Detlev Doring
- Listed as
- designer, engineer
- Firm
- Detlev Doring S.E.
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2006 to Mar 2023
25 permits since 2000 (engineer on 24 permits, designer on 1 permit): 22 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2023 | Completed final sign-off Mar 2023 | 578 Elizabeth St | Larkspur Builders Inc. | rev pa202205244881. wrt special inspections. no cast in place botls were used. all botls epoxy set. no welding was done on project, (e) railings were not replace.Details
rev pa202205244881. wrt special inspections. no cast in place botls were used. all botls epoxy set. no welding was done on project, (e) railings were not replace. | |
| May 24, 2022 | Completed final sign-off Mar 2023 | 578 Elizabeth St | Larkspur Builders Inc. | new prefab electric sauna shed. new prefab electric hydrospa with pad & retaining. new wood boardwalk. new custom natural gas fire feature. resurface metal bridge with wood. replace metal guardrail. custom electric heated benc.Details
new prefab electric sauna shed. new prefab electric hydrospa with pad & retaining. new wood boardwalk. new custom natural gas fire feature. resurface metal bridge with wood. replace metal guardrail. custom electric heated benc. | $200,000 |
| Feb 18, 2022 | Completed final sign-off Nov 2022 | 141 Warren Dr | window replacement at rear elevation: level 1:new sliding doors in place of extg windows. level 2: replacing exg window. level 3: nw windows in place of extg glass door, new sliding doors in place of extg windows.Details
window replacement at rear elevation: level 1:new sliding doors in place of extg windows. level 2: replacing exg window. level 3: nw windows in place of extg glass door, new sliding doors in place of extg windows. | $50,000 | |
| Jun 30, 2021 | Completed final sign-off Nov 2022 | 50 Henry St | interior remodel of garage to increase acces, structural beams and enlagre (e) hobby rm. ht to 8', change out windows at rear of building, remove interior walls at kit/dining/porch areas, add new beams to replace walls, add new shear wall etc. add 2 new balconies and ext 5to garden atDetails
interior remodel of garage to increase acces, structural beams and enlagre (e) hobby rm. ht to 8', change out windows at rear of building, remove interior walls at kit/dining/porch areas, add new beams to replace walls, add new shear wall etc. add 2 new balconies and ext 5to garden at | $150,000 | |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 115 Rutledge St | all work at rear yard, no work at building, new soncrete retaining walls, new concrete stairs on gradeDetails
all work at rear yard, no work at building, new soncrete retaining walls, new concrete stairs on grade | $15,000 | |
| Jun 25, 2019 | Never finaled issued Oct 2019, no final | 2137 Jones St | Orchard Construction | revisions to voluntary seismic upgrade per existing permit #201903044287. add concrete wall to mitigate moisture penetration at (e) retaining wall on neighboring property. (not a tenent pass through cost).Details
revisions to voluntary seismic upgrade per existing permit #201903044287. add concrete wall to mitigate moisture penetration at (e) retaining wall on neighboring property. (not a tenent pass through cost). | $30,000 |
| Mar 4, 2019 | Never finaled issued Apr 2019, no final | 2137 Jones St | Orchard Construction | voluntary seismic upgrade retrofit per ab-094 for pa# 201806252805 for additional work.Details
voluntary seismic upgrade retrofit per ab-094 for pa# 201806252805 for additional work. | $100,000 |
| Jan 24, 2018 | Completed final sign-off Sep 2020 | 654 Castro St | to comply with nov #201719248. soft story retrofit per sfebc chapter 4d engineering criteria, other rational criteria.Details
to comply with nov #201719248. soft story retrofit per sfebc chapter 4d engineering criteria, other rational criteria. | $120,000 | |
| Apr 3, 2017 | Completed final sign-off Sep 2022 | 955 Page St | soft story wood frames seismic retrofit per sfbc chapter 34b, other rational design.Details
soft story wood frames seismic retrofit per sfbc chapter 34b, other rational design. | $80,000 | |
| Jul 19, 2016 | Completed final sign-off Sep 2017 | 4443 17th St | S O G Construction | add wine storage, bedroom & bathroom @ basement level, install a sewer line, reinforce (e) footing, add reataining wall, (1) window installation, tile, glass cellar, new doors, lights, outlets.Details
add wine storage, bedroom & bathroom @ basement level, install a sewer line, reinforce (e) footing, add reataining wall, (1) window installation, tile, glass cellar, new doors, lights, outlets. | $10,000 |
| Jan 19, 2016 | Completed final sign-off Oct 2016 | 100 Varennes St | Creative Builders | soft story retrofit per sfbc chapter 34b, other rational desig- asce 7-10, wood frame seismic retrofit.Details
soft story retrofit per sfbc chapter 34b, other rational desig- asce 7-10, wood frame seismic retrofit. | $40,000 |
| Apr 15, 2015 | Completed final sign-off Jun 2016 | 1313 06th Av | Towey Construction Inc. | (n) roof deck at rear of (e) 2 family dwelling located at flat roof built under pa#201503312361. n/a for maher ordinance.Details
(n) roof deck at rear of (e) 2 family dwelling located at flat roof built under pa#201503312361. n/a for maher ordinance. | $2,000 |
| Jan 5, 2015 | Completed final sign-off May 2016 | 956 Pierce St | Creative Builders | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. maher ordinance is not required.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. maher ordinance is not required. | $10,000 |
| Sep 29, 2014 | Completed final sign-off Dec 2014 | 1501 Baker St | Steven Edward Neil | additional structural work for 201307232524; revision to structural permit & 'red lines' set for 201403191102, revised set includes additional shear wall & shear wall notes.Details
additional structural work for 201307232524; revision to structural permit & 'red lines' set for 201403191102, revised set includes additional shear wall & shear wall notes. | $5,000 |
| May 22, 2014 | Completed final sign-off Jan 2015 | 4070 23rd St | Adonis Building And Electrical | revision to appl #201402037657, 201403281961, 201404143182, 201404102894: revision to reflect new engineer for the record & additional concrete underpinning & shear wall grade deam & moment frame & steel beam.Details
revision to appl #201402037657, 201403281961, 201404143182, 201404102894: revision to reflect new engineer for the record & additional concrete underpinning & shear wall grade deam & moment frame & steel beam. | $60,000 |
| Mar 19, 2014 | Completed final sign-off Dec 2014 | 1501 Baker St | Steven Edward Neil | rev. to pa#201307232524 structural work shear walls, footings, moment frame, foundation.Details
rev. to pa#201307232524 structural work shear walls, footings, moment frame, foundation. | $60,000 |
| Oct 25, 2013 | Completed final sign-off Sep 2014 | 3117 20th St | remove closet, open door opening to 11', repair plaster.Details
remove closet, open door opening to 11', repair plaster. | $1,500 | |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 26 Cumberland St | A R C Dba/ Architectural Coatings | revision to appl #2013.04.23.5246 - new footing gridline 3 between b & e.Details
revision to appl #2013.04.23.5246 - new footing gridline 3 between b & e. | $4,900 |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 26 Cumberland St | A R C Dba/ Architectural Coatings | repair dryrot damage at foundaiton, support upper floor & pour new concrete center foundation to repair foundation.Details
repair dryrot damage at foundaiton, support upper floor & pour new concrete center foundation to repair foundation. | $108,000 |
| Mar 19, 2013 | Completed final sign-off May 2014 | 130 Seacliff Av | O'neill Construction Inc | install pool & hot tub on deck, tiles & finishes per drawingsDetails
install pool & hot tub on deck, tiles & finishes per drawings | $41,360 |
| May 28, 2008 | Completed final sign-off Jun 2009 | 2741 Divisadero St | Gelling & Judd Inc. | documentation of structural field revisions as requested by field inspector, steel upgrade in floor framing, helical piers to be covered under future revisionDetails
documentation of structural field revisions as requested by field inspector, steel upgrade in floor framing, helical piers to be covered under future revision | $20,000 |
| Feb 20, 2007 | Completed final sign-off Apr 2007 | 783 Francisco St | C.R. Baumsteiger Const Inc | demo of partial concrete slab, excavation for grade beams, install helical piers, place rebar, place concrete, finishe slab.Details
demo of partial concrete slab, excavation for grade beams, install helical piers, place rebar, place concrete, finishe slab. | $21,000 |
| Oct 18, 2006 | Expired or cancelled withdrawn May 2009 | 855 Bush St | to comply with nov 200669698 to add seating and 2 new bathrooms.Details
to comply with nov 200669698 to add seating and 2 new bathrooms. | $17,000 | |
| Aug 2, 2006 | Completed final sign-off Apr 2007 | 296 Dalewood Wy | James Pilcher Contruction | board of appeals for appl#200509273979Details
board of appeals for appl#200509273979 | |
| Jul 27, 2006 | Completed final sign-off Apr 2007 | 292 Dalewood Wy | James Pilcher Contruction | boa#06-006 for appl#200509273974, new retaining walls in rear yard approx ht 7'xp"Details
boa#06-006 for appl#200509273974, new retaining walls in rear yard approx ht 7'xp" |