Bruce Prescott
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Santos Prescott & Assoc.
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Nov 2025
35 permits since 2000 (architect on 33 permits, engineer on 2 permits, authorized agent-others on 1 permit): 21 completed, 5 in progress, 8 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 600 07th St | Guzman Construction Group Inc. | change locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center.Details
change locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center. | $6,000 |
| Jul 14, 2025 | In progress issued Jan 2026 | 150 04th Ti St | Nibbi Bros Assoc Inc. | priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b)Details
priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b) | $40,000,000 |
| Jun 9, 2025 | In progress issued May 2026 | 5116 03rd St | Hearth Corporation | documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpermitted demolition of (e) rear cottage)Details
documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpermitted demolition of (e) rear cottage) | $87,754 |
| Nov 6, 2024 | In progress issued Apr 2025 | 3262 25th St | Mrcc | upgrade foundations. selective demo of rear rear additions and interior partitions. partition a portion of garage to create vestibule and add new stair to upper level. new rear windows at rear elevations. fill in existing property line windows wih rated construction. reframe rear area of house.Details
upgrade foundations. selective demo of rear rear additions and interior partitions. partition a portion of garage to create vestibule and add new stair to upper level. new rear windows at rear elevations. fill in existing property line windows wih rated construction. reframe rear area of house. | $310,500 |
| Oct 29, 2024 | Completed final sign-off Feb 2025 | 240 Van Ness Av | Cahill Contractors Llc. | rev 202101042034- revise 1st floor cmu wall and add 3 hr concrete ceiling.Details
rev 202101042034- revise 1st floor cmu wall and add 3 hr concrete ceiling. | $15,467 |
| Sep 6, 2024 | Completed final sign-off Feb 2025 | 240 Van Ness Av | Cahill Contractors Llc. | adding drinking fountain in courtyardDetails
adding drinking fountain in courtyard | $5,000 |
| Feb 8, 2024 | Expired or cancelled expired Sep 2026 | 580 Banks St | Saturn Construction Co | ref pa 202212279156 application for shoring permit for south wall for replacement of south foundation and retaining wall.Details
ref pa 202212279156 application for shoring permit for south wall for replacement of south foundation and retaining wall. | $10,000 |
| Jan 12, 2024 | Completed final sign-off Sep 2025 | 600 07th St | Guzman - Suffolk Jv Llc | add fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof levelDetails
add fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof level | $10,000 |
| Nov 10, 2023 | Completed final sign-off Sep 2025 | 600 07th St | Guzman Construction Group Inc. | elevator smoke detector access panel, ref bpa#20210196871-s8Details
elevator smoke detector access panel, ref bpa#20210196871-s8 | $5,000 |
| Aug 10, 2023 | In progress issued Oct 2023 | 3801 Balboa St | 2/f-3/f: remodel restroomsDetails
2/f-3/f: remodel restrooms | $10,000 | |
| Dec 27, 2022 | Completed final sign-off Sep 2026 | 580 Banks St | Saturn Construction Co | demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retainingDetails
demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retaining | $471,270 |
| Oct 27, 2022 | Completed final sign-off Jul 2023 | 1051 South Van Ness Av | R Bay Construction | replace existing kitchen and laundry room fixtures and finishes. remove walls to enlarge space new beam to carry load of (e) bearing wall. add new partition to define closet. replace four windows with new clad wood frame windows.Details
replace existing kitchen and laundry room fixtures and finishes. remove walls to enlarge space new beam to carry load of (e) bearing wall. add new partition to define closet. replace four windows with new clad wood frame windows. | $47,060 |
| Oct 24, 2022 | Completed final sign-off Mar 2023 | 75 Laguna St | Angotti & Reilly Inc. | 1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits.Details
1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits. | $228,597 |
| Oct 21, 2022 | Never finaled issued Oct 2022, no final | 954 Florida St | Rony's Handyman Construction | remove existing brick chimneys. kitchen remodel; replace window and door, divide existing bathroom into two and move bedroom closet.Details
remove existing brick chimneys. kitchen remodel; replace window and door, divide existing bathroom into two and move bedroom closet. | $54,000 |
| Oct 25, 2021 | Completed final sign-off Jul 2022 | 1053 South Van Ness Av | replace entry door, change one door to window add two windows and a skylight remove non -structural wall and frame new ceiling construct new bathroom wall relocate bathroom fixtures, new shower new mini-split hvac; new tankless hot water heaterDetails
replace entry door, change one door to window add two windows and a skylight remove non -structural wall and frame new ceiling construct new bathroom wall relocate bathroom fixtures, new shower new mini-split hvac; new tankless hot water heater | $20,000 | |
| Apr 6, 2021 | Completed final sign-off Mar 2022 | 164 Hartford St | Mrcc | kitchen renovation. remove non structural wall. replace fixtures and finishes.Details
kitchen renovation. remove non structural wall. replace fixtures and finishes. | $50,000 |
| Jan 4, 2021 | Completed final sign-off Oct 2025 | 240 Van Ness Av | Cahill Contractors Llc. | to erect a type 1-b, 8-story, 112 units, mixed-use building with ground flr office/commercial space and no basement level. 100% affordable housing.Details
to erect a type 1-b, 8-story, 112 units, mixed-use building with ground flr office/commercial space and no basement level. 100% affordable housing. | $40,100,000 |
| Oct 19, 2020 | Completed final sign-off Sep 2025 | 600 07th St | Guzman Construction Group Inc., Guzman - Suffolk Jv Llc, Suffolk-Guzman A Joint Venture I, Sun Light & Power | to erect a 8-story, type 1b, mixed use bldg with 221 residential unit, no basement. **comply to maher, route to dph**Details
to erect a 8-story, type 1b, mixed use bldg with 221 residential unit, no basement. **comply to maher, route to dph** | $82,127,000 |
| Jan 16, 2020 | Completed final sign-off Feb 2021 | 1558 23rd Av | Shelter Cove Construction | add entryway to basement. widen door at street facade to access entryway.Details
add entryway to basement. widen door at street facade to access entryway. | $25,000 |
| Nov 22, 2019 | Never finaled filed Nov 2019, never issued | 75 Laguna St | change of occupancy load calculation only. reference permit application #201908148714. **maher n/a**Details
change of occupancy load calculation only. reference permit application #201908148714. **maher n/a** | ||
| Oct 24, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Arana Group, Inc. | add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maherDetails
add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maher | $5,000 |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 75 Laguna St | Arana Group, Inc. | change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a.Details
change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a. | |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Arana Group, Inc. | tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm systemDetails
tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm system | $2,500,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 220 Beale St | C W S Construction Group Inc | 1/f: revision to pa #201805219695, modify ceiling plan. maher n/a.Details
1/f: revision to pa #201805219695, modify ceiling plan. maher n/a. | |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 280 Beale St | Garnett Signs Llc | install 1 non-electric wall sign "natalie gubb commons" shorter towerDetails
install 1 non-electric wall sign "natalie gubb commons" shorter tower | $15,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 222 Beale St | Garnett Signs Llc | install 1 non-electric "natalie gubb commons" signDetails
install 1 non-electric "natalie gubb commons" sign | $15,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 280 Beale St | Garnett Signs Llc | install 1 non-electric wall sign "heart" logo shorter towerDetails
install 1 non-electric wall sign "heart" logo shorter tower | $500 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 255 Fremont St | Garnett Signs Llc | install 1 non-electric "natalie gubb commons" signDetails
install 1 non-electric "natalie gubb commons" sign | $15,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 95 Laguna St | James E Roberts-Obayashi Corporation | storm water control plan review. building under permit application #2015/0706/0668sDetails
storm water control plan review. building under permit application #2015/0706/0668s | $50,000 |
| May 21, 2018 | Completed final sign-off Aug 2019 | 220 Beale St | C W S Construction Group Inc | add partitions, finishes, plumbing fixture and electrical systems to create child care center from "warm" shell space. no exterior work except door controller maher naDetails
add partitions, finishes, plumbing fixture and electrical systems to create child care center from "warm" shell space. no exterior work except door controller maher na | $1,200,000 |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 255 Fremont St | Cahill Contractors Inc | fire pump anchorage structural review deferred from 2014-0624-9199/s3 fire protectionDetails
fire pump anchorage structural review deferred from 2014-0624-9199/s3 fire protection | |
| Jul 6, 2015 | Completed final sign-off Jul 2020 | 95 Laguna St | James E Roberts-Obayashi Corporation, Pac Integrations Inc | to erect 6 stories, no basement, 79 units residential senior center building.Details
to erect 6 stories, no basement, 79 units residential senior center building. | $21,000,000 |
| Jun 24, 2014 | Completed final sign-off Nov 2018 | 255 Fremont St | Cahill Contractors Llc., Cahill Contractors Inc | to erect 6 stories, no basement, 85 residential and childcare building.Details
to erect 6 stories, no basement, 85 residential and childcare building. | $29,938,900 |
| Aug 24, 2009 | Completed final sign-off Feb 2010 | 251 Duncan St | Michael C Hargrove Construction | remove existing cabinets and counters. enlarge existing wall opening from 5-12'. replace existing window with new sliding door, new kitchen cabinets, appliances, lighting.repair and replace finishesDetails
remove existing cabinets and counters. enlarge existing wall opening from 5-12'. replace existing window with new sliding door, new kitchen cabinets, appliances, lighting.repair and replace finishes | $50,000 |
| May 2, 2006 | Completed final sign-off Sep 2007 | 2325 Union St | construct new 6' tall concrete/stone (wall only) garden wall/columbarium. special inspections and tests are required as per building code section 1701.Details
construct new 6' tall concrete/stone (wall only) garden wall/columbarium. special inspections and tests are required as per building code section 1701. | $80,000 |