Arana Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Apr 2025
- Last 24 months
- 1 permit filed
87 permits since 2000: 80 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2025 | Completed final sign-off Oct 2025 | 2567 San Bruno Av | replace existing unreinforced concrete wall with new timber wall. remove 2 windows and door per da checklist. add automatic door at front entry. add ada children's bathroom.Details
replace existing unreinforced concrete wall with new timber wall. remove 2 windows and door per da checklist. add automatic door at front entry. add ada children's bathroom. | $75,000 |
| May 1, 2023 | Expired or cancelled cancelled Jan 2026 | 185 06th St | remove drinking fountain/replace w/a sink with cabinetsDetails
remove drinking fountain/replace w/a sink with cabinets | $5,000 |
| Mar 8, 2023 | Completed final sign-off Nov 2023 | 1400 Judah St | to comply with nov# 202310802. demolition of alter i (24x10) 240 sqft and installation of plywood and carpet. all interior.Details
to comply with nov# 202310802. demolition of alter i (24x10) 240 sqft and installation of plywood and carpet. all interior. | $3,500 |
| Dec 9, 2022 | Completed final sign-off Jun 2023 | 214 Frida Kahlo Wy | revision to permit 201902041952. built a new concrete box under front of house (driveway) to house (2) water sewer pumps.Details
revision to permit 201902041952. built a new concrete box under front of house (driveway) to house (2) water sewer pumps. | $10,000 |
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 214 Frida Kahlo Wy | revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplaceDetails
revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplace | $20,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2022 | 101 Horne Av | revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil.Details
revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil. | $50,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2022 | 101 Horne Av | fire evacuation maps only. ref 201912300885. (18 total)Details
fire evacuation maps only. ref 201912300885. (18 total) | $7,614 |
| Aug 18, 2021 | Completed final sign-off Feb 2022 | 101 Horne Av | pw ocii bldg 101 p2 hunters point shipyard building 101 upgrade install 4" ductile iron pipe from (e) 8" dedicated fire water line ref pa# 20191011230-0885,Details
pw ocii bldg 101 p2 hunters point shipyard building 101 upgrade install 4" ductile iron pipe from (e) 8" dedicated fire water line ref pa# 20191011230-0885, | $45,000 |
| Jan 30, 2020 | Completed final sign-off Feb 2020 | 75 Laguna St | evacuation map.Details
evacuation map. | $1,500 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 101 Horne Av | convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable**Details
convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable** | $3,000,000 |
| Dec 18, 2019 | Completed final sign-off Aug 2020 | 201 Phelan Av | convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door.Details
convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door. | $80,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2023 | 2060 Folsom St | tenant improvement for (e) tenant space at ground lvl to host a group e family day care center. proposed improvements include non-structural walls, ceilings & finishes. (n) electrical, plumbing & automatic sprinkler system.Details
tenant improvement for (e) tenant space at ground lvl to host a group e family day care center. proposed improvements include non-structural walls, ceilings & finishes. (n) electrical, plumbing & automatic sprinkler system. | $1,000,000 |
| Oct 24, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maherDetails
add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maher | $5,000 |
| Oct 24, 2019 | Completed final sign-off Nov 2019 | 57 Westwood Dr | revision #4 to pa 2018-0813-7136 - new double doors at rear garageDetails
revision #4 to pa 2018-0813-7136 - new double doors at rear garage | $500 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 75 Laguna St | street spaceDetails
street space | |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 75 Laguna St | change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a.Details
change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a. | |
| May 2, 2019 | Completed final sign-off Nov 2019 | 57 Westwood Dr | revision #3 to pa 2018-0813-7136 & 201902153109 - new deck, new windows to the basement, new tub in bathroom in basement. new hvac furnace in the attic. elimination of laundry room. structural plan s2 ceiling beams in ground floorDetails
revision #3 to pa 2018-0813-7136 & 201902153109 - new deck, new windows to the basement, new tub in bathroom in basement. new hvac furnace in the attic. elimination of laundry room. structural plan s2 ceiling beams in ground floor | $6,000 |
| Feb 15, 2019 | Completed final sign-off Nov 2019 | 57 Westwood Dr | revision to pa 2018-0813-7136 replacement and new construction of windows in ground floor and basement; create family room, new bedroom and 2 new bathrooms in basement. front and side windws to be wood windows. other windows back and rear side to be replace by fiber or vynilDetails
revision to pa 2018-0813-7136 replacement and new construction of windows in ground floor and basement; create family room, new bedroom and 2 new bathrooms in basement. front and side windws to be wood windows. other windows back and rear side to be replace by fiber or vynil | |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm systemDetails
tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm system | $2,500,000 |
| Feb 4, 2019 | Completed final sign-off Jun 2023 | 214 Phelan Av | two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room.Details
two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room. | $250,000 |
| Sep 13, 2018 | Completed final sign-off May 2019 | 5016 Mission St | administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7Details
administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7 | |
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 57 Westwood Dr | excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemenDetails
excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemen | $120,000 |
| Jun 15, 2018 | Completed final sign-off May 2019 | 5016 Mission St | new electrical system for entire building. ref ba # 201704073503Details
new electrical system for entire building. ref ba # 201704073503 | $25,000 |
| May 14, 2018 | Completed final sign-off May 2019 | 5016 Mission St | structural improvement for app#201704073503 for t.i.Details
structural improvement for app#201704073503 for t.i. | $200,000 |
| Feb 23, 2018 | Completed final sign-off Feb 2018 | 445 Grant Av | revision to previously approved bldg pa #201708185243. drawing is provided to reflect as-built condition. no changes to original proposed scope of work.Details
revision to previously approved bldg pa #201708185243. drawing is provided to reflect as-built condition. no changes to original proposed scope of work. | |
| Jan 24, 2018 | Completed final sign-off Mar 2018 | 5016 Mission St | ground flr & mezzanine:5271 sqft soft demo for ti (ref 201704073503) maher naDetails
ground flr & mezzanine:5271 sqft soft demo for ti (ref 201704073503) maher na | |
| Jan 12, 2018 | Completed final sign-off Feb 2020 | 4439 03rd St | combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathroomsDetails
combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathrooms | $68,000 |
| Nov 2, 2017 | Expired or cancelled expired Feb 2023 | 568 Natoma St | mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $75,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 568 Natoma St | demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area.Details
demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area. | $1,500 |
| Sep 12, 2017 | Completed final sign-off Feb 2018 | 4042 Fulton St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $253,000 |
| Aug 18, 2017 | Completed final sign-off Feb 2018 | 445 Grant Av | int ti project of changing an (e) retail space to a (n) outpatient clinic included to removing (e) partition wall & non-accessible restrooms, & add (n) partition wall for (n) exam rooms & therapy room, two (n) accessible restrms & providing (n) finish throughout. mep,sprinkler under separate permit.Details
int ti project of changing an (e) retail space to a (n) outpatient clinic included to removing (e) partition wall & non-accessible restrooms, & add (n) partition wall for (n) exam rooms & therapy room, two (n) accessible restrms & providing (n) finish throughout. mep,sprinkler under separate permit. | $199,000 |
| May 16, 2017 | Completed final sign-off Oct 2017 | 747 Howard St | install about(+ or -) 100 panels on top of extg panels; fence and balcony. n/a for maherDetails
install about(+ or -) 100 panels on top of extg panels; fence and balcony. n/a for maher | $200,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2017 | 10 Roanoke St | drywall reparations/water intrusion, compliance with nov #201760151. framing and finishes to be replaced in kind.Details
drywall reparations/water intrusion, compliance with nov #201760151. framing and finishes to be replaced in kind. | $1,500 |
| Dec 30, 2016 | Completed final sign-off Jul 2018 | 568 Natoma St | repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher naDetails
repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher na | $160,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 3044 Franklin St | remodeling of 1/2 bathroom(toilet and shower)Details
remodeling of 1/2 bathroom(toilet and shower) | $6,000 |
| Nov 2, 2016 | Completed final sign-off Sep 2019 | 920 Sacramento St | repair all existing wood windows to remain; replace glazing with insulated glass, clean & re-surface existing roof membrane, new flashing, make water tight, repair damaged roof cornice trim, new flashing.Details
repair all existing wood windows to remain; replace glazing with insulated glass, clean & re-surface existing roof membrane, new flashing, make water tight, repair damaged roof cornice trim, new flashing. | $100,000 |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 2840 Folsom St | soft story retrofit pes sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit pes sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $35,000 |
| Jun 29, 2016 | Completed final sign-off Dec 2016 | 2846 Folsom St | renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry stepsDetails
renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry steps | $20,000 |
| Dec 3, 2015 | Completed final sign-off Dec 2015 | 3415 Mission St | revision to permit 201509015812 , to add the reconstruction of side deck by changing old wood and attachments.Details
revision to permit 201509015812 , to add the reconstruction of side deck by changing old wood and attachments. | $2,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2020 | 733 Kearny St | renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab)Details
renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab) | $1,987,718 |
| Sep 1, 2015 | Completed final sign-off Apr 2016 | 3415 Mission St | make (e) unit into 2 units. build new kitchen, open (3) outside doors.Details
make (e) unit into 2 units. build new kitchen, open (3) outside doors. | $12,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 610 Clipper St | #19- revision to 201503171152. revised layout at bathrooms, add one more bathroom to bedroom, all work is non structural only.Details
#19- revision to 201503171152. revised layout at bathrooms, add one more bathroom to bedroom, all work is non structural only. | |
| Apr 16, 2015 | Completed final sign-off Mar 2016 | 570 Ramsell St | remodel extg kitchen and remove 2 extg walls.Details
remodel extg kitchen and remove 2 extg walls. | $15,000 |
| Apr 16, 2015 | Completed final sign-off Jun 2015 | 795 Pine St | unit #2: remodeling existing bathroom, no change on walls and opening.Details
unit #2: remodeling existing bathroom, no change on walls and opening. | $9,000 |
| Apr 8, 2015 | Never finaled issued Jun 2015, no final | 1870 Pacific Av | #604 -remodel of kit & bath. add w/dDetails
#604 -remodel of kit & bath. add w/d | $30,000 |
| Apr 2, 2015 | Completed final sign-off Jan 2016 | 795 Pine St | unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom.Details
unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom. | $25,000 |
| Mar 27, 2015 | Completed final sign-off Aug 2015 | 3419 Mission St | barrier removal. relocate existing bathroom.Details
barrier removal. relocate existing bathroom. | $9,000 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 660 Clipper St | unit #315: to relocate non-loading partition wall at closet to add a new washer/dryer per plan. maher n/a.Details
unit #315: to relocate non-loading partition wall at closet to add a new washer/dryer per plan. maher n/a. | $10,000 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 610 Clipper St | unit #19: modigy (e) closets to add new wash and dryer. t0 add partition wall and new door per plan. maher n/a.Details
unit #19: modigy (e) closets to add new wash and dryer. t0 add partition wall and new door per plan. maher n/a. | $10,000 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 660 Clipper St | unit #101: to add a new washer/dryer at (e) closet per plan. maher n/n.Details
unit #101: to add a new washer/dryer at (e) closet per plan. maher n/n. | $10,000 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 610 Clipper St | unit #12: change (e) closet to add washer and dryer.Details
unit #12: change (e) closet to add washer and dryer. | $10,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2015 | 795 Pine St | units # 21,31,41, and 61. add wash and dryer.remodel kitchen in kind.Details
units # 21,31,41, and 61. add wash and dryer.remodel kitchen in kind. | $40,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | #20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13Details
#20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13 | $25,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchenDetails
remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchen | $25,000 |
| Jan 30, 2015 | Completed final sign-off Aug 2015 | 1168 Jamestown Av | to comply w/nov 201409361 - demolition existing basement apartment to become storage only. n/a maher ordinanceDetails
to comply w/nov 201409361 - demolition existing basement apartment to become storage only. n/a maher ordinance | $1,500 |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 1870 Pacific Av | #403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer.Details
#403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer. | $10,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 900 Mendell St | to obtain final inspection for work approved under pa 200602033711; all workis completeDetails
to obtain final inspection for work approved under pa 200602033711; all workis complete | |
| Oct 2, 2014 | Never finaled issued Jul 2019, no final | 653 Bay St | additions & alterations to (e) 3 story 8 unit apt bldg. additions includes: raising the roof @ rear of bldg (gable @ front of bldg to remain)construction of roof decks on new flat roof. horizon addition of exterior exit stair@rear to grade. interior work includes remodel of (e) units & bldg out ofDetails
additions & alterations to (e) 3 story 8 unit apt bldg. additions includes: raising the roof @ rear of bldg (gable @ front of bldg to remain)construction of roof decks on new flat roof. horizon addition of exterior exit stair@rear to grade. interior work includes remodel of (e) units & bldg out of | $1,200,000 |
| Sep 29, 2014 | Completed final sign-off Aug 2015 | 3415 Mission St | relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closetsDetails
relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closets | $39,500 |
| Sep 5, 2014 | Completed final sign-off Dec 2014 | 900 Mendell St | revision to permit application no. 201408115508. remove and replace 125 square feet of stucco on the visible facade.Details
revision to permit application no. 201408115508. remove and replace 125 square feet of stucco on the visible facade. | $4,800 |
| Aug 11, 2014 | Completed final sign-off Apr 2015 | 900 Mendell St | kitchen remodeling, new cabinets, electricity, hot & cold water, high efficacy lighting.Details
kitchen remodeling, new cabinets, electricity, hot & cold water, high efficacy lighting. | $21,000 |
| Dec 28, 2011 | Completed final sign-off Feb 2012 | 1860 Washington St | remodeling of existing master bathroom na hallway bathroom, new sink, toilet, bath tub, shower, tile. high efficiency lighting or occupancy sensor (cec 150k). no change to exhaust system.Details
remodeling of existing master bathroom na hallway bathroom, new sink, toilet, bath tub, shower, tile. high efficiency lighting or occupancy sensor (cec 150k). no change to exhaust system. | $15,000 |
| Apr 22, 2009 | Completed final sign-off Jul 2009 | 1504 Jerrold Av | remodel (e) 2nd flr bathrm & kitchen, plumbing fixtures will be @ same place. electrical by others. kitchen 110 sqft. bathrm 47 sqft.Details
remodel (e) 2nd flr bathrm & kitchen, plumbing fixtures will be @ same place. electrical by others. kitchen 110 sqft. bathrm 47 sqft. | $30,000 |
| Apr 17, 2009 | Completed final sign-off Jun 2009 | 40 Aptos Av | built 1/2 bathroom on basement/garage at right back corner, 8ft by 5ft wide with toilet & one sink. built next to 1/2 bathroom a new laundry closet (3'6" wide by 9ft long with hot/cold water, gas, drain & one small sinkDetails
built 1/2 bathroom on basement/garage at right back corner, 8ft by 5ft wide with toilet & one sink. built next to 1/2 bathroom a new laundry closet (3'6" wide by 9ft long with hot/cold water, gas, drain & one small sink | $5,000 |
| Feb 19, 2009 | Completed final sign-off Apr 2009 | 87 Christopher Dr | remodel of existing 1 bathroom. (no bath tub. only shower) to be the same configuration.Details
remodel of existing 1 bathroom. (no bath tub. only shower) to be the same configuration. | $11,200 |
| Feb 10, 2009 | Completed final sign-off Mar 2009 | 1554 Jerrold Av | remove & install apprx 250 sq. ft. of stucco in front of house on stairs side. remove & install 19 sq. ft. of concrete floor on landing. prime & paint new stucco.Details
remove & install apprx 250 sq. ft. of stucco in front of house on stairs side. remove & install 19 sq. ft. of concrete floor on landing. prime & paint new stucco. | $4,000 |
| Oct 25, 2007 | Completed final sign-off Jan 2008 | 40 Aptos Av | kitchen remodel. no structural work. 50% wattage high efficiency & switched seperately.Details
kitchen remodel. no structural work. 50% wattage high efficiency & switched seperately. | $15,000 |
| Sep 27, 2007 | Completed final sign-off Nov 2007 | 432 42nd Av | remodeleing bathroom (upstairs), replace toilet sink, tub, shower and tile, new electric and hot and cold water. no sewers. ( to use existing)Details
remodeleing bathroom (upstairs), replace toilet sink, tub, shower and tile, new electric and hot and cold water. no sewers. ( to use existing) | $6,000 |
| Jul 26, 2007 | Completed final sign-off Sep 2007 | 1934 Donner Av | remodel one bathroom, change tile, toilet, sink, bath tub (change bath tub to jacuzzi tub). 50% lighting shall be flourscentDetails
remodel one bathroom, change tile, toilet, sink, bath tub (change bath tub to jacuzzi tub). 50% lighting shall be flourscent | $7,000 |
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 320 Alabama St | remove existing sprinkler head in bathroom closet.Details
remove existing sprinkler head in bathroom closet. | $150 |
| May 31, 2007 | Completed final sign-off Jul 2007 | 320 Alabama St | to add a shower on existing bathroom with a new light and switch.Details
to add a shower on existing bathroom with a new light and switch. | $3,500 |
| Apr 23, 2007 | Completed final sign-off Feb 2008 | 234 Precita Av | 10x12 back addition to kitchenDetails
10x12 back addition to kitchen | $16,000 |
| Apr 6, 2007 | Completed final sign-off Feb 2008 | 234 Precita Av | remodel back of garage into a bedroom, bathroom, closet, hallway and laundry closetDetails
remodel back of garage into a bedroom, bathroom, closet, hallway and laundry closet | $15,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 1860 Washington St | work @ apt# 105. kitchen remodel, new countertop, new cabinets, sink, lighting, appliances, 1/2 fluor lighting. no walls removed.Details
work @ apt# 105. kitchen remodel, new countertop, new cabinets, sink, lighting, appliances, 1/2 fluor lighting. no walls removed. | $12,000 |
| Jun 28, 2006 | Completed final sign-off Sep 2006 | 1 Vesta St | kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural workDetails
kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural work | $20,000 |
| May 30, 2006 | Completed final sign-off Jul 2006 | 122 Arguello Bl | to build new bathroom (shower, toilet, sink) a closet and to move laundry area.Details
to build new bathroom (shower, toilet, sink) a closet and to move laundry area. | $25,000 |
| Feb 21, 2006 | Completed final sign-off Jun 2006 | 1560 Greenwich St | remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural workDetails
remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural work | $15,000 |
| Jan 3, 2006 | Completed final sign-off May 2006 | 69 Encanto Av | remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbingDetails
remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbing | $30,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 1560 Greenwich St | revised appl#200508291502 revise detail.Details
revised appl#200508291502 revise detail. | |
| Aug 29, 2005 | Completed final sign-off Mar 2006 | 1560 Greenwich St | enlarge (e) garage door from 7'08" to 10'-6" (see plans)Details
enlarge (e) garage door from 7'08" to 10'-6" (see plans) | $12,500 |
| Jul 15, 2005 | Completed final sign-off Nov 2005 | 1560 Greenwich St | repair dry rot portion of wall as per plan. as a revision to app#200505192937.Details
repair dry rot portion of wall as per plan. as a revision to app#200505192937. | $5,000 |
| May 19, 2005 | Completed final sign-off Nov 2005 | 1560 Greenwich St | build deck at ground w/ jacuzzi at rear yard. build deck (extend) at 2nd floor. build bathroom atDetails
build deck at ground w/ jacuzzi at rear yard. build deck (extend) at 2nd floor. build bathroom at | $30,000 |
| Mar 14, 2005 | Completed final sign-off Jun 2005 | 2012 Broadway | remodel complete kitchen w/new electricity, plumbing , sheetrock ,tile flr cabs & countertops. all wDetails
remodel complete kitchen w/new electricity, plumbing , sheetrock ,tile flr cabs & countertops. all w | $20,000 |
| Feb 28, 2005 | Completed final sign-off Jun 2005 | 2012 Broadway | remodel a complete bthrm/new electricald hot & cold water supply/sheet rock and tileDetails
remodel a complete bthrm/new electricald hot & cold water supply/sheet rock and tile | $12,000 |
| Jan 10, 2005 | Completed final sign-off Jul 2005 | 1540 Florida St | remodeling a 7'x6' bthrm/new toilet /sink/bthtb to shower/ tile/ floorDetails
remodeling a 7'x6' bthrm/new toilet /sink/bthtb to shower/ tile/ floor | $10,000 |
| Oct 28, 2004 | Completed final sign-off Jan 2005 | 1860 Washington St | remodeling of a complete bathroom 5 ft by 8 ft 6 inches. replace tile, sink, bathtub. no structuralDetails
remodeling of a complete bathroom 5 ft by 8 ft 6 inches. replace tile, sink, bathtub. no structural | $12,000 |
| Jul 16, 2004 | Completed final sign-off Jan 2005 | 1027 Russia Av | kitchen remodel and fire damage on left out side wall on proerty line 26'x10' approx.Details
kitchen remodel and fire damage on left out side wall on proerty line 26'x10' approx. | $40,000 |