Luis E. Rodriguez
- Listed as
- architect, engineer
- Firm
- Innovative Design Engineering
- Based in
- Emeryville
- On San Francisco permits
- Sep 2010 to Sep 2026
34 permits since 2000 (engineer on 29 permits, architect on 5 permits): 17 completed, 4 in progress, 6 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 1873 Turk St | in kind balcony repair 6 x21 balcony. no extensions or changes like for like repair at rearDetails
in kind balcony repair 6 x21 balcony. no extensions or changes like for like repair at rear | $15,000 | |
| May 18, 2026 | Completed final sign-off Aug 2026 | 1923 32nd Av | Clarity Construction Group | add 290 sq ft roof deck to existing roof. existing access door and guardrailing to remain.Details
add 290 sq ft roof deck to existing roof. existing access door and guardrailing to remain. | $20,000 |
| Mar 19, 2026 | In progress issued Apr 2026 | 339 Faxon Av | revision to 202311030091: new livable space at 1st/f, kitchenette, bathroom, & 2 bedroomsDetails
revision to 202311030091: new livable space at 1st/f, kitchenette, bathroom, & 2 bedrooms | $40,000 | |
| May 1, 2025 | Completed final sign-off Oct 2025 | 21 Samoset St | Abstract Windows Inc. | installation of (1) fixed window at the entryway next to the front door. the new window will be alum clad wood, obscured and tempered glass. (there is a preliminary approval from a planner)Details
installation of (1) fixed window at the entryway next to the front door. the new window will be alum clad wood, obscured and tempered glass. (there is a preliminary approval from a planner) | $9,000 |
| Apr 25, 2025 | Completed final sign-off Oct 2025 | 73 Fountain St | rev to pa# 2024-0229-6832: change gas furnace to heat pump and mini splitDetails
rev to pa# 2024-0229-6832: change gas furnace to heat pump and mini split | $3,500 | |
| Jul 11, 2024 | In progress issued Jul 2024 | 76 Dorado Tr | Ibr Construction Inc | bathrooms remodeling - one bathroom remodel in kind, change master bathroom layout. install new furnace and waterheater. replace skylights in kind, not visible from the street.Details
bathrooms remodeling - one bathroom remodel in kind, change master bathroom layout. install new furnace and waterheater. replace skylights in kind, not visible from the street. | $60,000 |
| Jan 22, 2024 | In progress issued Jan 2024 | 76 Dorado Tr | Ibr Construction Inc | revision 202304045019- structual details to address field condtions of footingDetails
revision 202304045019- structual details to address field condtions of footing | |
| Apr 13, 2023 | Completed final sign-off Oct 2025 | 73 Fountain St | Sdmi Construction | revision to permit 202001131721. new details for foundation.Details
revision to permit 202001131721. new details for foundation. | |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 1750 48th Av | Ibr Construction Inc | addition to back of house: 2 levels attched to the back of the (e) home. 1 master bedroom with a closet and a walk-in closet. home office and an additional bathroom. new sunroom. new deck right above the sunroom.Details
addition to back of house: 2 levels attched to the back of the (e) home. 1 master bedroom with a closet and a walk-in closet. home office and an additional bathroom. new sunroom. new deck right above the sunroom. | $180,000 |
| Jun 24, 2022 | Completed final sign-off May 2025 | 1363 35th Av | David Rodriguez Construction | rev to pa 202205265036: structural revision - details of beam connection only.Details
rev to pa 202205265036: structural revision - details of beam connection only. | |
| May 26, 2022 | Completed final sign-off May 2025 | 1363 35th Av | David Rodriguez Construction | voluntary structural strenghteningDetails
voluntary structural strenghtening | $15,000 |
| May 24, 2022 | Completed final sign-off Nov 2022 | 233 30th St | Creekside Pro Construction Inc | adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area.Details
adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area. | $8,000 |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 590 06th St | unit 301: new closet partitions @ laundry room, non bearing walls to be removed, 1/f-2/f bathrooms, (2) total, to be remodeled, relocate 1/f bedroom door, 1/f new windowsDetails
unit 301: new closet partitions @ laundry room, non bearing walls to be removed, 1/f-2/f bathrooms, (2) total, to be remodeled, relocate 1/f bedroom door, 1/f new windows | $40,000 | |
| Oct 26, 2021 | Completed final sign-off Jun 2022 | 10 Godeus St | repair 13" of dryrot at 2/f. revision to 202102104375. 80% of wall was replaced at office.Details
repair 13" of dryrot at 2/f. revision to 202102104375. 80% of wall was replaced at office. | $5,000 | |
| Sep 29, 2021 | Expired or cancelled expired Sep 2026 | 721 Bay St | Edri Construction Inc *See Notes* | revision to pa# 202108055834 (no plan); remove bearing wall between kitchen and living room. add a sink.Details
revision to pa# 202108055834 (no plan); remove bearing wall between kitchen and living room. add a sink. | $25,000 |
| Feb 4, 2021 | Never finaled issued Oct 2022, no final | 1558 Shafter Av | S And L Remodeling And Design Inc, G B U Construction Development | new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.Details
new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall. | $200,000 |
| Dec 29, 2020 | Expired or cancelled cancelled Jan 2026 | 161 Gilbert St | add new powder room.Details
add new powder room. | $8,000 | |
| Sep 26, 2020 | Completed final sign-off Apr 2021 | 209 Anderson St | Edri Construction Inc *See Notes* | living room, dining room & kitchen to be rearranged, including new bathroom. a few bearing walls to be removed, no exterior work.Details
living room, dining room & kitchen to be rearranged, including new bathroom. a few bearing walls to be removed, no exterior work. | $70,000 |
| Feb 6, 2020 | Completed final sign-off Apr 2021 | 127 Valdez Av | Winder Construction Inc. | revsion to 201911157469, structural changes to framing designDetails
revsion to 201911157469, structural changes to framing design | |
| Jan 30, 2020 | Expired or cancelled withdrawn May 2022 | 472 Gold Mine Dr | repair dry-rot in (e) sunroom, up to 50%. like for like replace/replacement.Details
repair dry-rot in (e) sunroom, up to 50%. like for like replace/replacement. | $6,000 | |
| Nov 5, 2019 | Completed final sign-off Jan 2020 | 572 Dewey Bl | Bay Build Design Inc | rev to pa#201910104200: new bileting detail for hold downs.Details
rev to pa#201910104200: new bileting detail for hold downs. | |
| Sep 27, 2019 | Completed final sign-off Feb 2020 | 1755 11th Av | Sky Home Builders Inc | kitchen & bathroom remodel, replace bearing wall and replace with support beam, posts & footingsDetails
kitchen & bathroom remodel, replace bearing wall and replace with support beam, posts & footings | $10,000 |
| Aug 14, 2019 | Expired or cancelled cancelled Jan 2026 | 25 Bessie St | home remodel, convert (e) bathroom into open deck areaDetails
home remodel, convert (e) bathroom into open deck area | $20,000 | |
| Aug 13, 2019 | Completed final sign-off Feb 2020 | 4 Bass Ct | Sky Home Builders Inc | remove wall and support it w/ structural beamDetails
remove wall and support it w/ structural beam | $10,000 |
| May 15, 2019 | Completed final sign-off Sep 2019 | 1733 Hayes St | Prosper Construction Dev Inc. | expand bathroom & remodel bathroom, install new barn door at toliet room, replace 2 windows & make them smallerDetails
expand bathroom & remodel bathroom, install new barn door at toliet room, replace 2 windows & make them smaller | $16,000 |
| Apr 10, 2019 | Completed final sign-off Dec 2019 | 321 Caselli Av | add window at upper floorDetails
add window at upper floor | $2,000 | |
| Apr 10, 2019 | Expired or cancelled cancelled Jan 2026 | 2312 09th Av | infill under 2nd floor rear, additional storage at garage levelDetails
infill under 2nd floor rear, additional storage at garage level | $25,000 | |
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 1901 Oakdale Av | barrier removal only -add new lift inside bldg footprint. remove 1 window & 1 door at new lift.Details
barrier removal only -add new lift inside bldg footprint. remove 1 window & 1 door at new lift. | $45,000 | |
| Feb 22, 2019 | Completed final sign-off May 2019 | 1239 22nd Av | Prosper Construction Dev Inc. | convert (e) closet into new bathroom and new skylight.Details
convert (e) closet into new bathroom and new skylight. | $26,000 |
| Feb 20, 2019 | Never finaled issued Dec 2019, no final | 321 Caselli Av | new rooftop deck.Details
new rooftop deck. | $20,000 | |
| Dec 19, 2018 | Expired or cancelled withdrawn Feb 2019 | 579 Moscow St | horizontal addition, 2nd story addition at back & house remodel, (3) new bedrooms.Details
horizontal addition, 2nd story addition at back & house remodel, (3) new bedrooms. | $400,000 | |
| Dec 4, 2017 | Completed final sign-off May 2019 | 516 Victoria St | Quartz Construction | extg stairs (not to code) to be removed and new stairs to be built in different location. garage to be converted to include 1 car garage, 2 bedroom, and 1 bath room. 2nd floor lightwell to be infilled, new 1/2 bath at 2nd floor.Details
extg stairs (not to code) to be removed and new stairs to be built in different location. garage to be converted to include 1 car garage, 2 bedroom, and 1 bath room. 2nd floor lightwell to be infilled, new 1/2 bath at 2nd floor. | $100,000 |
| Apr 10, 2017 | Never finaled issued Oct 2018, no final | 553 Valley St | Sky Home Builders Inc | horizontal addition. add kitchen, master room, & bedroom. remodel kitchen & bath room, coutertops, shower, toilet vanity, kitchen cabinets, counter tops, flooring & paint.Details
horizontal addition. add kitchen, master room, & bedroom. remodel kitchen & bath room, coutertops, shower, toilet vanity, kitchen cabinets, counter tops, flooring & paint. | $275,000 |
| Sep 24, 2010 | Never finaled issued Apr 2019, no final | 2317 15th St | Bay Build Design Inc | add a dwelling unit on ground floor, 1 bedroom, 1 living room / kitchen. 1 bathroom.Details
add a dwelling unit on ground floor, 1 bedroom, 1 living room / kitchen. 1 bathroom. | $30,000 |