Paramount Construction
- Based in
- Hayward
- On San Francisco permits
- Feb 2001 to Oct 2023
- Last 24 months
- 0 permits filed
34 permits since 2000: 20 completed, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2023 | Completed final sign-off Jan 2024 | 745 Buchanan St | rev to pa# 2021-0809-6018; remove (n) 2 each doubled door replace (n) 2 each 36x7'6"Details
rev to pa# 2021-0809-6018; remove (n) 2 each doubled door replace (n) 2 each 36x7'6" | $1,000 |
| Feb 6, 2023 | Completed final sign-off Jun 2023 | 879 32nd Av | remove (e) kitchen cabinets with stove and sink. replace (n) same above. put (n) gfci receptacles. no remove wallDetails
remove (e) kitchen cabinets with stove and sink. replace (n) same above. put (n) gfci receptacles. no remove wall | $20,000 |
| Dec 14, 2022 | Expired or cancelled withdrawn Nov 2024 | 1132 Quesada Av | remove (e) unauthorized construction of interior done by tenant. replace (n) meter main, 200 amp, 3 phase, 240v panelDetails
remove (e) unauthorized construction of interior done by tenant. replace (n) meter main, 200 amp, 3 phase, 240v panel | $8,000 |
| Oct 13, 2022 | Expired or cancelled cancelled Jan 2026 | 96 Caselli Av | demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area.Details
demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area. | $200,000 |
| Feb 24, 2022 | Completed final sign-off Jul 2022 | 96 Caselli Av | remodel interior of 96 caselli ave: remove walls between kitchen, living, dining. remove laundry nook, add toilet to bath, add lav to powder room.Details
remodel interior of 96 caselli ave: remove walls between kitchen, living, dining. remove laundry nook, add toilet to bath, add lav to powder room. | $40,000 |
| Feb 24, 2022 | Completed final sign-off Feb 2024 | 745 Buchanan St | amend to pa202112214819 for additional work. remove (e) windows & replace same style of 20 additional windows. replace (e) opening. u=.30maxDetails
amend to pa202112214819 for additional work. remove (e) windows & replace same style of 20 additional windows. replace (e) opening. u=.30max | $15,000 |
| Dec 21, 2021 | Completed final sign-off Feb 2024 | 745 Buchanan St | remove (e) window sill and repair, replace of 20 each. remove (e) window and replace same style of 15 each. wood, wood sash window. replaced in (e) opening. u < or = .3Details
remove (e) window sill and repair, replace of 20 each. remove (e) window and replace same style of 15 each. wood, wood sash window. replaced in (e) opening. u < or = .3 | $30,000 |
| Dec 15, 2021 | Never finaled issued Dec 2021, no final | 2435 Funston Av | replace (n) kitchen cabinet in kind.Details
replace (n) kitchen cabinet in kind. | $15,000 |
| Aug 9, 2021 | Completed final sign-off Feb 2024 | 745 Buchanan St | replace e stairs and wheelchir lifts. remodel e restrooms for accessibility. remodel office area and kitchen. related mechanical, plumbing, elec works. reconfigure attic. windows sep permitDetails
replace e stairs and wheelchir lifts. remodel e restrooms for accessibility. remodel office area and kitchen. related mechanical, plumbing, elec works. reconfigure attic. windows sep permit | $175,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 32 Dorland St | install new washer/ dryer & sub water meter in garage, provide venting for dryer.Details
install new washer/ dryer & sub water meter in garage, provide venting for dryer. | $5,000 |
| Aug 29, 2019 | Never finaled issued Sep 2019, no final | 1825 Balboa St | rev to pa# 201408042922 s1; change simpsons moment frame to standard moment frame. update foundation planDetails
rev to pa# 201408042922 s1; change simpsons moment frame to standard moment frame. update foundation plan | |
| Aug 16, 2019 | Completed final sign-off Sep 2019 | 1479 45th Av | partial repair foundation (foundation cap). approx. 14 linear foot at left front of building (in garage).Details
partial repair foundation (foundation cap). approx. 14 linear foot at left front of building (in garage). | $3,000 |
| Aug 2, 2019 | Expired or cancelled withdrawn Mar 2021 | 2277 Mission St | revision to 201707101421 t-24Details
revision to 201707101421 t-24 | |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 2277 Mission St | put 1 exit door 36" w x 80" h with ramp. revision to pa# 201707101421Details
put 1 exit door 36" w x 80" h with ramp. revision to pa# 201707101421 | $4,000 |
| Jun 28, 2018 | Never finaled issued Jul 2018, no final | 2277 Mission St | street spaceDetails
street space | |
| Jul 10, 2017 | Completed final sign-off Dec 2021 | 2277 Mission St | commercial t.i., remodel & convert existing mezz. and 2/f into dental office, approximately 1746 sq.ft., create new entrance, add one new ada elevator and upgrade restroom.Details
commercial t.i., remodel & convert existing mezz. and 2/f into dental office, approximately 1746 sq.ft., create new entrance, add one new ada elevator and upgrade restroom. | $150,000 |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 1217 27th Av | remove (e) bath tub, toilet & replace them.Details
remove (e) bath tub, toilet & replace them. | $2,000 |
| Dec 17, 2014 | Completed final sign-off Jul 2015 | 540 Haight St | revision to pa#201308094011; reduce depth of wall 36" to 31" @ front of building.Details
revision to pa#201308094011; reduce depth of wall 36" to 31" @ front of building. | |
| Jul 1, 2014 | Completed final sign-off Jul 2014 | 704 North Point St | revision to pa#2013-1121-2460. remove (e) asphalt shingle roofing. replace (n) in-kind.Details
revision to pa#2013-1121-2460. remove (e) asphalt shingle roofing. replace (n) in-kind. | $10,000 |
| Jun 13, 2014 | Completed final sign-off Aug 2014 | 221 29th St | retiling work on shower room wall and floor. work to be done on upper unit only. no wall alteration or modificationDetails
retiling work on shower room wall and floor. work to be done on upper unit only. no wall alteration or modification | $4,000 |
| Nov 21, 2013 | Never finaled issued Mar 2014, no final | 704 North Point St | remodel restaurant @ 2701 leavenworth to include installation of (n) equipment, reconfigure non-bearing walls @ bathroom, install (2) (n) awnings @ east elevation. 704 north point install (n) window @ 2nd fl, replace (3) windows @ 3rd fl, replace asphalt shingle siding dormers w/ wood siding;Details
remodel restaurant @ 2701 leavenworth to include installation of (n) equipment, reconfigure non-bearing walls @ bathroom, install (2) (n) awnings @ east elevation. 704 north point install (n) window @ 2nd fl, replace (3) windows @ 3rd fl, replace asphalt shingle siding dormers w/ wood siding; | $21,000 |
| Aug 9, 2013 | Completed final sign-off Jul 2015 | 540 Haight St | install walkup facility (atm)machine per plan (front approach only 36" minimum x 48" level landing).Details
install walkup facility (atm)machine per plan (front approach only 36" minimum x 48" level landing). | $1,650 |
| Nov 2, 2012 | Expired or cancelled cancelled Jan 2026 | 1737 Post St | revision to pa# 201210172228. revise electrical panel per plan.Details
revision to pa# 201210172228. revise electrical panel per plan. | |
| Oct 17, 2012 | Completed final sign-off Nov 2012 | 1737 Post St | 1st floor, #300. remodel 500 sq ft (e) retail space to includes: (n) display furnitures, lightings.Details
1st floor, #300. remodel 500 sq ft (e) retail space to includes: (n) display furnitures, lightings. | $10,000 |
| Apr 13, 2011 | Never finaled issued Apr 2011, no final | 820 Post St | replace (e) dry cleaning equipment with new one, same size, same location.Details
replace (e) dry cleaning equipment with new one, same size, same location. | $4,000 |
| May 12, 2010 | Never finaled issued Jun 2010, no final | 930 Columbus Av | replacement of old dry cleaning machine with new at first floor. class iii system with combusitible liquid iiia. new supply fan, new 2 hour bolier room with rated door.Details
replacement of old dry cleaning machine with new at first floor. class iii system with combusitible liquid iiia. new supply fan, new 2 hour bolier room with rated door. | $3,000 |
| Nov 2, 2009 | Completed final sign-off Sep 2010 | 1551 Leavenworth St | 2 front windows to be wood clad singel hung sash. 4 rear and side wndws to be replaced with vinyl. inkind. same size u factor 0.47 maxDetails
2 front windows to be wood clad singel hung sash. 4 rear and side wndws to be replaced with vinyl. inkind. same size u factor 0.47 max | $8,000 |
| Sep 30, 2008 | Expired or cancelled cancelled Jul 2010 | 300 De Haro St | convert drycleaning drop shop to dry cleaning processing plant. install new equipementDetails
convert drycleaning drop shop to dry cleaning processing plant. install new equipement | $60,000 |
| Oct 23, 2003 | Completed final sign-off May 2004 | 2849 Baker St | revision to 200307159545 put (n) parallam 2.oe 5 1/4 x 14Details
revision to 200307159545 put (n) parallam 2.oe 5 1/4 x 14 | $3,500 |
| Jul 15, 2003 | Completed final sign-off May 2004 | 2849 Baker St | revise 200307109202. reconfigure (n) ftg at front property line. to not go pass fl to sidewalk.Details
revise 200307109202. reconfigure (n) ftg at front property line. to not go pass fl to sidewalk. | |
| Jul 10, 2003 | Completed final sign-off May 2004 | 2849 Baker St | revision to app #200302147592/remove 1 post & add new mc18 members to span/revise & strengthen alongDetails
revision to app #200302147592/remove 1 post & add new mc18 members to span/revise & strengthen along | $12,000 |
| May 6, 2003 | Completed final sign-off May 2003 | 3727 Geary Bl | renew:200210028013 for final inpsection onlyDetails
renew:200210028013 for final inpsection only | |
| Oct 2, 2002 | Never finaled issued Oct 2002, no final | 4051 18th St | remove (e) concrete inside garage. pour (n) concrete same above.Details
remove (e) concrete inside garage. pour (n) concrete same above. | $3,000 |
| Feb 26, 2001 | Completed final sign-off Apr 2001 | 229 Columbus Av | modify counter and remove pizza oven relocate range sep permit for hood/duct fire protectDetails
modify counter and remove pizza oven relocate range sep permit for hood/duct fire protect | $11,000 |