Quartz Construction
- Based in
- San Jose
- On San Francisco permits
- Dec 2017 to Dec 2017
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2017 | Completed final sign-off May 2019 | 516 Victoria St | extg stairs (not to code) to be removed and new stairs to be built in different location. garage to be converted to include 1 car garage, 2 bedroom, and 1 bath room. 2nd floor lightwell to be infilled, new 1/2 bath at 2nd floor.Details
extg stairs (not to code) to be removed and new stairs to be built in different location. garage to be converted to include 1 car garage, 2 bedroom, and 1 bath room. 2nd floor lightwell to be infilled, new 1/2 bath at 2nd floor. | $100,000 |