Concept Construction
- Based in
- Alameda
- On San Francisco permits
- Feb 2005 to Aug 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 118 Virginia Av | rev to pa# 201610170517 & 202306260849, adding new beam at kitchen/dining area to widen existing opening per structural plan.Details
rev to pa# 201610170517 & 202306260849, adding new beam at kitchen/dining area to widen existing opening per structural plan. | $3,000 |
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 118 Virginia Av | to obtain final inspection for work approved under pa# 201610170517. all work is complete.Details
to obtain final inspection for work approved under pa# 201610170517. all work is complete. | |
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 118 Virginia Av | kitchen remodeling, replace existing cabinets with new units, intsll new sink, faucet, countertop, led lights, install new window, install wall ceiling insulation, drywall, painting. provide plumbing to islandDetails
kitchen remodeling, replace existing cabinets with new units, intsll new sink, faucet, countertop, led lights, install new window, install wall ceiling insulation, drywall, painting. provide plumbing to island | $8,000 |
| Jun 6, 2014 | Completed final sign-off Jan 2020 | 1170 Rhode Island St | renovation & addition. coverting single family home to 2 units.Details
renovation & addition. coverting single family home to 2 units. | $90,000 |
| Mar 7, 2008 | Expired or cancelled expired Feb 2009 | 906 Stanyan St | renew pa#200502185803 for final inspection.Details
renew pa#200502185803 for final inspection. | |
| Sep 6, 2006 | Completed final sign-off Feb 2007 | 1358 Grove St | redo (1) hallway bath with corner shower, replumb for bidet, install wall and floor tile, replace sink, mirror, repaint entire bathroom. non-structural work.Details
redo (1) hallway bath with corner shower, replumb for bidet, install wall and floor tile, replace sink, mirror, repaint entire bathroom. non-structural work. | $6,780 |
| Sep 6, 2006 | Never finaled issued Sep 2006, no final | 1356 Grove St | re-do (1) hallway bathroom with walk in shower, install wall and floor tile, replace mirror and vanaity, repaint entire bathroom. non-structural work.Details
re-do (1) hallway bathroom with walk in shower, install wall and floor tile, replace mirror and vanaity, repaint entire bathroom. non-structural work. | $7,200 |
| Aug 2, 2006 | Completed final sign-off Jan 2007 | 3010 21st Av | redo master bath with walk in shower, replace current tub with new unit 9same location), tile shower pna, wall and floor area, install medicine cabinet, exhaust fan, light fixture, toiletDetails
redo master bath with walk in shower, replace current tub with new unit 9same location), tile shower pna, wall and floor area, install medicine cabinet, exhaust fan, light fixture, toilet | $7,000 |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 210 Beacon St | replace downstairs bathroom window in rear with new unit (same location). cap off shower drain & supply lines, replace sink, toilet, mirror and faucet with new units. comply with comp# 200671737.Details
replace downstairs bathroom window in rear with new unit (same location). cap off shower drain & supply lines, replace sink, toilet, mirror and faucet with new units. comply with comp# 200671737. | $2,000 |
| Jun 27, 2006 | Completed final sign-off Jan 2007 | 210 Beacon St | replace exg kchn cabinets with new units instll back splash tiles, cooktop, microwave. redo master bath with walk in shower floor tile insulate exterior wall, drywall and finish. install mirror, sink toilet( no lighting change)Details
replace exg kchn cabinets with new units instll back splash tiles, cooktop, microwave. redo master bath with walk in shower floor tile insulate exterior wall, drywall and finish. install mirror, sink toilet( no lighting change) | $24,375 |
| Nov 10, 2005 | Completed final sign-off Jul 2006 | 650 Faxon Av | redo 1 kitchen & 1 bathroom,no change to lay out.non structuralDetails
redo 1 kitchen & 1 bathroom,no change to lay out.non structural | $24,778 |
| Aug 5, 2005 | Completed final sign-off Apr 2006 | 1511 Innes Av | legalize rooms in the downstairs, for storage only, remove wall on 2nd fl between kitchen & living rDetails
legalize rooms in the downstairs, for storage only, remove wall on 2nd fl between kitchen & living r | $40,000 |
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 906 Stanyan St | kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet,Details
kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet, | $32,000 |