor:convert exist. closet to washer and dryer space.Details
3rd floor:convert exist. closet to washer and dryer space. | $1,000 |
| Sep 11, 2017 | Completed final sign-off Nov 2017 | 1635 Bush St | kitchen remodel. no walls added or removed.Details
kitchen remodel. no walls added or removed. | $15,000 |
| Aug 14, 2017 | Completed final sign-off Apr 2019 | 771 28th Av | remodel (e) kitchen, infill lightwell, relocate laundry from garage to 1/f, convert sunroom to full bath on 2/f.Details
remodel (e) kitchen, infill lightwell, relocate laundry from garage to 1/f, convert sunroom to full bath on 2/f. | $40,000 |
| Jun 16, 2017 | Completed final sign-off Feb 2018 | 16 Loyola Tr | 1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bathDetails
1st flr: add 1 media room, 2 bedrooms, 1 bath abd interior stairs to connect to 2nd flr. 2nd flr: remodel kitchen and bathroom, add 1 full bath | $60,000 |
| Apr 17, 2017 | Completed final sign-off Jan 2018 | 1485 16th Av | interior remodel of existing sfd. remodel bathrooms. new elevator. new laundry space on second floor.Details
interior remodel of existing sfd. remodel bathrooms. new elevator. new laundry space on second floor. | $50,000 |
| Dec 19, 2016 | Completed final sign-off Feb 2017 | 125 Galewood Cr | window replacemnt with orginal aluminum windows.Details
window replacemnt with orginal aluminum windows. | $6,500 |
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 125 Galewood Cr | kitchen & baths remodel with same layout, new cabinets, countertop, appliances, faucets, toilets, bath tubs and shower.Details
kitchen & baths remodel with same layout, new cabinets, countertop, appliances, faucets, toilets, bath tubs and shower. | $35,000 |
| Sep 15, 2016 | Completed final sign-off Jan 2017 | 619 11th Av | kitchen remodel with same layout, new cabinets, countertop, applaances, faucet.Details
kitchen remodel with same layout, new cabinets, countertop, applaances, faucet. | $15,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2025 | 4104 California St | to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stairDetails
to comply w/nov#202042521. legalize attic studio w/ kitchen, full bath, to include rear spiral stair | $50,000 |
| Jul 7, 2016 | Completed final sign-off Dec 2016 | 2591 21st Av | 1 kitchen & 2 bathrooms remodeling. replace 2 windows on side of house not visbale from street. no structural work. no wall modification. no ground floor work.Details
1 kitchen & 2 bathrooms remodeling. replace 2 windows on side of house not visbale from street. no structural work. no wall modification. no ground floor work. | $25,000 |
| Mar 22, 2016 | Completed final sign-off Aug 2016 | 134 Naples St | 2nd floor: remodel kitchen and bath.Details
2nd floor: remodel kitchen and bath. | $20,000 |
| Feb 6, 2015 | Completed final sign-off Jun 2015 | 1037 Rivera St | add two bedrooms, two full bathrooms, family room & laundry at 1st floor per plan.Details
add two bedrooms, two full bathrooms, family room & laundry at 1st floor per plan. | $43,300 |