Deb Construction Llc
- Based in
- Anaheim
- On San Francisco permits
- Sep 2003 to May 2026
- Last 24 months
- 4 permits filed
52 permits since 2000: 37 completed, 4 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | In progress issued Oct 2026 | 1301 Noriega St | ground floor retail bank branch ti no strurtural partitions, ceilings, finishes and mep.Details
ground floor retail bank branch ti no strurtural partitions, ceilings, finishes and mep. | $850,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 1000 Grant Av | existing citi bank store-ada upgrades to the entryways and sidewalk. remove the existing concrete sidewalk to allow for proper grading and transition to new sidewalk pavers. potentially remove existing plywood to install new resin coating at atm landing.Details
existing citi bank store-ada upgrades to the entryways and sidewalk. remove the existing concrete sidewalk to allow for proper grading and transition to new sidewalk pavers. potentially remove existing plywood to install new resin coating at atm landing. | $20,000 |
| Jul 22, 2025 | Completed final sign-off Feb 2026 | 6001 Geary Bl | 1st & 2nd floors: interior tenant improvement including demo of prior tenant interiors, new partitions, doors, ceilings, millwork, equipment, finishes, and mep.Details
1st & 2nd floors: interior tenant improvement including demo of prior tenant interiors, new partitions, doors, ceilings, millwork, equipment, finishes, and mep. | $810,524 |
| Oct 17, 2024 | In progress issued Mar 2026 | 2400 19th Av | citibank: teller counters. voluntary accessibility remediation intended to remove barriers to branch access.Details
citibank: teller counters. voluntary accessibility remediation intended to remove barriers to branch access. | $164,000 |
| Sep 6, 2024 | In progress issued Jan 2026 | 701 Irving St | existing back of house area for access to roof of building for maintenance. for a fixed ladder w fall arrest system, new opening to roofDetails
existing back of house area for access to roof of building for maintenance. for a fixed ladder w fall arrest system, new opening to roof | $5 |
| Dec 6, 2023 | Completed final sign-off Mar 2024 | 2198 Chestnut St | existing wood siding in front of site on the second fl. to be replaced with in-kind than paint to match (e) an enchroachment permit will be submited to install scalfoldingDetails
existing wood siding in front of site on the second fl. to be replaced with in-kind than paint to match (e) an enchroachment permit will be submited to install scalfolding | $120,000 |
| Nov 3, 2022 | Never finaled issued Dec 2022, no final | 3251 20th Av | minor changes to mep. ref pa# 202201316962.Details
minor changes to mep. ref pa# 202201316962. | $35,000 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 601 Montgomery St | revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment planDetails
revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment plan | |
| May 5, 2022 | Completed final sign-off Jan 2023 | 601 Montgomery St | 1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work.Details
1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work. | $510,000 |
| Jan 31, 2022 | Completed final sign-off Apr 2023 | 3251 20th Av | op190: change occupancy from restaurant to lending institution. t.i. including exterior storefront with structural columns & headers, interior non-bearing partitions, millwork, & interior finishes. mechanical, electrical power & lighting. plumbing fixtures. deferred fire & signage.Details
op190: change occupancy from restaurant to lending institution. t.i. including exterior storefront with structural columns & headers, interior non-bearing partitions, millwork, & interior finishes. mechanical, electrical power & lighting. plumbing fixtures. deferred fire & signage. | $812,000 |
| Jan 26, 2022 | Completed final sign-off Feb 2022 | 350 University St | renew permit 200906150462 and 201808298704 for final inspection.Details
renew permit 200906150462 and 201808298704 for final inspection. | |
| Dec 18, 2020 | Completed final sign-off Jul 2021 | 4638 Mission St | replace existing through the wall atm with newer model. recess floor at new atm per accessibility reach range requirement.Details
replace existing through the wall atm with newer model. recess floor at new atm per accessibility reach range requirement. | $4,000 |
| Sep 4, 2020 | Completed final sign-off Oct 2020 | 350 University St | to obtain final inspection for work approved under permit application #201804257402; all work is completeDetails
to obtain final inspection for work approved under permit application #201804257402; all work is complete | $19,000 |
| Aug 20, 2020 | Completed final sign-off Oct 2021 | 260 California St | barrior removal.Details
barrior removal. | $10,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 211 Main St | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with newDetails
new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| Apr 25, 2018 | Expired or cancelled expired Nov 2019 | 350 University St | construct room to enclose boiler room. separate permit for plumbing electrical, & exhaust. abatement of pipe insulation by othersDetails
construct room to enclose boiler room. separate permit for plumbing electrical, & exhaust. abatement of pipe insulation by others | $19,000 |
| Mar 12, 2018 | Completed final sign-off Mar 2018 | 400 California St | to obtain final inspection for work approved under pa#201312184444. all work is complete.Details
to obtain final inspection for work approved under pa#201312184444. all work is complete. | |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | 10th floor - install new lighting & lighting controls. ref pa#201610140269. n/a maher ordinanceDetails
10th floor - install new lighting & lighting controls. ref pa#201610140269. n/a maher ordinance | $6,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | 3rd floor - install new lighting & lighting controls. ref pa#201610140268. n/a maher ordinanceDetails
3rd floor - install new lighting & lighting controls. ref pa#201610140268. n/a maher ordinance | $3,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13Details
basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13 | $425,000 |
| Oct 14, 2016 | Completed final sign-off Sep 2017 | 1455 Market St | 10th fl barrier removal and build back of new compliant restrooms. all new or revised mep and l/s under sep permit bldg fully sprinklered ) maher not reqDetails
10th fl barrier removal and build back of new compliant restrooms. all new or revised mep and l/s under sep permit bldg fully sprinklered ) maher not req | $120,000 |
| Oct 14, 2016 | Completed final sign-off Sep 2017 | 1455 Market St | level 3 barrier removal constructing new compliant restrooms. all new or revised mep and l/s work will be design build and submitted for permit and separately building full sprinkleredDetails
level 3 barrier removal constructing new compliant restrooms. all new or revised mep and l/s work will be design build and submitted for permit and separately building full sprinklered | $80,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | 16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes.Details
16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes. | $1,800,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | 6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes.Details
6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes. | $1,700,000 |
| Oct 27, 2015 | Never finaled issued Dec 2015, no final | 1455 Market St | partial floor ti for single tenant on 1st fl including but not limited to selective demo,partitions, ceiling and finishes. life safety under sep maher not req. ref pa201508113903. mechanical & electrical t24 plans.Details
partial floor ti for single tenant on 1st fl including but not limited to selective demo,partitions, ceiling and finishes. life safety under sep maher not req. ref pa201508113903. mechanical & electrical t24 plans. | $150,000 |
| Sep 17, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | 31st floor, office ti/demising wall. maher na. sprinkler & alarm under deferred submittal.Details
31st floor, office ti/demising wall. maher na. sprinkler & alarm under deferred submittal. | $200,000 |
| Aug 11, 2015 | Never finaled issued Oct 2015, no final | 1455 Market St | 1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher naDetails
1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher na | $467,544 |
| Dec 19, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | tenant improvement 6th fl. modification of 1 conference room and new network equipment room. maher not req. life safety deferred.Details
tenant improvement 6th fl. modification of 1 conference room and new network equipment room. maher not req. life safety deferred. | $300,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | flrs: 3 & 4: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices, new conference room, and addition of furniture by furniture vendor & tenant on floor 3 & 4: maher n/a. life safety deferred submittals.Details
flrs: 3 & 4: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices, new conference room, and addition of furniture by furniture vendor & tenant on floor 3 & 4: maher n/a. life safety deferred submittals. | $380,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | 5th flr: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices & addition of furniture by furniture vendor & tenant on 5th flr; maher n/aDetails
5th flr: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices & addition of furniture by furniture vendor & tenant on 5th flr; maher n/a | $400,000 |
| May 22, 2014 | Completed final sign-off Jul 2014 | 299 Valencia St | add concrete slab & wood isolators on rooftop as acoustic isolators for mechanical equipment.Details
add concrete slab & wood isolators on rooftop as acoustic isolators for mechanical equipment. | $20,000 |
| Dec 31, 2013 | Completed final sign-off Jan 2014 | 400 California St | remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017Details
remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017 | $20,000 |
| Dec 18, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | demo existing single floor tenant improvement, work limited to selective demolition of partitions, ceiling and finishes. no new construction, per ab-017Details
demo existing single floor tenant improvement, work limited to selective demolition of partitions, ceiling and finishes. no new construction, per ab-017 | $10,000 |
| Nov 27, 2013 | Completed final sign-off Jan 2014 | 400 California St | 3/f: partial remodel of single tenant floor, upgrade to (e) finishes, flooring, paint & furniture, new millwork, demolition limited to finishes, select partitions and ceilings. separate sprinkler permit & life and fire safety.Details
3/f: partial remodel of single tenant floor, upgrade to (e) finishes, flooring, paint & furniture, new millwork, demolition limited to finishes, select partitions and ceilings. separate sprinkler permit & life and fire safety. | $100,000 |
| Sep 16, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | b1 level:construction of new bicycle storage,men and women's locker and shower rooms, and associated fitness room in extg empty shell space. includes plmg, mech, and electrical necessary to finish the space. f/a and sprinklers under separate permit. all work is on level b-1Details
b1 level:construction of new bicycle storage,men and women's locker and shower rooms, and associated fitness room in extg empty shell space. includes plmg, mech, and electrical necessary to finish the space. f/a and sprinklers under separate permit. all work is on level b-1 | $324,166 |
| Sep 4, 2013 | Completed final sign-off Mar 2014 | 188 Spear St | 1st floor #190: tenant improvement of existing retail space for new branch bank including exterior storefront, interior partitions, restroom, finishes.Details
1st floor #190: tenant improvement of existing retail space for new branch bank including exterior storefront, interior partitions, restroom, finishes. | $300,906 |
| Aug 1, 2013 | Completed final sign-off Feb 2014 | 1455 Market St | demo short partition wall, construct new demising wall to seperate a portion of the 7th floor. separate mechanical hvac and electrical system from newly demised area.Details
demo short partition wall, construct new demising wall to seperate a portion of the 7th floor. separate mechanical hvac and electrical system from newly demised area. | $450,000 |
| May 11, 2012 | Completed final sign-off Sep 2012 | 560 Mission St | 20th floor-(e) training room, finish refresh with carpet, paint, new millwork. lighting upgrade & minor hvac modifications for a/v racks. additionally add small storage room at north side of floorDetails
20th floor-(e) training room, finish refresh with carpet, paint, new millwork. lighting upgrade & minor hvac modifications for a/v racks. additionally add small storage room at north side of floor | $130,000 |
| Feb 13, 2012 | Completed final sign-off Jun 2013 | 1501 Beach St | t.i. of leased space for a branch bank. work includes new interior atm, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, electrical and plumbing work.Details
t.i. of leased space for a branch bank. work includes new interior atm, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, electrical and plumbing work. | $286,000 |
| Aug 8, 2011 | Completed final sign-off Nov 2011 | 3981 Alemany Bl | change of occupancy from retail to bank (chase)new interior atm, non struc partitions, clgs, soffits, finishes, furniture and related hvac, elec and plbg. work at ground floorDetails
change of occupancy from retail to bank (chase)new interior atm, non struc partitions, clgs, soffits, finishes, furniture and related hvac, elec and plbg. work at ground floor | $625,000 |
| Dec 22, 2010 | Completed final sign-off Jan 2011 | 2500 Mission St | replace extg entry ramp. revision to app#201004059616Details
replace extg entry ramp. revision to app#201004059616 | $5,000 |
| Oct 15, 2010 | Completed final sign-off Dec 2010 | 800 Irving St | bank of america. ada upgrades to public areas ( safety depost viewing room) access to coupon booth.Details
bank of america. ada upgrades to public areas ( safety depost viewing room) access to coupon booth. | $20,000 |
| Aug 31, 2010 | Completed final sign-off Dec 2010 | 2500 Mission St | repair of existing roof structure. revision to 201004059616Details
repair of existing roof structure. revision to 201004059616 | $50,000 |
| Apr 5, 2010 | Completed final sign-off Jan 2011 | 2500 Mission St | t.i. of (e) 3200 sf bank space including removal of non-structural partition and (n) build-out of space with (n) ceiling, hvac, electrical & plumbing work. work includes modification of (e) exterior facade.Details
t.i. of (e) 3200 sf bank space including removal of non-structural partition and (n) build-out of space with (n) ceiling, hvac, electrical & plumbing work. work includes modification of (e) exterior facade. | $401,592 |
| Feb 17, 2010 | Completed final sign-off Jan 2011 | 2500 Mission St | chase bank. demolition of (e) exterior wall to allow min. 3 ft setback from property line for two new atm openings. all interior work incl. electrical, mech, struc and finishes will be submitted under separate permitDetails
chase bank. demolition of (e) exterior wall to allow min. 3 ft setback from property line for two new atm openings. all interior work incl. electrical, mech, struc and finishes will be submitted under separate permit | $15,000 |
| Jan 18, 2007 | Completed final sign-off Aug 2008 | 2323 Irving St | installation of new walk-up atm next to existing atm.Details
installation of new walk-up atm next to existing atm. | $15,000 |
| Jul 6, 2006 | Expired or cancelled expired Sep 2009 | 2001 Union St | replace one exterior window at ground floor, main entry to bank.Details
replace one exterior window at ground floor, main entry to bank. | $20,000 |
| Apr 28, 2006 | Never finaled issued Apr 2006, no final | 1720 Fulton St | renew pa# 200506175324 for final inspection.Details
renew pa# 200506175324 for final inspection. | |
| Apr 19, 2006 | Completed final sign-off Apr 2006 | 1720 Fulton St | renew 200507066887 for final inspectionDetails
renew 200507066887 for final inspection | |
| Apr 27, 2005 | Expired or cancelled expired Dec 2009 | 1500 Polk St | remove an (e) 5685 atm and install 2 new p-86 atms with (e) back branch.Details
remove an (e) 5685 atm and install 2 new p-86 atms with (e) back branch. | $5,000 |
| Apr 1, 2005 | Completed final sign-off Aug 2005 | 1720 Fulton St | t.i.built out of an existing vacancy ground floor of 4-story building wowrk constist:Details
t.i.built out of an existing vacancy ground floor of 4-story building wowrk constist: | $300,000 |
| Sep 8, 2003 | Completed final sign-off Jan 2004 | 1040 Grant Av | install atm to ext wall, enlarge exist atm roomDetails
install atm to ext wall, enlarge exist atm room | $20,000 |