S And L Remodeling And Design Inc
- Based in
- Pleasant Hill
- On San Francisco permits
- Apr 2016 to Feb 2026
- Last 24 months
- 9 permits filed
47 permits since 2000: 28 completed, 4 in progress, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | In progress issued Mar 2026 | 2450 16th Av | 1)partial garage conversion to living space. 2) lightwell enclosure with repair stair. 3) rear patio construction. 4) space heating system replacment. 5) structural strengthening of existing structure.Details
1)partial garage conversion to living space. 2) lightwell enclosure with repair stair. 3) rear patio construction. 4) space heating system replacment. 5) structural strengthening of existing structure. | $225,000 |
| Sep 5, 2025 | Completed final sign-off Jun 2026 | 2122 42nd Av | remodel bath, add full bath, infill lightwell, add flat skylights on 2nd fl. add 2 bedroom, a bath, laundry & media w/ kitchenette (2) burner stove, hood & sink. replace window, add sliding door on 1st fl. replace garage door. relocate water heater & furnace. remove interior stairs.Details
remodel bath, add full bath, infill lightwell, add flat skylights on 2nd fl. add 2 bedroom, a bath, laundry & media w/ kitchenette (2) burner stove, hood & sink. replace window, add sliding door on 1st fl. replace garage door. relocate water heater & furnace. remove interior stairs. | $170,000 |
| Aug 12, 2025 | In progress issued May 2026 | 1262 41st Av | add 1 bed, 1 bath, 371 sq. ft unit per density at ground floor. add 2 bed, 1 bath, 490 sq. ft. adu per ca state program at ground floor. 151 sq. ft. added conditioned space at ground flooor.Details
add 1 bed, 1 bath, 371 sq. ft unit per density at ground floor. add 2 bed, 1 bath, 490 sq. ft. adu per ca state program at ground floor. 151 sq. ft. added conditioned space at ground flooor. | $70,000 |
| Apr 7, 2025 | Completed final sign-off May 2025 | 44 Powers Av | revision to pa 2025-0319-2578 rev 1 swap locations of the vanity and toiletDetails
revision to pa 2025-0319-2578 rev 1 swap locations of the vanity and toilet | |
| Mar 19, 2025 | Completed final sign-off May 2025 | 44 Powers Av | convert (e)wic in main bedroom to (n) master bath on second floor. no work on first floor.Details
convert (e)wic in main bedroom to (n) master bath on second floor. no work on first floor. | $15,000 |
| Feb 4, 2025 | Completed final sign-off May 2025 | 2 Santa Rita Av | 3rd/fl:relocate wall,remodel bath & closets. remove wall,remodel kitchen,replace door and window at rear, close window on side, replace tiles and fixtures in powder room on the 2nd/fl. add counter and sinks,to remove partition wall in laundry rm 1st/flDetails
3rd/fl:relocate wall,remodel bath & closets. remove wall,remodel kitchen,replace door and window at rear, close window on side, replace tiles and fixtures in powder room on the 2nd/fl. add counter and sinks,to remove partition wall in laundry rm 1st/fl | $98,000 |
| Jan 10, 2025 | Completed final sign-off Feb 2025 | 2579 29th Av | remodel one bathroom like for like - replace (e) tub, (e) toilet, and (e) sink. run new electrical wire for switches and outlets. upgrade the plumbing up to code. no change to floor layout. no change to wall layout. no structural work.Details
remodel one bathroom like for like - replace (e) tub, (e) toilet, and (e) sink. run new electrical wire for switches and outlets. upgrade the plumbing up to code. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Jan 10, 2025 | Completed final sign-off Oct 2025 | 366 15th Av | remodel one kitchen like for like. upgrade electrical and plumbing. install new cabinets. no change to floor layout. no change to wall layout. no structural work.Details
remodel one kitchen like for like. upgrade electrical and plumbing. install new cabinets. no change to floor layout. no change to wall layout. no structural work. | $35,000 |
| Dec 4, 2024 | In progress filed Dec 2024, not yet issued | 2 Santa Rita Av | demo kitchen cabinets; kitchen flooring; full bath demo. no wall removal or additions. will obtain permits for work in futureDetails
demo kitchen cabinets; kitchen flooring; full bath demo. no wall removal or additions. will obtain permits for work in future | $8,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 670 05th Av | first flr atlerations: remove wall in half, re-add shower, replace laundry sink with counter sinkDetails
first flr atlerations: remove wall in half, re-add shower, replace laundry sink with counter sink | $10,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 366 15th Av | revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382.Details
revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382. | $150,000 |
| May 26, 2023 | Completed final sign-off Jul 2023 | 22 Almaden Ct | like for like bathroom remodel, replace tub, replace vanity, replace toilet, new lights, new floor and wall tiles.Details
like for like bathroom remodel, replace tub, replace vanity, replace toilet, new lights, new floor and wall tiles. | $20,000 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 2121 Laguna St | bathroom remodel like for like; new tub, new vanity, new toilet, new tiles, update electrical up to code.Details
bathroom remodel like for like; new tub, new vanity, new toilet, new tiles, update electrical up to code. | $11,000 |
| Apr 26, 2023 | Completed final sign-off Aug 2023 | 2422 16th Av | bathroom remodel like for like: new vanity, new toilet, new tiles.Details
bathroom remodel like for like: new vanity, new toilet, new tiles. | $28,000 |
| Mar 24, 2023 | Never finaled issued Mar 2023, no final | 51 Codman Pl | repair walls damaged from water leak. replace approx. six damaged studs as needed. all work in 3 bathrooms. no layout changes. no bathroom remodels.Details
repair walls damaged from water leak. replace approx. six damaged studs as needed. all work in 3 bathrooms. no layout changes. no bathroom remodels. | $6,000 |
| Mar 22, 2023 | Never finaled issued Mar 2023, no final | 333 01st St | bathroom remodel in kind- convert tub to shower, new tiles, shower fixtures and new vanity.Details
bathroom remodel in kind- convert tub to shower, new tiles, shower fixtures and new vanity. | $7,500 |
| Jul 29, 2022 | Completed final sign-off Sep 2022 | 555 04th St | revision permit # 2022-0428-3178: replacing tub with walk in showerDetails
revision permit # 2022-0428-3178: replacing tub with walk in shower | |
| Apr 28, 2022 | Completed final sign-off Sep 2022 | 555 04th St | (1) bathroom remodel like for like - new tub, new tiles, update plumbing and electrical up to code. (1) kitchen remodel like for like - install new countertops.Details
(1) bathroom remodel like for like - new tub, new tiles, update plumbing and electrical up to code. (1) kitchen remodel like for like - install new countertops. | $13,340 |
| Jan 14, 2022 | Completed final sign-off Mar 2022 | 1427 35th Av | bathroom remodel like for like, new shower pan, new tub, new vanity, new toilet, new tiles, new light fixtures.Details
bathroom remodel like for like, new shower pan, new tub, new vanity, new toilet, new tiles, new light fixtures. | $15,500 |
| Nov 15, 2021 | Completed final sign-off Feb 2022 | 555 04th St | bathroom remodel: like for like- new vanity, new floor, new toilet, new shower pan. 2 recessed lights (same location)Details
bathroom remodel: like for like- new vanity, new floor, new toilet, new shower pan. 2 recessed lights (same location) | $13,000 |
| Sep 28, 2021 | Never finaled issued Nov 2021, no final | 663 Carolina St | one bathroom remodel like for like. new shower pan, new toilet, new vanity, new toilet, new fan. lighting comply with cec 150.0(k)Details
one bathroom remodel like for like. new shower pan, new toilet, new vanity, new toilet, new fan. lighting comply with cec 150.0(k) | $10,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2022 | 2358 28th Av | convert partial extg garage into habitable area. add new bedroom and bath at 1st floor. total will be 3 bedrooms and 2 baths after the conversion.Details
convert partial extg garage into habitable area. add new bedroom and bath at 1st floor. total will be 3 bedrooms and 2 baths after the conversion. | $75,000 |
| Feb 4, 2021 | Never finaled issued Oct 2022, no final | 1558 Shafter Av | new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.Details
new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall. | $200,000 |
| Nov 24, 2020 | Never finaled issued Nov 2020, no final | 3454 Pierce St | master bathroom remodel 0 demo all (e), build pocket door framing, upgrade plumbing up to code; install shower head, relocate pipes and drain, install exhaust fan, build custom shower pan, build bench in shower pan, shampoo niche, replace floor tiles, new sink, new toiletDetails
master bathroom remodel 0 demo all (e), build pocket door framing, upgrade plumbing up to code; install shower head, relocate pipes and drain, install exhaust fan, build custom shower pan, build bench in shower pan, shampoo niche, replace floor tiles, new sink, new toilet | $22,000 |
| Oct 22, 2020 | Never finaled issued Oct 2020, no final | 1558 Shafter Av | dedicate line to subpanel for tub and heated floor. upgrade main panel to 200 amp. new main panel. new 28 recessed lights. rewire first floor and cancel tube and wiring change from water heater to tanklessDetails
dedicate line to subpanel for tub and heated floor. upgrade main panel to 200 amp. new main panel. new 28 recessed lights. rewire first floor and cancel tube and wiring change from water heater to tankless | $24,000 |
| Oct 15, 2020 | Completed final sign-off Jan 2021 | 555 04th St | like for like kitchen remodel update electric up to code, install new gfct, install 4 recessed lights, new under light cabinet/bathroom like for like, update electric up to code, install new exhaust fan, install new ressed lights, paint entire apt. no change in layoutDetails
like for like kitchen remodel update electric up to code, install new gfct, install 4 recessed lights, new under light cabinet/bathroom like for like, update electric up to code, install new exhaust fan, install new ressed lights, paint entire apt. no change in layout | $16,000 |
| Oct 15, 2020 | Completed final sign-off Feb 2021 | 5 Ankeny St | kitchen like for like remodel update plumbing up to code, new gfci, update electric up to code, 4 recessed lights, master bedroom like for like, update electric and plumbing up to code, recessed light, new fan, new shower pan,new toilet, no change in layoutDetails
kitchen like for like remodel update plumbing up to code, new gfci, update electric up to code, 4 recessed lights, master bedroom like for like, update electric and plumbing up to code, recessed light, new fan, new shower pan,new toilet, no change in layout | $38,000 |
| Sep 8, 2020 | Never finaled issued Sep 2020, no final | 1558 Shafter Av | bayth remodel like for like. update plumnbing elec up to codeDetails
bayth remodel like for like. update plumnbing elec up to code | $14,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2750 Market St | kitchen remodel like for like update all electrical in kitchen up to code, update plumbing in kitchen up to codeDetails
kitchen remodel like for like update all electrical in kitchen up to code, update plumbing in kitchen up to code | $12,000 |
| Jan 10, 2019 | Expired or cancelled cancelled Jan 2026 | 328 Gold Mine Dr | add wet bar, vanity, sink, and cabinet at family roomDetails
add wet bar, vanity, sink, and cabinet at family room | $9,000 |
| Oct 17, 2018 | Completed final sign-off Mar 2019 | 568 05th Av | unit 3, 3rd fl; kitchen remodel. remove walls, 1 bearing, 1 non load bearingDetails
unit 3, 3rd fl; kitchen remodel. remove walls, 1 bearing, 1 non load bearing | $8,500 |
| Jun 12, 2018 | Completed final sign-off Jan 2019 | 2121 Taylor St | (1) bathroom remodel: new tub, shower, toilet, vanity, tiles, fan and r.l. in kind, same location. no moving of doors or walls.Details
(1) bathroom remodel: new tub, shower, toilet, vanity, tiles, fan and r.l. in kind, same location. no moving of doors or walls. | $8,000 |
| May 22, 2018 | Never finaled issued May 2018, no final | 411 Raymond Av | 2nd floor kitchen remodeling - new cabinets, new countertops, new sink, new light fixtures, and appliances. kitchen area approx. 210 sq. ft.. 2nd floor:bathroom remodel - new tub, new vanity, new toilet, new light fixtures, new tiles. bathroom are 53 sq. ft. lighting per cec 150.o(k)Details
2nd floor kitchen remodeling - new cabinets, new countertops, new sink, new light fixtures, and appliances. kitchen area approx. 210 sq. ft.. 2nd floor:bathroom remodel - new tub, new vanity, new toilet, new light fixtures, new tiles. bathroom are 53 sq. ft. lighting per cec 150.o(k) | $20,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 4846 17th St | revision to pa 2018-020-0913 - adding foundation for garage doorDetails
revision to pa 2018-020-0913 - adding foundation for garage door | $2,000 |
| Jan 24, 2018 | Completed final sign-off May 2018 | 3788 16th St | repair exterior roof flooring at front roof deckDetails
repair exterior roof flooring at front roof deck | $6,100 |
| Jan 11, 2018 | Completed final sign-off Feb 2018 | 683 Castro St | half bathroom remodel; upgrade plumbing, new toilet, new vanity, new tiles, new r.lDetails
half bathroom remodel; upgrade plumbing, new toilet, new vanity, new tiles, new r.l | $3,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 4846 17th St | revision to foundation & partial framing (ref: permit #201609087037).Details
revision to foundation & partial framing (ref: permit #201609087037). | |
| Nov 30, 2017 | Completed final sign-off Jan 2018 | 5 Bowman Ct | one bath remodel on 3rd floor. new shower and toiletDetails
one bath remodel on 3rd floor. new shower and toilet | $9,000 |
| Oct 17, 2017 | Completed final sign-off Oct 2017 | 260 Banks St | demo any dry rot on south side elevation 250 sf. no exterior work on the front. install a new barrier wall paper and wood siding. all other dry rot replace with match existing wood siding & color for trim in kindDetails
demo any dry rot on south side elevation 250 sf. no exterior work on the front. install a new barrier wall paper and wood siding. all other dry rot replace with match existing wood siding & color for trim in kind | $11,650 |
| Jul 10, 2017 | Completed final sign-off Aug 2017 | 1945 Franklin St | demo & ahul away (e) siding 1100 ft planks10" with apply weather protector paper new siding match the (e) street facing,install insulation as neededDetails
demo & ahul away (e) siding 1100 ft planks10" with apply weather protector paper new siding match the (e) street facing,install insulation as needed | $7,500 |
| May 8, 2017 | Completed final sign-off Feb 2018 | 408 Girard St | to comply with nov 201614751 dated 5/3/2016 - repair (e) exterior stairs @ front of the house in-kindDetails
to comply with nov 201614751 dated 5/3/2016 - repair (e) exterior stairs @ front of the house in-kind | $10,000 |
| Apr 4, 2017 | Expired or cancelled cancelled Jan 2026 | 222 Gates St | convert pantry and storage rooms into bathroom on 2nd flDetails
convert pantry and storage rooms into bathroom on 2nd fl | $9,000 |
| Sep 8, 2016 | Never finaled issued Jun 2017, no final | 4846 17th St | new rear addition to extend under (e) rear deck to create new family room @ 1st floor, new bath, laundry area and new interior stairDetails
new rear addition to extend under (e) rear deck to create new family room @ 1st floor, new bath, laundry area and new interior stair | $100,000 |
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 165 Juanita Wy | remodel bathroom, 1st floor, replace (e) tub, toilet, sink, fan and add (3) lights, upgrade outlets, tile tub walls.Details
remodel bathroom, 1st floor, replace (e) tub, toilet, sink, fan and add (3) lights, upgrade outlets, tile tub walls. | $16,000 |
| May 6, 2016 | Completed final sign-off Jul 2016 | 262 Precita Av | repair outside stairs like for like replace outside stairs like for like (in kind), adjacent porch decking repair & ledge etc. repair front siding (all in kind)Details
repair outside stairs like for like replace outside stairs like for like (in kind), adjacent porch decking repair & ledge etc. repair front siding (all in kind) | $20,000 |
| Apr 20, 2016 | Expired or cancelled withdrawn Aug 2016 | 780 Pacheco St | to comply with novDetails
to comply with nov | $3,500 |
| Apr 6, 2016 | Completed final sign-off Jul 2016 | 262 Precita Av | update bathroom. existing floor, toilet, sink, light to remain. new shower tub, shower walls, shower valve. new gfi, new fan.Details
update bathroom. existing floor, toilet, sink, light to remain. new shower tub, shower walls, shower valve. new gfi, new fan. | $10,300 |