Michael Gemmill
- Listed as
- engineer
- Firm
- Nabih Youssef
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2005 to Mar 2026
14 permits since 2000 (engineer on 14 permits): 7 completed, 4 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2026 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public rowDetails
exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public row | $125,000 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferredDetails
20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred | $1,168,299 |
| Dec 9, 2025 | In progress issued Jul 2026 | 3175 17th St | Singular Builders | change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.Details
change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings. | $7,273,634 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | Peacock Construction | 12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged.Details
12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged. | |
| Apr 15, 2025 | In progress issued Aug 2025 | 185 Berry St | Hathaway Dinwiddie Co. | converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.Details
converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades. | $15,000,000 |
| Jan 17, 2025 | In progress issued May 2025 | 560 Mission St | Gci, Inc | basement parking garage includes new finishes and lighting at elevator lobby and entry area.g/f: new cafe area, new seating areas throughout, new restrooms and phone rooms, new entry doors and new finishes throughout. 2/f: new seating areas, new training room, new gym area with lockers and showersDetails
basement parking garage includes new finishes and lighting at elevator lobby and entry area.g/f: new cafe area, new seating areas throughout, new restrooms and phone rooms, new entry doors and new finishes throughout. 2/f: new seating areas, new training room, new gym area with lockers and showers | $15,000,000 |
| Jan 11, 2022 | Completed final sign-off Mar 2022 | 2100 Pacific Av | Alpha Restoration & Wateproof | rev to pa202103237049: to record that shortcrete was used instead of pour in place concrete. update special inspection form to reflect change.Details
rev to pa202103237049: to record that shortcrete was used instead of pour in place concrete. update special inspection form to reflect change. | |
| Dec 26, 2019 | Never finaled issued Feb 2020, no final | 601 California St | Fisher Development Inc | 20/f: tenant convienience stair be6tween floors 2-21. strutural & architectural only. work is associated with t.i pa20191226. maher n/a.Details
20/f: tenant convienience stair be6tween floors 2-21. strutural & architectural only. work is associated with t.i pa20191226. maher n/a. | $45,000 |
| Dec 26, 2019 | Never finaled issued Feb 2020, no final | 601 California St | Fisher Development Inc | 20/f: interior t.i. including drywall, millwork, finisehs, ceiling, lighting, plumbing, eletrical & mechanical. maher n/a.Details
20/f: interior t.i. including drywall, millwork, finisehs, ceiling, lighting, plumbing, eletrical & mechanical. maher n/a. | $1,431,060 |
| Sep 9, 2019 | Completed final sign-off Jan 2021 | 170 Ofarrell St | Freeman Construction Company | 1/f:this project involves the interior improvements of an existing tenant space for christian dior parfum & cosmetics. work includes new finishes, millwork (by others), canopy, and lighting. work is limted to approx 545 sq ft of the 1st fl of the west building.Details
1/f:this project involves the interior improvements of an existing tenant space for christian dior parfum & cosmetics. work includes new finishes, millwork (by others), canopy, and lighting. work is limted to approx 545 sq ft of the 1st fl of the west building. | $130,000 |
| Aug 9, 2019 | Never finaled issued Sep 2019, no final | 560 Mission St | Clune Construction Company L P | suite 3100 - revision to 201902273940 the structural scope of work is limited to provide support steel for a leaf wall on 31st floorDetails
suite 3100 - revision to 201902273940 the structural scope of work is limited to provide support steel for a leaf wall on 31st floor | |
| Mar 29, 2019 | Completed final sign-off Apr 2022 | 185 Berry St | Hathaway Dinwiddie Co. | voluntary seismic upgrade of existing china basin wharfside building.Details
voluntary seismic upgrade of existing china basin wharfside building. | $54,876,000 |
| Mar 28, 2019 | Completed final sign-off Feb 2020 | 333 Bush St | Skyline Construction | strengthening for existing floor to support new loads at mdf 26-113/27 idf 27-113 29th idf 29-113, 28th idf 28-113 ref pa 2018-1205-7508, 2018-1129-6941, 2018-1129-6942 and 2018-1205-7507. maher n/a.Details
strengthening for existing floor to support new loads at mdf 26-113/27 idf 27-113 29th idf 29-113, 28th idf 28-113 ref pa 2018-1205-7508, 2018-1129-6941, 2018-1129-6942 and 2018-1205-7507. maher n/a. | $15,000 |
| Aug 17, 2005 | Completed final sign-off Feb 2006 | 249 Monterey Bl | replace (e) exterior deck. new deck will extend an additional 3'-0" to south & 5'-0" to west.Details
replace (e) exterior deck. new deck will extend an additional 3'-0" to south & 5'-0" to west. | $9,000 |