S O G Construction
- Based in
- Richmond
- On San Francisco permits
- Jul 2015 to Jul 2026
- Last 24 months
- 6 permits filed
44 permits since 2000: 30 completed, 4 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 1679 37th Av | remodel existing bathroom in the garage area. everything to be done in kind.Details
remodel existing bathroom in the garage area. everything to be done in kind. | $20,000 |
| Jul 1, 2026 | Expired or cancelled suspend Jul 2026 | 1247 Palou Av | to comply with nov# 202175122: remove unpermitted stairs built on (e) deck leading to roof. no plans required per ces as stairs did not alter layout of deck. patch small area of roof. dryrot repair to rear deck, like for like, <50% repair post and fascia board.Details
to comply with nov# 202175122: remove unpermitted stairs built on (e) deck leading to roof. no plans required per ces as stairs did not alter layout of deck. patch small area of roof. dryrot repair to rear deck, like for like, <50% repair post and fascia board. | $1,500 |
| Apr 28, 2026 | In progress issued Apr 2026 | 1247 Palou Av | to obtain final inspection for work approved under pa# 202212017488. all work is complete.Details
to obtain final inspection for work approved under pa# 202212017488. all work is complete. | |
| Apr 28, 2026 | Expired or cancelled suspend Jul 2026 | 1247 Palou Av | recommencement and completion of work approved under pa# 200610255962 & 200707126605.Details
recommencement and completion of work approved under pa# 200610255962 & 200707126605. | $30,000 |
| Nov 5, 2025 | In progress issued Dec 2025 | 2240 Green St | unit 1- add (n) powder room at (e) balacony area.Details
unit 1- add (n) powder room at (e) balacony area. | $40,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2025 | 594 Moscow St | to obtain final inspection for work approved under pa# 202309207044 + 202311150834. all work is complete.Details
to obtain final inspection for work approved under pa# 202309207044 + 202311150834. all work is complete. | |
| Jul 17, 2024 | In progress issued Jul 2024 | 330 Prague St | remove (e) damage stucco install new stucco at approx 1000 sq ft. work to be performed in the front, right and left side of the houseDetails
remove (e) damage stucco install new stucco at approx 1000 sq ft. work to be performed in the front, right and left side of the house | $25,000 |
| Nov 15, 2023 | Expired or cancelled expired Feb 2025 | 594 Moscow St | ref 202309207044. dry rot repair and grade beam, steel moment frame installation, shearwallDetails
ref 202309207044. dry rot repair and grade beam, steel moment frame installation, shearwall | $25,000 |
| Sep 20, 2023 | Expired or cancelled expired Feb 2025 | 594 Moscow St | to comply with nov202313378: remove (e) siding approx 900sf and remove (e) stucco at total of 1600sf and redo everything with new stucco. replace (e) 14 windows. new windows to be alum clad woodDetails
to comply with nov202313378: remove (e) siding approx 900sf and remove (e) stucco at total of 1600sf and redo everything with new stucco. replace (e) 14 windows. new windows to be alum clad wood | $50,000 |
| Jun 7, 2023 | Completed final sign-off Aug 2023 | 1033 Fell St | 2 bathroom remodels: master bathroom remove tile to redo shower floor tile, and shower pan, in-kind. main bathroom remove bathtub install new bathtub, same tile work, in-kind. no moving walls, no layout changes.Details
2 bathroom remodels: master bathroom remove tile to redo shower floor tile, and shower pan, in-kind. main bathroom remove bathtub install new bathtub, same tile work, in-kind. no moving walls, no layout changes. | $8,000 |
| Jan 20, 2023 | Completed final sign-off Jul 2023 | 1125 20th St | proposed east facade windows to the upper unit of an (e)(2) unit over garage multi-family residential building on corner lot. east wall & windows are adjacent to an existing public right of way.Details
proposed east facade windows to the upper unit of an (e)(2) unit over garage multi-family residential building on corner lot. east wall & windows are adjacent to an existing public right of way. | $40,000 |
| Jan 5, 2021 | Completed final sign-off Dec 2021 | 1467 39th Av | kitchen remodel im kind. install new cabinet in kind. new hardwood floor, sink faucet, and new gfci outlets. no walls to be removed or relocated.Details
kitchen remodel im kind. install new cabinet in kind. new hardwood floor, sink faucet, and new gfci outlets. no walls to be removed or relocated. | $20,000 |
| Oct 14, 2020 | Completed final sign-off Dec 2023 | 40 Francis St | 1st floor: convert garage/storage to bedroom & bath, (n0 stair infill under room above. 2nd floor: renovate kitchen & bath, add powder, reconstruct interior stair. 3rd floor: add bathroom. add 10 skylights.Details
1st floor: convert garage/storage to bedroom & bath, (n0 stair infill under room above. 2nd floor: renovate kitchen & bath, add powder, reconstruct interior stair. 3rd floor: add bathroom. add 10 skylights. | $150,000 |
| Sep 21, 2020 | Never finaled issued Sep 2020, no final | 1429 07th Av | to comply with nov #202052581 - correct item 2, 3, 4, 5 (repair dryrot for stairs under 50%, install 8 windows and install siding at rear wall). stairs in rear of bldg.Details
to comply with nov #202052581 - correct item 2, 3, 4, 5 (repair dryrot for stairs under 50%, install 8 windows and install siding at rear wall). stairs in rear of bldg. | $30,000 |
| Aug 19, 2019 | Never finaled issued Feb 2020, no final | 2444 Greenwich St | kitchen remodel. remove/add wallsDetails
kitchen remodel. remove/add walls | $55,000 |
| May 3, 2019 | Completed final sign-off Sep 2019 | 2363 28th Av | remodeling (e) bathroom.Details
remodeling (e) bathroom. | $15,000 |
| Mar 14, 2019 | Completed final sign-off Apr 2019 | 1331 03rd Av | upgrade (e) laundry room , new plumbing demo walls for new 2" plumbing, electrical wiring outletDetails
upgrade (e) laundry room , new plumbing demo walls for new 2" plumbing, electrical wiring outlet | $3,000 |
| Nov 21, 2018 | Completed final sign-off Dec 2018 | 1331 03rd Av | repari dry rot siding on the sidewall not visible from public way. all repair in kind. area 6x5 of cedar shiplap siding.Details
repari dry rot siding on the sidewall not visible from public way. all repair in kind. area 6x5 of cedar shiplap siding. | $2,500 |
| Oct 15, 2018 | Completed final sign-off Apr 2019 | 1063 Alabama St | replace existing water heater (electric) and install new subpanel. demo existing tile and hardwood floor. install new hardwood floor, tile.Details
replace existing water heater (electric) and install new subpanel. demo existing tile and hardwood floor. install new hardwood floor, tile. | $13,000 |
| Oct 1, 2018 | Completed final sign-off Oct 2018 | 1620 10th Av | dryrot repair existing rear deck, 30% of decking. repair in kind.Details
dryrot repair existing rear deck, 30% of decking. repair in kind. | $3,500 |
| Aug 29, 2018 | Completed final sign-off Feb 2019 | 42 Cortland Av | front window replacement total of five and full back window replacement window total of 1 dbl casement.Details
front window replacement total of five and full back window replacement window total of 1 dbl casement. | $5,000 |
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 1790 Mckinnon Av | voluntary structural stregthening at ground level. remove vinyl siding at rear wall and replace with hardi plank. not visible from the street. add anchor bolts 32" oc embed with epoxy on *e( footing. 1/2 cdx plywood at rear wall added for siding backingDetails
voluntary structural stregthening at ground level. remove vinyl siding at rear wall and replace with hardi plank. not visible from the street. add anchor bolts 32" oc embed with epoxy on *e( footing. 1/2 cdx plywood at rear wall added for siding backing | $17,000 |
| Apr 12, 2018 | Completed final sign-off Apr 2018 | 89 Cervantes Bl | to comply with nov 201720121 - repairt wall damage due to car impact. repair stucco and minor framing at front facadeDetails
to comply with nov 201720121 - repairt wall damage due to car impact. repair stucco and minor framing at front facade | $7,000 |
| Oct 25, 2017 | Completed final sign-off May 2018 | 1831 Union St | apt a: remodel existing kitchen and (2) bathrooms.Details
apt a: remodel existing kitchen and (2) bathrooms. | $45,000 |
| Oct 23, 2017 | Completed final sign-off Oct 2017 | 1598 34th Av | repair damaged wood siding on south side wall in-kind, approximately 60 sq ftDetails
repair damaged wood siding on south side wall in-kind, approximately 60 sq ft | $1,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2017 | 1231 25th Av | dryrot repair underneath front exterior stairs. interior access to repair area from garage. in-kind repair to macth existing.Details
dryrot repair underneath front exterior stairs. interior access to repair area from garage. in-kind repair to macth existing. | $1,500 |
| Aug 30, 2017 | Completed final sign-off Sep 2017 | 480 Eddy St | revision to 201703312939. replace heat pump for elec heat maher not reqDetails
revision to 201703312939. replace heat pump for elec heat maher not req | |
| Jul 20, 2017 | Completed final sign-off Aug 2017 | 335 Winfield St | front stairs dry rot repair. area to be repaired approx. 20 sf at landing. existing stairs are wood, repairs will be in-kind.Details
front stairs dry rot repair. area to be repaired approx. 20 sf at landing. existing stairs are wood, repairs will be in-kind. | $2,500 |
| Jul 13, 2017 | Completed final sign-off Jul 2017 | 2415 Harrison St | revision to pa #201704033030 - to exclude kitchen remodel. (verify in field)Details
revision to pa #201704033030 - to exclude kitchen remodel. (verify in field) | |
| May 2, 2017 | Never finaled issued May 2017, no final | 531 Silver Av | add new plywood sheathing on roof nailing of rafters or joists.Details
add new plywood sheathing on roof nailing of rafters or joists. | $3,000 |
| May 2, 2017 | Completed final sign-off Sep 2018 | 531 Silver Av | reroofingDetails
reroofing | $8,000 |
| May 2, 2017 | Never finaled issued May 2017, no final | 333 Winfield St | reroofingDetails
reroofing | $8,000 |
| May 2, 2017 | Completed final sign-off Feb 2018 | 333 Winfield St | add new plywood sheathing on roof, nailing of rafters or joists.Details
add new plywood sheathing on roof, nailing of rafters or joists. | $3,000 |
| May 1, 2017 | Completed final sign-off Jun 2017 | 333 Winfield St | existing 1 floor (above the basement) remove shower pan - change tile, replace vanity and toilet / not located in basement. repair dry rot on stairs, entry stairs, and repair dry rot on window trim exterior.Details
existing 1 floor (above the basement) remove shower pan - change tile, replace vanity and toilet / not located in basement. repair dry rot on stairs, entry stairs, and repair dry rot on window trim exterior. | $10,000 |
| May 1, 2017 | Never finaled issued May 2017, no final | 531 Silver Av | voluntary structural strengthening at the rear yard.Details
voluntary structural strengthening at the rear yard. | $16,000 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 2415 Harrison St | remodel existing upper bathroom and kitchen. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
remodel existing upper bathroom and kitchen. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $13,000 |
| Mar 31, 2017 | Completed final sign-off Sep 2017 | 480 Eddy St | remodel exgt vacant office space. add partition walls upgrade handicap toilet and new mechanical. n/a for maherDetails
remodel exgt vacant office space. add partition walls upgrade handicap toilet and new mechanical. n/a for maher | $40,000 |
| Mar 24, 2017 | Completed final sign-off Sep 2017 | 4443 17th St | using heavy duty brackets, clamps instead of using toprail for glass guardrail at interior stair. rev to pa201507091064.Details
using heavy duty brackets, clamps instead of using toprail for glass guardrail at interior stair. rev to pa201507091064. | |
| Nov 3, 2016 | Completed final sign-off Jan 2017 | 42 Cortland Av | add 1/2 bath next to the master bedroom on 3rd flr; maher ord 155-13 naDetails
add 1/2 bath next to the master bedroom on 3rd flr; maher ord 155-13 na | $9,000 |
| Jul 19, 2016 | Completed final sign-off Sep 2017 | 4443 17th St | add wine storage, bedroom & bathroom @ basement level, install a sewer line, reinforce (e) footing, add reataining wall, (1) window installation, tile, glass cellar, new doors, lights, outlets.Details
add wine storage, bedroom & bathroom @ basement level, install a sewer line, reinforce (e) footing, add reataining wall, (1) window installation, tile, glass cellar, new doors, lights, outlets. | $10,000 |
| May 25, 2016 | Completed final sign-off Sep 2017 | 4443 17th St | revision to 201507091064, additional footing and detail at stair replacementDetails
revision to 201507091064, additional footing and detail at stair replacement | $17,000 |
| Oct 26, 2015 | Never finaled issued Jul 2018, no final | 3820 Quintara St | remove an (e) bearing wall on the upper level between kitchen & living roomDetails
remove an (e) bearing wall on the upper level between kitchen & living room | $7,000 |
| Oct 6, 2015 | Completed final sign-off May 2017 | 1173 Ingerson Av | to comply with nov #201541691 to legalize work at ground floor. one bedroom, study, closet, and bathroom. replace garage door with entry door.Details
to comply with nov #201541691 to legalize work at ground floor. one bedroom, study, closet, and bathroom. replace garage door with entry door. | $10,000 |
| Jul 9, 2015 | Completed final sign-off Sep 2017 | 4443 17th St | residential renovtions - relocate the front door (not visible from street) & add staircase to basement @ 1st floor & basement.Details
residential renovtions - relocate the front door (not visible from street) & add staircase to basement @ 1st floor & basement. | $17,000 |