33 permits since 2000 (engineer on 32 permits, architect on 1 permit): 17 completed, 2 in progress, 7 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2025 | In progress issued Nov 2025 | 3355 Pacific Av | Fma Builders | revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage systemDetails
revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage system | $100,001 |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code.Details
revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code. | |
| Jun 27, 2024 | Expired or cancelled expired Sep 2026 | 2920 Broadway | Cello & Maudru Construction Co Inc | revision to bpa# 2024-0314-7863, 2022-0607-5750, and 2019-1223-0360-s3: revision to mechanical system at level to include to level 0 to incllude exhaust system for future battery room.Details
revision to bpa# 2024-0314-7863, 2022-0607-5750, and 2019-1223-0360-s3: revision to mechanical system at level to include to level 0 to incllude exhaust system for future battery room. | $8,951 |
| Sep 20, 2023 | In progress issued Jul 2026 | 2760 Vallejo St | Matarozzi/Pelsinger Builders Inc. | renovation of sfd. minimum horizontal addition @ rear. add decks @ several levels @ rear. reconfigure facade @ rear by modifying windows, doors & finishes. replace windows throughout in-kind or similar. new rear yard terrace & equip vault, update shoring for pool under pa# 202508263945.Details
renovation of sfd. minimum horizontal addition @ rear. add decks @ several levels @ rear. reconfigure facade @ rear by modifying windows, doors & finishes. replace windows throughout in-kind or similar. new rear yard terrace & equip vault, update shoring for pool under pa# 202508263945. | $300,000 |
| Jul 13, 2023 | Completed final sign-off Oct 2023 | 470 Pacific Av | Cookline Construction Inc | revision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions.Details
revision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions. | |
| Jun 27, 2023 | Completed final sign-off Nov 2025 | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof.Details
revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof. | $191,880 |
| May 17, 2023 | Expired or cancelled expired Sep 2026 | 2920 Broadway | Cello & Maudru Construction Co Inc | revision 201912230360. addendum 3 include revision to level 3 and level 4 plan layouts and rcp layoutsDetails
revision 201912230360. addendum 3 include revision to level 3 and level 4 plan layouts and rcp layouts | |
| Nov 9, 2022 | Completed final sign-off Nov 2024 | 1080 Chestnut St | Black Mountain Development | 18 fl: demo (e) int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes.Details
18 fl: demo (e) int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes. | $400,000 |
| Jun 7, 2022 | Expired or cancelled expired Sep 2026 | 2920 Broadway | Cello & Maudru Construction Co Inc | revision to pa 2019-1223-0360 s3 to incorporate arch/mep revisions; added 8 hours to cover back check hours for this permit application as well as for back check hours to cover time for structural and shoring revisions that was not previously charged, dmj 10/24/2022;Details
revision to pa 2019-1223-0360 s3 to incorporate arch/mep revisions; added 8 hours to cover back check hours for this permit application as well as for back check hours to cover time for structural and shoring revisions that was not previously charged, dmj 10/24/2022; | |
| May 31, 2022 | Completed final sign-off Apr 2023 | 201 Folsom St | Aaron Gordon Construction Inc | revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetryDetails
revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetry | |
| Dec 8, 2020 | Completed final sign-off Jan 2022 | 2121 Webster St | Marina Mechanical Services | #804/gph4: finish & install vrf system, exhaust fans, with associated ductwork and grilles, controls, insulation and air balance. ref bpa# 201904258942.Details
#804/gph4: finish & install vrf system, exhaust fans, with associated ductwork and grilles, controls, insulation and air balance. ref bpa# 201904258942. | $320,074 |
| Dec 13, 2019 | Expired or cancelled cancelled Jul 2024 | 950 Gough St | mep for new sanctuary, social dining hall, kitchen and office for st paulus lutheran church. ref pa 2019-1008-3860Details
mep for new sanctuary, social dining hall, kitchen and office for st paulus lutheran church. ref pa 2019-1008-3860 | $30,000 | |
| Jan 15, 2015 | Completed final sign-off Jul 2016 | 1455 Market St | Bcci Construction Company | mechanical & electrical work associated with approved pa 201412103447;, life safety under separate permit; maher n/aDetails
mechanical & electrical work associated with approved pa 201412103447;, life safety under separate permit; maher n/a | $875,000 |
| Dec 8, 2014 | Completed final sign-off Jul 2016 | 1455 Market St | Bcci Construction Company | t.i. on a portion of the 8th floor to include new drywall, ceiling work, doors, finishes and associated mechanical and electrical work. n/a for maher. life safety systems & standpipe removal on deferred permitsDetails
t.i. on a portion of the 8th floor to include new drywall, ceiling work, doors, finishes and associated mechanical and electrical work. n/a for maher. life safety systems & standpipe removal on deferred permits | $1,367,000 |
| Jul 15, 2014 | Never finaled issued Jul 2014, no final | 350 California St | Skyline Construction | 15th floor - revision to appl #2013.1126.2862 for mechanical revisions. n/a maher ordinanceDetails
15th floor - revision to appl #2013.1126.2862 for mechanical revisions. n/a maher ordinance | |
| Jul 15, 2014 | Never finaled issued Jul 2014, no final | 350 California St | Skyline Construction | 7th floor - revision to appl #2013.1106.1258 for mechanical revisions. n/a maher ordinanceDetails
7th floor - revision to appl #2013.1106.1258 for mechanical revisions. n/a maher ordinance | |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 181 03rd St | replacement of 2 extg hot water heating boilers with new high efficiency furnace air boilers to meet air quality requirements.Details
replacement of 2 extg hot water heating boilers with new high efficiency furnace air boilers to meet air quality requirements. | $207,000 | |
| Jun 26, 2014 | Completed final sign-off Nov 2014 | 100 01st St | Skyline Construction | mechanical and electrical for tenant improvement, new vav, new transfer fans, new lighting. ref. arch# 201306037389Details
mechanical and electrical for tenant improvement, new vav, new transfer fans, new lighting. ref. arch# 201306037389 | $10,000 |
| Jun 20, 2014 | Completed final sign-off Jan 2016 | 475 Sansome St | Novo Construction Inc | 22nd flr: replacement of existing chiller, cooling towers, and (2) condenser water pumps, removal & demolition of existing chiller & cooling towers; maher n/aDetails
22nd flr: replacement of existing chiller, cooling towers, and (2) condenser water pumps, removal & demolition of existing chiller & cooling towers; maher n/a | $900,000 |
| Dec 10, 2013 | Completed final sign-off Feb 2014 | 221 Main St | Commercial Interior Builders Inc | 2nd floor - mechanical & electrical work. ref pa #2013.0923.7459 for architectural work.Details
2nd floor - mechanical & electrical work. ref pa #2013.0923.7459 for architectural work. | $128,000 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 1245 04th St | Hawk Mechanical Inc | unit c: install two new fan coils & condensers with new grilles, new thermostats, refrigerant piping & duct work, install bath exhaust fan with duct & exhaust louver, instlal outside air duct from new outside air louver to two fan coil return plenums.Details
unit c: install two new fan coils & condensers with new grilles, new thermostats, refrigerant piping & duct work, install bath exhaust fan with duct & exhaust louver, instlal outside air duct from new outside air louver to two fan coil return plenums. | $42,000 |
| Aug 7, 2013 | Never finaled issued Nov 2013, no final | 350 California St | Swinerton Builders | 23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad.Details
23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad. | $1,500,000 |
| Jun 24, 2013 | Completed final sign-off Aug 2013 | 221 Main St | Gci, Inc | 12/f #1280 -mechanical title 24 to provide 5 new vav box & 5 new air supply unit. refer to pa# 2013-0513-6749Details
12/f #1280 -mechanical title 24 to provide 5 new vav box & 5 new air supply unit. refer to pa# 2013-0513-6749 | $42,000 |
| Jun 24, 2013 | Completed final sign-off Aug 2013 | 221 Main St | Gci, Inc | 7/f #700- mechanical title 24 to provide 1 new vav box & 1 new air supply unit. refer to pa# 2013-0513-6752Details
7/f #700- mechanical title 24 to provide 1 new vav box & 1 new air supply unit. refer to pa# 2013-0513-6752 | $36,000 |
| Apr 4, 2013 | Completed final sign-off Jul 2014 | 1455 Market St | Bcci Construction Company | 9th floor. mechanical & electrical work associated with pa# 2013/03/19/2494. food service equipment under separate permit.Details
9th floor. mechanical & electrical work associated with pa# 2013/03/19/2494. food service equipment under separate permit. | $550,000 |
| Mar 13, 2013 | Expired or cancelled cancelled Jan 2026 | 150 Spear St | Rossi Builders Inc. | med - ref to pa# 201302130127. relocate 4 fan coil with duct work. install new grilles.Details
med - ref to pa# 201302130127. relocate 4 fan coil with duct work. install new grilles. | $80,000 |
| Jan 17, 2013 | Never finaled issued Mar 2013, no final | 345 Stockton St | Howard S. Wright Constructors Lp | for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321.Details
for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321. | |
| Sep 21, 2012 | Expired or cancelled withdrawn Dec 2015 | 284 Stanyan St | structurel seismic work & interior tenant improvement of existing offices.Details
structurel seismic work & interior tenant improvement of existing offices. | $200,000 | |
| Sep 19, 2012 | Completed final sign-off Jun 2025 | 266 04th St | Tutor Perini Corporation | erect central transit subway station.Details
erect central transit subway station. | $38,314,494 |
| Apr 3, 2012 | Never finaled issued Jul 2013, no final | 933 Stockton St | Tutor Perini Corporation | erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton streetDetails
erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street | $69,970,683 |
| Jan 27, 2012 | Completed final sign-off Nov 2012 | 760 Market St | Gci, Inc | electrical and mechanical for ti work on the 5th fl. add , relocate, and remove fixtures and equipment. refer to 201109134435Details
electrical and mechanical for ti work on the 5th fl. add , relocate, and remove fixtures and equipment. refer to 201109134435 | $935,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 1199 Bush St | H L S. Inc Dba Wolf General | suite 290 - remove (e) kitchen & convert to mdf room, install full height wall, new sheetrock, new ceiling (t-bar) new vct floor, hvac. main distribution frame. sprinkler & fire alarm revisions under seperate application.Details
suite 290 - remove (e) kitchen & convert to mdf room, install full height wall, new sheetrock, new ceiling (t-bar) new vct floor, hvac. main distribution frame. sprinkler & fire alarm revisions under seperate application. | $40,000 |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 560 Mission St | Gci, Inc | oti-2 11th floor, el, meDetails
oti-2 11th floor, el, me | $42,000 |