Silver Arrows Paint Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Nov 2023
- Last 24 months
- 0 permits filed
71 permits since 2000: 45 completed, 1 in progress, 18 never finaled, 7 expired or cancelled.
Of the 18 never-finaled permits, 1 is 3 to 5 years old, 15 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2023 | Expired or cancelled cancelled Jan 2025 | 112 Putnam St | replace 800 sf siding at garage. re-roof garage, replace concrete slab in bonus room(next to the garage) approx. 280sf no excavation or ceiling height changes. replace ext. brick front facade of garage with wood slats. install insul. in walls and ceiling of bonus room. resheetrock bonus room.Details
replace 800 sf siding at garage. re-roof garage, replace concrete slab in bonus room(next to the garage) approx. 280sf no excavation or ceiling height changes. replace ext. brick front facade of garage with wood slats. install insul. in walls and ceiling of bonus room. resheetrock bonus room. | $25,200 |
| Nov 16, 2023 | Completed final sign-off Jan 2024 | 1477 Guerrero St | renewal for work approved under pa# 202005067316. all work is complete.Details
renewal for work approved under pa# 202005067316. all work is complete. | |
| Oct 6, 2023 | In progress issued Oct 2023 | 1477 Guerrero St | revision to 202305238419 to cost cutting by reducing voluntary soft story retrofit to voluntary structural strengthening of base level of the 3 story, 2 flat residential building.Details
revision to 202305238419 to cost cutting by reducing voluntary soft story retrofit to voluntary structural strengthening of base level of the 3 story, 2 flat residential building. | |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 163 Belvedere St | partial foundation replacement of common wall on this property (south pl 15' @ front sec)Details
partial foundation replacement of common wall on this property (south pl 15' @ front sec) | $8,000 |
| May 23, 2023 | Never finaled issued Jun 2023, no final | 1477 Guerrero St | voluntary structural strengthening of ground flr/ garage lvlDetails
voluntary structural strengthening of ground flr/ garage lvl | $40,000 |
| Apr 19, 2023 | Completed final sign-off Mar 2024 | 451 Locust St | replace front terrazo stair in-kind with concrete stair due to significant deterioration. stair layout to remain the same as the existing stair.Details
replace front terrazo stair in-kind with concrete stair due to significant deterioration. stair layout to remain the same as the existing stair. | $15,000 |
| Mar 16, 2023 | Completed final sign-off Mar 2024 | 163 Belvedere St | revision from original 202211045927 w/plans. consolidate work in permit 202011249586, 202208170689, 202201276736, 202207219046 (no plans)Details
revision from original 202211045927 w/plans. consolidate work in permit 202011249586, 202208170689, 202201276736, 202207219046 (no plans) | $5,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 163 Belvedere St | level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement.Details
level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement. | $85,000 |
| Nov 3, 2022 | Completed final sign-off Nov 2023 | 455 Locust St | installation of sheetrock on ceiling on a 2 car garage over locust st side, installation of 6 ceiling lights and outlets for garage openers. with electrical panel for common areas.Details
installation of sheetrock on ceiling on a 2 car garage over locust st side, installation of 6 ceiling lights and outlets for garage openers. with electrical panel for common areas. | $18,000 |
| Sep 19, 2022 | Completed final sign-off Nov 2022 | 455 Locust St | remodel one unit permiting sheet rock, insulation, electrical and plumbing, no walls removed, one bathroom, one kitchen 2 bedrooms, living room and hallway. use 5/8" type x min at walls and ceilings between other units.Details
remodel one unit permiting sheet rock, insulation, electrical and plumbing, no walls removed, one bathroom, one kitchen 2 bedrooms, living room and hallway. use 5/8" type x min at walls and ceilings between other units. | $30,000 |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 167 Belvedere St | remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration.Details
remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration. | $75,000 |
| Jul 21, 2022 | Completed final sign-off Aug 2023 | 163 Belvedere St | (e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel.Details
(e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel. | $15,800 |
| Jun 24, 2022 | Expired or cancelled expired Sep 2022 | 455 Locust St | restoration of interior windows, sheet rock, insulation, baseboard and floorwood due to water intrusion, through two window, total area per incident no more than 25 sqft (including wall and floor). two windows in total one in living room and the other one in bedroom. all windows interiorDetails
restoration of interior windows, sheet rock, insulation, baseboard and floorwood due to water intrusion, through two window, total area per incident no more than 25 sqft (including wall and floor). two windows in total one in living room and the other one in bedroom. all windows interior | $6,950 |
| May 13, 2022 | Completed final sign-off Dec 2022 | 451 Locust St | post removal new floor girder installation and new floor joists in ceiling of garage per nov #2022-87989Details
post removal new floor girder installation and new floor joists in ceiling of garage per nov #2022-87989 | $15,000 |
| Jan 27, 2022 | Completed final sign-off Aug 2023 | 165 Belvedere St | replace lath and plaster walls with sheetrock, upgrade electrical entire unit replacing knob and tube. original building permit# 202011249586.Details
replace lath and plaster walls with sheetrock, upgrade electrical entire unit replacing knob and tube. original building permit# 202011249586. | $25,000 |
| Mar 26, 2021 | Completed final sign-off Oct 2022 | 453 Locust St | upgrading electrical panel, bring 1 kitchen to code and install lighting throughout the home, 1 bathroom remodel. no new wakk & no existing wall relocations. new lighting shall comple with cec 150.0(k)3 & (k)5. all new plumbing fixtures sall be remain at same location.Details
upgrading electrical panel, bring 1 kitchen to code and install lighting throughout the home, 1 bathroom remodel. no new wakk & no existing wall relocations. new lighting shall comple with cec 150.0(k)3 & (k)5. all new plumbing fixtures sall be remain at same location. | $50,000 |
| Mar 26, 2021 | Completed final sign-off Sep 2022 | 451 Locust St | remodel of 1 kitchen and 1 bthroom, upgrade electrical panel & cosmetic work. no new wall & no existing wall relocation. all new plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
remodel of 1 kitchen and 1 bthroom, upgrade electrical panel & cosmetic work. no new wall & no existing wall relocation. all new plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5. | $75,000 |
| Mar 26, 2021 | Completed final sign-off Sep 2022 | 457 Locust St | remodel of 1 full kitchen and 1 bathroom, and upgrade electrical panel. lighting shall comply with cec 150.0(k)3 & (k)5. no new wall & no (e) wall relocation. new plumbing fixtures to be remain at same location.Details
remodel of 1 full kitchen and 1 bathroom, and upgrade electrical panel. lighting shall comply with cec 150.0(k)3 & (k)5. no new wall & no (e) wall relocation. new plumbing fixtures to be remain at same location. | $75,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 1863 44th Av | to obtain a final inspection for work approved under previous permits 201807164621 201808227982 201811075327. all work is complete.Details
to obtain a final inspection for work approved under previous permits 201807164621 201808227982 201811075327. all work is complete. | |
| Feb 12, 2021 | Never finaled issued Feb 2021, no final | 1863 44th Av | to obtain a final inspection for work approved under previous permits 201805250184 & 201812178488. all work is complete.Details
to obtain a final inspection for work approved under previous permits 201805250184 & 201812178488. all work is complete. | |
| Nov 24, 2020 | Completed final sign-off Aug 2023 | 165 Belvedere St | 2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panelDetails
2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panel | $70,000 |
| May 6, 2020 | Never finaled issued May 2020, no final | 1477 Guerrero St | unit #1477 & #1479: remodel kitchen and bathroom, tile work, and painting.like-for-like.Details
unit #1477 & #1479: remodel kitchen and bathroom, tile work, and painting.like-for-like. | $80,000 |
| Jan 17, 2020 | Completed final sign-off Mar 2020 | 300 Molimo Dr | installation of 2 8ft trench drains on garage port entrance, add lightfing circuit for lighting and power outlet on crawl space, replace rotten beam 20" supportDetails
installation of 2 8ft trench drains on garage port entrance, add lightfing circuit for lighting and power outlet on crawl space, replace rotten beam 20" support | $10,000 |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 420 Mission Bay Blvd North Bl | remodel of guest bathroom, includes: construction & shower pan, replacing mixing valve, vanity cabinet, install electric radiant floor heating and replace all accessories.Details
remodel of guest bathroom, includes: construction & shower pan, replacing mixing valve, vanity cabinet, install electric radiant floor heating and replace all accessories. | $31,500 |
| Aug 8, 2019 | Completed final sign-off Aug 2020 | 895 46th Av | bathroom remodel 8' x 8'. replacement of floor w/ hardwood, replace 28 - 4" led lights with housing, countertop replacement and interior painting. no alteration of wallsDetails
bathroom remodel 8' x 8'. replacement of floor w/ hardwood, replace 28 - 4" led lights with housing, countertop replacement and interior painting. no alteration of walls | $26,500 |
| Jun 4, 2019 | Completed final sign-off Sep 2020 | 650 Hayes St | remove (e) wood siding, remove deteriorated wood board ends back to sound wood and re-installed (e) siding at front and side elevations from top to bottom. optional treatment of (e) siding w/ brocide. new wood siding to match original wood siding in design, profile and dimensions.Details
remove (e) wood siding, remove deteriorated wood board ends back to sound wood and re-installed (e) siding at front and side elevations from top to bottom. optional treatment of (e) siding w/ brocide. new wood siding to match original wood siding in design, profile and dimensions. | $7,500 |
| Feb 28, 2019 | Completed final sign-off May 2020 | 159 Wool St | revision to 201805239928 new 36" high concrete wall & wood gate at front prop lineDetails
revision to 201805239928 new 36" high concrete wall & wood gate at front prop line | $1,800 |
| Feb 22, 2019 | Completed final sign-off Sep 2020 | 650 Hayes St | rev to pa# 201808016138; strengthen (e) cripple wall at lower levelDetails
rev to pa# 201808016138; strengthen (e) cripple wall at lower level | |
| Feb 19, 2019 | Completed final sign-off Sep 2020 | 650 Hayes St | comply with planning enforcement case no 2018-014623enf, replcement of front facade windows in kind, replace rear yard level 1 & 2 windows. replacement of exterior wood siding in kind, at limited areas.Details
comply with planning enforcement case no 2018-014623enf, replcement of front facade windows in kind, replace rear yard level 1 & 2 windows. replacement of exterior wood siding in kind, at limited areas. | $12,000 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 69 Winfield St | rev to pa# 201612155101 s1, replace (e) water heater with new 50 gallon electric water hater. in - kind replacementDetails
rev to pa# 201612155101 s1, replace (e) water heater with new 50 gallon electric water hater. in - kind replacement | |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 925 Corbett Av | unit 201. remodel of 2 full bathrooms and kitchen, no alterations to walls or ceilings. replacing shower valve trims, tile, kitchen cabinets, faucets, lighting. bathroom 1: 40 sqft. bathroom 2: 40 sqft. kitchen: 100 sqft.Details
unit 201. remodel of 2 full bathrooms and kitchen, no alterations to walls or ceilings. replacing shower valve trims, tile, kitchen cabinets, faucets, lighting. bathroom 1: 40 sqft. bathroom 2: 40 sqft. kitchen: 100 sqft. | $50,000 |
| Dec 20, 2018 | Completed final sign-off May 2020 | 159 Wool St | rev to pa# 201805239928; replacing lower south wall entirely due to rotten wood, and not to code existing wall, per nov 201812011.Details
rev to pa# 201805239928; replacing lower south wall entirely due to rotten wood, and not to code existing wall, per nov 201812011. | $10,000 |
| Dec 17, 2018 | Completed final sign-off May 2022 | 1863 44th Av | structural revision to adu legalization permit 201805250184 to repair/replace pour foundation & framing, provide seismic improvememt to ground level. no exterior work.Details
structural revision to adu legalization permit 201805250184 to repair/replace pour foundation & framing, provide seismic improvememt to ground level. no exterior work. | $45,000 |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 1863 44th Av | remodel of garage; electrical, plumbing and cosmetics. no walls to be removed. sheetrock walls with soffits for plubming. adding 5/8" type x sheet rock to garage walls and 2 layers of 5/8" type x for ceilingDetails
remodel of garage; electrical, plumbing and cosmetics. no walls to be removed. sheetrock walls with soffits for plubming. adding 5/8" type x sheet rock to garage walls and 2 layers of 5/8" type x for ceiling | $17,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 1863 44th Av | 2nd floor: remove extg bearing wall between kitchen and living room.Details
2nd floor: remove extg bearing wall between kitchen and living room. | $5,000 |
| Aug 1, 2018 | Completed final sign-off Sep 2020 | 650 Hayes St | reconfigur level 1 kitchen and add pantry. reconfigure level 2 kitchen & bath to relocate laundry room. original pa #201609208262.Details
reconfigur level 1 kitchen and add pantry. reconfigure level 2 kitchen & bath to relocate laundry room. original pa #201609208262. | |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 1863 44th Av | kitchen and bathroom remodel. upgrade electrical and furnaceDetails
kitchen and bathroom remodel. upgrade electrical and furnace | $50,000 |
| May 25, 2018 | Never finaled issued Dec 2018, no final | 1863 44th Av | legalize illegal in-law unit per ord# 43-14 w/ living room, bath, bedroom, kitchen.Details
legalize illegal in-law unit per ord# 43-14 w/ living room, bath, bedroom, kitchen. | $44,500 |
| May 23, 2018 | Completed final sign-off May 2020 | 159 Wool St | work is on unit 161. convert extg garage to habitable space. replace footings and slab. new interior renovation with 2 bathrooms, kitchen, and 1 bedroom. secure bike parking, new windows on front and curbcut removal. 2 units dwelling to remain as 2 units.Details
work is on unit 161. convert extg garage to habitable space. replace footings and slab. new interior renovation with 2 bathrooms, kitchen, and 1 bedroom. secure bike parking, new windows on front and curbcut removal. 2 units dwelling to remain as 2 units. | $110,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 69 Winfield St | revision to 201801118435 (lateral foundation replacement)Details
revision to 201801118435 (lateral foundation replacement) | $15,000 |
| Feb 1, 2018 | Expired or cancelled expired Dec 2023 | 650 Hayes St | revision to pa 2016-0920-8262 -basement level to have the bathroom locations & mech room reconfigured. entrance door to be relocated to west exterior wall. no revisions to level 1 and 2.Details
revision to pa 2016-0920-8262 -basement level to have the bathroom locations & mech room reconfigured. entrance door to be relocated to west exterior wall. no revisions to level 1 and 2. | |
| Jan 11, 2018 | Never finaled issued Feb 2018, no final | 69 Winfield St | voluntary seismic stregthening of crawl space per 2016 cebc appx a4. replacement of (e) retaining wall at garageDetails
voluntary seismic stregthening of crawl space per 2016 cebc appx a4. replacement of (e) retaining wall at garage | $25,000 |
| Jan 2, 2018 | Completed final sign-off Feb 2018 | 145 Santa Rosa Av | update kitchen, new sink, new countertops, and remodel one and half bathroom. new garbage disposal.Details
update kitchen, new sink, new countertops, and remodel one and half bathroom. new garbage disposal. | $2,000 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 124 Panorama Dr | small bathroom remodel upgrade of toilet and one walk in shower, tile, install vanity lights and flooring. painting. no changes in layout.Details
small bathroom remodel upgrade of toilet and one walk in shower, tile, install vanity lights and flooring. painting. no changes in layout. | $10,000 |
| Sep 27, 2017 | Expired or cancelled expired Dec 2023 | 650 Hayes St | revision to pa #201609208262. new bathroom added on level 2 (unit 650). no structural work required.Details
revision to pa #201609208262. new bathroom added on level 2 (unit 650). no structural work required. | $20,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2017 | 1700 Gough St | unit 8 (204): kitchen and bathroom remodel - replace cabinets, new flooring, painting, door replacement. all work to be in kind. n/a maherDetails
unit 8 (204): kitchen and bathroom remodel - replace cabinets, new flooring, painting, door replacement. all work to be in kind. n/a maher | $20,000 |
| Apr 18, 2017 | Never finaled issued May 2017, no final | 576 Folsom St | extg elevators control panels and fl. id signage. relocation & configuration of coffee stations & kitchenette. reconf. enlargement of extg toilets-2nd & 3rd fl. new accessibilty toilet & shower at basement level. new private offices & phone booths. no exterior work.Details
extg elevators control panels and fl. id signage. relocation & configuration of coffee stations & kitchenette. reconf. enlargement of extg toilets-2nd & 3rd fl. new accessibilty toilet & shower at basement level. new private offices & phone booths. no exterior work. | $138,000 |
| Mar 28, 2017 | Completed final sign-off Apr 2017 | 231 Coleridge St | anchor bolting foundation, 32" on center, sister studs existing 2"x6" rotten damaged studs and replace rotten sill plate.Details
anchor bolting foundation, 32" on center, sister studs existing 2"x6" rotten damaged studs and replace rotten sill plate. | $2,000 |
| Dec 15, 2016 | Never finaled issued Nov 2017, no final | 69 Winfield St | repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd.Details
repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd. | $100,000 |
| Dec 13, 2016 | Completed final sign-off Apr 2017 | 231 Coleridge St | 2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rearDetails
2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rear | $50,000 |
| Dec 12, 2016 | Completed final sign-off Apr 2017 | 535 Laidley St | 2 feet of front foundationg waterproofing with elastomeric membraine. ancho bolting garage. 5/8" & a.b.s 4 o.c. max, 7" embed into conc, simpson set-xp epoxy.Details
2 feet of front foundationg waterproofing with elastomeric membraine. ancho bolting garage. 5/8" & a.b.s 4 o.c. max, 7" embed into conc, simpson set-xp epoxy. | $4,000 |
| Nov 29, 2016 | Completed final sign-off Feb 2018 | 1915 14th Av | remodel lower level bathroom, relocate exterior stair to yard & build (n) deck.Details
remodel lower level bathroom, relocate exterior stair to yard & build (n) deck. | $18,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 535 Laidley St | addition of half bath. new sink, new toilet & ligting in half bath on ground floorDetails
addition of half bath. new sink, new toilet & ligting in half bath on ground floor | $10,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 1700 Gough St | #7 - kitchen remodel: cabinet replacement, floor installation & paint. no walls add or removed. n/a maher ordinanceDetails
#7 - kitchen remodel: cabinet replacement, floor installation & paint. no walls add or removed. n/a maher ordinance | $35,000 |
| Oct 7, 2016 | Completed final sign-off Jan 2017 | 1200 Gough St | kitchen remodel, cabinet replacement, tile install & new appliances bathroom remodel (1) , cabinet replacemebt, tile install & paintingDetails
kitchen remodel, cabinet replacement, tile install & new appliances bathroom remodel (1) , cabinet replacemebt, tile install & painting | $30,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 1 Daniel Burnham Ct | kitchen remodel (1) cabinet replacement, tile install & new appliances installation, (1) bathorom remodel, cabinet replacement tile install, & closet ,painting, installation of tile floor in whole aprt.Details
kitchen remodel (1) cabinet replacement, tile install & new appliances installation, (1) bathorom remodel, cabinet replacement tile install, & closet ,painting, installation of tile floor in whole aprt. | $55,000 |
| Sep 20, 2016 | Expired or cancelled expired Dec 2023 | 652 Hayes St | replace retaining walls in rear yard, replace fence, demolish slab & lower 24". new footings, new conditioned basement with 2 new baths, family room, laundry room, mech. room & stairs to connect floor in unit. main floor: new study room, new closet, update lighting, new fireplace built-ins.Details
replace retaining walls in rear yard, replace fence, demolish slab & lower 24". new footings, new conditioned basement with 2 new baths, family room, laundry room, mech. room & stairs to connect floor in unit. main floor: new study room, new closet, update lighting, new fireplace built-ins. | $350,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 338 Main St | tower d - unit #11c: reconfiguration of master bathroom to add a powder room with one toilet and one sink. will install one exaust fan, 2 light receptacles, 2 outlets, 1 fire sprinkler and reconfigure walls. n/a for maher.Details
tower d - unit #11c: reconfiguration of master bathroom to add a powder room with one toilet and one sink. will install one exaust fan, 2 light receptacles, 2 outlets, 1 fire sprinkler and reconfigure walls. n/a for maher. | $19,000 |
| Aug 18, 2016 | Completed final sign-off Jul 2017 | 423 Duboce Av | remodel of kitchen: install new cabinets, tile, contertops, hardwood floors, paint etc. remodel of bathroom: install new cabinets, re route vent ducts, tile floors and wall, and waterproof floor subfloor etc. install new outside door and new window (not visible to the street)Details
remodel of kitchen: install new cabinets, tile, contertops, hardwood floors, paint etc. remodel of bathroom: install new cabinets, re route vent ducts, tile floors and wall, and waterproof floor subfloor etc. install new outside door and new window (not visible to the street) | $65,000 |
| Aug 11, 2016 | Completed final sign-off Dec 2016 | 36 Terra Vista Av | unit #2 remodel kitchen, add new bathroom, new lighting, new flooring, no exterior work. this is a revision to app#201607213026 adding $20k in construction cost (total $80,000.00.Details
unit #2 remodel kitchen, add new bathroom, new lighting, new flooring, no exterior work. this is a revision to app#201607213026 adding $20k in construction cost (total $80,000.00. | $80,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2016 | 36 Terra Vista Av | remodel of kitchen; new cabinets install appliances, counter tops, tile and backsplash, tile floor, etc. remodel of bathroom; new cabinets, tile on shower and floor, shower tub, etc. install new hardwood floor and restore entrance deck. waterproof patio deck roof. work for front deck is less than 50Details
remodel of kitchen; new cabinets install appliances, counter tops, tile and backsplash, tile floor, etc. remodel of bathroom; new cabinets, tile on shower and floor, shower tub, etc. install new hardwood floor and restore entrance deck. waterproof patio deck roof. work for front deck is less than 50 | $60,000 |
| May 6, 2016 | Completed final sign-off Jul 2016 | 355 Buena Vista East Av | kitchen remodel: replace cabinets, countertops and appliances. bathroom remodel: replace cabinets, faucets, sink, install tile on shower area and floor. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen remodel: replace cabinets, countertops and appliances. bathroom remodel: replace cabinets, faucets, sink, install tile on shower area and floor. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |
| Apr 28, 2016 | Completed final sign-off Apr 2017 | 609 Castro St | unit c: remodel of bathroom, replace floor tile, wall tile, replace shower tub, install new vanity cabinets, re-paint and install a venting unit.Details
unit c: remodel of bathroom, replace floor tile, wall tile, replace shower tub, install new vanity cabinets, re-paint and install a venting unit. | $17,474 |
| Apr 28, 2016 | Completed final sign-off Jul 2016 | 654 23rd Av | remodel of bathroom and kitchen: bathroom - removal of tile and replacing it, replace bath tub, cabinets and paint. kitchen - removal of old cabinets, reframe wall for support and paint counter top, replace tile install on floor and backsplash.Details
remodel of bathroom and kitchen: bathroom - removal of tile and replacing it, replace bath tub, cabinets and paint. kitchen - removal of old cabinets, reframe wall for support and paint counter top, replace tile install on floor and backsplash. | $42,000 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 2250 24th St | bathroom remodel: replace shower tub, cabinet, faucet, shower valve and trims. remove vinyl floor and install tile on floor. install quartz panels on shower walls and paint bathroom.Details
bathroom remodel: replace shower tub, cabinet, faucet, shower valve and trims. remove vinyl floor and install tile on floor. install quartz panels on shower walls and paint bathroom. | $13,237 |
| Dec 9, 2015 | Expired or cancelled expired Apr 2021 | 1200 Gough St | installation of washer and dryer hookups and framing of laundry area to fit appliances. ventless dryer.Details
installation of washer and dryer hookups and framing of laundry area to fit appliances. ventless dryer. | $15,000 |
| Sep 16, 2015 | Completed final sign-off Apr 2016 | 2225 23rd St | unit #116: remodel of one bathrm,remove (e)tile, cabinets, tub & panels etc.install tile floor,tile on shower area,new cabinets,lighting fixture & vent unit.no walls moved,removed, added or installed,all (e) layouts to remain unchanged; maher n/aDetails
unit #116: remodel of one bathrm,remove (e)tile, cabinets, tub & panels etc.install tile floor,tile on shower area,new cabinets,lighting fixture & vent unit.no walls moved,removed, added or installed,all (e) layouts to remain unchanged; maher n/a | $13,500 |
| Aug 26, 2015 | Expired or cancelled expired Apr 2021 | 1200 Gough St | revision to application 201508184642; remove walk in showser for cast iron tub type shower.Details
revision to application 201508184642; remove walk in showser for cast iron tub type shower. | |
| Aug 18, 2015 | Completed final sign-off Oct 2016 | 1200 Gough St | unit 9d: install new kitchen cabinets, laminated hard wood floor, carpet. install tile on walk in sshower, bathroom floor, up laundry rm and install 5/8" gyp board where removed. interior partitions - maintain fire rating.Details
unit 9d: install new kitchen cabinets, laminated hard wood floor, carpet. install tile on walk in sshower, bathroom floor, up laundry rm and install 5/8" gyp board where removed. interior partitions - maintain fire rating. | $22,000 |
| Aug 18, 2015 | Never finaled issued Aug 2015, no final | 100 Roanoke St | install 3x3x.229 sq washers to (e) 5/8" diameter bolting anchors. frame to mud sill. with 7" into concrete. install missing bolts every 4' in framing to mud sill (foundation). install new gyp board after bolting is done. replace rotten 4x4 se corner of home (5 studs) and 1 4x6. wp crack se sideDetails
install 3x3x.229 sq washers to (e) 5/8" diameter bolting anchors. frame to mud sill. with 7" into concrete. install missing bolts every 4' in framing to mud sill (foundation). install new gyp board after bolting is done. replace rotten 4x4 se corner of home (5 studs) and 1 4x6. wp crack se side | $25,000 |
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 244 Juanita Wy | paint interior at home, install kitchen cabinets, refinish hardwood floors. replace paving stone path 10'x'4', install tile on kitchen.Details
paint interior at home, install kitchen cabinets, refinish hardwood floors. replace paving stone path 10'x'4', install tile on kitchen. | $40,000 |