Cht Properties Development
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Sep 2026
- Last 24 months
- 13 permits filed
200 permits since 2000: 162 completed, 12 in progress, 16 never finaled, 10 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
Showing the 100 most recent of 200.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress | 1682 Alemany Bl | remodel one bathroom: not moving any wall, no changes in plumbing fixtures count. new lighting shall comply with cec 150.0 (k)5. | $14,000 |
| Jul 23, 2026 | Completed | 75 Topeka Av | to obtain final inspection for work approved under pa# 201912200237. all work is complete. | |
| Jul 23, 2026 | Completed | 75 Topeka Av | to obtain final inspection for work approved under pa# 201811155981. all work is complete. | |
| Dec 17, 2025 | In progress | 1911 20th St | revision to pa 201806182159 field changes: change rear stairs to spiral stairs, changes to floor plan to accommodate elevator | $15,000 |
| Dec 1, 2025 | Completed | 735 22nd Av | 2/f: remodel kitchen and bath with reconfiguration. remove wall (interior) b/w kitchen and dining room. replace bathroom window with new opening. 3/f: remodel bath with reconfiguration and add half bath. | $35,000 |
| Nov 4, 2025 | Completed | 1332 Vermont St | replace bathroom floors due to water damage in the church. like for like, no structual work. | $18,000 |
| Aug 28, 2025 | In progress | 1911 20th St | new rear landscape retaining walls. ref pa 2018.0618.2159 | $5,000 |
| Aug 26, 2025 | Completed | 2083 29th Av | enclose entryway and stairwell. add bathroom and office at gr fl. rebuild interior staircase. new window and door at rear wall. | $150,000 |
| Jun 16, 2025 | Completed | 1242 11th Av | remove and replace cabinetry and countertop in kitchen. same footprint. | $11,000 |
| May 1, 2025 | In progress | 1911 20th St | revision to 201806182159: reduction in drilled pier count | |
| Apr 29, 2025 | Completed | 1679 38th Av | replacement of rear deck and stair of single family dwellling | $38,000 |
| Feb 12, 2025 | In progress | 540 45th Av | widen existing garage door of single family dwelling; replace (e) garage door w/8'-0" garage door | $16,000 |
| Nov 22, 2024 | Completed | 1316 Larkin St | remodel 1 kitchen 1 bathroom. add sink in toilet room. not moving any walls | $28,000 |
| Apr 22, 2024 | Completed | 2700 15th Av | remodel 1 full bath, 1 1/2 bath, 1 kitchen. not moving any walls. | $45,000 |
| Feb 15, 2024 | Completed | 1945 Eddy St | kitchen remodel at 1/f (1945 eddy), remove non-structural wall between kitchen, pantry & dining room, strengthen ceiling framing w/ additional joist to support 2/f wall. | $33,000 |
| Feb 8, 2024 | Completed | 3927 Clement St | remodel to single family home, include soft demo to interior space, reconfigure (2) bedrooms located at 2nd floor, remodel kitchen and bathroom finishes, fixtures. add (n) full bathroom located at second floor. replace window in the same opening located at side of property. mep under seperate permit | $78,000 |
| Jan 19, 2024 | Completed | 677 10th Av | remodel (2) bathrooms. not moving any walls. | $31,000 |
| Jan 19, 2024 | Completed | 675 10th Av | remodel (2) bathrooms. not moving any walls. | $31,000 |
| Dec 1, 2023 | Completed | 387 Hanover St | demo/replace front entrance stair. re-build in kind | $6,000 |
| Nov 30, 2023 | Completed | 2306 26th Av | kitchen remodel and entry wall removal of roughly 10 linear foot. remove (e) closet at entry | $15,000 |
| Oct 4, 2023 | In progress | 112 Woodland Av | repair deck in kind up to 40% back of building | $8,000 |
| Sep 11, 2023 | In progress | 3931 20th St | replace (6) windows at front with aluminum clad wood windows | $6,000 |
| Aug 15, 2023 | Completed | 1679 38th Av | renovation of 2nd fl of single family dwelling. remodel existing bathroom. convert (e) half bath to full bathroom. remove two skylights and add one skylight. | $30,000 |
| Jun 23, 2023 | Completed | 999 16th St | apt 4. bathroom remodel, hardwood floor insatllation, built in cabinet installation. lighitng and electrical installation. | $50,000 |
| Jun 12, 2023 | In progress | 2623 44th Av | comply with nov 202022622 & nov 202176242, under ord 95-17 for adding adu on 1st fl of single family dwelling. added per government code section 65852.2. no excavation under this building permit application. | $20,000 |
| Apr 6, 2023 | In progress | 2623 44th Av | to comply with nov# 202022622 & 202176242, remove illegal kitchen. | $8,000 |
| Mar 16, 2023 | Completed | 3931 20th St | remodel (2) bathrooms,one kitchen & replace all flooring. non structural | $50,000 |
| Mar 7, 2023 | Completed | 835 Diamond St | revision to approved pa# 202211186881. unit 1: add skylight in kitchen area. unit 2: minor reconfigurew interior layout. replace siding at rear. | $7,500 |
| Jan 6, 2023 | Completed | 148 Prague St | unit 148: remodel kitchen/bathroom, new sheetrock thruout, new plubming/electrical, sister (2)2x4 to maintain structural sound of bldg, replace some plywood sheathing; unit 150: remodel (1)bathroom, replace (1)window, (1)skylight-fire damage, replace sheetrock (1)bedroom, sister (2)2x4 to maintain | $85,000 |
| Nov 18, 2022 | Completed | 835 Diamond St | unit 1: remodel kitchen, family room, 2 bath and add 1 bath. unit 2: remodel kitchen, powder room, bath, bedrooms, laundry. add 1 bath. relocate interior stairs. replace windows at front and rear per plan. all windows facing street to be wood windows. | $120,000 |
| Nov 9, 2022 | Completed | 109 22nd Av | remodel kitchen in kind | $30,000 |
| Sep 8, 2022 | Completed | 969 Market St | interior renovation including walls, door and finishes on the 1st, 2nd and 3rd floors. | $90,000 |
| Jul 12, 2022 | Completed | 1954 44th Av | remodel one bathroom on 2nd floor: enlarge shower: small tub | $15,000 |
| Jun 23, 2022 | Completed | 2329 Taraval St | remodel 1 kitchen & 1 bathroom. convert tub to shower pan. replace window in kind in shower. all work in dwelling unit. | $32,000 |
| May 24, 2022 | Completed | 5535 Anza St | one kitchen remodel: replace cabinets, flooring. non structural | $16,000 |
| May 12, 2022 | Completed | 1156 Shafter Av | install non-bearing partition for office space & ada restroom. no change to building facade or structural systems. | $20,000 |
| Feb 7, 2022 | Completed | 1334 Guerrero St | to obtain a final inspection for work approved under prevoius pa 200805303233. all work is complete. | |
| Jan 18, 2022 | Completed | 613 Carolina St | remodel 1 kitchen, 2 bathroom: kitchen replace countertop. bath #1 replace shower pan. bathroom # 2: remove tub and replace with shower pan. | $51,000 |
| Dec 23, 2021 | Completed | 83 Apollo St | 1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height. | $52,000 |
| Oct 20, 2021 | Completed | 2027 09th Av | obtain final inspection under 2013-1009-8922 and 201205080038. | |
| Oct 12, 2021 | In progress | 2027 09th Av | horizontal expansion to enlarge existing bedroom at the rear to become a master suite. convert existing ground floor space to become a media room. new interior connecting staircase. new increase of 477sf of conditioned space. | $78,000 |
| Sep 22, 2021 | Never finaled | 442 Taraval St | remove e wood siding and replace with hardie siding on left and right side of property. app 900 sf no work on front elevation. | $18,000 |
| Jul 8, 2021 | Completed | 664 Teresita Bl | rev to pa# 2020-1208-0510; change (e) rear sliding door to window, match (e) width of the opening ant 2nd fl and replace (e) 2 windows in-kind, lowering bedroom and bathrooom slab on grade and foundation underpining at ground fl. | $15,000 |
| Apr 19, 2021 | Completed | 1125 Noriega St | install hardi siding on top of the (e) wood siding on the rear, left and right side. not street visible. about 750sf. | $11,000 |
| Jan 12, 2021 | Never finaled | 56 Holyoke St | 1st fl: add family room, bathroom & exercise room in a single famiy dwelling. | $60,000 |
| Dec 8, 2020 | Completed | 664 Teresita Bl | add 1 bedroom, 1 full bath, walk-in closet @ existing ground floor. relocate & renew (e) water heater & furnace. add washer & dryer on garage level. | $50,000 |
| Nov 18, 2020 | Never finaled | 56 Holyoke St | remodel kitchen , everything stays the same | $10,000 |
| Aug 24, 2020 | Completed | 2824 21st St | garage door replacement - no change to size location or number of openings | $1,500 |
| Dec 20, 2019 | In progress | 75 Topeka Av | (n) adu unit per ordinance #162-16. add kitchen, family room, (2) bedrooms & (1) full bathroom. horizontal addition @ rear under separate permit appln #201811155981. | $5,000 |
| Dec 19, 2019 | Completed | 653 28th St | revision pa#201702179712. basemt:relocate util rm. 1st floor- extend hallway, add laundry rm, show (n) utility location. 2nd fl:- enlarge window, shift staircase, revise bath fixture layout, add grill at deck. 3rd fl: remove bath, add laundry room, add (n) window, adjust fire-rated window east wall | $12,000 |
| Dec 17, 2019 | Completed | 91 Apollo St | install cement hardie siding on top of existing wood siding 180 sf on southside on rear of house. | $6,000 |
| Nov 13, 2019 | Completed | 1448 Union St | comply with complaint 201900833. framing for fireplace (no structural) replace(2) wood burning fireplace w/ gas fireplace/ under separate permit. 2 kitchens, replace countertop, paint cabinet door, replace faucets only. 2 bathrooms replace vanity and faucet only. | $15,000 |
| Jul 23, 2019 | Completed | 2824 21st St | installing protective cabinet around gas meters relocate gas meters to facade. new brace wall | $4,000 |
| May 14, 2019 | Completed | 130 Grafton Av | horizontal addition. add one family room, three beds, one bath @ 1st fl, add one bedrrom & one bath @ 2nd fl. mech, elec, plumbing under separate permits. nfpa 13-r on separate addendum. | $150,000 |
| Mar 5, 2019 | Completed | 4147 26th St | as-built floor plans to approved app #201410088434. | |
| Dec 7, 2018 | Completed | 2824 21st St | revision to pa #2017-1229-7642 light well change only at 2nd fl fill in with 1 hour fire rated construction. | |
| Nov 15, 2018 | In progress | 75 Topeka Av | comply w/ dbi nov# 201709321 & 2017-013028 enf. horizontal addition at rear & interior remodel. add adu under separate permit | $49,600 |
| Oct 26, 2018 | Completed | 61 Seminole Av | demo of basement interior. redo hvac/ele/plm. redo basement bedroom. add two closets. replace w/h. | $59,000 |
| Sep 11, 2018 | Completed | 715 Foerster St | replace about 150sf of pressure treated deck plank to trex deck board. deck is less than 30 inches above grade. | $6,500 |
| Aug 29, 2018 | Completed | 2824 21st St | add code cokmpliant 5'-0" metal sprial staircase from 3rd flr to new rear deck. add new 249 sf roof deck to be accessed by top unit only | $5,000 |
| Aug 23, 2018 | Completed | 645 Duncan St | to obtain final inspection for work approved under pa# 201111179087. all work is complete. | |
| Aug 3, 2018 | Completed | 87 Apollo St | add new living space on 1st fl. install under (e) bedroom. (n) water heater, furnance, and laundry in garage. foundation and slab work for ceiling height | $30,000 |
| Jul 18, 2018 | Completed | 112 Woodland Av | to comply with nov# 201723131. basemet:nw walls to create nw office & hall. removal of cabinet & counter for nw closet. 1st floor: removal of balcony, 2 nw water heater & dr. relocation of sink. 2nd flr: removal of 2x lin with relocatn of dr. additn of shower. 3rd flr:remove wine storag/ fire place | $10,000 |
| Jun 18, 2018 | Never finaled | 1911 20th St | 2-story vertical addition; additon of 1 unit and an 1 adu; sprinkler nfpa13 throughout | $500,000 |
| May 31, 2018 | Completed | 2623 44th Av | to comply with nov #201859431. to obtain permit for 1,000 sq ft of paved concrete patio | $6,000 |
| Mar 9, 2018 | Expired or cancelled | 1758 Palou Av | conversion of (e) attic space into a bedroom and storage riim with addition of dormers | $6,000 |
| Feb 23, 2018 | Completed | 2824 21st St | excavate front half of basement to increase ceiling height from 6'7" to 8'0". add wide garage door & ramp. alter floor framing in front 1st floor bedroom only to accomodate new garage | $10,000 |
| Feb 6, 2018 | Completed | 1559 44th Av | ground floor: addition below extg 2nd floor extension. remodel of extg garage area to include bedroom, bathroom, family room, laundry and storage. structural upgrade as req. demolition of interior walls is less than 75%. | $65,000 |
| Jan 19, 2018 | Completed | 56 Winfield St | remodel one bathroom - all walls stay in same location. convert tub to shower pan. | $12,000 |
| Dec 5, 2017 | Completed | 653 28th St | (n) accessory dwelling unit (adu) to be created on the basement & 1st fl levels. application is supplemental to permit appln #201702179712-s & is submitted in accordance to required action from planning "dra-0551" ord 162-16 | $65,000 |
| Oct 12, 2017 | Completed | 703 05th Av | in kind replacement of back/terrazzo entry stair to match (e); (n) brick veneer at wall and entry columns; replacement wood windows to match (e) at visible north & east - 3rd fl; replacement vinyl windows at non-visible south & west - 3rd fl | $40,000 |
| Sep 19, 2017 | Never finaled | 75 Topeka Av | remodel 1 bath on 2nd floor in kind & same location, no moving of walls, doors or windows | $8,000 |
| Sep 14, 2017 | Completed | 2623 44th Av | at first floor, remodel extg space including new bathroom, home office and bedrooms. at 2nd floor: remodel extg kitchen, bathroom, new bathroom. 1 level new wood rear deck | $60,000 |
| Mar 22, 2017 | Completed | 25 Western Shore Ln | remodel 1 bath & 1 kitchen in unit#2 only. | $35,000 |
| Mar 17, 2017 | Completed | 167 Harvard St | to obtain final inspection for work approved under pa# 201506179164 & 201411252522. all work is complete. | |
| Feb 17, 2017 | Completed | 653 28th St | to erect 3 stories, 1 basement, type v-b, single family dwelling. | $540,631 |
| Oct 27, 2016 | Completed | 546 44th Av | 3rd floor - window replacement; 2nd floor - kitchen remodeling, (n) laundry room, replacement of 2 windows & 1 (n) skylight; 1st floor - (n) livable area (755 sq ft) (n) bath, (n) bedroom & family room, relocate mech, room structural/plumbnig, mech, electrical per plan and as required | $154,000 |
| Jun 20, 2016 | Completed | 1530 44th Av | 1)920 sq ft of new conditioned space on 1st floor. 2) new master bedroom, master bath, entertainment, yoga/pilates room and 1/2 bath. 3)new stair (interior). | $75,000 |
| Jun 16, 2016 | Completed | 3320 Santiago St | infill open space under extg 2nd floor habitable area. add 1 bedroom. 1 full bath room storage room and relocated washer and dryer at 1st floor per plan. | $41,000 |
| May 18, 2016 | Completed | 2162 26th Av | remodel 1-1/2 bathrooms; replace tile, lights & plumbing fixtures, in-kind. | $16,600 |
| Jan 12, 2016 | Never finaled | 715 Foerster St | reface and paint kitchen cabinets. no structural work. | $7,500 |
| Jan 8, 2016 | Completed | 3149 Washington St | new balcony with glass sliding door. replace windows on 2nd and 3rd floors | $20,000 |
| Dec 31, 2015 | Completed | 3149 Washington St | intall all interior material doors, cabinets, for kitchen and bath. ref pa# 201504143544, interior finishes only | $70,000 |
| Oct 16, 2015 | Completed | 1559 44th Av | 3rd floor: remodel bathroom. electrical and plumbing fixtures will comply with title 24. no structural work. | $11,000 |
| Oct 8, 2015 | Completed | 1350 Noe St | install all interior materials, doors, cabinets for kitchen & bath. ref to pa# 201012176969 | $60,000 |
| Aug 18, 2015 | Completed | 614 30th Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, install shear wall, steel moment frame where called for. | $40,000 |
| Jun 25, 2015 | Completed | 2367 Washington St | comply with complaint 201554121; remove 2 bearing walls and replace with steel beams. rebuild interior stairs. soundproof media room, walls and ceiling. | $70,000 |
| Apr 13, 2015 | Completed | 1615 Funston Av | kitchen remodel: relocate sink and appliances, add new bar counter. bath remodel: relocate toilet and shower, new landscape deck structural: remove wall between dining: kichen, new beam and new shearwalls for future 2nd floor extension. | $55,000 |
| Feb 6, 2015 | Completed | 2567 Mission St | lighting plan towards pa#201412053135. | |
| Dec 12, 2014 | Expired or cancelled | 5801 Geary Bl | change of use from retail to restaurant (b) 46 seats. | $15,000 |
| Dec 5, 2014 | Completed | 2567 Mission St | revision to pa#201307010921 & 201311051195 revised layout per plan. add uni-sex bathroom rooms & offices. | |
| Nov 25, 2014 | Completed | 167 Harvard St | reconfigure (e) rooms layout at 2nd floor per plan. remodel (e) kitchen, bathroom and add 1 new bath. remove (e) ext. stair from 2nd to ground floor. convert (e) dining to office. infill (e) lightwell at 2nd floor per plan. | $40,000 |
| Oct 21, 2014 | Completed | 167 Harvard St | legalize of ground floor unit with 2 bedrooms, a living room, a kitchen and 2 bathrooms and one study per plan. | $68,000 |
| Sep 16, 2014 | Completed | 5801 Geary Bl | new hand sink, and mop sink in existing kitchen, relocate existing bathroom and upgrade to a new ada bathroom. | $25,000 |
| Sep 15, 2014 | Completed | 830 40th Av | convert extg toilet and e closet into a full bath on extg 2nd floor. replace and reinstall furnace and extg washer w/h at rear of extg garage area. to comply with complaint #20141912 | $6,000 |
| Sep 5, 2014 | Completed | 911 Minnesota St | revisionto 201405236674. new structural detail for footing replacement at garage | $100,000 |
| Jul 29, 2014 | Completed | 248 Cumberland St | remodel kitchen & bathroom at 2nd flr per plan | $20,000 |
| Jul 18, 2014 | Completed | 647 Duncan St | erect 3 stories, 2 basements, one single family | $500,000 |
| Jun 4, 2014 | Completed | 911 Minnesota St | doors at exterior, windows, deck, exterior stairs, skylights. subject to certificate of appropriateness. 20100522a. interior remodel under seperate pa# 2014/05/23/6674. | $50,000 |
| May 23, 2014 | Completed | 911 Minnesota St | comply with nov# 201399141 & 200838950. interior remodel of (e) residence. (e) building is 2 story. proposed structural will be 2 story, 3 bedrooms & 2 1/2 baths. no change to the size of the building envelope. no exterior work. | $100,000 |