Thompson Suskind L P
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
- Last 24 months
- 22 permits filed
285 permits since 2000: 179 completed, 13 in progress, 41 never finaled, 52 expired or cancelled.
Of the 41 never-finaled permits, 7 are 3 to 5 years old, 8 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 285.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 825 Francisco St | remodel of 3/f with horizontal expansion at south facade, extend (e) elevator to this level, (n) third fl windows & doors, replace (e) guardrail.Details
remodel of 3/f with horizontal expansion at south facade, extend (e) elevator to this level, (n) third fl windows & doors, replace (e) guardrail. | $165,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 825 Francisco St | revision to permits 2025-1006-6774 and 2026-0701-4402 and correction notice dated 08/25/2026 to temporarily remove exterior basement wall and balcony at first floor, gridline 0-6 and h-k in order to install a steel beam.Details
revision to permits 2025-1006-6774 and 2026-0701-4402 and correction notice dated 08/25/2026 to temporarily remove exterior basement wall and balcony at first floor, gridline 0-6 and h-k in order to install a steel beam. | |
| Aug 3, 2026 | In progress issued Aug 2026 | 825 Francisco St | temporary vertical shoring of existing building to perform work permitted under 202510066774 and revision 202607014402Details
temporary vertical shoring of existing building to perform work permitted under 202510066774 and revision 202607014402 | |
| Jul 24, 2026 | In progress issued Jul 2026 | 2730 Vallejo St | revision to pa # 202605191569 (original kitchen remodel), add steel beam support at mid span and relocate shear wall.Details
revision to pa # 202605191569 (original kitchen remodel), add steel beam support at mid span and relocate shear wall. | $5,000 |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 2360 Washington St | demo and replace the dormer at the front facade to create a useable ceiling height at the interior and create symmetry from the exterior. this permit is also to replace one property line window with a fire rated unit. this window will match the dimensions of other existing windows.Details
demo and replace the dormer at the front facade to create a useable ceiling height at the interior and create symmetry from the exterior. this permit is also to replace one property line window with a fire rated unit. this window will match the dimensions of other existing windows. | $22,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 825 Francisco St | revision 202510066774- scope reduction to the sub basement excavation and interior changesDetails
revision 202510066774- scope reduction to the sub basement excavation and interior changes | |
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 845 Francisco St | dig temporary shoring pit for temporary relocation building due to work under pa#: 202605121069 and removal of 7 trees. temporay shoring will not affect adjacent property.Details
dig temporary shoring pit for temporary relocation building due to work under pa#: 202605121069 and removal of 7 trees. temporay shoring will not affect adjacent property. | |
| Jun 17, 2026 | Expired or cancelled withdrawn Aug 2026 | 825 Francisco St | temporary vertical shoring and temporary move of (e) building to adjacent lot ot perform work permitted under pa#: 202605121069Details
temporary vertical shoring and temporary move of (e) building to adjacent lot ot perform work permitted under pa#: 202605121069 | |
| May 19, 2026 | In progress issued May 2026 | 2730 Vallejo St | 2nd floor kitchen remodel including fixtures and finshes.Details
2nd floor kitchen remodel including fixtures and finshes. | $25,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 845 Francisco St | installation of 81 tiebacks along east side of property line for foundation work at 825 francisco street. reference bpa 202510066774 if needed.Details
installation of 81 tiebacks along east side of property line for foundation work at 825 francisco street. reference bpa 202510066774 if needed. | |
| Dec 18, 2025 | In progress issued May 2026 | 2360 Washington St | revision to pa 202305177995 layout changes to 1st fl layount; 2nd fl layout & 3rd floor layout; new interior stair; reduced scope @ 3rd fl & roof; reduced horizontal addition - more existing roof line to remainDetails
revision to pa 202305177995 layout changes to 1st fl layount; 2nd fl layout & 3rd floor layout; new interior stair; reduced scope @ 3rd fl & roof; reduced horizontal addition - more existing roof line to remain | |
| Oct 23, 2025 | In progress issued May 2026 | 825 Francisco St | interior renovation with new elevator. replace windows and doors in-kind typ. remove hillavator and excavate 1.5 stories to connect (e) basement to (e) garageDetails
interior renovation with new elevator. replace windows and doors in-kind typ. remove hillavator and excavate 1.5 stories to connect (e) basement to (e) garage | $2,500,000 |
| Sep 26, 2025 | Expired or cancelled cancelled Nov 2025 | 2148 Pine St | install (n) waterproofing, drain mat, foundation drains run to new catch basin/ dand trap per sf guidelines at rear of propertyDetails
install (n) waterproofing, drain mat, foundation drains run to new catch basin/ dand trap per sf guidelines at rear of property | $5,000 |
| Jul 28, 2025 | Completed final sign-off Sep 2025 | 135 Locust St | revision pa#: 202502190621. incorporate strucutural sk religion perspector request.Details
revision pa#: 202502190621. incorporate strucutural sk religion perspector request. | |
| Mar 28, 2025 | In progress issued Mar 2025 | 3948 Clay St | remove planter at front elevation due to water damage. replace finishes to match elevation. visible from street.Details
remove planter at front elevation due to water damage. replace finishes to match elevation. visible from street. | $2,500 |
| Feb 19, 2025 | Completed final sign-off Sep 2025 | 135 Locust St | 1/fl- (n) steel trellis at rear of propertyDetails
1/fl- (n) steel trellis at rear of property | $15,000 |
| Feb 5, 2025 | Completed final sign-off Feb 2025 | 3610 Washington St | renew for final 202110291486. all work is complete.Details
renew for final 202110291486. all work is complete. | |
| Feb 5, 2025 | Completed final sign-off Feb 2025 | 3600 Washington St | renew for final 20210221057. all work is complete.Details
renew for final 20210221057. all work is complete. | |
| Feb 5, 2025 | Completed final sign-off Feb 2025 | 135 Locust St | renew for final 202208120480 and 202206075813. all work is complete.Details
renew for final 202208120480 and 202206075813. all work is complete. | |
| Feb 5, 2025 | Completed final sign-off Feb 2025 | 135 Locust St | renew for final 202110070082 and 202012019885. all work is complete.Details
renew for final 202110070082 and 202012019885. all work is complete. | |
| Oct 31, 2024 | Completed final sign-off Mar 2025 | 2646 Greenwich St | bathroom remodel consisting of demolition/removal of all existing fixtures, utility cover/cap, installation of new shower niche & pan, drywall patch and repair, installatio of new shower tiling, floor tiling, light & fan fixtures, new glass shower door, nw sink & vanity, & new restroom accessories.Details
bathroom remodel consisting of demolition/removal of all existing fixtures, utility cover/cap, installation of new shower niche & pan, drywall patch and repair, installatio of new shower tiling, floor tiling, light & fan fixtures, new glass shower door, nw sink & vanity, & new restroom accessories. | $90,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2025 | 2760 Lyon St | replace shower pan @ primary bathroom. in kindDetails
replace shower pan @ primary bathroom. in kind | $5,000 |
| Aug 7, 2024 | Completed final sign-off Mar 2025 | 2645 Baker St | remove and replace kitchen cabinets. plumbing to remain in existing location. (one kitchen)Details
remove and replace kitchen cabinets. plumbing to remain in existing location. (one kitchen) | $35,000 |
| Aug 7, 2024 | Completed final sign-off Feb 2025 | 2760 Lyon St | replace 3 windows and 2 doors in-kind. no size changes. remove and replace stucco to finish window and door replacement.Details
replace 3 windows and 2 doors in-kind. no size changes. remove and replace stucco to finish window and door replacement. | $12,000 |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 135 Locust St | revision to pa 202110070082 (original permit) not inclusive of roof work. addition of rated skylight @ roof rev 1 ref pa 202304216262Details
revision to pa 202110070082 (original permit) not inclusive of roof work. addition of rated skylight @ roof rev 1 ref pa 202304216262 | $7,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 3610 Washington St | revision to pa#201901100038 and 202403137745 to address district inspector correction notice for dry rot repair add replacement of a non-historical greenhouse structure in cordination with prior approved structural plans. greenouse material to be steel.Details
revision to pa#201901100038 and 202403137745 to address district inspector correction notice for dry rot repair add replacement of a non-historical greenhouse structure in cordination with prior approved structural plans. greenouse material to be steel. | $2,467 |
| Mar 28, 2024 | Completed final sign-off Dec 2024 | 3712 Jackson St | interior finish updated @ 2nd floor: guest bedroom and closet , 3rd floor game room, guest bathroom and bedroom. interior finishes and fixtures. new paint. seperate mep permits will need to be obtain. no wall removal or addition or exterior work to be doneDetails
interior finish updated @ 2nd floor: guest bedroom and closet , 3rd floor game room, guest bathroom and bedroom. interior finishes and fixtures. new paint. seperate mep permits will need to be obtain. no wall removal or addition or exterior work to be done | $7,000 |
| Mar 13, 2024 | Completed final sign-off Jul 2024 | 3610 Washington St | to obtain final inspection for work approved under pa#202007150192, 202101223106,202107194658. all work is complete.Details
to obtain final inspection for work approved under pa#202007150192, 202101223106,202107194658. all work is complete. | |
| Oct 23, 2023 | Completed final sign-off Jul 2024 | 3610 Washington St | prority process per ab004: as-built revision at district insp's request to bpa#201901100038 and bpa#202101223106 to incorporate field structural changesDetails
prority process per ab004: as-built revision at district insp's request to bpa#201901100038 and bpa#202101223106 to incorporate field structural changes | |
| May 31, 2023 | Expired or cancelled cancelled Jan 2026 | 3501 Clay St | revision to permit 202108045807. remove foundation work from proposed scope.Details
revision to permit 202108045807. remove foundation work from proposed scope. | |
| May 25, 2023 | Completed final sign-off Oct 2024 | 2342 Broadway | replace 3 windows on west facade. no changes to exterior trim or opening sizes.Details
replace 3 windows on west facade. no changes to exterior trim or opening sizes. | $20,000 |
| May 17, 2023 | In progress issued Dec 2024 | 2360 Washington St | rear horizontal addition at second floor, and horizontal additions to east, west, and north sides at third floor. interior alterations at all levels including a new elevator that will serve all floors. new occupied roof at rear of third floor.Details
rear horizontal addition at second floor, and horizontal additions to east, west, and north sides at third floor. interior alterations at all levels including a new elevator that will serve all floors. new occupied roof at rear of third floor. | $900,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 2607 Franklin St | revision to 202207077939 modification to floor planDetails
revision to 202207077939 modification to floor plan | |
| Apr 21, 2023 | Completed final sign-off Feb 2025 | 135 Locust St | revision to address nov 202305978. to revise quantity of demolition & structural details not previously captured under pa#202110070082. foundation replacement, 202112094048 bp, 202206075813 & rev 202208120480Details
revision to address nov 202305978. to revise quantity of demolition & structural details not previously captured under pa#202110070082. foundation replacement, 202112094048 bp, 202206075813 & rev 202208120480 | $100,000 |
| Nov 17, 2022 | Completed final sign-off Mar 2023 | 2159 Bay St | repair dry rotted egress stairDetails
repair dry rotted egress stair | $6,000 |
| Oct 17, 2022 | Never finaled issued Oct 2022, no final | 2342 Broadway | interior remodel to include kitchen, one bathroom, remodel of one bathroom into powder room and new finishes. installation of new gas fire place appliances and replacement of 2 fire places, exterior replacement of rear facade windows and doors. addition of 3 skylights.Details
interior remodel to include kitchen, one bathroom, remodel of one bathroom into powder room and new finishes. installation of new gas fire place appliances and replacement of 2 fire places, exterior replacement of rear facade windows and doors. addition of 3 skylights. | $215,000 |
| Oct 6, 2022 | Never finaled issued Oct 2022, no final | 2430 Vallejo St | remove and replace stucoo, south wall, west wall and north walls. to comply with complaint 202296463.Details
remove and replace stucoo, south wall, west wall and north walls. to comply with complaint 202296463. | $200,000 |
| Aug 12, 2022 | Expired or cancelled expired Feb 2025 | 135 Locust St | revision to bpa#202112094048 & 202206075813 for minor facade/window alterationsDetails
revision to bpa#202112094048 & 202206075813 for minor facade/window alterations | $8,000 |
| Jul 7, 2022 | Never finaled issued Aug 2022, no final | 2607 Franklin St | interior only remodel to 1st floor (e occupancy). new room layout removal of select non bearing partitions, new bathroom finishes, new electrical.Details
interior only remodel to 1st floor (e occupancy). new room layout removal of select non bearing partitions, new bathroom finishes, new electrical. | $185,000 |
| Jun 30, 2022 | Never finaled issued Jun 2022, no final | 2230 Leavenworth St | apt 4: replace/ remove kitchen bath finishes. remove steam radiator and install radiant flooring. relace wood floors no changes to framing. replace finishes in kind.Details
apt 4: replace/ remove kitchen bath finishes. remove steam radiator and install radiant flooring. relace wood floors no changes to framing. replace finishes in kind. | $25,000 |
| Jun 7, 2022 | Expired or cancelled expired Feb 2025 | 135 Locust St | revision to pa#202112094048. restoration and vertical extension of extg damaged flues being replaced in kind. restoration of oringinal double hung window at front facade to match existing windows.Details
revision to pa#202112094048. restoration and vertical extension of extg damaged flues being replaced in kind. restoration of oringinal double hung window at front facade to match existing windows. | $15,000 |
| Jun 2, 2022 | Completed final sign-off Aug 2022 | 2507 Broadway | remove (e) wood fireplace and install gas fp in same openingDetails
remove (e) wood fireplace and install gas fp in same opening | $3,000 |
| May 10, 2022 | Never finaled issued Jun 2022, no final | 2230 Leavenworth St | application for roof deck to be added to previously approved permit 201909252739. structural approved prior.Details
application for roof deck to be added to previously approved permit 201909252739. structural approved prior. | $17,300 |
| Feb 11, 2022 | Completed final sign-off Apr 2022 | 3015 Pacific Av | remove and replace siding at rear. elevation to repair dryrot.Details
remove and replace siding at rear. elevation to repair dryrot. | $15,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 38 Calhoun Tr | repair dry rot at back balcony. to comply with his nov #202182527 item #5. repair 50% or less in kindDetails
repair dry rot at back balcony. to comply with his nov #202182527 item #5. repair 50% or less in kind | $500 |
| Dec 9, 2021 | Completed final sign-off Feb 2025 | 135 Locust St | renovation & structural upgrade of exiting house. convertion of attic to habitable space with dormers.removal of building mass at first & second floor levels at rear (west) facade. removal of enclosed stairs at south facade.Details
renovation & structural upgrade of exiting house. convertion of attic to habitable space with dormers.removal of building mass at first & second floor levels at rear (west) facade. removal of enclosed stairs at south facade. | $60,000 |
| Oct 29, 2021 | Expired or cancelled expired Feb 2025 | 3610 Washington St | underpinning associated with foundation replacement at adjacent property at 135 locust street under pa #202110070082Details
underpinning associated with foundation replacement at adjacent property at 135 locust street under pa #202110070082 | $20,000 |
| Oct 22, 2021 | Expired or cancelled expired Feb 2025 | 3600 Washington St | underpinning associated wth the foundation replacement at the adjacent property at 135 locust street under pa202110070082Details
underpinning associated wth the foundation replacement at the adjacent property at 135 locust street under pa202110070082 | $15,000 |
| Oct 7, 2021 | Expired or cancelled expired Feb 2025 | 135 Locust St | foundation relace, relocation of stair between 1/f & basement. alt of (e) sideyard stairs.Details
foundation relace, relocation of stair between 1/f & basement. alt of (e) sideyard stairs. | $185,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 3712 Jackson St | in kind kitchen, primary bathroom, and shower remodel in laundry room. no changes to the floor plan or walls.Details
in kind kitchen, primary bathroom, and shower remodel in laundry room. no changes to the floor plan or walls. | $58,000 |
| Aug 17, 2021 | Completed final sign-off Oct 2021 | 2768 Green St | demolition of (e) rear balcony and doors install windows in place of former doorsDetails
demolition of (e) rear balcony and doors install windows in place of former doors | |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 3501 Clay St | interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area.Details
interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area. | $112,500 |
| Jul 19, 2021 | Expired or cancelled expired Mar 2024 | 3610 Washington St | administrative permit to bpa# 2019-0110-0038 s to correct number of stories. proposed project to name four stories above grade plane.Details
administrative permit to bpa# 2019-0110-0038 s to correct number of stories. proposed project to name four stories above grade plane. | |
| Feb 26, 2021 | Never finaled issued Feb 2021, no final | 2115 Bush St | street facing dryrot repair on stairs less than 50% in kind. non structural repair and replacing in kind. minor framing. no other work.Details
street facing dryrot repair on stairs less than 50% in kind. non structural repair and replacing in kind. minor framing. no other work. | $1,000 |
| Feb 8, 2021 | Expired or cancelled cancelled Jan 2026 | 280 32nd Av | remodel includes new kitchen and bathrooms, new foundation, new rear yard access and select new windows in rear yard.Details
remodel includes new kitchen and bathrooms, new foundation, new rear yard access and select new windows in rear yard. | $600,000 |
| Jan 22, 2021 | Expired or cancelled expired Mar 2024 | 3610 Washington St | rev 201901100038 addendum 1: redux excavation below (e) ground level courtyard.omission of basement level sunken courtyard; addition of small lightwell in west alley (not used for required light and ventilation).no changes to building envelope above grade.Details
rev 201901100038 addendum 1: redux excavation below (e) ground level courtyard.omission of basement level sunken courtyard; addition of small lightwell in west alley (not used for required light and ventilation).no changes to building envelope above grade. | |
| Nov 12, 2020 | Completed final sign-off Jan 2021 | 1641 Grove St | install ac condenser on roof.Details
install ac condenser on roof. | $3,000 |
| Sep 26, 2020 | Completed final sign-off Apr 2022 | 3636 Washington St | the work illustrated herein is for hand-dug piers and tiebacks in the notrh-east corner of the property for the proposed excavation on the adjacent property (3610 washington st)Details
the work illustrated herein is for hand-dug piers and tiebacks in the notrh-east corner of the property for the proposed excavation on the adjacent property (3610 washington st) | |
| Sep 11, 2020 | Completed final sign-off Jan 2021 | 323 Cumberland St | fence & attachment to (e) site wall (approved pa#20171154059) at rear yard of residence.Details
fence & attachment to (e) site wall (approved pa#20171154059) at rear yard of residence. | $10,000 |
| Sep 8, 2020 | Never finaled issued Sep 2020, no final | 880 El Camino Del Mar | remodel one dbathroom. replace fixture and finishes in kindDetails
remodel one dbathroom. replace fixture and finishes in kind | $25,000 |
| Sep 8, 2020 | Completed final sign-off Oct 2021 | 2768 Green St | unit m: replace in kind the following: kitchen cabinets, kitchen appliances, toilets, sinks in both bathrooms, new tile floor in both bathrooms, replace in kind all plumbing fixtures, replace plaster with new drywall throughout replace in kind 1 window at rear wall not on lot line.Details
unit m: replace in kind the following: kitchen cabinets, kitchen appliances, toilets, sinks in both bathrooms, new tile floor in both bathrooms, replace in kind all plumbing fixtures, replace plaster with new drywall throughout replace in kind 1 window at rear wall not on lot line. | $47,000 |
| Jul 15, 2020 | Expired or cancelled expired Mar 2024 | 3610 Washington St | interior only, exploratory non-structural demolition. sheetrock onlyDetails
interior only, exploratory non-structural demolition. sheetrock only | $1,000 |
| May 11, 2020 | Never finaled issued May 2020, no final | 4001 21st St | street spaceDetails
street space | |
| May 11, 2020 | Never finaled issued May 2020, no final | 101 Spruce St | street spaceDetails
street space | |
| Jan 9, 2020 | Completed final sign-off Jul 2021 | 3636 Jackson St | to obtain final inspection for work approved under pa# 2014-1126-2640, 2015-1117-2775, and 2016-0720-2791 all work is complete.Details
to obtain final inspection for work approved under pa# 2014-1126-2640, 2015-1117-2775, and 2016-0720-2791 all work is complete. | |
| Dec 16, 2019 | Completed final sign-off Aug 2021 | 2406 Bush St | comply with sf planning notice reinstate 2nd dwelling unit, add back 2 doors and enclosure at entry. add back kitchen previously removed at 2nd floor to address complaint 200557539.**maher n/a**Details
comply with sf planning notice reinstate 2nd dwelling unit, add back 2 doors and enclosure at entry. add back kitchen previously removed at 2nd floor to address complaint 200557539.**maher n/a** | $10,000 |
| Sep 25, 2019 | Never finaled issued Nov 2021, no final | 2230 Leavenworth St | renovation of (e) top floor unit w/ new roof deck. roof over new mezzanine and (e) living room. match height of (e) stairwell and roof structure. renovation of kitchen & bathroom. addition of bathroom & w.c. roof deck to be submitted under separate permit.Details
renovation of (e) top floor unit w/ new roof deck. roof over new mezzanine and (e) living room. match height of (e) stairwell and roof structure. renovation of kitchen & bathroom. addition of bathroom & w.c. roof deck to be submitted under separate permit. | $279,755 |
| Sep 20, 2019 | Completed final sign-off Apr 2021 | 1641 Grove St | ref app#201808278362 for structural details for sunken patio in rear yard.Details
ref app#201808278362 for structural details for sunken patio in rear yard. | |
| Aug 30, 2019 | Completed final sign-off Mar 2020 | 1234 Page St | replace existing wood windows with in-kind wood clad to address water damage from fire in adjacent property. remove and replace trim in-kind to waterproof new assembly. repaint upon completion of install.Details
replace existing wood windows with in-kind wood clad to address water damage from fire in adjacent property. remove and replace trim in-kind to waterproof new assembly. repaint upon completion of install. | $40,000 |
| Jul 29, 2019 | Completed final sign-off Jul 2021 | 3636 Jackson St | revision to previously approved permit 201411262640. basement storage space to become media roomDetails
revision to previously approved permit 201411262640. basement storage space to become media room | $5,000 |
| Jun 24, 2019 | Completed final sign-off Nov 2020 | 4001 21st St | (n) bay window in buildable area on northeast corner facing street & (n) roof deckDetails
(n) bay window in buildable area on northeast corner facing street & (n) roof deck | $5,000 |
| Apr 11, 2019 | Completed final sign-off May 2019 | 2066 Pine St | rev pa #201806081363. as builts drawings showing removed & replaced of stairs, post & girder at g.l.4, provide 3"x10" joist between g.l.a-b and 1-2.Details
rev pa #201806081363. as builts drawings showing removed & replaced of stairs, post & girder at g.l.4, provide 3"x10" joist between g.l.a-b and 1-2. | |
| Apr 5, 2019 | Completed final sign-off Nov 2020 | 4001 21st St | replace (e) windows with (n) alum windows facing street. new garage door and door to mudroom.Details
replace (e) windows with (n) alum windows facing street. new garage door and door to mudroom. | $10,000 |
| Mar 28, 2019 | Completed final sign-off May 2019 | 125 Villa Tr | correct record on pa's to reflect "2 story over 1 basement." correction to pa's 201312315323, 201305318385, 201309066119 and 201901311719.Details
correct record on pa's to reflect "2 story over 1 basement." correction to pa's 201312315323, 201305318385, 201309066119 and 201901311719. | |
| Mar 28, 2019 | Completed final sign-off Jun 2021 | 2406 Bush St | to fully comply with complaint & n.o.v. #200557539. shrink existing upper deck by 9" and legalize. deck is in rear.Details
to fully comply with complaint & n.o.v. #200557539. shrink existing upper deck by 9" and legalize. deck is in rear. | $1,500 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 2406 Bush St | partial comply with nov 200557539. infill 1 window @ west prop. legalize (e) lower level deck - upper deck and dwellling unit removal under sep permitDetails
partial comply with nov 200557539. infill 1 window @ west prop. legalize (e) lower level deck - upper deck and dwellling unit removal under sep permit | $2,000 |
| Mar 27, 2019 | Completed final sign-off Sep 2019 | 1234 Page St | comply with nov 201930041- repair and restore finishes @ roof, interior & partial exterior as a result of fire. to be repaired in kind, like for like with wood siding, fish scale and cornice line to match existing.Details
comply with nov 201930041- repair and restore finishes @ roof, interior & partial exterior as a result of fire. to be repaired in kind, like for like with wood siding, fish scale and cornice line to match existing. | $10,000 |
| Mar 15, 2019 | Expired or cancelled cancelled Sep 2019 | 2406 Bush St | to comply with nov 200557539: infill 1 window at west property line, legalize (e) upper and lower rear decks.Details
to comply with nov 200557539: infill 1 window at west property line, legalize (e) upper and lower rear decks. | $2,000 |
| Mar 15, 2019 | Completed final sign-off Nov 2020 | 4001 21st St | revision to app#201801108253. revise interior layout, windows, new skylights, new deck, replace siding and replace roof.Details
revision to app#201801108253. revise interior layout, windows, new skylights, new deck, replace siding and replace roof. | $20,000 |
| Feb 11, 2019 | Completed final sign-off Feb 2019 | 2406 Bush St | to obtain final inspection for work approved under pa# 2002-0514-6571, 2004-0727-9944, 2003-0715-9480. all work is completed.Details
to obtain final inspection for work approved under pa# 2002-0514-6571, 2004-0727-9944, 2003-0715-9480. all work is completed. | |
| Feb 11, 2019 | Completed final sign-off Feb 2019 | 2406 Bush St | to obtain final inspection for work approved under pa# 2001-0928-9465. all work is completed.Details
to obtain final inspection for work approved under pa# 2001-0928-9465. all work is completed. | |
| Feb 11, 2019 | Completed final sign-off Feb 2019 | 2406 Bush St | to obtain final inspection for work approved under pa# 2002-1004-8265. all work is completed.Details
to obtain final inspection for work approved under pa# 2002-1004-8265. all work is completed. | |
| Jan 31, 2019 | Expired or cancelled cancelled Feb 2019 | 2406 Bush St | to obtain final inspection for work approved under pa#200703226941, 200703226943, 200205146571. all work is complete.Details
to obtain final inspection for work approved under pa#200703226941, 200703226943, 200205146571. all work is complete. | |
| Jan 31, 2019 | Completed final sign-off May 2019 | 125 Villa Tr | to obtain final inspection for work approved under pa#201312315323, 201309066119, 201305318385. all work is complete.Details
to obtain final inspection for work approved under pa#201312315323, 201309066119, 201305318385. all work is complete. | |
| Jan 23, 2019 | Completed final sign-off Dec 2019 | 135 Parker Av | new windows, new exterior entry doors, new garage door at front facade. new stone veneer at bottom story front facade. install new steel trowl smooth finish to remainder of front facade. install metal edge detail at roof and new light at entryDetails
new windows, new exterior entry doors, new garage door at front facade. new stone veneer at bottom story front facade. install new steel trowl smooth finish to remainder of front facade. install metal edge detail at roof and new light at entry | $50,000 |
| Jan 10, 2019 | Completed final sign-off Jul 2024 | 3610 Washington St | renovation & structural upgrade of existing house, partial vertical & 3rd floor partial horizontal addition @ north facade. partial horizontal at 2nd floor over existing basementDetails
renovation & structural upgrade of existing house, partial vertical & 3rd floor partial horizontal addition @ north facade. partial horizontal at 2nd floor over existing basement | $2,500,000 |
| Dec 21, 2018 | Completed final sign-off Dec 2019 | 135 Parker Av | revision to pa# 2018/03/02/2647. revised bathroom, stairs, add 1 bathroom, windows, doors, closets. added elevations, lighting, outlets, plumbing fixture schedule, finish plans, revised deck guard.Details
revision to pa# 2018/03/02/2647. revised bathroom, stairs, add 1 bathroom, windows, doors, closets. added elevations, lighting, outlets, plumbing fixture schedule, finish plans, revised deck guard. | |
| Nov 19, 2018 | Completed final sign-off Apr 2021 | 1641 Grove St | extend new footing and stem wall at west property line from gridline 7 to 3' past the southeast corner of the adjacent neighbor's building.Details
extend new footing and stem wall at west property line from gridline 7 to 3' past the southeast corner of the adjacent neighbor's building. | $8,000 |
| Nov 15, 2018 | Completed final sign-off Oct 2020 | 101 Spruce St | residential interior renovation incl kitchen remodel, bathroom modifications and floor refinishDetails
residential interior renovation incl kitchen remodel, bathroom modifications and floor refinish | $410,000 |
| Sep 26, 2018 | Completed final sign-off Sep 2018 | 950 Lombard St | to obtain final inspection for work approved under pa's 201509096418, 201407100957 and 201306250415.Details
to obtain final inspection for work approved under pa's 201509096418, 201407100957 and 201306250415. | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 841 Chestnut St | to obtain final inspection for work approved under pa 2015-1016-9924 and 2017-0126-8001. all work is completeDetails
to obtain final inspection for work approved under pa 2015-1016-9924 and 2017-0126-8001. all work is complete | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 950 Lombard St | to obtain final inspection for work approved under pa 201610200765, 201111048277, 201610140305. all work is complete.Details
to obtain final inspection for work approved under pa 201610200765, 201111048277, 201610140305. all work is complete. | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 950 Lombard St | to obtain final inspection for work approved under pa 201510160016, 201608256040, 201609238683. all work is complete.Details
to obtain final inspection for work approved under pa 201510160016, 201608256040, 201609238683. all work is complete. | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 841 Chestnut St | to obtain final inspection for work approved under pa# 201505267119, 2015-1014-9636, 2014-0205-7897. all work is complete.Details
to obtain final inspection for work approved under pa# 201505267119, 2015-1014-9636, 2014-0205-7897. all work is complete. | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 841 Chestnut St | to obtain final inspection for work approved under pa# 201507232229, 201605056707, 201111048278. all work is complete.Details
to obtain final inspection for work approved under pa# 201507232229, 201605056707, 201111048278. all work is complete. | |
| Sep 5, 2018 | Completed final sign-off Sep 2019 | 2505 Broadway | revision to 201401065671- revision to entry doorway adjacent to the covered driveway. there is no other proposed change, no change in height or useDetails
revision to 201401065671- revision to entry doorway adjacent to the covered driveway. there is no other proposed change, no change in height or use | |
| Aug 27, 2018 | Completed final sign-off Apr 2021 | 1641 Grove St | comply with nov201860521 & 201858961. horizontal addition to 1st flr unit, add garage to 1st flr, minor horizontal addition to 2nd & 3rd flr units, restoration of front facade, interior renovations to all flrs, replace frontstair, windows throughout, smoke alarms & carbon monoxide detectors.Details
comply with nov201860521 & 201858961. horizontal addition to 1st flr unit, add garage to 1st flr, minor horizontal addition to 2nd & 3rd flr units, restoration of front facade, interior renovations to all flrs, replace frontstair, windows throughout, smoke alarms & carbon monoxide detectors. | $725,000 |
| Aug 8, 2018 | Completed final sign-off Sep 2019 | 2505 Broadway | revision to pa 2014-0106-5671 the scope of work consists of reduction to the width of the approved addition for the new elevator on the east side of the existing home. there is no other proposed change; no change in use or height. this revision results in a slight reduction in bulkDetails
revision to pa 2014-0106-5671 the scope of work consists of reduction to the width of the approved addition for the new elevator on the east side of the existing home. there is no other proposed change; no change in use or height. this revision results in a slight reduction in bulk | |
| Aug 8, 2018 | Expired or cancelled cancelled Jan 2026 | 2066 Pine St | temp bld shoring in order to conduct foundation work under pa#201806081363Details
temp bld shoring in order to conduct foundation work under pa#201806081363 | $30,000 |
| Jul 30, 2018 | Completed final sign-off Dec 2019 | 135 Parker Av | revision 201803022647 foundation modifications only. eliminate property line foundation work. decrease value of original permit by $50,000Details
revision 201803022647 foundation modifications only. eliminate property line foundation work. decrease value of original permit by $50,000 |