Pinnacle Construction & Maintenance Llc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Dec 2014
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2014 | Completed final sign-off Feb 2015 | 3798 Mission St | revision to pa#2014-0924-7176. revision to plans dated 9/24/14. repair beam at rear storage.Details
revision to pa#2014-0924-7176. revision to plans dated 9/24/14. repair beam at rear storage. | $10,000 |
| Oct 10, 2014 | Completed final sign-off May 2015 | 1821 Polk St | interior remodel of unit 1. remodel kitchen and bathroomDetails
interior remodel of unit 1. remodel kitchen and bathroom | $25,000 |
| Oct 8, 2014 | Completed final sign-off Nov 2014 | 1780 Mcallister St | repair rear exterior stairs, less than 50%, repair in kind. egress must be maintained during all times of construction.Details
repair rear exterior stairs, less than 50%, repair in kind. egress must be maintained during all times of construction. | $7,000 |
| Sep 24, 2014 | Completed final sign-off Feb 2015 | 3798 Mission St | revision to 201407312676. dryrot repair at rear of building and entry from 85 richland not visible from streetDetails
revision to 201407312676. dryrot repair at rear of building and entry from 85 richland not visible from street | $20,000 |
| Aug 21, 2014 | Never finaled issued Aug 2014, no final | 1850 Sacramento St | unit #506: renovate studio apartment; convert to 1 bedroom layout: no change to unit sizeDetails
unit #506: renovate studio apartment; convert to 1 bedroom layout: no change to unit size | $20,000 |
| Jul 31, 2014 | Completed final sign-off Feb 2015 | 85 Richland Av | dry rot repair in kind in rear. lobby framingDetails
dry rot repair in kind in rear. lobby framing | $15,000 |
| Jul 31, 2014 | Completed final sign-off May 2015 | 1821 Polk St | basement: installation of two (2) washers, 2 dryers, 8 storage cages, bike rack and repair walls separating retail space (ups) storage.Details
basement: installation of two (2) washers, 2 dryers, 8 storage cages, bike rack and repair walls separating retail space (ups) storage. | $20,000 |
| Jul 24, 2014 | Completed final sign-off Sep 2014 | 1850 Sacramento St | unit 204 remodel - kitchen: cabinets, counters, appliances, fixtures and tile. (1) bathroom: fixtures - valves, tile, vanity. fully paint & refinish hard wood floors. kitchen lighting & control per cec 150(k)Details
unit 204 remodel - kitchen: cabinets, counters, appliances, fixtures and tile. (1) bathroom: fixtures - valves, tile, vanity. fully paint & refinish hard wood floors. kitchen lighting & control per cec 150(k) | $22,000 |
| Jul 22, 2014 | Completed final sign-off Nov 2014 | 688 Haight St | remodel unit #3 per plan include relocation of kitchen and bathroom. ref demo permit #2014.0423.3961 for unit #3. legalization of unit #4 under separate appl. 201406249274.Details
remodel unit #3 per plan include relocation of kitchen and bathroom. ref demo permit #2014.0423.3961 for unit #3. legalization of unit #4 under separate appl. 201406249274. | $20,000 |
| Jul 2, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | remodel & replace cabinets counters, valves, tile , fixtures and appliances paint , replace hardware fixtures and refinish, hardwood floors.Details
remodel & replace cabinets counters, valves, tile , fixtures and appliances paint , replace hardware fixtures and refinish, hardwood floors. | $24,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | unit 7: bathroom & kitchen remodel/replace cabinets, counters, tile fixtures appliances. paint entire unit, refinish hardwood floors. to correct item #3, his nov #201478661/patcdh fire barrierDetails
unit 7: bathroom & kitchen remodel/replace cabinets, counters, tile fixtures appliances. paint entire unit, refinish hardwood floors. to correct item #3, his nov #201478661/patcdh fire barrier | $24,000 |
| Jun 24, 2014 | Expired or cancelled expired Dec 2019 | 688 Haight St | legalization of unwarranted 1 bedroom, 1 bath unit at 3rd flDetails
legalization of unwarranted 1 bedroom, 1 bath unit at 3rd fl | $34,700 |
| Jun 24, 2014 | Completed final sign-off Oct 2014 | 85 Richland Av | #2- remodel unit, relocate entry door, relocate kitchen and bathroom inside unit.Details
#2- remodel unit, relocate entry door, relocate kitchen and bathroom inside unit. | $18,000 |
| Jun 12, 2014 | Completed final sign-off Aug 2014 | 1850 Sacramento St | unit #203. remodel kitchen: replace cabinets, counters, appliances, fixtures tile, bathroom remodel: replace fixtures, tub, tile, vanity. paint refinish floor & walls. no walls removed.Details
unit #203. remodel kitchen: replace cabinets, counters, appliances, fixtures tile, bathroom remodel: replace fixtures, tub, tile, vanity. paint refinish floor & walls. no walls removed. | $22,000 |
| Jun 10, 2014 | Completed final sign-off Oct 2014 | 3571 16th St | #6 & #11 - eplacement of kitchen cabinets, counters, fixtures & appliances. replacement of bathroom tile, vanity, fixtures. install engineer flooring paint & repalce fixtures.Details
#6 & #11 - eplacement of kitchen cabinets, counters, fixtures & appliances. replacement of bathroom tile, vanity, fixtures. install engineer flooring paint & repalce fixtures. | $44,000 |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 1565 Washington St | #11 - remodel kitchen: replace cabinets, counters, appliances, fixtures tile. remodel bathroom: replace fixtures, tub, tile vanity, refinish floors & paint.Details
#11 - remodel kitchen: replace cabinets, counters, appliances, fixtures tile. remodel bathroom: replace fixtures, tub, tile vanity, refinish floors & paint. | $26,000 |
| May 29, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | unit 5. kitchen remodel: replace cabinets, fixtures, tile, appliances, paint, refinish floors. no walls to be removed. no changes to walls or doors. work only to his unit.Details
unit 5. kitchen remodel: replace cabinets, fixtures, tile, appliances, paint, refinish floors. no walls to be removed. no changes to walls or doors. work only to his unit. | $24,000 |
| Apr 23, 2014 | Never finaled issued Apr 2014, no final | 688 Haight St | removal of al lwall & ceiling finishes including bathroom & kitchen appliances/fixture for the purpose of remodeling the unit ,(kitchen and bath remodel)Details
removal of al lwall & ceiling finishes including bathroom & kitchen appliances/fixture for the purpose of remodeling the unit ,(kitchen and bath remodel) | $2,800 |
| Mar 21, 2014 | Completed final sign-off Jul 2014 | 1821 Polk St | renovation of unit #8. kitchen & bathroom remodelDetails
renovation of unit #8. kitchen & bathroom remodel | $30,000 |
| Mar 14, 2014 | Completed final sign-off Feb 2015 | 285 Grand View Av | soft story retrofit per iebc appendiz a4 at the lower two levels of the building.Details
soft story retrofit per iebc appendiz a4 at the lower two levels of the building. | $80,000 |
| Jan 10, 2014 | Completed final sign-off Jul 2014 | 1821 Polk St | kitchen remodel: cabinets, counters, appliances; bathroom: replace tub w/shower, fixtures, tile. upgrade electrical panel, paint, refinish floors, fixture hardware. no change of wall, window and door.Details
kitchen remodel: cabinets, counters, appliances; bathroom: replace tub w/shower, fixtures, tile. upgrade electrical panel, paint, refinish floors, fixture hardware. no change of wall, window and door. | $25,000 |
| Oct 11, 2013 | Completed final sign-off Dec 2013 | 2020 Larkin St | front building: remodel the unit - separate 2 bathrooms, remodel with a new finishes. complete kitchen remodel with new finishes. paint and refinish hardwood floors. turn powder room into laundry room.Details
front building: remodel the unit - separate 2 bathrooms, remodel with a new finishes. complete kitchen remodel with new finishes. paint and refinish hardwood floors. turn powder room into laundry room. | $20,000 |
| Oct 3, 2013 | Completed final sign-off May 2014 | 957 Hayes St | work in apt. #4: revision to app#201309066196:1)add peninsula counter/cabs and end cap wall. 2)move w/d closet. 3)eliminate moved apt entry door(so now door is in original location) 4) flip ba2 floor plan so have plmg wall on n side of bath.Details
work in apt. #4: revision to app#201309066196:1)add peninsula counter/cabs and end cap wall. 2)move w/d closet. 3)eliminate moved apt entry door(so now door is in original location) 4) flip ba2 floor plan so have plmg wall on n side of bath. | |
| Sep 13, 2013 | Completed final sign-off May 2014 | 957 Hayes St | unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & denDetails
unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & den | $41,270 |