O'neill Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2001 to Sep 2026
- Last 24 months
- 10 permits filed
169 permits since 2000: 82 completed, 8 in progress, 32 never finaled, 47 expired or cancelled.
Of the 32 never-finaled permits, 4 are 3 to 5 years old, 4 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 169.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2026 | Completed final sign-off Sep 2026 | 1001 Vallejo St | renew permits for final inspection, all work complete 2007-0109-1247, 2007-0620-4589, 2007-0927-3927Details
renew permits for final inspection, all work complete 2007-0109-1247, 2007-0620-4589, 2007-0927-3927 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 1000 Ashbury St | to obtain final inspection for work approved under pa 201501085184. all work is complete.Details
to obtain final inspection for work approved under pa 201501085184. all work is complete. | |
| Jul 7, 2026 | In progress issued Jul 2026 | 1000 Ashbury St | recommencement and completion of work approved under pa#201709188787 and 201411050822.Details
recommencement and completion of work approved under pa#201709188787 and 201411050822. | $100,000 |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 160 Seacliff Av | revision to pa 202410213318 add new yoga/gym and spa with hot tub at garage level. redesign subterranean basement level roomsDetails
revision to pa 202410213318 add new yoga/gym and spa with hot tub at garage level. redesign subterranean basement level rooms | $114,364 |
| Oct 21, 2025 | In progress filed Oct 2025, not yet issued | 160 Seacliff Av | to comply with dbi nov 202544513 and updated landscape area per drawingsDetails
to comply with dbi nov 202544513 and updated landscape area per drawings | $48,500 |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 120 Seacliff Av | renew permit#200909247546, 201009201179 and 201210101727. all work completed, obtain final inspection to comply with nov#202316530.Details
renew permit#200909247546, 201009201179 and 201210101727. all work completed, obtain final inspection to comply with nov#202316530. | |
| Jun 20, 2025 | Completed final sign-off Aug 2025 | 224 Seacliff Av | revision to permit pa#202407096025 tfo reflect as-built conditions after the concrete and stairs been removed as much as possible.Details
revision to permit pa#202407096025 tfo reflect as-built conditions after the concrete and stairs been removed as much as possible. | |
| Jun 9, 2025 | In progress issued Jul 2025 | 160 Seacliff Av | rev 202410213318: appeal agreenment between 140 seacliff ave and 160 seacliff ave based on "east elevation agreement w/ neighbor at 140 seacliff ave. see 2/a3.3. 1) osbcure film to glass; planter; solid balcony rail.Details
rev 202410213318: appeal agreenment between 140 seacliff ave and 160 seacliff ave based on "east elevation agreement w/ neighbor at 140 seacliff ave. see 2/a3.3. 1) osbcure film to glass; planter; solid balcony rail. | $1,564 |
| Dec 11, 2024 | In progress issued May 2026 | 224 Seacliff Av | work to include foundation upgrade & upgrade structural framing. add new basement. remodel of 1st, 2nd & 3rd floors per drawings and to comply with bid_insp notice of violation 202547909 (12-12-2025) additional scope for removal of stucco on north,east and west side facades.Details
work to include foundation upgrade & upgrade structural framing. add new basement. remodel of 1st, 2nd & 3rd floors per drawings and to comply with bid_insp notice of violation 202547909 (12-12-2025) additional scope for removal of stucco on north,east and west side facades. | $264,419 |
| Dec 10, 2024 | In progress issued Mar 2025 | 160 Seacliff Av | revision to pa 202303214117. new horizontal addition within the building area to existing single family home at the first, second, and thrid flr. (2) new 2'8" deep roof eave overhang (e) rear yard parapet wall to match (e) and (3) new proposed skylight.Details
revision to pa 202303214117. new horizontal addition within the building area to existing single family home at the first, second, and thrid flr. (2) new 2'8" deep roof eave overhang (e) rear yard parapet wall to match (e) and (3) new proposed skylight. | $286,415 |
| Jul 9, 2024 | Completed final sign-off Aug 2025 | 224 Seacliff Av | to comply with nov 202183822 rear stairs. remove partial exterior walls and steps to beach per drawingsDetails
to comply with nov 202183822 rear stairs. remove partial exterior walls and steps to beach per drawings | $185,464 |
| Feb 27, 2024 | Expired or cancelled suspend Dec 2025 | 224 Seacliff Av | comply w/ nov# 202293488, for fire damage. repair and replace in kind fire damaged windows and doors, framing, hole in roof, stucco as needed and exploritory demo to assess structural stregth (up to 10%)Details
comply w/ nov# 202293488, for fire damage. repair and replace in kind fire damaged windows and doors, framing, hole in roof, stucco as needed and exploritory demo to assess structural stregth (up to 10%) | $147,000 |
| Feb 7, 2024 | Expired or cancelled suspend Dec 2025 | 224 Seacliff Av | to comply with nov 202312587 & 202293488 remodel existing kitchen. install (n) cabinets, countertop appliances & fixtures. 5 existing bath,two powder rooms, (n) tiles on floors & walls, cabinet countertops & fixtures. install (n) hardwood floors, drywall,doors, trim package & paint.Details
to comply with nov 202312587 & 202293488 remodel existing kitchen. install (n) cabinets, countertop appliances & fixtures. 5 existing bath,two powder rooms, (n) tiles on floors & walls, cabinet countertops & fixtures. install (n) hardwood floors, drywall,doors, trim package & paint. | $158,564 |
| Jan 31, 2024 | Expired or cancelled expired Aug 2025 | 120 Seacliff Av | renew permit 201210101727. all work complete obtain for final inspection. comply with 202316530Details
renew permit 201210101727. all work complete obtain for final inspection. comply with 202316530 | |
| Mar 21, 2023 | Expired or cancelled suspend Dec 2025 | 160 Seacliff Av | add non-visible below grade underground garage with mechanical and storage rooms. no exterior work to (e) building.Details
add non-visible below grade underground garage with mechanical and storage rooms. no exterior work to (e) building. | $550,750 |
| Nov 8, 2022 | Never finaled issued Mar 2023, no final | 160 Seacliff Av | structural upgrade to (e) building. no expansion proposed. interior work only.Details
structural upgrade to (e) building. no expansion proposed. interior work only. | $150,000 |
| Sep 27, 2022 | Never finaled issued Sep 2022, no final | 160 Seacliff Av | rev to pa 202202117829 on foundation detial s4.1 detail #3 add extended concrete roe per new detail drawings by atrium structural engineers, inc.Details
rev to pa 202202117829 on foundation detial s4.1 detail #3 add extended concrete roe per new detail drawings by atrium structural engineers, inc. | $32,780 |
| Apr 26, 2022 | Expired or cancelled suspend Dec 2022 | 160 Seacliff Av | repair existing garden belvedere, support and repair in kind. details and finish to match existing in kind. up to 50% repair.Details
repair existing garden belvedere, support and repair in kind. details and finish to match existing in kind. up to 50% repair. | $26,330 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 160 Seacliff Av | remodel existing kitchen, (n) cabinets, countertop, appliances & fixtures. six (e) bath. (n) tile fl & wall, cabinets, countertops & fixtures. install (n) hardwood fl, drywall, doors, trim package & paint etcDetails
remodel existing kitchen, (n) cabinets, countertop, appliances & fixtures. six (e) bath. (n) tile fl & wall, cabinets, countertops & fixtures. install (n) hardwood fl, drywall, doors, trim package & paint etc | $158,750 |
| Feb 11, 2022 | Never finaled issued Mar 2022, no final | 160 Seacliff Av | address footing embedment per geotech report. reinforce gravity retaning wall at basement per geotech with re-enforced to be for over turning and remove & replace slab.reinfoce (e) framing 1/f below. add plywood at basin and moment frame at rear. repair driveway slab.Details
address footing embedment per geotech report. reinforce gravity retaning wall at basement per geotech with re-enforced to be for over turning and remove & replace slab.reinfoce (e) framing 1/f below. add plywood at basin and moment frame at rear. repair driveway slab. | $100,000 |
| Oct 25, 2021 | Completed final sign-off Apr 2023 | 3625 Jackson St | remodel extg kitchen, new cabinets, counter tops, appliances and fixtures. remodel six extg bathrooms. new tile floor and walls, nw cabinets, countertops & fixtures. install nw hardwood floors throughout, drywall, nw doors & trim package & paint etcDetails
remodel extg kitchen, new cabinets, counter tops, appliances and fixtures. remodel six extg bathrooms. new tile floor and walls, nw cabinets, countertops & fixtures. install nw hardwood floors throughout, drywall, nw doors & trim package & paint etc | $158,500 |
| Aug 24, 2021 | Never finaled issued Aug 2021, no final | 747 Rhode Island St | remodel existing kitchen, new cabinets, countertops, appliances and fixtures. remodel existing bathroom, new tile floor and walls, new cabinets countertops and fixtures. install new hardwood floor throughout drywall, new doors and trim package and paint etc.Details
remodel existing kitchen, new cabinets, countertops, appliances and fixtures. remodel existing bathroom, new tile floor and walls, new cabinets countertops and fixtures. install new hardwood floor throughout drywall, new doors and trim package and paint etc. | $42,550 |
| Jul 2, 2020 | Completed final sign-off Feb 2022 | 740 Tennessee St | there is no waterproofing on the exterior of building, remove existing siding and stucco and install sheating and waterproof barrier on sides of building and around windows and doors. re-install existing siding where possible and additinal siding profile to match in kind. per planning approval 7/1/2Details
there is no waterproofing on the exterior of building, remove existing siding and stucco and install sheating and waterproof barrier on sides of building and around windows and doors. re-install existing siding where possible and additinal siding profile to match in kind. per planning approval 7/1/2 | $55,460 |
| Jul 23, 2019 | Completed final sign-off Sep 2020 | 2102 Leavenworth St | remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, fixtures, bathroom counter tops, tile, shower & tub, new trim, finish hw floors & paintDetails
remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, fixtures, bathroom counter tops, tile, shower & tub, new trim, finish hw floors & paint | $22,910 |
| Jun 12, 2019 | Completed final sign-off Oct 2022 | 2824 Scott St | upgrade to steel frames per pat buscovich engineers plans, voluntry strenthening add 2 steel moment frames. master t.i. to follow to show complete foundation and slab on grade. full seismic n/a for maherDetails
upgrade to steel frames per pat buscovich engineers plans, voluntry strenthening add 2 steel moment frames. master t.i. to follow to show complete foundation and slab on grade. full seismic n/a for maher | $122,550 |
| Feb 14, 2019 | Completed final sign-off Sep 2020 | 1080 Filbert St | remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, appliances, fixtures, bathroom counter tops, shower & tub. electrical & plumbing under seperate permit.Details
remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, appliances, fixtures, bathroom counter tops, shower & tub. electrical & plumbing under seperate permit. | $24,850 |
| Jan 31, 2019 | Completed final sign-off Feb 2022 | 740 Tennessee St | seismic upgrade, per drawingsDetails
seismic upgrade, per drawings | $145,550 |
| Jan 31, 2019 | Completed final sign-off Nov 2022 | 740 Tennessee St | take off non-original stucco & shingles, install (e) ship lap siding, (n) windows throughtout building. (n) bulk head for elevator. convert (e) attic/storage to gym/office, (n) dormers. (n) roof deck per drawings. **maher n/a**Details
take off non-original stucco & shingles, install (e) ship lap siding, (n) windows throughtout building. (n) bulk head for elevator. convert (e) attic/storage to gym/office, (n) dormers. (n) roof deck per drawings. **maher n/a** | $255,050 |
| Jan 15, 2019 | Completed final sign-off Oct 2022 | 2824 Scott St | open up with holes in walls and ceiling for exploratory demo for new structural upgrade.Details
open up with holes in walls and ceiling for exploratory demo for new structural upgrade. | $8,260 |
| Dec 6, 2018 | Completed final sign-off Oct 2022 | 2824 Scott St | foundation upgrade.Details
foundation upgrade. | $68,440 |
| Sep 10, 2018 | Completed final sign-off Sep 2018 | 263 29th Av | to obtain final inspection for work approved under pa#2002-1104-0750. all work is complete.Details
to obtain final inspection for work approved under pa#2002-1104-0750. all work is complete. | |
| Sep 6, 2018 | Completed final sign-off Nov 2018 | 2900 Vallejo St | interior remodel of existing building per plans. note structural upgrades on separate permit #201605258280.Details
interior remodel of existing building per plans. note structural upgrades on separate permit #201605258280. | |
| Sep 6, 2018 | Completed final sign-off Jan 2019 | 2900 Vallejo St | repair & restore exterior as needed. all historic detailing to be repaired & painted per plans. install sunshade & roof deck.Details
repair & restore exterior as needed. all historic detailing to be repaired & painted per plans. install sunshade & roof deck. | |
| Apr 16, 2018 | Expired or cancelled revoked Jun 2018 | 2900 Vallejo St | convert existing mechanical roof area and (e) handrail to habitable roof deck. add pedestal deck. fully sprinkled. 125' travel. see pa #201803052829.Details
convert existing mechanical roof area and (e) handrail to habitable roof deck. add pedestal deck. fully sprinkled. 125' travel. see pa #201803052829. | |
| Mar 5, 2018 | Completed final sign-off May 2018 | 2900 Vallejo St | install 42 inch glass handrail at roofDetails
install 42 inch glass handrail at roof | $2,500 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #1: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/aDetails
unit #1: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #2: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/aDetails
unit #2: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #4: remodel kitchen and (2) bathrooms: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & no change in (e) layout. maher n/aDetails
unit #4: remodel kitchen and (2) bathrooms: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & no change in (e) layout. maher n/a | $33,550 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #3: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & change in (e) layout. maher n/aDetails
unit #3: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & change in (e) layout. maher n/a | $24,850 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 809 Montgomery St | voluntary steel frames upgrades per patrick buscovich engineer's drawing. maher naDetails
voluntary steel frames upgrades per patrick buscovich engineer's drawing. maher na | $135,880 |
| Jan 12, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | add a basement (vertical addition) convert the area excavation under foundation permit 201710050463 to basement with new access from 1st flr to basement. maher naDetails
add a basement (vertical addition) convert the area excavation under foundation permit 201710050463 to basement with new access from 1st flr to basement. maher na | $50,000 |
| Nov 28, 2017 | Completed final sign-off Feb 2022 | 740 Tennessee St | upgrade to steel frames per engineer's plans voluntary strengthening add two steel moment frames. maher naDetails
upgrade to steel frames per engineer's plans voluntary strengthening add two steel moment frames. maher na | $123,740 |
| Nov 9, 2017 | Never finaled issued Dec 2017, no final | 809 Montgomery St | upgrade foundation per patrick buscovich engineers drawings. n/a for maher.Details
upgrade foundation per patrick buscovich engineers drawings. n/a for maher. | $152,750 |
| Oct 30, 2017 | Completed final sign-off Feb 2022 | 740 Tennessee St | remove damage plaster and replace on interior wall 5/8 type x gyp board, 50%Details
remove damage plaster and replace on interior wall 5/8 type x gyp board, 50% | $10,000 |
| Oct 5, 2017 | Completed final sign-off Feb 2022 | 740 Tennessee St | upgrade entire foundation with new concrete walls & slab per patrick buscovich engineering dated 9/7/17. maher naDetails
upgrade entire foundation with new concrete walls & slab per patrick buscovich engineering dated 9/7/17. maher na | $145,560 |
| Oct 4, 2017 | Completed final sign-off Oct 2017 | 520 El Camino Del Mar | to obtain a final inspection for work approved under pa#201504062860 & 201507302889.Details
to obtain a final inspection for work approved under pa#201504062860 & 201507302889. | |
| Sep 18, 2017 | In progress issued Oct 2023 | 1000 Ashbury St | mandatory soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a4. na for maher. install 2 steel moment frames at garage door openings,add shearwalls in garage. adddress complaint 201992451Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a4. na for maher. install 2 steel moment frames at garage door openings,add shearwalls in garage. adddress complaint 201992451 | $100,000 |
| Aug 4, 2017 | Completed final sign-off Jan 2018 | 1100 Sacramento St | unit 802: remodel 3 bathroom's showers,tub, tile, cabinets, counter tops, trim & paint. install new master closet and retile kitchen floor.Details
unit 802: remodel 3 bathroom's showers,tub, tile, cabinets, counter tops, trim & paint. install new master closet and retile kitchen floor. | $48,830 |
| Mar 21, 2017 | Completed final sign-off May 2018 | 2900 Vallejo St | replace windows in-kind due to dry-rot frame and sash. new windows to match existing exactly; all wood, matching in operation (i.e. double-hung, pivot, casement, fixed) per window survey, and true divided lights. retain leaded and stained glass windows. og on double hung. patch stucco where needed.Details
replace windows in-kind due to dry-rot frame and sash. new windows to match existing exactly; all wood, matching in operation (i.e. double-hung, pivot, casement, fixed) per window survey, and true divided lights. retain leaded and stained glass windows. og on double hung. patch stucco where needed. | $50,000 |
| Jun 17, 2016 | Completed final sign-off Oct 2017 | 207 Avila St | enlarge (e) garage door from 10'-0" wide to 11'-9"; maher n/aDetails
enlarge (e) garage door from 10'-0" wide to 11'-9"; maher n/a | $3,500 |
| May 25, 2016 | Completed final sign-off May 2018 | 2900 Vallejo St | seismic strengthening. no exterior workDetails
seismic strengthening. no exterior work | $500,000 |
| May 17, 2016 | Completed final sign-off May 2018 | 2900 Vallejo St | during installation of structural steel frames uncovered three area's in building with damage due to 1) fire and/or 2) (e) plumbing which notched joist and/or 3) dryrot, reframe to match (e) joist, suze approx 200 sq.ft. (n) plywood to match (e) sheathing. basement, 1/f & 2/fDetails
during installation of structural steel frames uncovered three area's in building with damage due to 1) fire and/or 2) (e) plumbing which notched joist and/or 3) dryrot, reframe to match (e) joist, suze approx 200 sq.ft. (n) plywood to match (e) sheathing. basement, 1/f & 2/f | $50,000 |
| Mar 31, 2016 | Never finaled issued Apr 2018, no final | 499 Jackson St | (n) entry for retail space along jackson street. (n) exterior paint. approvedDetails
(n) entry for retail space along jackson street. (n) exterior paint. approved | $35,000 |
| Mar 17, 2016 | Completed final sign-off Aug 2019 | 3340 Washington St | replace existing windows, install (n) french door, install /replace (n) roof @ breakfast room; maher n/aDetails
replace existing windows, install (n) french door, install /replace (n) roof @ breakfast room; maher n/a | $15,000 |
| Mar 7, 2016 | Completed final sign-off Oct 2017 | 207 Avila St | structural strengthening upgrade and stucco replacement maher naDetails
structural strengthening upgrade and stucco replacement maher na | $150,000 |
| Jan 26, 2016 | Completed final sign-off May 2018 | 2900 Vallejo St | install 2 steel moment resisting transverse framesDetails
install 2 steel moment resisting transverse frames | $50,000 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 2900 Vallejo St | remodel existing kitchen, new cabinets, new appliances, counter tops, fixtures, upgrade trim package with new hardwood floor on 1st floor. remodel 4 bathrooms, showers, tub, tile, cabinets, counter tops, fixtures. upgrade trim package with new hardwood floor on 2nd & 3rd floor & basement. mep unerDetails
remodel existing kitchen, new cabinets, new appliances, counter tops, fixtures, upgrade trim package with new hardwood floor on 1st floor. remodel 4 bathrooms, showers, tub, tile, cabinets, counter tops, fixtures. upgrade trim package with new hardwood floor on 2nd & 3rd floor & basement. mep uner | $53,870 |
| Nov 6, 2015 | Completed final sign-off May 2018 | 2900 Vallejo St | install new foundation and garage slab per drawings @ the (e) baker st. garage.Details
install new foundation and garage slab per drawings @ the (e) baker st. garage. | $68,750 |
| Oct 5, 2015 | Completed final sign-off May 2018 | 2900 Vallejo St | take out existing main stair case and replace with new circular stairs per drawings. remodel wine storage room, remodel existing master bath and closet. new cabinets, new tile, new fixtures, trim and paint.Details
take out existing main stair case and replace with new circular stairs per drawings. remodel wine storage room, remodel existing master bath and closet. new cabinets, new tile, new fixtures, trim and paint. | $42,880 |
| Jul 30, 2015 | Expired or cancelled expired Oct 2017 | 520 El Camino Del Mar | revision to 201504062860 upgrade/replace e foundation as shown on attached plans to show shoring crib towers and steel beam, lines 1 and 3. for temporary purpose.Details
revision to 201504062860 upgrade/replace e foundation as shown on attached plans to show shoring crib towers and steel beam, lines 1 and 3. for temporary purpose. | |
| Jul 14, 2015 | Completed final sign-off Oct 2022 | 2824 Scott St | alteration to existing residence, interior remodel, repair decks, update architectural features on facades, wood and trim work, new glazing, replace windows and doors. n/a maher ordinance #155-13.Details
alteration to existing residence, interior remodel, repair decks, update architectural features on facades, wood and trim work, new glazing, replace windows and doors. n/a maher ordinance #155-13. | $750,000 |
| May 12, 2015 | Expired or cancelled cancelled Jan 2026 | 2375 Broadway | add dormers to third floor.Details
add dormers to third floor. | $22,180 |
| Apr 6, 2015 | Expired or cancelled expired Oct 2017 | 520 El Camino Del Mar | upgrade (replace) (e) foundation as shown on attached plans.Details
upgrade (replace) (e) foundation as shown on attached plans. | $20,000 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 3460 Scott St | #3460 remodel (e) kitchen, new cabinets, counter tops, appliances, fixts, update 2 (e) bathrms, new tile, fixts etc. one on lower flr & 1st fl & closets. install 1 level elevator, new finishes, trim & paint. 3462 update (e) kitchen, cabinets, doors inside garage not visible), counter tops, applianceDetails
#3460 remodel (e) kitchen, new cabinets, counter tops, appliances, fixts, update 2 (e) bathrms, new tile, fixts etc. one on lower flr & 1st fl & closets. install 1 level elevator, new finishes, trim & paint. 3462 update (e) kitchen, cabinets, doors inside garage not visible), counter tops, appliance | $24,950 |
| Oct 20, 2014 | Never finaled issued Oct 2014, no final | 3460 Baker St | upfate wine tasting room with new wine racks, stone walls aomt & finishes etc. install wine storage cubbie's & finishes; update kitchen cabinet face's, repaint walls, doors & surfaces etc, change out floor surfaces as neeeded, cosmetic repairs etc. n/a maher ordinanceDetails
upfate wine tasting room with new wine racks, stone walls aomt & finishes etc. install wine storage cubbie's & finishes; update kitchen cabinet face's, repaint walls, doors & surfaces etc, change out floor surfaces as neeeded, cosmetic repairs etc. n/a maher ordinance | $28,550 |
| Jul 8, 2014 | Completed final sign-off Feb 2015 | 2273 California St | install 3 dormers on top floor at rear of building plus bathroom & skylights. n/a ordinance #155-13.Details
install 3 dormers on top floor at rear of building plus bathroom & skylights. n/a ordinance #155-13. | $18,770 |
| Jul 3, 2014 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | exploratory demolition non structural drywall only apx 30% of building.Details
exploratory demolition non structural drywall only apx 30% of building. | |
| Jun 13, 2014 | Never finaled issued Apr 2015, no final | 1055 Green St | remove lower story of (e) bay window & add new balcony @ 1st floor with new doors. no change to front facade on west & east elevation. all work @ rear elevation.Details
remove lower story of (e) bay window & add new balcony @ 1st floor with new doors. no change to front facade on west & east elevation. all work @ rear elevation. | $25,000 |
| May 14, 2014 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | upgrade existing foundation as shown at basement floor. maher n/a. less than 50 cu. yard.Details
upgrade existing foundation as shown at basement floor. maher n/a. less than 50 cu. yard. | $65,000 |
| Mar 28, 2014 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | install landscape walls (3') in rear yard per drawings. compliance with ordinance #155-13 not requiredDetails
install landscape walls (3') in rear yard per drawings. compliance with ordinance #155-13 not required | $25,400 |
| Jan 6, 2014 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | install new wood french doors into extg opening at living room to front yard.Details
install new wood french doors into extg opening at living room to front yard. | $3,250 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 1055 Green St | voluntary seismic strengthening on 1st floor & basement level.Details
voluntary seismic strengthening on 1st floor & basement level. | $28,710 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 1055 Green St | install new bathroom and study in basement. no exterior work.Details
install new bathroom and study in basement. no exterior work. | $19,000 |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 1055 Green St | in-fill window at sideyard. relocate door at sideyard.Details
in-fill window at sideyard. relocate door at sideyard. | $3,000 |
| Oct 30, 2013 | Never finaled issued Oct 2013, no final | 1055 Green St | relocate stairs on 1st floor to basement and structural details per patrick buscovich engineer's drawings. install cabinets, add trim and hardwood floor to basement level.Details
relocate stairs on 1st floor to basement and structural details per patrick buscovich engineer's drawings. install cabinets, add trim and hardwood floor to basement level. | $16,340 |
| Sep 11, 2013 | Completed final sign-off Sep 2014 | 130 Seacliff Av | install new master bathroom, fixtures, cabinets, toilet, shower, tub, tile, counter tops, update closets, trim hardwood floors, paint, etc., on 2nd fl. install new kitchen cabinets. appliances, countertops, trim, hardwood floor, paint, etc. - remodel bathroom & kitchen area.Details
install new master bathroom, fixtures, cabinets, toilet, shower, tub, tile, counter tops, update closets, trim hardwood floors, paint, etc., on 2nd fl. install new kitchen cabinets. appliances, countertops, trim, hardwood floor, paint, etc. - remodel bathroom & kitchen area. | $18,750 |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 1055 Green St | install new bathroom, fixtures, cabinets, shower , tub, tile and countertops update closets trim , paint etc on 2nd flr, install new kitchen cabinets, appliances, countertops, trims paint, and new fixtures, toilet, cabinets in power room 1st floor .Details
install new bathroom, fixtures, cabinets, shower , tub, tile and countertops update closets trim , paint etc on 2nd flr, install new kitchen cabinets, appliances, countertops, trims paint, and new fixtures, toilet, cabinets in power room 1st floor . | $18,880 |
| May 1, 2013 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | remodel (e)wood framed,stucco finished sfd.add 2nd story over(e)living rm wing.add single story&multi story addition into rear yd.raise(e)roof&cornice.add arch details,reconfigure int. walls&provide(n)finishes,fixtures&cabinetry.add piers&fencing@frt,retaining walls@rear yd.Details
remodel (e)wood framed,stucco finished sfd.add 2nd story over(e)living rm wing.add single story&multi story addition into rear yd.raise(e)roof&cornice.add arch details,reconfigure int. walls&provide(n)finishes,fixtures&cabinetry.add piers&fencing@frt,retaining walls@rear yd. | $1,000,000 |
| Mar 19, 2013 | Completed final sign-off May 2014 | 130 Seacliff Av | install pool & hot tub on deck, tiles & finishes per drawingsDetails
install pool & hot tub on deck, tiles & finishes per drawings | $41,360 |
| Jan 17, 2013 | Completed final sign-off May 2014 | 130 Seacliff Av | add reinforced concrete piers per drawings grade beams and structural details per drawingsDetails
add reinforced concrete piers per drawings grade beams and structural details per drawings | $36,850 |
| Nov 28, 2012 | Completed final sign-off May 2014 | 130 Seacliff Av | add reinforced concrete piers per drawings. grade beams and structural details per drawingsDetails
add reinforced concrete piers per drawings. grade beams and structural details per drawings | $33,750 |
| Oct 30, 2012 | Completed final sign-off May 2014 | 130 Seacliff Av | revision t0 201210162112 to increase valuto to 1425000.Details
revision t0 201210162112 to increase valuto to 1425000. | $142,500 |
| Oct 16, 2012 | Completed final sign-off May 2014 | 130 Seacliff Av | renew pa#200708240833 to complete work.Details
renew pa#200708240833 to complete work. | $5,500 |
| Oct 16, 2012 | Completed final sign-off May 2014 | 130 Seacliff Av | install new concrete retaining wall per plans. structural work only.Details
install new concrete retaining wall per plans. structural work only. | $18,620 |
| Oct 10, 2012 | Expired or cancelled expired Aug 2025 | 120 Seacliff Av | revision to 201009201179 to correct revision # 200909247506 to reflect correct permit # of 200909247546Details
revision to 201009201179 to correct revision # 200909247506 to reflect correct permit # of 200909247546 | |
| Aug 20, 2012 | Expired or cancelled expired Aug 2025 | 120 Seacliff Av | to obtain final inspection for work approved under pa#200909247546. all work is complete.Details
to obtain final inspection for work approved under pa#200909247546. all work is complete. | |
| Aug 20, 2012 | Never finaled issued Aug 2012, no final | 130 Seacliff Av | structural work only - revision to bpa# 200708240833. add pier's to support existing to beach and add new stone steps, retaining walls and lanscaping with pool spas per plans.Details
structural work only - revision to bpa# 200708240833. add pier's to support existing to beach and add new stone steps, retaining walls and lanscaping with pool spas per plans. | $38,740 |
| Aug 20, 2012 | Expired or cancelled expired Sep 2016 | 120 Seacliff Av | to obtain final inspection for work approved under pa#201009201179. all work is complete.Details
to obtain final inspection for work approved under pa#201009201179. all work is complete. | |
| Jun 8, 2012 | Completed final sign-off Jun 2012 | 299 Santa Paula Av | replace (e) garage door and replace dry rotted storage area and storage door; note: refer to enclosed st. francis home assn dtd may 24,2012Details
replace (e) garage door and replace dry rotted storage area and storage door; note: refer to enclosed st. francis home assn dtd may 24,2012 | $2,210 |
| Oct 5, 2011 | Completed final sign-off Jun 2012 | 299 Santa Paula Av | increase cost of valuation to $31,180 for total cost of foundation upgrade to $64,780 per correction notice dated 10-4-11- building inspector (ref. 201105125882)Details
increase cost of valuation to $31,180 for total cost of foundation upgrade to $64,780 per correction notice dated 10-4-11- building inspector (ref. 201105125882) | $31,120 |
| Oct 5, 2011 | Completed final sign-off Oct 2011 | 98 Seacliff Av | to obtain final inspection for work approved under pa 200905289254; all work is completeDetails
to obtain final inspection for work approved under pa 200905289254; all work is complete | |
| May 12, 2011 | Completed final sign-off Jun 2012 | 299 Santa Paula Av | replace and upgrade foundations in basement storage area.Details
replace and upgrade foundations in basement storage area. | $33,660 |
| Apr 26, 2011 | Completed final sign-off Jun 2012 | 299 Santa Paula Av | relocate extg fireplace to living room from study. replace stairs to basement with new hardwood stairs and handrail paint and add trim details.Details
relocate extg fireplace to living room from study. replace stairs to basement with new hardwood stairs and handrail paint and add trim details. | $7,580 |
| Sep 20, 2010 | Expired or cancelled expired Aug 2025 | 120 Seacliff Av | revision 200909247506 to add piers to support extg stairs in kind to beach and new stone on steps and lanscaping & pool per plansDetails
revision 200909247506 to add piers to support extg stairs in kind to beach and new stone on steps and lanscaping & pool per plans | $28,660 |
| Jun 1, 2010 | Completed final sign-off Oct 2011 | 98 Seacliff Av | install residential elevator per plan.Details
install residential elevator per plan. | $41,100 |
| May 14, 2010 | Completed final sign-off May 2010 | 245 Mallorca Wy | to obtain final inspection for work approved under app#200809030623. all work is complete.Details
to obtain final inspection for work approved under app#200809030623. all work is complete. | |
| Apr 7, 2010 | Never finaled issued Apr 2010, no final | 70 Commonwealth Av | remodel 1 bathroom on 3rd floor, new tile on floor and shower walls, paint.Details
remodel 1 bathroom on 3rd floor, new tile on floor and shower walls, paint. | $6,830 |
| Mar 19, 2010 | Never finaled issued May 2010, no final | 31 Commonwealth Av | excavation of existing basement around 24" & foundation alteration, remove exist brick flue & replace w/metal flue, new stairs to attic, new dormers at attic, remodel existing bathroom & laundry room in basement.Details
excavation of existing basement around 24" & foundation alteration, remove exist brick flue & replace w/metal flue, new stairs to attic, new dormers at attic, remodel existing bathroom & laundry room in basement. | $185,000 |
| Mar 16, 2010 | Never finaled issued Mar 2010, no final | 98 Seacliff Av | install new hot tub & stairs in rear yard per drawings & deck stairs.Details
install new hot tub & stairs in rear yard per drawings & deck stairs. | $18,660 |
| Jan 6, 2010 | Never finaled issued Jan 2010, no final | 2336 Broadway | replace (e) deck railings at rear with new glass, replace window sashes with new wood one's to match (e), install new flat skylight, 3'x2' on roofDetails
replace (e) deck railings at rear with new glass, replace window sashes with new wood one's to match (e), install new flat skylight, 3'x2' on roof | $48,440 |