Chris Mcmahon
- Listed as
- architect, authorized agent-others, designer
- Firm
- Mcmahon Arch
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2026
126 permits since 2000 (architect on 120 permits, designer on 4 permits, authorized agent-others on 2 permits): 78 completed, 7 in progress, 12 never finaled, 29 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 126.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 4092 18th St | install new modular bar, new customer seating, new sinks, w/d dookups, d/w hookup, replace incandes, w/l.e.d lighting, new ada ramp(12.5" floor ht difference), remove one entry door, replace windows in kind.Details
install new modular bar, new customer seating, new sinks, w/d dookups, d/w hookup, replace incandes, w/l.e.d lighting, new ada ramp(12.5" floor ht difference), remove one entry door, replace windows in kind. | $76,420 | |
| Jun 10, 2026 | In progress filed Jun 2026, not yet issued | 4546 19th St | add bathroom , convert 2nd laundry to 2nd bathroom, remodel 1/2 bathroom, remodel pantryDetails
add bathroom , convert 2nd laundry to 2nd bathroom, remodel 1/2 bathroom, remodel pantry | $127,345 | |
| May 18, 2026 | In progress issued May 2026 | 266 Connecticut St | Smart Demolition And Excavation Inc | non-structural. (soft) interior demo including walls, siding, and finishes.Details
non-structural. (soft) interior demo including walls, siding, and finishes. | |
| Apr 10, 2026 | Completed final sign-off Jul 2026 | 203 Eureka St | Paul Power Construction | convert (e) walk in closet to bathroom. add toilet, shower, change door 24" to 28", convert 110v to gfci. add sconce.Details
convert (e) walk in closet to bathroom. add toilet, shower, change door 24" to 28", convert 110v to gfci. add sconce. | $9,755 |
| Sep 29, 2025 | In progress issued Apr 2026 | 4546 19th St | Paul Power Construction | demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered.Details
demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered. | $73,660 |
| Sep 10, 2025 | In progress filed Sep 2025, not yet issued | 1942 Pacific Av | replace (e)wooden deck @ rear w/a differently configured rear deck & enclosing the space underneath as extension of (e) basement rooms. basement flr: new addition to rear, remove (e) upper & lower decks & stiars, replace on grade wood rear deck w/mansory pavers, new glass doors & 1 new double hung wDetails
replace (e)wooden deck @ rear w/a differently configured rear deck & enclosing the space underneath as extension of (e) basement rooms. basement flr: new addition to rear, remove (e) upper & lower decks & stiars, replace on grade wood rear deck w/mansory pavers, new glass doors & 1 new double hung w | $50,000 | |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 3695 Market St | correective action to show plans of actual construction from permit(s) 201504133511 and 201609157791 to comply with nov 202424060Details
correective action to show plans of actual construction from permit(s) 201504133511 and 201609157791 to comply with nov 202424060 | ||
| Dec 3, 2024 | Completed final sign-off Aug 2025 | 215 Eureka St | R.M.R. Construction Company | revision to pa# 201810223816: clarify roof type (metal) and revise carpentry slope.Details
revision to pa# 201810223816: clarify roof type (metal) and revise carpentry slope. | |
| Feb 6, 2024 | Completed final sign-off Aug 2024 | 4334 19th St | West Coast Builders | add 1/2 bathroom (2nd fl) in existing conditioned area to include direct vent with additional non bearing partition wall and add (2) interior doors. remodel (e) bathroom to replace (e) exhaust fan, tile and fixture and finishes. no shower pan removal. replace ladder steps to atticDetails
add 1/2 bathroom (2nd fl) in existing conditioned area to include direct vent with additional non bearing partition wall and add (2) interior doors. remodel (e) bathroom to replace (e) exhaust fan, tile and fixture and finishes. no shower pan removal. replace ladder steps to attic | $74,470 |
| Nov 17, 2022 | Completed final sign-off May 2026 | 161 Beaver St | Seapoint Construction | remodel one bedroom,2 baths,1 kitchen,reconstruct laundry room fl,northwall and roof,add gangway(sloping roof deck)over new laundry roof(laundry room in kind const)no increase in footprint or height)add iron spiral stair from(e) lower patio to(e)upper deck.Details
remodel one bedroom,2 baths,1 kitchen,reconstruct laundry room fl,northwall and roof,add gangway(sloping roof deck)over new laundry roof(laundry room in kind const)no increase in footprint or height)add iron spiral stair from(e) lower patio to(e)upper deck. | $62,455 |
| Apr 18, 2022 | Expired or cancelled withdrawn Sep 2025 | 1942 Pacific Av | replace (e) wood deck with new wood deck in same location. replace (e) exterior stair. new deck is approximately 118 sq.ft. add a 3'x 7' balcony at 3rd flr, directly above deck.Details
replace (e) wood deck with new wood deck in same location. replace (e) exterior stair. new deck is approximately 118 sq.ft. add a 3'x 7' balcony at 3rd flr, directly above deck. | $12,687 | |
| Apr 7, 2022 | Never finaled filed Apr 2022, never issued | 1909 Quesada Av | erect a 4 stories,2 dwelling with one basement duplex type 5b.Details
erect a 4 stories,2 dwelling with one basement duplex type 5b. | $570,000 | |
| Apr 7, 2022 | Never finaled filed Apr 2022, never issued | 1909 Quesada Av | erect a 3 story,1 dwelling duplex type 5b.Details
erect a 3 story,1 dwelling duplex type 5b. | $570,000 | |
| Jan 3, 2022 | In progress issued Feb 2026 | 266 Connecticut St | Galaxy Building Construction | rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation.Details
rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation. | $1,168,850 |
| Aug 17, 2021 | Completed final sign-off Jun 2023 | 1942 Pacific Av | Larkspur Builders Inc. | rev to pa202008272787: change a rear window to french door in (e) opening, max u factor 0.30. add code compliant iron guardrail. no balcony.Details
rev to pa202008272787: change a rear window to french door in (e) opening, max u factor 0.30. add code compliant iron guardrail. no balcony. | |
| May 6, 2021 | Expired or cancelled withdrawn Dec 2021 | 266 Connecticut St | demolish existing 3-story type v single family residenceDetails
demolish existing 3-story type v single family residence | $25,000 | |
| May 6, 2021 | Expired or cancelled withdrawn Dec 2021 | 266 Connecticut St | erect new 4-story type v 2 family residenceDetails
erect new 4-story type v 2 family residence | $787,355 | |
| Aug 27, 2020 | Completed final sign-off Jul 2023 | 1942 Pacific Av | Larkspur Builders Inc. | bsmt: replace & repair full foundation, remodel lower kitchen flr, relocate/remodel bath, relocate & upgrade mech equip, add shared laundry rm, new wine closet. 1st fl: remodel kitchen, relocate powder rm, repair (e) staircase, open wall below main stair. 2nd fl: remodel 2 baths, add gas applianceDetails
bsmt: replace & repair full foundation, remodel lower kitchen flr, relocate/remodel bath, relocate & upgrade mech equip, add shared laundry rm, new wine closet. 1st fl: remodel kitchen, relocate powder rm, repair (e) staircase, open wall below main stair. 2nd fl: remodel 2 baths, add gas appliance | $302,065 |
| Dec 27, 2019 | Never finaled filed Dec 2019, never issued | 1101 Jarboe Av | to erect 3-story, type 5b, no basement, 2 residential unit building.Details
to erect 3-story, type 5b, no basement, 2 residential unit building. | $330,000 | |
| Jul 24, 2019 | Completed final sign-off Mar 2021 | 2424 Divisadero St | Ren Lei Construction Co, Alex Builder Inc | remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear.Details
remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear. | $578,440 |
| Jul 23, 2019 | Completed final sign-off Nov 2019 | 2824 21st St | Cht Properties Development | installing protective cabinet around gas meters relocate gas meters to facade. new brace wallDetails
installing protective cabinet around gas meters relocate gas meters to facade. new brace wall | $4,000 |
| Jul 12, 2019 | Completed final sign-off Aug 2023 | 703 San Bruno Av | 1st fl: tv room & bathroom addition. 2nd fl: kitchen remodel, (n) office, deck & spiral staircase from 2nd to 3rd fl. 3rd fl: (2) bedroom & (2) bathroom addition, (n) 225 sf roof deckDetails
1st fl: tv room & bathroom addition. 2nd fl: kitchen remodel, (n) office, deck & spiral staircase from 2nd to 3rd fl. 3rd fl: (2) bedroom & (2) bathroom addition, (n) 225 sf roof deck | $231,741 | |
| Jun 18, 2019 | Expired or cancelled withdrawn Aug 2019 | 4660 18th St | replace 8 front facade windows in-kind. all to remain same size and materialDetails
replace 8 front facade windows in-kind. all to remain same size and material | $5,000 | |
| May 23, 2019 | Never finaled filed May 2019, never issued | 3124 Gough St | remodel kitchen; remodel rear grd flr area; remodel 2 baths; add rear ext stair; remove (e) bath @ rear 2nd flr; add (n) 3rd flr w/ 3 brs & 3 baths; add (n) 4th flr w/ full bath & 2 roof decks. fire sprinkler under separate permit.Details
remodel kitchen; remodel rear grd flr area; remodel 2 baths; add rear ext stair; remove (e) bath @ rear 2nd flr; add (n) 3rd flr w/ 3 brs & 3 baths; add (n) 4th flr w/ full bath & 2 roof decks. fire sprinkler under separate permit. | $617,800 | |
| May 1, 2019 | Expired or cancelled withdrawn Aug 2019 | 1665 08th Av | detached garage remodel. expand garage into (e) covered storage. (n) foundation. remove rot. remove mold. replace roof.Details
detached garage remodel. expand garage into (e) covered storage. (n) foundation. remove rot. remove mold. replace roof. | $10,000 | |
| Mar 29, 2019 | Completed final sign-off May 2019 | 3154 17th St | revision to app#201801259530. add mother nursing room. add 3 new ada compliant unisesx restrooms. add 4 new conference rooms (2 on ground floor, 2 at north mezzanine) add new it closet. n/a for maherDetails
revision to app#201801259530. add mother nursing room. add 3 new ada compliant unisesx restrooms. add 4 new conference rooms (2 on ground floor, 2 at north mezzanine) add new it closet. n/a for maher | $10,000 | |
| Mar 5, 2019 | Completed final sign-off Feb 2020 | 4147 26th St | Cht Properties Development | as-built floor plans to approved app #201410088434.Details
as-built floor plans to approved app #201410088434. | |
| Jan 31, 2019 | Completed final sign-off May 2021 | 1155 Bryant St | change-of-use/change-of-occupancy: from manufactory (f1-occ.) to lab suite (l-occ). provide new lab space and clean room areas, all on the 1st floor. n/a for maher.Details
change-of-use/change-of-occupancy: from manufactory (f1-occ.) to lab suite (l-occ). provide new lab space and clean room areas, all on the 1st floor. n/a for maher. | $100,000 | |
| Dec 20, 2018 | Expired or cancelled cancelled Jan 2026 | 65 Cresta Vista Dr | interior kitchen, bath, stair remodel. no change to envelope or square footage window replacementDetails
interior kitchen, bath, stair remodel. no change to envelope or square footage window replacement | $135,000 | |
| Dec 7, 2018 | Completed final sign-off Nov 2019 | 2824 21st St | Cht Properties Development | revision to pa #2017-1229-7642 light well change only at 2nd fl fill in with 1 hour fire rated construction.Details
revision to pa #2017-1229-7642 light well change only at 2nd fl fill in with 1 hour fire rated construction. | |
| Oct 22, 2018 | Expired or cancelled expired Aug 2025 | 215 Eureka St | R.M.R. Construction Company | horizontal addition. removal of existing sunroom, replace with new family room. roofdeck on new roomDetails
horizontal addition. removal of existing sunroom, replace with new family room. roofdeck on new room | $73,744 |
| Jul 27, 2018 | Completed final sign-off Jun 2020 | 2327 Fillmore St | Ren Lei Construction Co | to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 aDetails
to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 a | $180,000 |
| Apr 26, 2018 | Completed final sign-off Apr 2023 | 2831 Pierce St | Paniagua Construction Inc | remodel (e) 3-story 2-unit bldg. addition of 4th flr.Details
remodel (e) 3-story 2-unit bldg. addition of 4th flr. | $1,000,000 |
| Mar 7, 2018 | Never finaled filed Mar 2018, never issued | 828 Arkansas St | erect new 4 story 1 basement, 2 residential units, type 5b building with 4th floor setback 18'10.5" from front property line. solar under sep permit. sprinkler & sprinkler monitoring under sep permits.Details
erect new 4 story 1 basement, 2 residential units, type 5b building with 4th floor setback 18'10.5" from front property line. solar under sep permit. sprinkler & sprinkler monitoring under sep permits. | $800,000 | |
| Feb 23, 2018 | Completed final sign-off Nov 2019 | 2824 21st St | Cht Properties Development | excavate front half of basement to increase ceiling height from 6'7" to 8'0". add wide garage door & ramp. alter floor framing in front 1st floor bedroom only to accomodate new garageDetails
excavate front half of basement to increase ceiling height from 6'7" to 8'0". add wide garage door & ramp. alter floor framing in front 1st floor bedroom only to accomodate new garage | $10,000 |
| Jan 25, 2018 | Completed final sign-off May 2019 | 3154 17th St | remove non-structural interior walls. add 4 new ada compliant unisex restrooms. enlarge (e) windows openings. replace (e) side-rolling wood doors with new overhead metal doors. maher naDetails
remove non-structural interior walls. add 4 new ada compliant unisex restrooms. enlarge (e) windows openings. replace (e) side-rolling wood doors with new overhead metal doors. maher na | $100,000 | |
| Dec 15, 2017 | Expired or cancelled withdrawn Jun 2025 | 4546 19th St | add glass skylight only at the open roof terrace on 3rd fl.Details
add glass skylight only at the open roof terrace on 3rd fl. | $3,000 | |
| Nov 22, 2017 | Completed final sign-off Jul 2020 | 663 21st Av | 1 story rear addition with deck on top as back porch adding bath & bed with family living spaceDetails
1 story rear addition with deck on top as back porch adding bath & bed with family living space | $142,500 | |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 424 Townsend St | add non-structural partitions; add accessible restroom with shower; widen rear loading opening & truck ramp. replace windows in kind, 8 upper, like for like steel. no structural workDetails
add non-structural partitions; add accessible restroom with shower; widen rear loading opening & truck ramp. replace windows in kind, 8 upper, like for like steel. no structural work | $22,000 | |
| Aug 2, 2017 | Completed final sign-off Aug 2017 | 1431 12th Av | M A Morales | revision to app#201412304727. rear exterior stair eliminated from scope of work. the rear stair is not a required exit, it is being removed for security purposes.Details
revision to app#201412304727. rear exterior stair eliminated from scope of work. the rear stair is not a required exit, it is being removed for security purposes. | |
| Jul 3, 2017 | Expired or cancelled withdrawn Oct 2017 | 424 Townsend St | remove non-structural partitions, add 2 restrooms, upgrade plumbing, add ada compliant wheelchair ramp, add new entry door in-kind, replace overhead rollup truck dock doors in kind, no structural work.Details
remove non-structural partitions, add 2 restrooms, upgrade plumbing, add ada compliant wheelchair ramp, add new entry door in-kind, replace overhead rollup truck dock doors in kind, no structural work. | $138,655 | |
| May 1, 2017 | Expired or cancelled cancelled Mar 2023 | 357 Union St | covert 1 unit building into 3 unit building . add two stories above the (e) two stories. adding 4 bathrooms, 2 kitchens, 3 bedrooms.Details
covert 1 unit building into 3 unit building . add two stories above the (e) two stories. adding 4 bathrooms, 2 kitchens, 3 bedrooms. | $385,000 | |
| Apr 7, 2017 | Expired or cancelled withdrawn Jun 2017 | 316 Douglass St | remove shingles & stucco all sides of house.1st fl: excavate (e) garage to allow 8' ceiling. add media room bath & laundry. add interior stair & upgrade foundation. 2nd flr:remodel kitchen. replaces window w/matching wood windows. (n) 3rd flr: two new bedroom & two new bath.Details
remove shingles & stucco all sides of house.1st fl: excavate (e) garage to allow 8' ceiling. add media room bath & laundry. add interior stair & upgrade foundation. 2nd flr:remodel kitchen. replaces window w/matching wood windows. (n) 3rd flr: two new bedroom & two new bath. | $285,000 | |
| Jan 3, 2017 | Completed final sign-off Oct 2022 | 714 Rhode Island St | Ace Drilling & Excavation | erect a four-story above-grade, one-story below-grade, type 5-a two family dwellings (r-3). sprinklers to nfpa-13r on deferred submittal.Details
erect a four-story above-grade, one-story below-grade, type 5-a two family dwellings (r-3). sprinklers to nfpa-13r on deferred submittal. | $1,500,000 |
| Jan 3, 2017 | Completed final sign-off Feb 2020 | 714 Rhode Island St | Ace Drilling & Excavation | demolish 2 story type 5 single family dwellingDetails
demolish 2 story type 5 single family dwelling | $65,000 |
| Dec 14, 2016 | Completed final sign-off May 2020 | 3437 Fillmore St | Thompson Suskind L P, Burradell Construction Inc---See Notes | 4 story remodel of 2 units bldg(incl elect.)g/f:(n)kitchen;(re) bath(n)stairs to 2/f;(n) fire rated corridor to yard,(n)front door; 2/f:relocate kitchen,remove ceiling@living rm,(re) baths,replace windows in kind(n) stairs.3/f: remove kitchen,(re) baths,replace windows in kind(n) laundry;Details
4 story remodel of 2 units bldg(incl elect.)g/f:(n)kitchen;(re) bath(n)stairs to 2/f;(n) fire rated corridor to yard,(n)front door; 2/f:relocate kitchen,remove ceiling@living rm,(re) baths,replace windows in kind(n) stairs.3/f: remove kitchen,(re) baths,replace windows in kind(n) laundry; | $250,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2018 | 424 Townsend St | Tn Building | remove non-structural partitions, add 2 restrooms, upgrade plumbing supply, waste, drain & vent lines; add ada compliant wheel chair ramp, add new entry door in-kind, replace overhead roll up door, add water service for future fire sprinklersDetails
remove non-structural partitions, add 2 restrooms, upgrade plumbing supply, waste, drain & vent lines; add ada compliant wheel chair ramp, add new entry door in-kind, replace overhead roll up door, add water service for future fire sprinklers | $78,000 |
| Nov 4, 2016 | Expired or cancelled withdrawn Oct 2018 | 2831 Pierce St | erect 4-story, no basement, type 5-a, 2 dwelling units building.Details
erect 4-story, no basement, type 5-a, 2 dwelling units building. | $1,000,000 | |
| Nov 4, 2016 | Expired or cancelled withdrawn Oct 2018 | 2831 Pierce St | demolish 2-story, 1 basement, type 5, 2 units building.Details
demolish 2-story, 1 basement, type 5, 2 units building. | $50,000 | |
| Sep 29, 2016 | Completed final sign-off Jul 2017 | 63 Linda St | D K G Construction Inc | change (2) exterior facade windowDetails
change (2) exterior facade window | $2,125 |
| Aug 30, 2016 | Completed final sign-off Jul 2017 | 63 Linda St | D K G Construction Inc | new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade.Details
new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade. | $80,421 |
| Aug 25, 2016 | Expired or cancelled withdrawn Aug 2016 | 63 Linda St | add bedroom on 1st floor, add bath on 1st floor; add 1/2 bath on 1st floor. remove 2nd stairway, add roof enclosure over stair; remodel (e) bath and kitchen, replace windows in kind at rearDetails
add bedroom on 1st floor, add bath on 1st floor; add 1/2 bath on 1st floor. remove 2nd stairway, add roof enclosure over stair; remodel (e) bath and kitchen, replace windows in kind at rear | $83,725 | |
| Aug 19, 2016 | Expired or cancelled cancelled Oct 2016 | 1251 09th Av | Modern Construction Inc | voluntary seismic upgrade - install new seismic bolting to fasten (e) exterior wall mud sillDetails
voluntary seismic upgrade - install new seismic bolting to fasten (e) exterior wall mud sill | $7,000 |
| Aug 19, 2016 | Expired or cancelled cancelled Oct 2016 | 1260 09th Av | Modern Construction Inc | voluntary seismic upgrade - install new seismic bolting to fasten (e) exterior wall mud sillDetails
voluntary seismic upgrade - install new seismic bolting to fasten (e) exterior wall mud sill | $7,000 |
| May 3, 2016 | Completed final sign-off Nov 2016 | 5 Cook St | add bedroom in existing undeveloped rear of garage, add bath, add new interior stairway; add new window and door from new br.Details
add bedroom in existing undeveloped rear of garage, add bath, add new interior stairway; add new window and door from new br. | $71,140 | |
| Apr 28, 2016 | Expired or cancelled cancelled Apr 2020 | 1448 Union St | vertical addition. add 2 units, 2 story. fill in lightwell, new foundation, interior reconfiguration & remodel, new kitchens/bath, facade remodel, all new windows on facade, all new electrical/plumbing. sprinkler under separate permit. ** maher: n/a **Details
vertical addition. add 2 units, 2 story. fill in lightwell, new foundation, interior reconfiguration & remodel, new kitchens/bath, facade remodel, all new windows on facade, all new electrical/plumbing. sprinkler under separate permit. ** maher: n/a ** | $900,000 | |
| Mar 23, 2016 | Expired or cancelled withdrawn Jan 2019 | 112 Woodland Av | new foundation upgrade, add new laundry room, elevator, stairs & mechanical room. condition basement & sub-basement. remodel 2 bathroom, all existing bedroom & existing kitchen. add 2 new bathroom, replace all windows & doors.Details
new foundation upgrade, add new laundry room, elevator, stairs & mechanical room. condition basement & sub-basement. remodel 2 bathroom, all existing bedroom & existing kitchen. add 2 new bathroom, replace all windows & doors. | $100,000 | |
| Feb 24, 2016 | Expired or cancelled cancelled Sep 2022 | 357 Union St | replace wood siding with stucco. replace windows in kind including facing the streetDetails
replace wood siding with stucco. replace windows in kind including facing the street | $32,000 | |
| Feb 19, 2016 | Expired or cancelled cancelled Feb 2017 | 2267 15th St | new wood deck at 2nd flr. (7'9" abv grade). new wood deck at 3rd flr. (18'-7" abv. grade) decks are stacked and exactly the same size.Details
new wood deck at 2nd flr. (7'9" abv grade). new wood deck at 3rd flr. (18'-7" abv. grade) decks are stacked and exactly the same size. | $12,118 | |
| Feb 8, 2016 | Completed final sign-off Feb 2016 | 1138 Rhode Island St | add outdoor gas bbq, cold water sink & compact refrigerator at rear. main house approved under pa 2015-0211-8073Details
add outdoor gas bbq, cold water sink & compact refrigerator at rear. main house approved under pa 2015-0211-8073 | $7,500 | |
| Jan 12, 2016 | Completed final sign-off Aug 2016 | 4660 18th St | R & D Construction Co Inc | add roof access stair on 4th floor.add new roof deck per plan.Details
add roof access stair on 4th floor.add new roof deck per plan. | $7,000 |
| Jan 12, 2016 | Expired or cancelled cancelled Dec 2017 | 116 10th Av | horizontal & vertical addition at rear of blding, foundation upgrade, new bath on 1st,2nd & 3rd fl & attic, remodel kitch, 3 new bedrm on 2nd fl, 2 new bedrm on attic level, new staircase, replace facade wood windows in kind. remove & replace rotted wood at facade in kind.Details
horizontal & vertical addition at rear of blding, foundation upgrade, new bath on 1st,2nd & 3rd fl & attic, remodel kitch, 3 new bedrm on 2nd fl, 2 new bedrm on attic level, new staircase, replace facade wood windows in kind. remove & replace rotted wood at facade in kind. | $500,000 | |
| Oct 22, 2015 | Completed final sign-off Dec 2016 | 136 Bradford St | Quality Painting Construction | additional to pa#201510139524, add third bathroom, relocate laundry hookup within 5' of existing location.Details
additional to pa#201510139524, add third bathroom, relocate laundry hookup within 5' of existing location. | $71,323 |
| Sep 30, 2015 | Completed final sign-off Feb 2017 | 119 Gates St | Burradell Construction Inc---See Notes | remove (e) non-compliant rear stairs. build new rear deck on 1st & 2nd floor @ rear. add new code compliant 5'-0"spiral stairs.Details
remove (e) non-compliant rear stairs. build new rear deck on 1st & 2nd floor @ rear. add new code compliant 5'-0"spiral stairs. | $28,000 |
| Sep 9, 2015 | Completed final sign-off Jan 2020 | 3130 Webster St | Coll Construction, Inc., Tn Building | add 1 unit include bedroom, bathroom, kitchen, closet, living room, per ordinance# 30-15. relocate (e) laundry. relocate (e) bike storage.Details
add 1 unit include bedroom, bathroom, kitchen, closet, living room, per ordinance# 30-15. relocate (e) laundry. relocate (e) bike storage. | $85,000 |
| Aug 26, 2015 | Never finaled filed Aug 2015, never issued | 1178 Clayton St | vertical & rear horizontal addition, including (n) bathrooms & bedrooms. remodel (e) kitchen, (n) stairway.Details
vertical & rear horizontal addition, including (n) bathrooms & bedrooms. remodel (e) kitchen, (n) stairway. | $300,000 | |
| Jun 23, 2015 | Completed final sign-off Feb 2018 | 1447 12th Av | 2 story rear addition. remove (e) back porch & bath. reconstruct with conditioned space den & bath on ground floor, family room on 2nd floor.Details
2 story rear addition. remove (e) back porch & bath. reconstruct with conditioned space den & bath on ground floor, family room on 2nd floor. | $93,715 | |
| Jun 5, 2015 | Expired or cancelled withdrawn Dec 2021 | 120 Eureka St | Phollies Russ Murphy Inc. | new attic storage with attic access (drop down ladder), new plywood floor to new 2x8 joists and new cripple walls to support existing roof.Details
new attic storage with attic access (drop down ladder), new plywood floor to new 2x8 joists and new cripple walls to support existing roof. | $8,500 |
| Apr 14, 2015 | Completed final sign-off Jun 2017 | 3149 Washington St | Alex Builder Inc | sub-basement: convert (e) unconditioned sp to conditioned sp incl 2 bedrms, 1 bath, wet bar & living space. basement: add 2 (n) stair to 1st floor, kitchen, half bath & laundry. 1st fl:relocate (e) kitchen, new stair to 2nd fl. remove (e) bath, add 1/2 bath. 2nd flr: remove (e) bath, add laun &bathDetails
sub-basement: convert (e) unconditioned sp to conditioned sp incl 2 bedrms, 1 bath, wet bar & living space. basement: add 2 (n) stair to 1st floor, kitchen, half bath & laundry. 1st fl:relocate (e) kitchen, new stair to 2nd fl. remove (e) bath, add 1/2 bath. 2nd flr: remove (e) bath, add laun &bath | $100,000 |
| Apr 13, 2015 | Completed final sign-off Oct 2016 | 3695 Market St | Ren Lei Construction Co | convert ground space into living area, add 2 bedrooms, three bathrooms, and remodel kitchen, one bathroom. add 6 skylights, voluntary brace wall and foundation upgrade. all new windows at side and rear. replace stairway and balcony at rear.Details
convert ground space into living area, add 2 bedrooms, three bathrooms, and remodel kitchen, one bathroom. add 6 skylights, voluntary brace wall and foundation upgrade. all new windows at side and rear. replace stairway and balcony at rear. | $87,000 |
| Mar 30, 2015 | Expired or cancelled cancelled Jan 2026 | 1030 Broderick St | rumpus roomo finish out in e enclosed space. repair wood deck in kind. upgrade 2 x joist to 4x, new guardrail less than 50%Details
rumpus roomo finish out in e enclosed space. repair wood deck in kind. upgrade 2 x joist to 4x, new guardrail less than 50% | $114,680 | |
| Feb 11, 2015 | Completed final sign-off Mar 2016 | 1138 Rhode Island St | Occidental Express, R & D Construction Co Inc | interior remodel, widening rear pop-out room, add stair penthouse, roof deck, penthouse rm/bathroom, clerestory above dining rm, upgrade foundation, alter facade & replace all windows w/ dual glazed wood clad windows.Details
interior remodel, widening rear pop-out room, add stair penthouse, roof deck, penthouse rm/bathroom, clerestory above dining rm, upgrade foundation, alter facade & replace all windows w/ dual glazed wood clad windows. | $145,000 |
| Dec 30, 2014 | Completed final sign-off Aug 2017 | 1431 12th Av | add 2 story addition to rear of building. remodel ground floor bath. add 1 new bath @ 2nd floor. add sunroom on 2nd floor. expand (e) bedroom on ground floor. no change to bedroom count. add 121 sq. ft. wood deck.Details
add 2 story addition to rear of building. remodel ground floor bath. add 1 new bath @ 2nd floor. add sunroom on 2nd floor. expand (e) bedroom on ground floor. no change to bedroom count. add 121 sq. ft. wood deck. | $121,775 | |
| Dec 23, 2014 | Completed final sign-off Nov 2017 | 1155 Bryant St | remodel, retrofit & ada upgrade to include: remove (e) wood framed offices + storage, add (2) new floors (3 total).add elevator,egress stair, (n) internor stai, remove (e) exteirior siding covering (e) exterior windows, add bathrooms. change construction from type v to iiib. ** maher: n/a **Details
remodel, retrofit & ada upgrade to include: remove (e) wood framed offices + storage, add (2) new floors (3 total).add elevator,egress stair, (n) internor stai, remove (e) exteirior siding covering (e) exterior windows, add bathrooms. change construction from type v to iiib. ** maher: n/a ** | $450,000 | |
| Nov 19, 2014 | Completed final sign-off Feb 2016 | 1138 Rhode Island St | Occidental Express | 1st floor remodel: remodel extg bathroom and new bath, deck build out (balcony). 2nd floor remodel: remodel extg bath, and new bath, deck build out (balcony). relocate 2 bedroom to 1st floor.Details
1st floor remodel: remodel extg bathroom and new bath, deck build out (balcony). 2nd floor remodel: remodel extg bath, and new bath, deck build out (balcony). relocate 2 bedroom to 1st floor. | $125,000 |
| Oct 24, 2014 | Completed final sign-off Aug 2016 | 4660 18th St | Occidental Express | revision to 201405135665. revise foundation and bearing wall to eliminate poorly supported cantilever. infill lightwell at garageDetails
revision to 201405135665. revise foundation and bearing wall to eliminate poorly supported cantilever. infill lightwell at garage | $28,000 |
| Oct 16, 2014 | Never finaled issued Nov 2014, no final | 540 Delancey St | Burradell Construction Inc---See Notes | remodel and replace old kitchen with 100% new cabinets, appliances, counters and finishes. remodel existing bathroom, remove (2) non bearing partitions at closet. n/a ordinance #155-13.Details
remodel and replace old kitchen with 100% new cabinets, appliances, counters and finishes. remodel existing bathroom, remove (2) non bearing partitions at closet. n/a ordinance #155-13. | $47,272 |
| Sep 5, 2014 | Completed final sign-off Jun 2017 | 3149 Washington St | Alex Builder Inc | relocate (e) garage, upgrade (e) foundation, minor structural work per plans, excavate (e) sub-basement to create (n) unconditioned space.Details
relocate (e) garage, upgrade (e) foundation, minor structural work per plans, excavate (e) sub-basement to create (n) unconditioned space. | $75,000 |
| Aug 19, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | Occidental Express | revision to approved bpa 201407010217, replace header at living room/kitchen, correct location of beam at master bedroom, fill in recess where exposed flue was removed.Details
revision to approved bpa 201407010217, replace header at living room/kitchen, correct location of beam at master bedroom, fill in recess where exposed flue was removed. | $8,500 |
| Jul 29, 2014 | Completed final sign-off Aug 2016 | 4660 18th St | R & D Construction Co Inc | vertical & horizontal addition. add laundry, bedroom , bathroom and fam rm on 1/f, reconfigure 2/f (add 1 & 1/2 bathrm, reconfigure 3/f add 2 bathrms, add 4/f consist of dining rm, living rm, bedrm, kitchen, 1 & 1/2 bathrm (totally add 2 bedrms)Details
vertical & horizontal addition. add laundry, bedroom , bathroom and fam rm on 1/f, reconfigure 2/f (add 1 & 1/2 bathrm, reconfigure 3/f add 2 bathrms, add 4/f consist of dining rm, living rm, bedrm, kitchen, 1 & 1/2 bathrm (totally add 2 bedrms) | $512,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2016 | 1665 08th Av | Conti K Leung | revision to appl #201406057645. remove (e) wall in basement - replace w/ beam. remove (e) column in basement - replace w/ beam. replace (e) slab. add direct vent fireplace.Details
revision to appl #201406057645. remove (e) wall in basement - replace w/ beam. remove (e) column in basement - replace w/ beam. replace (e) slab. add direct vent fireplace. | $10,000 |
| Jun 6, 2014 | Completed final sign-off Jan 2020 | 1170 Rhode Island St | Concept Construction | renovation & addition. coverting single family home to 2 units.Details
renovation & addition. coverting single family home to 2 units. | $90,000 |
| May 12, 2014 | Completed final sign-off Feb 2015 | 2367 Washington St | Occidental Express | rev pa# 201302190478 comply complaint# 201388841 . removed angled window at rear. add opening from living/dining room to bedroom. extend garage length & relocate laundry. 1/f- remove 2 fireplaces. 2/f - relocate closet at bedrooms. remove angled windows at rear. relocate doors at closets.Details
rev pa# 201302190478 comply complaint# 201388841 . removed angled window at rear. add opening from living/dining room to bedroom. extend garage length & relocate laundry. 1/f- remove 2 fireplaces. 2/f - relocate closet at bedrooms. remove angled windows at rear. relocate doors at closets. | $9,800 |
| Apr 7, 2014 | Completed final sign-off Sep 2014 | 3921 17th St | H D Construction | 1)remove non-bearing partitions between kitchen and living room. 2)full kitchen remodel. 3)convert breakfast nook into walk in closet 4)new plmg in kchn. 5)new elec in kchn. 6)new appliances. 7)replace extg hollow core rear with s.c. door in kind. 8)replace jalousie wndw at rear to dual glazed tmprdDetails
1)remove non-bearing partitions between kitchen and living room. 2)full kitchen remodel. 3)convert breakfast nook into walk in closet 4)new plmg in kchn. 5)new elec in kchn. 6)new appliances. 7)replace extg hollow core rear with s.c. door in kind. 8)replace jalousie wndw at rear to dual glazed tmprd | $33,624 |
| Feb 21, 2014 | Never finaled issued May 2015, no final | 794 Andover St | Ren Lei Construction Co | revision of exterior of building. ref. pa #200603025880..Details
revision of exterior of building. ref. pa #200603025880.. | |
| Feb 21, 2014 | Never finaled issued May 2015, no final | 790 Andover St | Ren Lei Construction Co | revision of exterior of building. ref. pa #200603025881.Details
revision of exterior of building. ref. pa #200603025881. | |
| Feb 21, 2014 | Completed final sign-off Nov 2017 | 784 Andover St | Ren Lei Construction Co | revision of exterior of building. ref. pa #200603025879.Details
revision of exterior of building. ref. pa #200603025879. | |
| Jan 6, 2014 | Completed final sign-off May 2016 | 27 Buena Vista Tr | Occidental Express, Caruso Construction Inc. | 1. sub-basement: add 1 br, 1 ba & 1 clo. 2. basmt: add deck. 3. 1/f: add 1 ba & deck. 4. 2/f: remodel one ba.Details
1. sub-basement: add 1 br, 1 ba & 1 clo. 2. basmt: add deck. 3. 1/f: add 1 ba & deck. 4. 2/f: remodel one ba. | $128,000 |
| Oct 30, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | Occidental Express | 1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bathDetails
1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bath | $68,000 |
| Oct 17, 2013 | Completed final sign-off Oct 2014 | 53 Sanchez St | Occidental Express | revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazedDetails
revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazed | $8,500 |
| Sep 13, 2013 | Completed final sign-off May 2014 | 957 Hayes St | Pinnacle Construction & Maintenance Llc | unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & denDetails
unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & den | $41,270 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 957 Hayes St | Gaitan Construction | unit #4-reconfigure interior of (e) apartment. new kitchen, 2 new baths, new wallboard, new elec, new plmg, new doors. replace (e) footings, posts & beams. no windowsDetails
unit #4-reconfigure interior of (e) apartment. new kitchen, 2 new baths, new wallboard, new elec, new plmg, new doors. replace (e) footings, posts & beams. no windows | $50,000 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 957 Hayes St | Randomity Construction | window replacement(facade only)Details
window replacement(facade only) | $17,625 |
| Jul 17, 2013 | Completed final sign-off Jan 2014 | 957 Hayes St | Gaitan Construction | unit#9:revised scope to app#201303263023. show kitchen moved location. removed optional braced wall. detail (now no braced walls added). all new drywall moved location of 1 bedroom. (no other revisions)Details
unit#9:revised scope to app#201303263023. show kitchen moved location. removed optional braced wall. detail (now no braced walls added). all new drywall moved location of 1 bedroom. (no other revisions) | |
| Jul 17, 2013 | Completed final sign-off May 2014 | 957 Hayes St | Gaitan Construction | unit #2: revise scope of work per app#201304164704 to show moved kitchen to different area. delete w/d hookup in hall. delete optional braced wallDetails
unit #2: revise scope of work per app#201304164704 to show moved kitchen to different area. delete w/d hookup in hall. delete optional braced wall | |
| Apr 16, 2013 | Completed final sign-off May 2014 | 957 Hayes St | kitchen remodel. bath remodel. add 2nd bath. aadd w/d. refinish hardwood floors. no change to exterior. interior renovation only. all work on the 2nd fl.Details
kitchen remodel. bath remodel. add 2nd bath. aadd w/d. refinish hardwood floors. no change to exterior. interior renovation only. all work on the 2nd fl. | $27,250 | |
| Mar 26, 2013 | Completed final sign-off Jan 2014 | 957 Hayes St | Gaitan Construction | unit #9: 1) remodel 2 bathrooms,2)remodel kitchen, 3)all new electrical,4 new plmg fixtures, 5) install insulation to opened walls, 6) repair/replace hardwood floors, 7)new tile in bathrooms, 8)add stacked washer/dryer,9)replace extg furnace.Details
unit #9: 1) remodel 2 bathrooms,2)remodel kitchen, 3)all new electrical,4 new plmg fixtures, 5) install insulation to opened walls, 6) repair/replace hardwood floors, 7)new tile in bathrooms, 8)add stacked washer/dryer,9)replace extg furnace. | $50,000 |
| Mar 14, 2013 | Expired or cancelled cancelled Feb 2017 | 1625 Vallejo St | legalize a conversion of 4 units to 3 units. the prior work was completed pursuant to bldg permit#200105028274 issued may 2,2001. the permit was cancelled 08/11/03Details
legalize a conversion of 4 units to 3 units. the prior work was completed pursuant to bldg permit#200105028274 issued may 2,2001. the permit was cancelled 08/11/03 | $40,000 | |
| Feb 27, 2013 | Completed final sign-off Oct 2014 | 250 Cumberland St | upgrade foundation, remodel 2 kitchens, re-wire (e), re-plumbing (e), replace fire & water damaged plaster. replace fire damaged framing, replaced windows with dual glazed wood clad in kind & doors. sprinkler under seperate permit.Details
upgrade foundation, remodel 2 kitchens, re-wire (e), re-plumbing (e), replace fire & water damaged plaster. replace fire damaged framing, replaced windows with dual glazed wood clad in kind & doors. sprinkler under seperate permit. | $240,000 | |
| Feb 19, 2013 | Completed final sign-off Feb 2015 | 2367 Washington St | Cht Properties Development | voluntary upgrade of foundation, remodel 2 kitchens,remodel 4.5 baths, add storage room. repair dryrot, replace wood windows with new dual glazing. identical in appearance to facade windows, repair plaster walls. relocate one unit from 2nd flr to the ground floor. usable sp is provided @ grd flr.Details
voluntary upgrade of foundation, remodel 2 kitchens,remodel 4.5 baths, add storage room. repair dryrot, replace wood windows with new dual glazing. identical in appearance to facade windows, repair plaster walls. relocate one unit from 2nd flr to the ground floor. usable sp is provided @ grd flr. | $120,000 |