Gregory Paul Wallace
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Gregory Paul Wallace Struct
- Based in
- Emeryville
- On San Francisco permits
- Jul 2006 to Sep 2026
242 permits since 2000 (engineer on 216 permits, architect on 23 permits, authorized agent-others on 3 permits, designer on 3 permits): 172 completed, 20 in progress, 20 never finaled, 30 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 242.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 151 Elsie St | altered site permit for pa#201904057254 currently approved as prj#2025002553, reconfigure front bay window & replace garage door, add addition to rear façade, replace existing siding with (n) cement plaster, replace all wins & entry door, update staircase treads and railing, remodel kitchen, bath &Details
altered site permit for pa#201904057254 currently approved as prj#2025002553, reconfigure front bay window & replace garage door, add addition to rear façade, replace existing siding with (n) cement plaster, replace all wins & entry door, update staircase treads and railing, remodel kitchen, bath & | ||
| Sep 17, 2026 | In progress issued Sep 2026 | 2230 22nd Av | remodel existing first floor of single family residence and convert 1st floor into habitable space.Details
remodel existing first floor of single family residence and convert 1st floor into habitable space. | $188,000 | |
| Aug 27, 2026 | In progress issued Sep 2026 | 439 Jersey St | Wooden Heart | remove and add interior walls and fixtures. remodel units 439 and 441Details
remove and add interior walls and fixtures. remodel units 439 and 441 | $40,000 |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 2165 Lombard St | Gotham Bay Construction | repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codesDetails
repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codes | $570,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 3 Presidio Tr | Black Mountain Development | revision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcenDetails
revision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcen | $95,000 |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 800 Greenwich St | repair and resupport of existing steel beams supporting sidewalk over basement.Details
repair and resupport of existing steel beams supporting sidewalk over basement. | $21,000 | |
| Aug 12, 2026 | Completed final sign-off Aug 2026 | 1899 Oakdale Av | revision 202302722706 - wall layout changes. ref 202509155290 - minor bathroom layout changes. minor bathroom change to include layout changeDetails
revision 202302722706 - wall layout changes. ref 202509155290 - minor bathroom layout changes. minor bathroom change to include layout change | ||
| Jul 29, 2026 | Completed final sign-off Sep 2026 | 1983 18th Av | Alpha Construction & Solutions Inc. | revision to remodel permit 202410152905 to document field changes to floor plan. no exterior changes.Details
revision to remodel permit 202410152905 to document field changes to floor plan. no exterior changes. | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 1275 Guerrero St | swap kitchen & dining room location, remodel bathroom; add bedroom 3 in rear of building(previous playroom), rebuild gallery level with code compliant ceiling heights & stairs, legalize all areas on level 1 that are to remain; remove bath 2; reconfigure bedroomsDetails
swap kitchen & dining room location, remodel bathroom; add bedroom 3 in rear of building(previous playroom), rebuild gallery level with code compliant ceiling heights & stairs, legalize all areas on level 1 that are to remain; remove bath 2; reconfigure bedrooms | $260,000 | |
| Apr 14, 2026 | Completed final sign-off Apr 2026 | 132 Corbett Av | American Builders | addition of french drain & foundation waterproofing permit in responce to complaint #2026-53675Details
addition of french drain & foundation waterproofing permit in responce to complaint #2026-53675 | $5,000 |
| Apr 14, 2026 | In progress issued May 2026 | 1347 40th Av | Healthy Building Science Inc | convert existing conditioned space on street level to adu.Details
convert existing conditioned space on street level to adu. | $185,000 |
| Apr 14, 2026 | Completed final sign-off Apr 2026 | 4341 17th St | American Builders | addition of french drain & foundation waterproofing permit in response to complaint #2026-53675Details
addition of french drain & foundation waterproofing permit in response to complaint #2026-53675 | $5,000 |
| Jan 14, 2026 | In progress filed Jan 2026, not yet issued | 254 Collingwood St | in kind replacement of existing concrete retaining wall and fence along the north side property line. response to nov #202546700Details
in kind replacement of existing concrete retaining wall and fence along the north side property line. response to nov #202546700 | $30,000 | |
| Jan 9, 2026 | Completed final sign-off Jul 2026 | 42 Varennes St | Creative Concrete Sf Inc | revision to bpa: 202209283287 - sidewalk repair work (infill 2 of the 3 sub-sidewalk sections)Details
revision to bpa: 202209283287 - sidewalk repair work (infill 2 of the 3 sub-sidewalk sections) | |
| Jan 9, 2026 | Expired or cancelled suspend Jun 2026 | 18 Wilder St | Jtm Developments | comply w/ nov 202547608 in-kind repair of e) concrete retaining walls in rear yardDetails
comply w/ nov 202547608 in-kind repair of e) concrete retaining walls in rear yard | $10,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 850 35th Av | Todd Felix Costanza | remodel existing powder room, laundry room and playroom. remodel existing deck and stairs.Details
remodel existing powder room, laundry room and playroom. remodel existing deck and stairs. | $55,000 |
| Oct 17, 2025 | In progress filed Oct 2025, not yet issued | 45 Clarendon Av | landscape retaining wall and stair - wall height less than 4 feet.Details
landscape retaining wall and stair - wall height less than 4 feet. | $40,000 | |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 1039 Portola Dr | American Builders | rebuild stairs in kind bpa#2025-0923-5942Details
rebuild stairs in kind bpa#2025-0923-5942 | $25,000 |
| Sep 15, 2025 | Completed final sign-off Jul 2026 | 1899 Oakdale Av | Alpha Construction & Solutions Inc. | voluntary structural improvements to existing 3 story wood frame building.Details
voluntary structural improvements to existing 3 story wood frame building. | $25,000 |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 1487 Sacramento St | King Son Construction Co Llc | unit #10: interior improvements. removal of interior walls for reconfiguration of (e) spaces (bath & kitchen). no exterior changes, no change of use or number of bedrooms.Details
unit #10: interior improvements. removal of interior walls for reconfiguration of (e) spaces (bath & kitchen). no exterior changes, no change of use or number of bedrooms. | $30,000 |
| Sep 15, 2025 | Completed final sign-off Jan 2026 | 2919 Jackson St | Dollard Construction Inc. | deck replacement in kind in rear of residence. not visible from the street.Details
deck replacement in kind in rear of residence. not visible from the street. | $45,000 |
| Sep 2, 2025 | Completed final sign-off Jun 2026 | 15 Eagle St | Dmg Enterprises Inc | lower/l: demo part of e) toilet & full steam rm & create new bathroom w/ shower, convert part of unconditional e) mep/laundry into new store room. upper/l: replace balcony beams & make guardrail code compliantDetails
lower/l: demo part of e) toilet & full steam rm & create new bathroom w/ shower, convert part of unconditional e) mep/laundry into new store room. upper/l: replace balcony beams & make guardrail code compliant | $30,000 |
| Aug 25, 2025 | In progress issued Aug 2025 | 116 Delmar St | Amador General Construction Inc | interior remodel of e 2 story over basement, partial attic conversion including 1 library space, 1 finished attic space and 1 bath. all e windows to remain. 1 new window at 1st fl back kitchen, 1 new slider in at attic conversion to roof deck, 2 new skylights. e ext finishes remain. roof sep permit.Details
interior remodel of e 2 story over basement, partial attic conversion including 1 library space, 1 finished attic space and 1 bath. all e windows to remain. 1 new window at 1st fl back kitchen, 1 new slider in at attic conversion to roof deck, 2 new skylights. e ext finishes remain. roof sep permit. | $600,000 |
| Aug 11, 2025 | Completed final sign-off Apr 2026 | 216 Bemis St | Bay Building Structures Inc | add int'r walls to create 2 bedroom, laundry, closet & bathroom to (e) habitable space on 3rd fl; add 3 roof dormenrs conforming to zoning; admin bulletin #3 add skylights to (e) add lighting & electrical to area of work; add (n) heat pump water heater resue (e) furnace; add (n)ductwork serving areaDetails
add int'r walls to create 2 bedroom, laundry, closet & bathroom to (e) habitable space on 3rd fl; add 3 roof dormenrs conforming to zoning; admin bulletin #3 add skylights to (e) add lighting & electrical to area of work; add (n) heat pump water heater resue (e) furnace; add (n)ductwork serving area | $150,000 |
| Aug 8, 2025 | Completed final sign-off Apr 2026 | 760 Fell St | Eco Logic Construction & Design Inc. | kitchen renovation and wall removal between kitchen and dining room. voluntary seismic improvements. arch work per pa #202502281360Details
kitchen renovation and wall removal between kitchen and dining room. voluntary seismic improvements. arch work per pa #202502281360 | $10,000 |
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 4243 Folsom St | removal of bearing wall between kitchen and living room and minor wall. reconfiguration on ground floor.kichen and two bathrooms remodel under separate no-plan permit (2025-0702-9990)Details
removal of bearing wall between kitchen and living room and minor wall. reconfiguration on ground floor.kichen and two bathrooms remodel under separate no-plan permit (2025-0702-9990) | $25,000 | |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 166 Dolores St | A L V Construction Inc | addition of french door in e) window opening. no structural work. window is located in back of house.Details
addition of french door in e) window opening. no structural work. window is located in back of house. | $5,000 |
| Apr 29, 2025 | Completed final sign-off Jun 2026 | 2045 Jackson St | Trainor Builders | revision to pa #202501148329. tear off all stucco on house replace with stucco as per code. replace dryrot in kind. see engineering drawing attatched. no new window. reinstall 11 existing windows.Details
revision to pa #202501148329. tear off all stucco on house replace with stucco as per code. replace dryrot in kind. see engineering drawing attatched. no new window. reinstall 11 existing windows. | $275,000 |
| Mar 24, 2025 | Completed final sign-off Mar 2025 | 269 San Jose Av | revision to pa #2023-1215-2619. replacement window at side at kitchen. downsized to 36" x 36" wood window.Details
revision to pa #2023-1215-2619. replacement window at side at kitchen. downsized to 36" x 36" wood window. | ||
| Mar 24, 2025 | Completed final sign-off Sep 2026 | 1983 18th Av | Alpha Construction & Solutions Inc. | revision to pa # 202410152905 (remodel) to allow fiberglass window type in -lieu of metal clad at rear and side elevations only.Details
revision to pa # 202410152905 (remodel) to allow fiberglass window type in -lieu of metal clad at rear and side elevations only. | |
| Feb 18, 2025 | In progress issued May 2026 | 639 Edinburgh St | O'reilly Construction | abate complaint #2024-31597 - remodel (e) deck to achieve code compliance. install 1-hour fire rated walls at side lot lines.Details
abate complaint #2024-31597 - remodel (e) deck to achieve code compliance. install 1-hour fire rated walls at side lot lines. | $5,000 |
| Jan 21, 2025 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc. | revision to pa # 2021-0528-1316 revise column footing per plansDetails
revision to pa # 2021-0528-1316 revise column footing per plans | |
| Dec 17, 2024 | Completed final sign-off Jul 2025 | 43 Lisbon St | Jmc Quality Construction Inc | revision to framing and new shear walls for permit #202408148635 (conversion of ground floor to 2 bedrooms and game room.)Details
revision to framing and new shear walls for permit #202408148635 (conversion of ground floor to 2 bedrooms and game room.) | $5,000 |
| Dec 10, 2024 | In progress issued Dec 2024 | 1222 33rd Av | Fg Force Construction Inc | revision to 202407055891 1st fl to reconfigure bathroom and laundryDetails
revision to 202407055891 1st fl to reconfigure bathroom and laundry | $4,500 |
| Nov 19, 2024 | Completed final sign-off Jun 2026 | 618 12th Av | Mccowan Berrones & Company Llc | 1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet.Details
1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet. | $571,275 |
| Nov 7, 2024 | Completed final sign-off Jun 2026 | 64 Alpine Tr | Brady Construction Inc | revision to permit 202211086122-s1. remove concrete spiral stairs at rear from scope of work. garage post to remain.Details
revision to permit 202211086122-s1. remove concrete spiral stairs at rear from scope of work. garage post to remain. | |
| Nov 1, 2024 | Expired or cancelled withdrawn May 2025 | 8045 Geary Bl | Arris Build Group, Inc. | voluntary seismic improvements to base level for 12 unit bldgDetails
voluntary seismic improvements to base level for 12 unit bldg | $75,000 |
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 1983 18th Av | Alpha Construction & Solutions Inc. | remodel to the main level of the home. the lower level will be built out to add living room 2x bedrooms and 1 bathroomDetails
remodel to the main level of the home. the lower level will be built out to add living room 2x bedrooms and 1 bathroom | $80,000 |
| Aug 20, 2024 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc. | revision to pa# 202105281316: add ramp for extended garage use prior to future adu and revise (n) column layout.Details
revision to pa# 202105281316: add ramp for extended garage use prior to future adu and revise (n) column layout. | |
| Aug 16, 2024 | In progress issued Aug 2024 | 3167 Folsom St | removal of bearing wall between kitchen and living room. in-kind replacement of living room window (front street visible). same size same locationDetails
removal of bearing wall between kitchen and living room. in-kind replacement of living room window (front street visible). same size same location | $8,000 | |
| Jul 5, 2024 | In progress issued Sep 2024 | 1222 33rd Av | Fg Force Construction Inc | remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs.Details
remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs. | $77,322 |
| Jun 25, 2024 | In progress issued Sep 2024 | 794 Rhode Island St | Blue Zone Builders Inc | revision to pa# 2023-0221-2318 ground level interior remodel, lower (e) playroom, reinforce playroom ceiling for (n) suspended decorative metal sculpture, (n) interior walls, (n) shower, (n) mini split heat pump. 24.5 cubic yards of excavation at the playroom. 24.5 cu.yds. of excavation at playroom.Details
revision to pa# 2023-0221-2318 ground level interior remodel, lower (e) playroom, reinforce playroom ceiling for (n) suspended decorative metal sculpture, (n) interior walls, (n) shower, (n) mini split heat pump. 24.5 cubic yards of excavation at the playroom. 24.5 cu.yds. of excavation at playroom. | $90,000 |
| Jun 25, 2024 | In progress issued Jul 2024 | 910 Rockdale Dr | American Builders | rebuild stairs in kind at front. voluntary structural strengthening to crawl space, basement, garage. work will not affect public right awayDetails
rebuild stairs in kind at front. voluntary structural strengthening to crawl space, basement, garage. work will not affect public right away | $35,000 |
| Jun 25, 2024 | Expired or cancelled withdrawn Mar 2026 | 1667 Fulton St | Rua Woods Construction Inc | shoring work for pa 202212138159.Details
shoring work for pa 202212138159. | |
| Jun 18, 2024 | In progress filed Jun 2024, not yet issued | 1477 Guerrero St | rev pa 202305238419 and ref pa 202310068213- removal of 2 shear walls from voluntary structural stengthening scopeDetails
rev pa 202305238419 and ref pa 202310068213- removal of 2 shear walls from voluntary structural stengthening scope | ||
| Jun 18, 2024 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc. | revision to 202012090580 soft story mitigation per chap 4d of 2016 sfebc per 2016 cebc appendix a4Details
revision to 202012090580 soft story mitigation per chap 4d of 2016 sfebc per 2016 cebc appendix a4 | |
| May 8, 2024 | Completed final sign-off Aug 2024 | 342 Moultrie St | retain and reduce existing unauthorizd mezzanine to 1/3 within e garage and access stair for storage onlyDetails
retain and reduce existing unauthorizd mezzanine to 1/3 within e garage and access stair for storage only | $7,000 | |
| May 6, 2024 | Completed final sign-off Apr 2025 | 668 Castro St | rebuilding (e) exterior staircase with different configuration.Details
rebuilding (e) exterior staircase with different configuration. | $30,000 | |
| May 6, 2024 | Completed final sign-off Aug 2025 | 668 Castro St | Eco Logic Construction & Design Inc. | interior remodel for in kind bathrooms & bedroom. wall removal at living room.Details
interior remodel for in kind bathrooms & bedroom. wall removal at living room. | $90,000 |
| Apr 2, 2024 | Completed final sign-off Mar 2025 | 269 San Jose Av | Alpha Construction & Solutions Inc. | revision to 202312152619 remodel to gr fl unit 1. replace e windows front facade and one on side elevationDetails
revision to 202312152619 remodel to gr fl unit 1. replace e windows front facade and one on side elevation | $5,000 |
| Mar 15, 2024 | Completed final sign-off Jun 2024 | 120 Putnam St | Sederap's Drywall Inc. | renovation and addition to existing garage and storage room per nov 202316426Details
renovation and addition to existing garage and storage room per nov 202316426 | $35,000 |
| Mar 14, 2024 | In progress issued Jun 2024 | 161 Joost Av | Jtm Developments | rear deck repair and minor extention of upper level cantilevered deck.Details
rear deck repair and minor extention of upper level cantilevered deck. | $10,000 |
| Feb 16, 2024 | Completed final sign-off Feb 2025 | 1786 40th Av | voluntary structural strengthening to base level of single family homeDetails
voluntary structural strengthening to base level of single family home | $10,000 | |
| Jan 19, 2024 | Completed final sign-off Mar 2025 | 269 San Jose Av | Alpha Construction & Solutions Inc. | revision to bp# 202312152619 removal of some existing walls and related seismic improvmentsDetails
revision to bp# 202312152619 removal of some existing walls and related seismic improvments | |
| Dec 18, 2023 | Completed final sign-off Jun 2024 | 225 Dolores St | Stricklin Construciton | replacement in kind of an extg exterior stairway.Details
replacement in kind of an extg exterior stairway. | $10,000 |
| Dec 15, 2023 | Completed final sign-off Mar 2025 | 269 San Jose Av | Alpha Construction & Solutions Inc. | ground floor unit #1. remodel in a 3 story residential bldg. removal of some extg walls and related seismic improvements.Details
ground floor unit #1. remodel in a 3 story residential bldg. removal of some extg walls and related seismic improvements. | $30,000 |
| Oct 25, 2023 | Completed final sign-off Sep 2024 | 318 Caselli Av | remodel kitchen: reconfig corner wall, replace deck doors, rear yard facing windows, install cabinets/appliances/fixtures, electrical/plumbing as required; remodel adjacent powder room; lower level: reconfig corner wall, replace window; replace concrete slab, yard slope drainage.Details
remodel kitchen: reconfig corner wall, replace deck doors, rear yard facing windows, install cabinets/appliances/fixtures, electrical/plumbing as required; remodel adjacent powder room; lower level: reconfig corner wall, replace window; replace concrete slab, yard slope drainage. | $150,000 | |
| Oct 6, 2023 | In progress issued Oct 2023 | 1477 Guerrero St | Silver Arrows Paint Restoration | revision to 202305238419 to cost cutting by reducing voluntary soft story retrofit to voluntary structural strengthening of base level of the 3 story, 2 flat residential building.Details
revision to 202305238419 to cost cutting by reducing voluntary soft story retrofit to voluntary structural strengthening of base level of the 3 story, 2 flat residential building. | |
| Sep 7, 2023 | Completed final sign-off Feb 2024 | 48 Hemway Tr | Seismic Retrofitters Inc. | voluntary seismic improvements to base soft story for 2-unit bldg per chapter 34b of sf bldg code per iebc appendix a4Details
voluntary seismic improvements to base soft story for 2-unit bldg per chapter 34b of sf bldg code per iebc appendix a4 | $45,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 163 Belvedere St | Silver Arrows Paint Restoration | partial foundation replacement of common wall on this property (south pl 15' @ front sec)Details
partial foundation replacement of common wall on this property (south pl 15' @ front sec) | $8,000 |
| Jul 12, 2023 | Never finaled issued Jul 2023, no final | 651 Kansas St | revision to bpa#202305167825, add new cripple wall & brace and bolt, not to bring bldg up to codeDetails
revision to bpa#202305167825, add new cripple wall & brace and bolt, not to bring bldg up to code | $12,000 | |
| Jun 30, 2023 | Never finaled issued Aug 2023, no final | 4526 17th St | rev to pa202211186815: demolistion of (e) pony wall and railing within residential unit. new railing and guardrail/malutrade. no change to stair rise/run. no change to structure / stair framing.Details
rev to pa202211186815: demolistion of (e) pony wall and railing within residential unit. new railing and guardrail/malutrade. no change to stair rise/run. no change to structure / stair framing. | $1,500 | |
| Jun 5, 2023 | Completed final sign-off Oct 2023 | 65 Cleary Ct | Wolfe Painting Co | unit 11: restore wall between mechanical room & laundry roomDetails
unit 11: restore wall between mechanical room & laundry room | $5,000 |
| May 23, 2023 | Never finaled issued Jun 2023, no final | 1477 Guerrero St | Silver Arrows Paint Restoration | voluntary structural strengthening of ground flr/ garage lvlDetails
voluntary structural strengthening of ground flr/ garage lvl | $40,000 |
| Mar 16, 2023 | Completed final sign-off Apr 2024 | 1307 Mason St | struction revision to permit 202211176737. changes in foundation details due to (e) conditions.Details
struction revision to permit 202211176737. changes in foundation details due to (e) conditions. | ||
| Feb 21, 2023 | Never finaled issued Apr 2023, no final | 794 Rhode Island St | Blue Zone Builders Inc | ground level renovation, move walls/create different sized rooms, move bath, remove closet in primary bedroom. add railing on roof deck in place of wall at 2 sections. add sink and cabinetry in den.Details
ground level renovation, move walls/create different sized rooms, move bath, remove closet in primary bedroom. add railing on roof deck in place of wall at 2 sections. add sink and cabinetry in den. | $45,000 |
| Feb 13, 2023 | Completed final sign-off Jun 2023 | 653 Lake St | Daniel Larsen Builders | remove an existing wall between kitchen and dining room.existing kitchen remain.Details
remove an existing wall between kitchen and dining room.existing kitchen remain. | $3,000 |
| Feb 7, 2023 | Expired or cancelled expired Feb 2026 | 438 Vicksburg St | Sean Michael Mchugh Construction | new deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3.Details
new deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3. | $10,000 |
| Jan 31, 2023 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc., Seismic Retrofitters Inc. | revision to pa 2020-1209-0580 (soft story retrofit per chapter 4d of 2016 sfebc, appendix a4)Details
revision to pa 2020-1209-0580 (soft story retrofit per chapter 4d of 2016 sfebc, appendix a4) | |
| Jan 5, 2023 | Completed final sign-off Mar 2023 | 195 26th Av | R. C. Construction | revision to soft story mitigation 201709148114 to remove accomodations future aduDetails
revision to soft story mitigation 201709148114 to remove accomodations future adu | |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 1667 Fulton St | addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage.Details
addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage. | $70,000 | |
| Dec 20, 2022 | Completed final sign-off May 2024 | 145 Foerster St | kitchen renovation - no envelope changes - replace cabinets, sink, faucet, new lighting and outlets, new flooring, new insulation at walls, floor & ceiling, replace wood rot framing as needed, new wood header between kitchen and entry, replace windows.Details
kitchen renovation - no envelope changes - replace cabinets, sink, faucet, new lighting and outlets, new flooring, new insulation at walls, floor & ceiling, replace wood rot framing as needed, new wood header between kitchen and entry, replace windows. | $20,000 | |
| Dec 13, 2022 | Completed final sign-off Mar 2026 | 1667 Fulton St | Rua Woods Construction Inc | addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage.Details
addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage. | $70,000 |
| Nov 18, 2022 | Completed final sign-off Apr 2024 | 4526 17th St | unit #1: condo renovations due to fire/water damage. 1)remodel kitchen, 2) non structural partition removals, 3)bathroom remodel, 4)closet expansion, 5) new interior doors and exterior windows, 5)new interior doors and exterior windows. 6)new lighting, 7)new flooring, 8)relocate electrical panel.Details
unit #1: condo renovations due to fire/water damage. 1)remodel kitchen, 2) non structural partition removals, 3)bathroom remodel, 4)closet expansion, 5) new interior doors and exterior windows, 5)new interior doors and exterior windows. 6)new lighting, 7)new flooring, 8)relocate electrical panel. | $100,000 | |
| Nov 17, 2022 | Completed final sign-off Apr 2024 | 1307 Mason St | interior remodel of the office space, replacing the bathroom and kitchen appliances in kind complying with ada for shower and bathroom door. opening space in the west side pathway for pg&e meters (approx. 20sf)Details
interior remodel of the office space, replacing the bathroom and kitchen appliances in kind complying with ada for shower and bathroom door. opening space in the west side pathway for pg&e meters (approx. 20sf) | $175,000 | |
| Nov 10, 2022 | Completed final sign-off Feb 2024 | 175 Valley St | Maginn Construction | addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alterationDetails
addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alteration | $390,000 |
| Nov 8, 2022 | Completed final sign-off Jun 2026 | 64 Alpine Tr | Brady Construction Inc | 1st main flr level kitchen, bathrm & dining rm remodel. (n) exterior spiral staircase to connect 64 unit w/ garden level. upper flr level primary bedrm, family rm, bathrm, closets & laundry remodel. addition (n) dormer & reconstruct roof. seismic retrofit garage,create additional off street parkingDetails
1st main flr level kitchen, bathrm & dining rm remodel. (n) exterior spiral staircase to connect 64 unit w/ garden level. upper flr level primary bedrm, family rm, bathrm, closets & laundry remodel. addition (n) dormer & reconstruct roof. seismic retrofit garage,create additional off street parking | $800,000 |
| Nov 4, 2022 | Completed final sign-off Oct 2024 | 117 Molimo Dr | Zhou's International Inc. | revision to permit 201907186311 due to (e) conditions. temporary building shoring plans.Details
revision to permit 201907186311 due to (e) conditions. temporary building shoring plans. | $10,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 163 Belvedere St | Silver Arrows Paint Restoration | level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement.Details
level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement. | $85,000 |
| Nov 3, 2022 | Expired or cancelled cancelled Jan 2026 | 207 Skyline Bl | remodel/expansion of existing toddler playgound . ada compliant ramps from playground and adjacent existing building down to garden area. new garden area with pathways and sitting area.Details
remodel/expansion of existing toddler playgound . ada compliant ramps from playground and adjacent existing building down to garden area. new garden area with pathways and sitting area. | $195,000 | |
| Oct 19, 2022 | Completed final sign-off Dec 2024 | 38 Rossi Av | Flmc Development Corp Dba Adamo Campagna | minor lower level reconfiguration. bathroom addition and storage conversion into media room. infill of lightwells against blind wall at first two levels. minor adjustment of door openings at level 2. reconfigure powder room at level 2.Details
minor lower level reconfiguration. bathroom addition and storage conversion into media room. infill of lightwells against blind wall at first two levels. minor adjustment of door openings at level 2. reconfigure powder room at level 2. | $103,000 |
| Oct 13, 2022 | Expired or cancelled cancelled Jan 2026 | 96 Caselli Av | Paramount Construction | demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area.Details
demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area. | $200,000 |
| Sep 28, 2022 | Never finaled issued Oct 2022, no final | 5322 California St | interior renovation of entry foyer and living rm on 2/f; bedrooms and bathrooms on 3/f; new interior stair on 2/f to 3/f,new skylights; new exterior stairs replacement with code compliant rise & run, guardrail with new wdw replacements at (e) openings at facade.Details
interior renovation of entry foyer and living rm on 2/f; bedrooms and bathrooms on 3/f; new interior stair on 2/f to 3/f,new skylights; new exterior stairs replacement with code compliant rise & run, guardrail with new wdw replacements at (e) openings at facade. | $400,000 | |
| Sep 27, 2022 | Expired or cancelled expired Feb 2026 | 438 Vicksburg St | Sean Michael Mchugh Construction | replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition.Details
replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition. | $300,000 |
| Sep 2, 2022 | Completed final sign-off Oct 2024 | 117 Molimo Dr | Zhou's International Inc. | temporary soil shoring along west property line for construction pa 201907186311.Details
temporary soil shoring along west property line for construction pa 201907186311. | |
| Aug 4, 2022 | Completed final sign-off Jul 2023 | 377 Harkness Av | Nava Pro Construction | revision to bpa#202111162458. removal of bearing wall between kitchen and living roomDetails
revision to bpa#202111162458. removal of bearing wall between kitchen and living room | $4,000 |
| Jun 10, 2022 | Completed final sign-off Mar 2023 | 534 33rd Av | to comply with nov 202287549; replace (e) 5.5 ft hight fence with (n) 8" high fence . remove "l" shaped structure at north/east corner of rear yard that is 8' to 10' above grade (35' long)Details
to comply with nov 202287549; replace (e) 5.5 ft hight fence with (n) 8" high fence . remove "l" shaped structure at north/east corner of rear yard that is 8' to 10' above grade (35' long) | $40,000 | |
| May 13, 2022 | Completed final sign-off Dec 2022 | 451 Locust St | Silver Arrows Paint Restoration | post removal new floor girder installation and new floor joists in ceiling of garage per nov #2022-87989Details
post removal new floor girder installation and new floor joists in ceiling of garage per nov #2022-87989 | $15,000 |
| May 5, 2022 | Completed final sign-off Oct 2022 | 1519 Noe St | Daniel Larsen Builders | remodel (e) bath to become 1.5 baths. add 1 interior bedroom closet. relocate rear facing window in kitchen.Details
remodel (e) bath to become 1.5 baths. add 1 interior bedroom closet. relocate rear facing window in kitchen. | $45,000 |
| Feb 14, 2022 | Completed final sign-off Aug 2024 | 342 Moultrie St | permit to remove all unpermitted work in 2 car garage for use as garage. per nov.#202058938Details
permit to remove all unpermitted work in 2 car garage for use as garage. per nov.#202058938 | $91,000 | |
| Jan 19, 2022 | Completed final sign-off Dec 2023 | 4309 19th St | William Gregory Clause | remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work.Details
remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work. | $125,000 |
| Dec 23, 2021 | Completed final sign-off Mar 2022 | 242 San Jose Av | Seismic Retrofitters Inc. | voluntary structurual strengethning to the garage portions of the home.Details
voluntary structurual strengethning to the garage portions of the home. | $35,000 |
| Oct 22, 2021 | Never finaled filed Oct 2021, never issued | 15 Nebraska St | revision to permit #202010287683. 1) revisions for field conditions.Details
revision to permit #202010287683. 1) revisions for field conditions. | $10,000 | |
| Jul 15, 2021 | Completed final sign-off May 2022 | 72 Macondray Ln | Francis Mullan Construction | unit 1 - addition of interior spiral stair, kitchen remodelDetails
unit 1 - addition of interior spiral stair, kitchen remodel | $150,000 |
| May 28, 2021 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc., Seismic Retrofitters Inc. | lower slab elevation, underpinning (e) footings, new retaining wall and new steel beam for future adu (ref pa 201910245461). basement foundation work only.Details
lower slab elevation, underpinning (e) footings, new retaining wall and new steel beam for future adu (ref pa 201910245461). basement foundation work only. | $30,000 |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1524 Masonic Av | interior remodel of kitchen, 3 (e) full bathrooms and 1 powder room. replacement of 2 windows and 2 skylights in kind, 1 new skylight and 1 new window in master batyhroom. no new conditioned fl area.Details
interior remodel of kitchen, 3 (e) full bathrooms and 1 powder room. replacement of 2 windows and 2 skylights in kind, 1 new skylight and 1 new window in master batyhroom. no new conditioned fl area. | $350,000 | |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 21 Nebraska St | Jimenez Construction Sf Inc | repair garage post damaged by carDetails
repair garage post damaged by car | $5,000 |
| Mar 30, 2021 | Completed final sign-off Aug 2022 | 461 02nd St | Jian Lou Construction Co. | work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft.Details
work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft. | $150,000 |
| Dec 19, 2020 | Completed final sign-off Jul 2022 | 154 Beulah St | Tredway Made Inc | addition of (n) deck @ 1st fl above grade & (n) exterior door.Details
addition of (n) deck @ 1st fl above grade & (n) exterior door. | $25,000 |
| Dec 9, 2020 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | Arris Build Group, Inc., Seismic Retrofitters Inc. | soft story mitigation per chapter 4d of 2016 sfebc per 2016 cebc appendix a4. remaining work for adu in phase 2 per pa # 201910245461 or future permit.Details
soft story mitigation per chapter 4d of 2016 sfebc per 2016 cebc appendix a4. remaining work for adu in phase 2 per pa # 201910245461 or future permit. | $45,000 |