Jeffrey Schmierer
- Listed as
- architect, engineer
- Firm
- Gensler
- Based in
- Oakland
- On San Francisco permits
- May 2018 to Jul 2026
45 permits since 2000 (architect on 44 permits, engineer on 1 permit): 35 completed, 5 in progress, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 98 West Portal Av | no change in occupancy or use . no additions to area or height. interior ti of (e) retail bank and financial banking center to include (n) finishes, partitions, and mepsDetails
no change in occupancy or use . no additions to area or height. interior ti of (e) retail bank and financial banking center to include (n) finishes, partitions, and meps | $483,507 | |
| Apr 30, 2026 | In progress filed Apr 2026, not yet issued | 5655 Geary Bl | no change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical.Details
no change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical. | $78,498 | |
| Jun 10, 2025 | Completed final sign-off Mar 2026 | 315 Montgomery St | G Swanson Constr. Inc. | 1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of americaDetails
1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of america | $850,000 |
| Mar 27, 2025 | Completed final sign-off Jun 2025 | 3525 California St | Turner Construction Co | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $3,000 |
| Mar 6, 2025 | Completed final sign-off Jun 2025 | 3533 California St | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $27,000 | |
| Feb 12, 2025 | Completed final sign-off Dec 2025 | 3533 California St | Turner Construction Co | t.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parkingDetails
t.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parking | $3,500,000 |
| Feb 5, 2025 | Completed final sign-off May 2025 | 3533 California St | Turner Construction Co | interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanicalDetails
interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical | $100,000 |
| Nov 5, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | rev 202403188043- scope of work includes storefront upgrade at (e) bank branch. structural work to support storefront entrance. new slab on grade in some locations.Details
rev 202403188043- scope of work includes storefront upgrade at (e) bank branch. structural work to support storefront entrance. new slab on grade in some locations. | $10,000 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | 2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.Details
2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates. | $50,000 |
| Aug 13, 2024 | In progress filed Aug 2024, not yet issued | 5500 Geary Bl | exterior work only to include replacing light fixture housings, and re-painting of select exterior (street facing) locations, including stucco wall, roof rafter facades; exterior brick facing to remain.Details
exterior work only to include replacing light fixture housings, and re-painting of select exterior (street facing) locations, including stucco wall, roof rafter facades; exterior brick facing to remain. | $83,995 | |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 245 Winston Dr | G Swanson Constr. Inc. | project is an exterior improvement of e bank. no additonal area or height is part scope. scope is limited to exterior only including removal of existing metal clad awning, painting exterior walls and installation of bollard in front of atm sunshade.Details
project is an exterior improvement of e bank. no additonal area or height is part scope. scope is limited to exterior only including removal of existing metal clad awning, painting exterior walls and installation of bollard in front of atm sunshade. | $100,000 |
| Jun 27, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | 2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $960,000 |
| Jun 7, 2024 | Completed final sign-off Mar 2025 | 111 Pine St | Turner Construction Co | tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevationsDetails
tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations | $308,000 |
| May 31, 2024 | Completed final sign-off Mar 2025 | 4098 24th St | G Swanson Constr. Inc. | alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture.Details
alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture. | $430,000 |
| May 31, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | revision to permit 202402075406. revision will be on 1/f and cellar interiorDetails
revision to permit 202402075406. revision will be on 1/f and cellar interior | |
| May 29, 2024 | Completed final sign-off Jul 2024 | 3251 20th Av | Western States Fire Protection Company | suite 103-fire only- modify (3) sprinkers for (n) store layoutDetails
suite 103-fire only- modify (3) sprinkers for (n) store layout | $9,837 |
| May 23, 2024 | In progress issued Jul 2024 | 3251 20th Av | Jrm Construction Management | revision to pa#202403057106: ste 103 *zara stockroom* per narative - electrical, arch, structural updates w/ layout changes. add layoout changes to update mechanical/arch plansDetails
revision to pa#202403057106: ste 103 *zara stockroom* per narative - electrical, arch, structural updates w/ layout changes. add layoout changes to update mechanical/arch plans | $200,000 |
| Mar 18, 2024 | Completed final sign-off Oct 2025 | 2310 Fillmore St | Clune Construction Company L P | interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua.Details
interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua. | $2,000,000 |
| Mar 12, 2024 | Completed final sign-off Aug 2024 | 1007 Taraval St | G Swanson Constr. Inc. | project is exterior improvement of an (e) bank (bank of america). no additional area or height is part of the scope. scope is limited to exterior only including but not limited to cleaning and painting the exterior of the building and replaceing (1) light fixture.Details
project is exterior improvement of an (e) bank (bank of america). no additional area or height is part of the scope. scope is limited to exterior only including but not limited to cleaning and painting the exterior of the building and replaceing (1) light fixture. | $175,000 |
| Mar 5, 2024 | In progress issued May 2024 | 3251 20th Av | Jrm Construction Management | tenant improvement for 3135 sqft storage space for zara store. expand interior storefront, new lighting, finishes, storage racks. hvac-new interior facade signage.Details
tenant improvement for 3135 sqft storage space for zara store. expand interior storefront, new lighting, finishes, storage racks. hvac-new interior facade signage. | $620,000 |
| Feb 7, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $2,100,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i.Details
work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i. | $80,000 |
| Jan 11, 2024 | Completed final sign-off Nov 2025 | 245 Winston Dr | Mid America Contracting Inc | (e) 1 story 4208 sq ft bank of america branch within stonestown galleria mall- ti: partial demo of interior spaces, new finishes, partions, mechanical, electrical, and plumbing equipment. no change of egress of occupancy.Details
(e) 1 story 4208 sq ft bank of america branch within stonestown galleria mall- ti: partial demo of interior spaces, new finishes, partions, mechanical, electrical, and plumbing equipment. no change of egress of occupancy. | $135,000 |
| Oct 17, 2023 | Completed final sign-off May 2024 | 1640 Van Ness Av | G Swanson Constr. Inc. | tenant improvement of existing bank, scope limited to interior only, finishes, partitions, minor electrical.Details
tenant improvement of existing bank, scope limited to interior only, finishes, partitions, minor electrical. | $77,415 |
| Aug 8, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | 1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area.Details
1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area. | $120,000 |
| Jul 26, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be wentDetails
remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be went | $30,000 |
| Jan 12, 2023 | Completed final sign-off May 2023 | 555 California St | G Swanson Constr. Inc. | replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44Details
replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44 | $45,000 |
| Sep 22, 2022 | Completed final sign-off May 2023 | 701 Irving St | Powerhouse Retail Services Llc | install replacement atm site improvements to create accesible landing for atm infill window in atm roomDetails
install replacement atm site improvements to create accesible landing for atm infill window in atm room | $95,000 |
| Aug 24, 2022 | Never finaled issued Sep 2022, no final | 120 Stockton St | Novo Construction Inc | g/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only)Details
g/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only) | $1,272,550 |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 33 New Montgomery St | Clune Construction Company L P | 1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a.Details
1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a. | $500 |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 625 Market St | Clune Construction Company L P | 1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a.Details
1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a. | $500 |
| Jul 21, 2022 | Never finaled issued Aug 2022, no final | 120 Stockton St | Novo Construction Inc | placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above (e) concrete installed under bpa#202008101490 in preperation of future t.i. no demo of (e) concrete. temp guard will provided btw future t.i. along ramps, and where change in elev exceeded 6".Details
placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above (e) concrete installed under bpa#202008101490 in preperation of future t.i. no demo of (e) concrete. temp guard will provided btw future t.i. along ramps, and where change in elev exceeded 6". | $1,200,000 |
| Feb 22, 2022 | Never finaled issued Apr 2022, no final | 625 Market St | Clune Construction Company L P | lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic.Details
lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic. | $500 |
| Sep 8, 2021 | Completed final sign-off Jul 2022 | 1995 Union St | G Swanson Constr. Inc. | to remove (e) vault located at the bank of america which is being decommissioned,adding a bath. bank is vacant space. adding one new restroom & associated mepDetails
to remove (e) vault located at the bank of america which is being decommissioned,adding a bath. bank is vacant space. adding one new restroom & associated mep | $197,000 |
| Jun 29, 2021 | Completed final sign-off Jan 2022 | 1640 Van Ness Av | G Swanson Constr. Inc. | exterior improvement of (e) bank. no additional area or height is part of the scope. including but not limited to partial demo of painting, signage, & (n) canopy lighting. signage removal under separate permit.Details
exterior improvement of (e) bank. no additional area or height is part of the scope. including but not limited to partial demo of painting, signage, & (n) canopy lighting. signage removal under separate permit. | $35,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2021 | 4638 Mission St | Deb Construction Llc | replace existing through the wall atm with newer model. recess floor at new atm per accessibility reach range requirement.Details
replace existing through the wall atm with newer model. recess floor at new atm per accessibility reach range requirement. | $4,000 |
| Oct 24, 2020 | Completed final sign-off Jul 2021 | 1 Powell St | G Swanson Constr. Inc. | g/f: t.i. for removal of an non-load bearing paritions for breakroom & install new paritions associated finishes, electrical, and light fixture. accessible upgrades. maher n/aDetails
g/f: t.i. for removal of an non-load bearing paritions for breakroom & install new paritions associated finishes, electrical, and light fixture. accessible upgrades. maher n/a | $10,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 501 Castro St | G Swanson Constr. Inc. | revision to pa# 202002255299. minor electrical changes and entry way floor plans.Details
revision to pa# 202002255299. minor electrical changes and entry way floor plans. | |
| Jun 4, 2020 | Completed final sign-off Apr 2021 | 299 Fremont St | Swinerton Builders | tenant improvement of a vacant retail space. no additional area or height is a part of the scope. scope is limited to interior work only including but not limited to: new finishes, partitions andDetails
tenant improvement of a vacant retail space. no additional area or height is a part of the scope. scope is limited to interior work only including but not limited to: new finishes, partitions and | $600,000 |
| Mar 11, 2020 | Completed final sign-off Jan 2021 | 501 Castro St | demo of one existing atm, exterior atm surroud, & night deposit box. install new atm surround, new accessible night deposit, & patching wall opening at night deposit location. demo & replace of concrete pavement at atm & night deposit box for accessibility update.Details
demo of one existing atm, exterior atm surroud, & night deposit box. install new atm surround, new accessible night deposit, & patching wall opening at night deposit location. demo & replace of concrete pavement at atm & night deposit box for accessibility update. | $40,000 | |
| Nov 1, 2019 | Completed final sign-off Jan 2020 | 2325 Noriega St | G Swanson Constr. Inc. | install power activated door hardware maher not reqDetails
install power activated door hardware maher not req | $20,000 |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 1640 Van Ness Av | G Swanson Constr. Inc. | replace (e) vestible glass enclosure install bandit barrierDetails
replace (e) vestible glass enclosure install bandit barrier | $325,000 |
| Jun 7, 2019 | Completed final sign-off Jan 2020 | 4098 24th St | G Swanson Constr. Inc. | int ti of (e) bank - no additioal area or height, demo of int partitions (non-load bearing), doors, millwork, finishes & assoc mep & light fixtures. new work - installation of non load bearing partitions, doors, millwork, finishes & assoc mep & light fixturesDetails
int ti of (e) bank - no additioal area or height, demo of int partitions (non-load bearing), doors, millwork, finishes & assoc mep & light fixtures. new work - installation of non load bearing partitions, doors, millwork, finishes & assoc mep & light fixtures | $845,000 |
| Apr 30, 2019 | Completed final sign-off Aug 2021 | 1007 Taraval St | G Swanson Constr. Inc. | ti of existing bank. no additional area or height is part of the scope. interior only including but not limited to partial demo of interior spaces, new finishes, partitions, mechanical, electrical and plumbingDetails
ti of existing bank. no additional area or height is part of the scope. interior only including but not limited to partial demo of interior spaces, new finishes, partitions, mechanical, electrical and plumbing | $865,000 |
| May 22, 2018 | Completed final sign-off Nov 2022 | 625 Market St | Clune Construction Company L P | replacement of (e) atms w/newer models. atms are located more than 10' from storefront withing interior vestibule. installation of equipment with minor electrical and structural. no change in occupancies.Details
replacement of (e) atms w/newer models. atms are located more than 10' from storefront withing interior vestibule. installation of equipment with minor electrical and structural. no change in occupancies. | $156,162 |