Sky Home Builders Inc
- Based in
- Santa Clara
- On San Francisco permits
- Apr 2017 to Apr 2024
- Last 24 months
- 0 permits filed
33 permits since 2000: 28 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2024 | Completed final sign-off Apr 2024 | 77 Van Ness Av | unit 809: bathroom remodel in kind. remove tile. install new tile vanity mirror, shower doors.Details
unit 809: bathroom remodel in kind. remove tile. install new tile vanity mirror, shower doors. | $12,500 |
| May 12, 2023 | Completed final sign-off Jul 2024 | 1963 Ocean Av | graphics on awning: the pawber shop sfDetails
graphics on awning: the pawber shop sf | $1,000 |
| May 12, 2023 | Completed final sign-off Jul 2024 | 1963 Ocean Av | comply with code enforcement case 2002008089 enf. document the change of use to a district serving canine day care facility use and legalize outdoor activity area (dba the pawber shop sf) within the rear of property. hours of outdoor area 9 am-10 pm. legalize awningDetails
comply with code enforcement case 2002008089 enf. document the change of use to a district serving canine day care facility use and legalize outdoor activity area (dba the pawber shop sf) within the rear of property. hours of outdoor area 9 am-10 pm. legalize awning | $1,000 |
| Nov 8, 2022 | Completed final sign-off Apr 2024 | 553 Valley St | widen (e) drive way.Details
widen (e) drive way. | $500 |
| Oct 24, 2022 | Completed final sign-off Aug 2025 | 2591 25th Av | rev to pa# 2017-0710-1367. increase scope of foundation replacement. update simpson strongwall along grid d.Details
rev to pa# 2017-0710-1367. increase scope of foundation replacement. update simpson strongwall along grid d. | $40,000 |
| May 16, 2022 | Completed final sign-off Dec 2022 | 2145 Franklin St | apt 3: bathroom remodel, demo entire bathroom install new tile, toilet, vanity, paint bathroom "in kind"Details
apt 3: bathroom remodel, demo entire bathroom install new tile, toilet, vanity, paint bathroom "in kind" | $15,000 |
| Feb 22, 2022 | Completed final sign-off May 2022 | 4450 24th St | bathroom remodeling, demo extg bathroom. install new tile, vanity, toilet, paint walls and ceiling.Details
bathroom remodeling, demo extg bathroom. install new tile, vanity, toilet, paint walls and ceiling. | $15,000 |
| Jan 18, 2022 | Never finaled issued Jan 2022, no final | 611 Waller St | bathroom remodelingDetails
bathroom remodeling | $12,500 |
| Jul 28, 2021 | Expired or cancelled cancelled Jan 2026 | 1963 Ocean Av | remodeling of existing washroom. install new fan, electrical switches, lights. install new tile on floors and walls. paint entire store.Details
remodeling of existing washroom. install new fan, electrical switches, lights. install new tile on floors and walls. paint entire store. | $17,500 |
| Jun 12, 2020 | Completed final sign-off Sep 2020 | 3184 Mission St | remodel existing bathroom like for likeDetails
remodel existing bathroom like for like | $13,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 216 27th St | closet remodeling, repair damaged drywall, install tile flooring, install 4 lights (led) and 4 outletsDetails
closet remodeling, repair damaged drywall, install tile flooring, install 4 lights (led) and 4 outlets | $8,000 |
| Jan 8, 2020 | Completed final sign-off Mar 2020 | 260 King St | apt 415: demolish tile floors & shower, update tile in shower to bathroom floors. install new toilet & vanity. remodel in-kind, nostructural work. to comply with cec150.0k5.Details
apt 415: demolish tile floors & shower, update tile in shower to bathroom floors. install new toilet & vanity. remodel in-kind, nostructural work. to comply with cec150.0k5. | $12,500 |
| Oct 16, 2019 | Completed final sign-off Nov 2019 | 258 Caselli Av | enlarge extg reach in closet to a walk in closet. no structural changes.Details
enlarge extg reach in closet to a walk in closet. no structural changes. | $7,000 |
| Sep 27, 2019 | Completed final sign-off Feb 2020 | 1755 11th Av | kitchen & bathroom remodel, replace bearing wall and replace with support beam, posts & footingsDetails
kitchen & bathroom remodel, replace bearing wall and replace with support beam, posts & footings | $10,000 |
| Aug 13, 2019 | Completed final sign-off Feb 2020 | 4 Bass Ct | remove wall and support it w/ structural beamDetails
remove wall and support it w/ structural beam | $10,000 |
| Jul 23, 2019 | Completed final sign-off Feb 2020 | 4 Bass Ct | kitchen (70 sq. ft.) remodel, replace cabinets/countertops, upgrade plumbing & electrical, install new recessed lights, new appliancesDetails
kitchen (70 sq. ft.) remodel, replace cabinets/countertops, upgrade plumbing & electrical, install new recessed lights, new appliances | $19,900 |
| Jul 12, 2019 | Completed final sign-off Aug 2019 | 50 Lucerne St | apt 1: shower remodeling: remove & install new tub, install tile around tub and floors, install new fan & toilet.Details
apt 1: shower remodeling: remove & install new tub, install tile around tub and floors, install new fan & toilet. | $12,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 470 Clementina St | #302: kitchen remoodel. install new sink, replace cabinets, install new garbage disposal, install new dish washer, install new cook top, install counter tops. 50 sf kitchen. remodel in kind.Details
#302: kitchen remoodel. install new sink, replace cabinets, install new garbage disposal, install new dish washer, install new cook top, install counter tops. 50 sf kitchen. remodel in kind. | $19,500 |
| Jun 7, 2019 | Completed final sign-off Aug 2019 | 470 Clementina St | unit 302: bathroom remodel: demo bathroom, install new shower, vanity toilets, ugrade plumbing and electricalDetails
unit 302: bathroom remodel: demo bathroom, install new shower, vanity toilets, ugrade plumbing and electrical | $13,500 |
| Dec 17, 2018 | Never finaled issued Dec 2018, no final | 50 Lucerne St | shower remodeling, replace valve and shower head, install new fan & tile, paint shower alls and ceiling.Details
shower remodeling, replace valve and shower head, install new fan & tile, paint shower alls and ceiling. | $8,500 |
| Nov 13, 2018 | Never finaled issued Aug 2019, no final | 553 Valley St | revision to pa 2017-0410-3595 demo exterior walls & rebuildDetails
revision to pa 2017-0410-3595 demo exterior walls & rebuild | |
| Oct 9, 2018 | Completed final sign-off Nov 2018 | 3981 Alemany Bl | demo (e) walk-in shower. isntall custom shower pan and light and valv,tile walls & floor. insta mae location. maintain same accessible floor clr & heights.Details
demo (e) walk-in shower. isntall custom shower pan and light and valv,tile walls & floor. insta mae location. maintain same accessible floor clr & heights. | $4,000 |
| Aug 29, 2018 | Completed final sign-off Nov 2018 | 216 27th St | (2) bathroom remodel, walk-in shower, replace vanities, toilets, mirros, tile floors & walls; same locations and size, 8.5'x5' sq. ft. & 8'x5' sq ft.Details
(2) bathroom remodel, walk-in shower, replace vanities, toilets, mirros, tile floors & walls; same locations and size, 8.5'x5' sq. ft. & 8'x5' sq ft. | $22,000 |
| Aug 23, 2018 | Completed final sign-off Dec 2018 | 601 Van Ness Av | bathroom remodel in kind. everything in same location. maintain accessible heights and clearanceDetails
bathroom remodel in kind. everything in same location. maintain accessible heights and clearance | $11,000 |
| Aug 23, 2018 | Completed final sign-off Nov 2018 | 3981 Alemany Bl | kitchen remodeling. replace kitchen cabinets, faucet, and sink. install 13 recessed lights. everything in same location. maintain accessible heights and clearance.Details
kitchen remodeling. replace kitchen cabinets, faucet, and sink. install 13 recessed lights. everything in same location. maintain accessible heights and clearance. | $10,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 2374 Funston Av | 2 bathroom remodeling & kitchen remodeling, all remodel in kindDetails
2 bathroom remodeling & kitchen remodeling, all remodel in kind | $35,000 |
| Jul 25, 2017 | Completed final sign-off Apr 2019 | 492 Duboce Av | bathroom remodeling, demo, repair damaged wood build shower pan, install plumbing valve and drain, install new lights, fan, outlets and switches. install vanity, flooring, sink, faucet and paint.Details
bathroom remodeling, demo, repair damaged wood build shower pan, install plumbing valve and drain, install new lights, fan, outlets and switches. install vanity, flooring, sink, faucet and paint. | $15,000 |
| Jul 11, 2017 | Completed final sign-off Dec 2017 | 164 Pinehurst Wy | replace a existing old windows in the bathroom same size same place in-kind with double hung wood additonal work to no: 201706139232.Details
replace a existing old windows in the bathroom same size same place in-kind with double hung wood additonal work to no: 201706139232. | $1,500 |
| Jul 10, 2017 | Completed final sign-off Aug 2025 | 2591 25th Av | vertical 3rd story additio with two bathrooms.Details
vertical 3rd story additio with two bathrooms. | $120,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2017 | 855 Folsom St | remodel walk-in shower, replace shower head/valve & wall tile; n/a maherDetails
remodel walk-in shower, replace shower head/valve & wall tile; n/a maher | $12,500 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 517 Victoria St | create habitable space at garage level. 1 full bathroom, 2 bedrooms and 1 living room.Details
create habitable space at garage level. 1 full bathroom, 2 bedrooms and 1 living room. | $20,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 164 Pinehurst Wy | bathroom remodel, like for like, no layout changes or wall alterations.Details
bathroom remodel, like for like, no layout changes or wall alterations. | $15,000 |
| Apr 10, 2017 | Never finaled issued Oct 2018, no final | 553 Valley St | horizontal addition. add kitchen, master room, & bedroom. remodel kitchen & bath room, coutertops, shower, toilet vanity, kitchen cabinets, counter tops, flooring & paint.Details
horizontal addition. add kitchen, master room, & bedroom. remodel kitchen & bath room, coutertops, shower, toilet vanity, kitchen cabinets, counter tops, flooring & paint. | $275,000 |