Jrm Construction Management
- Based in
- Costa Mesa
- On San Francisco permits
- Jun 2016 to Mar 2026
- Last 24 months
- 7 permits filed
15 permits since 2000: 8 completed, 6 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | In progress issued May 2026 | 2061 Chestnut St | revision to permit 202508132979. revision includes updates to partitions, demolition scope, layout, finishes, ceiling design, storefront elements, and fixtures. no electrical or life safety scope (to be deferred)Details
revision to permit 202508132979. revision includes updates to partitions, demolition scope, layout, finishes, ceiling design, storefront elements, and fixtures. no electrical or life safety scope (to be deferred) | $25,000 |
| Oct 10, 2025 | In progress issued May 2026 | 2061 Chestnut St | deferred submittal reference under permit number: 2025-0813-2979.commercial interior tenat improvement work including electrical remodel scope for panel boad sytem & lighting sytem installation.Details
deferred submittal reference under permit number: 2025-0813-2979.commercial interior tenat improvement work including electrical remodel scope for panel boad sytem & lighting sytem installation. | $675,000 |
| Aug 13, 2025 | In progress issued Nov 2025 | 2061 Chestnut St | ground floor tenant improvement. interior tenant fit out of an existing retail space. no change of use, interior partitions, ceiling grid remodel, installing new lighting, restroom demo and replacement, and new finishes.Details
ground floor tenant improvement. interior tenant fit out of an existing retail space. no change of use, interior partitions, ceiling grid remodel, installing new lighting, restroom demo and replacement, and new finishes. | $675,000 |
| Jul 16, 2025 | In progress issued Dec 2025 | 400 Post St | non structural demolition of an interior space. removal of existing demising wall between the spaces. demo shall include removal of non-structual partition walls, finishes and fixtures. no change to existing building envelope/storefront. no change in use. no lighting fixtures.Details
non structural demolition of an interior space. removal of existing demising wall between the spaces. demo shall include removal of non-structual partition walls, finishes and fixtures. no change to existing building envelope/storefront. no change in use. no lighting fixtures. | $43,000 |
| May 16, 2025 | Completed final sign-off Feb 2026 | 58 Geary St | revision to pa 2025-0115-8364 hvac ductwork and inclusion of soffit detailDetails
revision to pa 2025-0115-8364 hvac ductwork and inclusion of soffit detail | $15,000 |
| Apr 15, 2025 | Completed final sign-off Feb 2026 | 58 Geary St | anchorage of fixed and mobile retail shelving unitsDetails
anchorage of fixed and mobile retail shelving units | $20,000 |
| Jan 15, 2025 | Completed final sign-off Feb 2026 | 58 Geary St | the complexity of the energy code lighting compliance method requires review by intake. interior renovation of an (e) vacant mercantile space. work includes demolition and new wall construction with remodel of space flooring and ceilings. no work to change bldg height or use to occur in cellar. (e)Details
the complexity of the energy code lighting compliance method requires review by intake. interior renovation of an (e) vacant mercantile space. work includes demolition and new wall construction with remodel of space flooring and ceilings. no work to change bldg height or use to occur in cellar. (e) | $700,000 |
| May 23, 2024 | In progress issued Jul 2024 | 3251 20th Av | revision to pa#202403057106: ste 103 *zara stockroom* per narative - electrical, arch, structural updates w/ layout changes. add layoout changes to update mechanical/arch plansDetails
revision to pa#202403057106: ste 103 *zara stockroom* per narative - electrical, arch, structural updates w/ layout changes. add layoout changes to update mechanical/arch plans | $200,000 |
| Mar 5, 2024 | In progress issued May 2024 | 3251 20th Av | tenant improvement for 3135 sqft storage space for zara store. expand interior storefront, new lighting, finishes, storage racks. hvac-new interior facade signage.Details
tenant improvement for 3135 sqft storage space for zara store. expand interior storefront, new lighting, finishes, storage racks. hvac-new interior facade signage. | $620,000 |
| Jun 28, 2019 | Completed final sign-off Jun 2020 | 845 Market St | demo (e) store and complete t.i. for hugo boss store. not visible from street. work includes (n) non load bearing partitions, (n) finishes, casework, mep., (n) storefront facade. deferred submittal: storefront signage. fire sprinkler alarmsDetails
demo (e) store and complete t.i. for hugo boss store. not visible from street. work includes (n) non load bearing partitions, (n) finishes, casework, mep., (n) storefront facade. deferred submittal: storefront signage. fire sprinkler alarms | $400,000 |
| Feb 11, 2019 | Completed final sign-off Jun 2019 | 49 Geary St | suite 67 - tenant improvement. minor interior demo, relocation of restroom, new walls for fitting room, (n) drop ceiling, plumb, mech, electrical, (n) flooring and fixturesDetails
suite 67 - tenant improvement. minor interior demo, relocation of restroom, new walls for fitting room, (n) drop ceiling, plumb, mech, electrical, (n) flooring and fixtures | $133,837 |
| Oct 11, 2017 | Completed final sign-off Nov 2017 | 216 Stockton St | rev to pa#201708013517: architectural, mechanical & electrical revisions. maher n/a.Details
rev to pa#201708013517: architectural, mechanical & electrical revisions. maher n/a. | |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 216 Stockton St | g/f -2/f -all 3 floors; demo finishes only. remove flooring, wall finishes, ceiling finishe. interior work only. ref; 201708013517 for interior ti permit. no work on (e) storefront system.Details
g/f -2/f -all 3 floors; demo finishes only. remove flooring, wall finishes, ceiling finishe. interior work only. ref; 201708013517 for interior ti permit. no work on (e) storefront system. | $3,000 |
| Aug 1, 2017 | Completed final sign-off Nov 2017 | 216 Stockton St | interior remodel build out/remodel. proposed work includes construction and installation of new non-load bearing partitions, fixtures, finishes, lighting, plumbing, mechanical.Details
interior remodel build out/remodel. proposed work includes construction and installation of new non-load bearing partitions, fixtures, finishes, lighting, plumbing, mechanical. | $72,600 |
| Jun 28, 2016 | Completed final sign-off Oct 2016 | 3251 20th Av | t.i. in unit #153, to include new finishes throughout. new partitions to create staff area in rear of store. restroom remodel for a.d.a. compliance.new nanawall security door at entry to store inside stonestown mall.Details
t.i. in unit #153, to include new finishes throughout. new partitions to create staff area in rear of store. restroom remodel for a.d.a. compliance.new nanawall security door at entry to store inside stonestown mall. | $150,000 |