Hearth Corporation
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to Jul 2026
- Last 24 months
- 9 permits filed
80 permits since 2000: 66 completed, 6 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 115 Gennessee St | to obtain final inspection for work approved under pa#202311060217 & pa#202201286877. all work is complete.Details
to obtain final inspection for work approved under pa#202311060217 & pa#202201286877. all work is complete. | |
| May 14, 2026 | In progress issued May 2026 | 401 Montecito Av | convert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech spaceDetails
convert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech space | $400,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 1755 Alabama St | kitchen and 2.5 baths upgrade. no structural work. replace fixtures, cabinetry, tile countertops. no change in interior walls.Details
kitchen and 2.5 baths upgrade. no structural work. replace fixtures, cabinetry, tile countertops. no change in interior walls. | $100,000 |
| Jan 6, 2026 | In progress issued May 2026 | 1282 Sacramento St | private roof deck, remodel of kitchen, new powder room, new penthouse roof & skylights, structural work.Details
private roof deck, remodel of kitchen, new powder room, new penthouse roof & skylights, structural work. | $125,000 |
| Oct 24, 2025 | Completed final sign-off Mar 2026 | 621 Baker St | replace existing accessory structure in kind per ordinance 146-25. replace trash enclosure in front.Details
replace existing accessory structure in kind per ordinance 146-25. replace trash enclosure in front. | $30,000 |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 1333 Jones St | condo upgrade: replace flooring, interior trim work, paint entire unit, remove peninsula, install new counters and back splash, install new vanity, replace tile floor in primary bath, recessed can trim upgradeDetails
condo upgrade: replace flooring, interior trim work, paint entire unit, remove peninsula, install new counters and back splash, install new vanity, replace tile floor in primary bath, recessed can trim upgrade | $75,000 |
| Jun 9, 2025 | In progress issued May 2026 | 5116 03rd St | documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpermitted demolition of (e) rear cottage)Details
documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpermitted demolition of (e) rear cottage) | $87,754 |
| Apr 22, 2025 | Completed final sign-off Nov 2025 | 2938 Pierce St | rev 202409160848: changes to layout, deck & basement framing.Details
rev 202409160848: changes to layout, deck & basement framing. | |
| Feb 7, 2025 | Completed final sign-off Sep 2025 | 1267 28th Av | 3-story horizontal addition at rear for new elevator shaft. remodel laundry areaDetails
3-story horizontal addition at rear for new elevator shaft. remodel laundry area | $150,000 |
| Sep 16, 2024 | Completed final sign-off Nov 2025 | 2938 Pierce St | kitchen remodel including the removal of some wall as shown on plans. new stair to basement/ lower level of unit, (1) new bathroom and remodel of (1) (e) bathroom. provide (n) deck at rear, less than 36" high and (n) 6' fence and (n) windows and doors at rear.Details
kitchen remodel including the removal of some wall as shown on plans. new stair to basement/ lower level of unit, (1) new bathroom and remodel of (1) (e) bathroom. provide (n) deck at rear, less than 36" high and (n) 6' fence and (n) windows and doors at rear. | $600,000 |
| Apr 10, 2024 | Completed final sign-off Dec 2024 | 2247 Fulton St | kitchen, laundry, primary suite and hall bath interior remodel of 4/f unit in a 3 unit, 4 story blg. replace 14 windows in existing openings, not visible from street. no change in bldg envelope.Details
kitchen, laundry, primary suite and hall bath interior remodel of 4/f unit in a 3 unit, 4 story blg. replace 14 windows in existing openings, not visible from street. no change in bldg envelope. | $135,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 591 Diamond St | revision to pa #202311281508 addition of powder room on first floor. move laundry room on first floor. remov step & build ramp.Details
revision to pa #202311281508 addition of powder room on first floor. move laundry room on first floor. remov step & build ramp. | $35,000 |
| Mar 14, 2024 | In progress issued Mar 2024 | 136 Collins St | replace garage door inkind. maintain garage ventingDetails
replace garage door inkind. maintain garage venting | $10,000 |
| Nov 28, 2023 | Completed final sign-off May 2024 | 591 Diamond St | partial foundation replacement along northside of building. no excavation or changes to floor elevation.Details
partial foundation replacement along northside of building. no excavation or changes to floor elevation. | $35,000 |
| Nov 15, 2023 | Completed final sign-off Apr 2025 | 619 Baker St | remodel lower unnit (first flr) with new deck less than 30" above grade.Details
remodel lower unnit (first flr) with new deck less than 30" above grade. | $145,000 |
| Nov 15, 2023 | Completed final sign-off Jul 2024 | 1980 Scott St | replace retaining wall and fences in backyard.Details
replace retaining wall and fences in backyard. | $24,000 |
| Nov 3, 2023 | Completed final sign-off Apr 2025 | 621 Baker St | revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window.Details
revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window. | $20,000 |
| Nov 1, 2023 | Completed final sign-off Jul 2025 | 179 Ripley St | one bathroom remodel w/ all new fixtures and finishes in kind in location. replace kitchen counters, replace rear deck decking boards.Details
one bathroom remodel w/ all new fixtures and finishes in kind in location. replace kitchen counters, replace rear deck decking boards. | $45,000 |
| Jul 11, 2023 | Completed final sign-off Feb 2025 | 2 Northwood Dr | single family residential renovation. finish (e) basement w/ (n) bedroom, 1.5 baths, laundryroom & family room, new foundation. 1 car covered parking to be maintained. no change to footprint or height.Details
single family residential renovation. finish (e) basement w/ (n) bedroom, 1.5 baths, laundryroom & family room, new foundation. 1 car covered parking to be maintained. no change to footprint or height. | $450,000 |
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 3474 16th St | hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting.Details
hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting. | $120,000 |
| Apr 19, 2023 | Completed final sign-off Apr 2025 | 621 Baker St | remodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception.Details
remodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception. | $150,000 |
| Apr 3, 2023 | Completed final sign-off Jul 2023 | 2279 Pine St | primary bath upgrade, new floors on 3rd floor.Details
primary bath upgrade, new floors on 3rd floor. | $50,000 |
| Jan 31, 2023 | Completed final sign-off Jun 2023 | 947 Church St | unit 4: kitchen upgrade- fixtures in same locations, bathroom upgrade fixtures in same location, refinish floors. remodel kitchen and 1 bath.Details
unit 4: kitchen upgrade- fixtures in same locations, bathroom upgrade fixtures in same location, refinish floors. remodel kitchen and 1 bath. | $40,000 |
| Jan 20, 2023 | Completed final sign-off Jun 2023 | 260 Romain St | rev to pa202208170699: basement remodel: finish out new bathroom, kitchentte and den. 1/f remodel: relcoate primary bathroom & closet. (no burner @ kitchenette)Details
rev to pa202208170699: basement remodel: finish out new bathroom, kitchentte and den. 1/f remodel: relcoate primary bathroom & closet. (no burner @ kitchenette) | $30,000 |
| Aug 17, 2022 | Completed final sign-off Jun 2023 | 260 Romain St | rev to pa202008222424: use stucco instead of wood siding for rear facade. relocate new deck in rear yard less than 3ft above grade. rough plumbing for future baths & wetbar.Details
rev to pa202008222424: use stucco instead of wood siding for rear facade. relocate new deck in rear yard less than 3ft above grade. rough plumbing for future baths & wetbar. | |
| Aug 8, 2022 | Never finaled issued Aug 2023, no final | 115 Gennessee St | 1st and 2nd floor horizontal addition, interior remodel. new backyard hardscape.Details
1st and 2nd floor horizontal addition, interior remodel. new backyard hardscape. | $125,000 |
| Jun 29, 2022 | Completed final sign-off Jul 2022 | 542 Natoma St | address correction from building permit # 2020-121-2375. issued to wrong address, verify inspections eid, pid & bid are complete.Details
address correction from building permit # 2020-121-2375. issued to wrong address, verify inspections eid, pid & bid are complete. | |
| Jun 9, 2022 | Completed final sign-off Sep 2022 | 145 Joost Av | upgrade primary and guest bathroom, install cabinets in (e) laundry room, new tile, fixtures, tub, and vanity.Details
upgrade primary and guest bathroom, install cabinets in (e) laundry room, new tile, fixtures, tub, and vanity. | $40,000 |
| Apr 8, 2022 | Completed final sign-off Sep 2024 | 393 Arlington St | interior renovation of 2 bedrooms on 2nd fl. replace non-conforming window at each bedroom with new double hung windows. replace windows at dining room with new double hung windows. replace (e) swing doors at kitchen with new bi-fold & swing doors.Details
interior renovation of 2 bedrooms on 2nd fl. replace non-conforming window at each bedroom with new double hung windows. replace windows at dining room with new double hung windows. replace (e) swing doors at kitchen with new bi-fold & swing doors. | $100,000 |
| Mar 22, 2022 | Completed final sign-off Jun 2022 | 947 Church St | kitchen remodeling in unit #2. new cabinets, fixtures, appliances- non structural. no change to layout of walls and openings.Details
kitchen remodeling in unit #2. new cabinets, fixtures, appliances- non structural. no change to layout of walls and openings. | $30,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 1980 Scott St | interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade.Details
interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade. | $175,000 |
| Jan 28, 2022 | Never finaled issued Feb 2022, no final | 115 Gennessee St | replace foundation. reloate laundry on 1st fl. remodel (e) 3rd fl bathroom.Details
replace foundation. reloate laundry on 1st fl. remodel (e) 3rd fl bathroom. | $75,000 |
| Dec 14, 2021 | Completed final sign-off May 2022 | 947 Church St | unit 1 and 5: kitchen upgrades. new cabinets, fixtures, appliances. non structural.Details
unit 1 and 5: kitchen upgrades. new cabinets, fixtures, appliances. non structural. | $50,000 |
| Aug 30, 2021 | Never finaled issued Aug 2021, no final | 466 Waller St | kitchen update: new cabinets, backsplash and appliances: remodel in kind- led lightsDetails
kitchen update: new cabinets, backsplash and appliances: remodel in kind- led lights | $25,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2022 | 972 Dolores St | foundation replacement. no change in elevation of existing floor level.Details
foundation replacement. no change in elevation of existing floor level. | $125,000 |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 1701 Jackson St | #102: kitchen & bathroom remodel. new flooring. removal of non-structural partition wall. <4' wide x 8' tall.Details
#102: kitchen & bathroom remodel. new flooring. removal of non-structural partition wall. <4' wide x 8' tall. | $50,000 |
| Dec 3, 2020 | Completed final sign-off May 2021 | 1654 Page St | revision to scope of work of building permit 201905211219 to reflect new sprinklers for 1st floor only.Details
revision to scope of work of building permit 201905211219 to reflect new sprinklers for 1st floor only. | |
| Aug 22, 2020 | Completed final sign-off Jun 2023 | 260 Romain St | remodel of home: including new decks at rear, conversion of portion of (e) basement to living space, including new internal stair and bath. 1/f bath remodel. landscsape work, including new retaining walls. no change to front facade or building footprint.Details
remodel of home: including new decks at rear, conversion of portion of (e) basement to living space, including new internal stair and bath. 1/f bath remodel. landscsape work, including new retaining walls. no change to front facade or building footprint. | $150,000 |
| Jan 21, 2020 | Completed final sign-off Nov 2021 | 539 02nd Av | 2nd fl dining room, kitchen, office & bath roemdel including 11sq ft addition within the bldg envelope, new windows & doors on rear wall, new fau, new attic access ladder & insulation, 3rd fl bath remodel.Details
2nd fl dining room, kitchen, office & bath roemdel including 11sq ft addition within the bldg envelope, new windows & doors on rear wall, new fau, new attic access ladder & insulation, 3rd fl bath remodel. | $105,000 |
| Jan 21, 2020 | Completed final sign-off Sep 2020 | 544 Natoma St | remodel 3rd lvl entry, 1/2 bath, guest bath. rmeodel 4th level kitchen, remodel 4th level master bath, 8th level (roof) new fenestration & hot tub on roof deck.Details
remodel 3rd lvl entry, 1/2 bath, guest bath. rmeodel 4th level kitchen, remodel 4th level master bath, 8th level (roof) new fenestration & hot tub on roof deck. | $175,000 |
| Sep 16, 2019 | Completed final sign-off May 2021 | 1654 Page St | temporary shoring permit in support for app#201905211219Details
temporary shoring permit in support for app#201905211219 | |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 5114 03rd St | exterior siding repair (not visible from the street).Details
exterior siding repair (not visible from the street). | $7,500 |
| Jul 31, 2019 | Completed final sign-off Aug 2019 | 65 Avila St | revision to 201902122730 replace 2 posts in kind and repair non structural concrete padDetails
revision to 201902122730 replace 2 posts in kind and repair non structural concrete pad | $7,500 |
| May 21, 2019 | Completed final sign-off May 2021 | 1654 Page St | replace (e) foundation and slab on 1st fl. framing upgrades to accommodate futre attic build-out, remodel garage and add 575 sq ft. rec room on 1st fl. remodel 3rd fl. bath, new sprinkler on 1st & 3rd & attic, no change to street facade or foot printDetails
replace (e) foundation and slab on 1st fl. framing upgrades to accommodate futre attic build-out, remodel garage and add 575 sq ft. rec room on 1st fl. remodel 3rd fl. bath, new sprinkler on 1st & 3rd & attic, no change to street facade or foot print | $200,000 |
| Feb 12, 2019 | Completed final sign-off Aug 2019 | 65 Avila St | remodel existing adu, with 14 sq ft increase in floor area. new fau. replace water heater with tankless modelDetails
remodel existing adu, with 14 sq ft increase in floor area. new fau. replace water heater with tankless model | $70,000 |
| Dec 13, 2018 | Never finaled issued Apr 2019, no final | 5114 03rd St | change of use to convert an (e) limited restaurant into a full service restaurant. scope include installing one dump sink, one ice bin & one under counter cooler. ** maher: n/a **Details
change of use to convert an (e) limited restaurant into a full service restaurant. scope include installing one dump sink, one ice bin & one under counter cooler. ** maher: n/a ** | $5,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 5114 03rd St | change of use from retail to cafe/deli. ref pa 2017-0302-0487 left use of commercial space unspecified. ref pa 2017-0926-9313 & 2018-0315-3766 were reviewed by mechanical and health reflected deli/cafe on plans but change of use from retail to cafe was deleted from scope.Details
change of use from retail to cafe/deli. ref pa 2017-0302-0487 left use of commercial space unspecified. ref pa 2017-0926-9313 & 2018-0315-3766 were reviewed by mechanical and health reflected deli/cafe on plans but change of use from retail to cafe was deleted from scope. | |
| Apr 27, 2018 | Completed final sign-off Feb 2019 | 1390 07th Av | interior remodel of partial kitchen and dining, laundry, 1/2 bath, new master bathroom and closet, hall bath remodelDetails
interior remodel of partial kitchen and dining, laundry, 1/2 bath, new master bathroom and closet, hall bath remodel | $75,000 |
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 5114 03rd St | revision to 201709269613/201703020487 for health routing onlyDetails
revision to 201709269613/201703020487 for health routing only | |
| Jan 31, 2018 | Completed final sign-off Apr 2018 | 260 Romain St | two new skylights on roofDetails
two new skylights on roof | $5,000 |
| Sep 26, 2017 | Completed final sign-off Oct 2018 | 5114 03rd St | mep permit related to pa #201703020487. maher naDetails
mep permit related to pa #201703020487. maher na | $35,000 |
| Jan 17, 2017 | Completed final sign-off Feb 2019 | 847 40th Av | at 1st flr, remodel (e) floor space for new bathroom, laundry, & home office, infill area under (e) 1 level deck area for new den, rear addition to cover exterior stair from 2nd floor to 1st flr at north. 1 story addition @ south 5'0" set back area.Details
at 1st flr, remodel (e) floor space for new bathroom, laundry, & home office, infill area under (e) 1 level deck area for new den, rear addition to cover exterior stair from 2nd floor to 1st flr at north. 1 story addition @ south 5'0" set back area. | $36,000 |
| Dec 30, 2016 | Completed final sign-off Mar 2017 | 393 Arlington St | interior renovations lowe level rooms, partition walls including new bathroom, bedroom, closet. deck/step outside bedroom to be less than 3' above gradeDetails
interior renovations lowe level rooms, partition walls including new bathroom, bedroom, closet. deck/step outside bedroom to be less than 3' above grade | $40,000 |
| Sep 29, 2016 | Completed final sign-off Dec 2017 | 1638 Fell St | work at upper unit only. remodel kitchen, living room, dining room, office, master bath. new furnace, new tankless water heater. replace some windows, and new skylight.Details
work at upper unit only. remodel kitchen, living room, dining room, office, master bath. new furnace, new tankless water heater. replace some windows, and new skylight. | $85,000 |
| Aug 25, 2016 | Completed final sign-off Jul 2017 | 892 Ashbury St | revision to app#201601197364. revise pre application minutes to allow attic to be sprinkler nfpa 13dDetails
revision to app#201601197364. revise pre application minutes to allow attic to be sprinkler nfpa 13d | |
| Aug 25, 2016 | Completed final sign-off Jul 2017 | 892 Ashbury St | revision to app#201604265670. revise pre application minutes to allow attic to be sprinkler nfpa 13dDetails
revision to app#201604265670. revise pre application minutes to allow attic to be sprinkler nfpa 13d | |
| Apr 26, 2016 | Completed final sign-off Jul 2017 | 892 Ashbury St | remodel 3/f master shower, hall bath & closets, remodel attic storage (portion over master bedroom), west chimney safety repairs.Details
remodel 3/f master shower, hall bath & closets, remodel attic storage (portion over master bedroom), west chimney safety repairs. | $50,000 |
| Apr 7, 2016 | Completed final sign-off Mar 2017 | 433 Natoma St | replace entry door, 3 new ada bathrooms, accessible kitchenettes, replace windows on 2nd and 3rd floors, new hvac system. all windows to be dbl hung aluminum clad wood windows. maher n/aDetails
replace entry door, 3 new ada bathrooms, accessible kitchenettes, replace windows on 2nd and 3rd floors, new hvac system. all windows to be dbl hung aluminum clad wood windows. maher n/a | $130,000 |
| Mar 23, 2016 | Completed final sign-off May 2017 | 1447 Oakdale Av | unit legalization ordinance 43-14.new bathroom to replace (e) bathroom to correct code violation. vent (e) kitchen. other work possible to make (e) in law unit buildt w/o permits conform to code.as a legal rental in law. provide (n) finance for in law unit & (n) entry vestibule.Details
unit legalization ordinance 43-14.new bathroom to replace (e) bathroom to correct code violation. vent (e) kitchen. other work possible to make (e) in law unit buildt w/o permits conform to code.as a legal rental in law. provide (n) finance for in law unit & (n) entry vestibule. | $15,000 |
| Jan 21, 2016 | Completed final sign-off May 2016 | 631 O'farrell St | 4th floor, #402: interior remodel; new tile, fixture in bathroom. relocate cabinets & fixtures in kitchen, new flooring; new elect outlets & lightingDetails
4th floor, #402: interior remodel; new tile, fixture in bathroom. relocate cabinets & fixtures in kitchen, new flooring; new elect outlets & lighting | $40,000 |
| Jan 19, 2016 | Completed final sign-off Jul 2017 | 892 Ashbury St | (n)attic dormer, skylights, & windows on east (rear) elev. extend ridge to east facade & remove collar ties. replace back brick chimney w/ (n)wood frames chimney enclosure & steel flue from 3rd flr up.Details
(n)attic dormer, skylights, & windows on east (rear) elev. extend ridge to east facade & remove collar ties. replace back brick chimney w/ (n)wood frames chimney enclosure & steel flue from 3rd flr up. | $25,000 |
| Jan 5, 2016 | Completed final sign-off Feb 2016 | 860 Waller St | soft story retrofit to comply with sfbc chapter 34b based on 2012 iebc appendix a-4Details
soft story retrofit to comply with sfbc chapter 34b based on 2012 iebc appendix a-4 | $12,000 |
| Aug 4, 2015 | Completed final sign-off Jan 2017 | 393 Arlington St | demo part of the wall b/w family room and kitchen & add beam above. add french door from kchn to deck at 1st floor. provide 2 nw shearwalls. relocate skylight in kchn & reframe roof. demo wall between family room & dining room & add beam. add joist in 1st fl. rev. to 201507171806.Details
demo part of the wall b/w family room and kitchen & add beam above. add french door from kchn to deck at 1st floor. provide 2 nw shearwalls. relocate skylight in kchn & reframe roof. demo wall between family room & dining room & add beam. add joist in 1st fl. rev. to 201507171806. | $25,000 |
| Jul 17, 2015 | Completed final sign-off Jan 2017 | 393 Arlington St | interior renovation - removel existing kitchen, bathroom & bedroom, closets, new powder room & laundry room, replace window & skylight @ kitchen. no additional sq ft will be added.Details
interior renovation - removel existing kitchen, bathroom & bedroom, closets, new powder room & laundry room, replace window & skylight @ kitchen. no additional sq ft will be added. | $40,000 |
| Mar 18, 2015 | Completed final sign-off Jun 2017 | 322 06th St | revision 201502178514. change in location of non structural walls- sprinklers under separate permit.Details
revision 201502178514. change in location of non structural walls- sprinklers under separate permit. | $2,500 |
| Feb 23, 2015 | Completed final sign-off Jun 2015 | 3363 22nd St | rear building- to comply with physical inspection report #cc-7804Details
rear building- to comply with physical inspection report #cc-7804 | $5,000 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 3363 22nd St | rear building- to obtain final inspection for work approved under pa# 200507278744 all work is complete.Details
rear building- to obtain final inspection for work approved under pa# 200507278744 all work is complete. | |
| Feb 17, 2015 | Completed final sign-off Jan 2017 | 322 06th St | #5: lower floor bathroom remodel, replace fireplace, main floor entry remodel, new closet, convert full bath to 1/2 bath, replace fireplace. n/a ordinance #155-13Details
#5: lower floor bathroom remodel, replace fireplace, main floor entry remodel, new closet, convert full bath to 1/2 bath, replace fireplace. n/a ordinance #155-13 | $45,000 |
| Dec 3, 2014 | Never finaled issued Dec 2014, no final | 2100 Bush St | revision to 201409126220, we did not insulate attic and repaired interior doors only, not replacedDetails
revision to 201409126220, we did not insulate attic and repaired interior doors only, not replaced | |
| Sep 12, 2014 | Completed final sign-off Dec 2014 | 2100 Bush St | repair wood front steps, replace gutters, repair window, interior workDetails
repair wood front steps, replace gutters, repair window, interior work | $10,000 |
| Jul 28, 2014 | Completed final sign-off Nov 2015 | 1447 Oakdale Av | (n) deck in rear yard. (2 levels).Details
(n) deck in rear yard. (2 levels). | $5,000 |
| Jun 23, 2014 | Completed final sign-off Nov 2014 | 1447 Oakdale Av | kitchen upgrade - new cabinets, new appliances, new tile floor, moving range and sink. new counter tops 50% of total rated wattage of permanently installed lighting in kitchen shall be high efficacy.Details
kitchen upgrade - new cabinets, new appliances, new tile floor, moving range and sink. new counter tops 50% of total rated wattage of permanently installed lighting in kitchen shall be high efficacy. | $20,000 |
| Feb 24, 2014 | Expired or cancelled expired Nov 2017 | 4349 20th St | revision to app#201307010866. 12 sq ft infill addition at family room, extg paint, replace 4 window in front. new bifold doors & kitchen window in back. interior remodel of both units, rear patio remodel. upgrade elect. and gas service.n/a for the maher ordinance #155-13Details
revision to app#201307010866. 12 sq ft infill addition at family room, extg paint, replace 4 window in front. new bifold doors & kitchen window in back. interior remodel of both units, rear patio remodel. upgrade elect. and gas service.n/a for the maher ordinance #155-13 | $50,000 |
| Oct 4, 2013 | Completed final sign-off Dec 2013 | 549 28th St | convert lower floor bathroom into steam room, relocate half bath to closet. plumbing fixtures added.Details
convert lower floor bathroom into steam room, relocate half bath to closet. plumbing fixtures added. | $50,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 1267 28th Av | replace in kind - 5 double hung wood windows, not visible from the street.Details
replace in kind - 5 double hung wood windows, not visible from the street. | $5,000 |
| Dec 12, 2012 | Completed final sign-off Feb 2013 | 1254 09th Av | cosmetic remodel of an extg clothing boutique. work to be performed includes intalling a new ada compliant entry door, electrical upgrades, new vinyl flooring a new paint.Details
cosmetic remodel of an extg clothing boutique. work to be performed includes intalling a new ada compliant entry door, electrical upgrades, new vinyl flooring a new paint. | $21,300 |
| Sep 10, 2012 | Completed final sign-off Nov 2012 | 1810 Webster St | repair rotten siding in kind (1600 sq. ft.) causing water petetration. remove and replace cable line. seal around floor drain in ceiling above garage.Details
repair rotten siding in kind (1600 sq. ft.) causing water petetration. remove and replace cable line. seal around floor drain in ceiling above garage. | $20,000 |
| Feb 29, 2012 | Completed final sign-off Aug 2012 | 875 Masonic Av | master bath- retile, new sink, toilet, vanity, add new shower fixtures, new recessed can lights. 2nd bath- re-tile, new sink, toilet, vanity, add new shower and tub fixtures, new recessed can lights. high efficacy lighting or occupancy sensor, cec150(k)Details
master bath- retile, new sink, toilet, vanity, add new shower fixtures, new recessed can lights. 2nd bath- re-tile, new sink, toilet, vanity, add new shower and tub fixtures, new recessed can lights. high efficacy lighting or occupancy sensor, cec150(k) | $10,000 |
| Sep 13, 2011 | Completed final sign-off Nov 2011 | 1826 Webster St | replace floor slab, floor joists, floor drain in light courtDetails
replace floor slab, floor joists, floor drain in light court | $4,000 |
| Apr 8, 2011 | Never finaled issued Apr 2011, no final | 1267 28th Av | replace in kind (6) windows in rear of house.Details
replace in kind (6) windows in rear of house. | $3,000 |