On San Francisco permits
Dec 2001 to Jun 2026

38 permits since 2000 (architect on 30 permits, engineer on 7 permits, authorized agent-others on 1 permit): 24 completed, 1 in progress, 7 never finaled, 6 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 9, 2026Completed
final sign-off Sep 2026
1275 Sacramento StTruebeck Constructionrevision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.
Details
Permit
202606092865
Status
complete
Filed
Jun 9, 2026
Permit issued
Jun 25, 2026
Final sign-off
Sep 17, 2026
Address
1275 Sacramento St

revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.

Open the permit page

Dec 22, 2025In progress
filed Dec 2025, not yet issued
120 Kearny Stinstall new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.
Details
Permit
202512222455
Status
filed
Filed
Dec 22, 2025
Declared cost
$1,000,000
Address
120 Kearny St

install new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.

Open the permit page

$1,000,000
Nov 4, 2016Never finaled
filed Nov 2016, never issued
744 Harrison Stto erect 8 stories, 1 basement, 4 units residential, 55 hotel rooms, restaurant & storage, roof deck building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **
Details
Permit
201611041986
Status
filed
Filed
Nov 4, 2016
Declared cost
$10,000,000
Address
744 Harrison St

to erect 8 stories, 1 basement, 4 units residential, 55 hotel rooms, restaurant & storage, roof deck building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **

Open the permit page

$10,000,000
Jun 8, 2016Completed
final sign-off Nov 2017
856 Market StSouth Bay Constructionproposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/a
Details
Permit
201606089412
Status
complete
Filed
Jun 8, 2016
Permit issued
Jul 20, 2016
Final sign-off
Nov 8, 2017
Declared cost
$123,000
Address
856 Market St

proposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/a

Open the permit page

$123,000
Dec 24, 2015Completed
final sign-off Aug 2016
368 Jackson StDevlin/Mcnally Constructionchange in use of existing retail use to office use; interior t.i. in 1/f suite of existing bldg, seperate from rest of bldg and accessable directly from street. work consists of installation of new partitions and fixtures, demo/mep/sprinkler system under seperate permit. n/a ordinance #155-13
Details
Permit
201512245913
Status
complete
Filed
Dec 24, 2015
Permit issued
Jan 6, 2016
Final sign-off
Aug 18, 2016
Declared cost
$150,000
Address
368 Jackson St

change in use of existing retail use to office use; interior t.i. in 1/f suite of existing bldg, seperate from rest of bldg and accessable directly from street. work consists of installation of new partitions and fixtures, demo/mep/sprinkler system under seperate permit. n/a ordinance #155-13

Open the permit page

$150,000
Oct 16, 2015Completed
final sign-off Mar 2017
135 Townsend StCannon Constructors North Incseismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance
Details
Permit
201510169929
Status
complete
Filed
Oct 16, 2015
Permit issued
Apr 4, 2016
Final sign-off
Mar 13, 2017
Declared cost
$1,500,000
Address
135 Townsend St

seismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance

Open the permit page

$1,500,000
May 18, 2015Completed
final sign-off Jan 2016
1 Kearny StNovo Construction Incnew non load bearing partitions, ceiling & finishes. mechanical & electrical included.
Details
Permit
201505186537
Status
complete
Filed
May 18, 2015
Permit issued
Jun 16, 2015
Final sign-off
Jan 6, 2016
Declared cost
$36,000
Address
1 Kearny St

new non load bearing partitions, ceiling & finishes. mechanical & electrical included.

Open the permit page

$36,000
Mar 9, 2015Completed
final sign-off Sep 2015
345 Brannan StSwinerton Buildersrevision to 200810275193. new subgrade room to house backflow prevention valves. maher not req
Details
Permit
201503090322
Status
complete
Filed
Mar 9, 2015
Permit issued
Apr 29, 2015
Final sign-off
Sep 30, 2015
Declared cost
$20,000
Address
345 Brannan St

revision to 200810275193. new subgrade room to house backflow prevention valves. maher not req

Open the permit page

$20,000
Nov 19, 2014Completed
final sign-off Dec 2014
690 Folsom StPlant Construction Company Lprevision to app#201307292946 .handrail minimum clearance detail change.n/a for the interim
Details
Permit
201411191952
Status
complete
Filed
Nov 19, 2014
Permit issued
Nov 19, 2014
Final sign-off
Dec 2, 2014
Address
690 Folsom St

revision to app#201307292946 .handrail minimum clearance detail change.n/a for the interim

Open the permit page

Sep 5, 2014Completed
final sign-off Nov 2015
660 Market Streconfigure stairs and new partition wall @ basement. n/a ordinance #155-13
Details
Permit
201409055542
Status
complete
Filed
Sep 5, 2014
Permit issued
Oct 22, 2014
Final sign-off
Nov 16, 2015
Declared cost
$36,000
Address
660 Market St

reconfigure stairs and new partition wall @ basement. n/a ordinance #155-13

Open the permit page

$36,000
Jul 3, 2014Completed
final sign-off Jan 2015
460 Bryant Stdocumentation only. change of use from warehouse to office approved by s.f. planning commission 8/9/12 case #20110895b and planning commision approval#18685. n/a maher ordinance
Details
Permit
201407030488
Status
complete
Filed
Jul 3, 2014
Permit issued
Jul 28, 2014
Final sign-off
Jan 29, 2015
Address
460 Bryant St

documentation only. change of use from warehouse to office approved by s.f. planning commission 8/9/12 case #20110895b and planning commision approval#18685. n/a maher ordinance

Open the permit page

Apr 30, 2013Completed
final sign-off Jan 2015
460 Bryant Stcompliance/w maher ord. #155-13 not req'd. excavation less than 50 cu ft. new roof deck on the (e) roof of the 1 story portion of building. work to include new lobby serving roof deck, exterior walkways & stairs that connect the roof deck to exit stairs.
Details
Permit
201304305767
Status
complete
Filed
Apr 30, 2013
Permit issued
Jan 6, 2014
Final sign-off
Jan 22, 2015
Declared cost
$65,000
Address
460 Bryant St

compliance/w maher ord. #155-13 not req'd. excavation less than 50 cu ft. new roof deck on the (e) roof of the 1 story portion of building. work to include new lobby serving roof deck, exterior walkways & stairs that connect the roof deck to exit stairs.

Open the permit page

$65,000
May 14, 2012Expired or cancelled
cancelled Feb 2013
2655 Broderick Stresponse to nov# 201168973 to legalize (e) roof deck. no new onstruction proposed.
Details
Permit
201205140394
Status
cancelled
Filed
May 14, 2012
Address
2655 Broderick St

response to nov# 201168973 to legalize (e) roof deck. no new onstruction proposed.

Open the permit page

Apr 3, 2012Never finaled
issued May 2012, no final
211 Sutter Stinstall new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits.
Details
Permit
201204037411
Status
issued
Filed
Apr 3, 2012
Permit issued
May 4, 2012
Declared cost
$300,000
Address
211 Sutter St

install new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits.

Open the permit page

$300,000
Mar 19, 2012Expired or cancelled
cancelled Feb 2013
2655 Broderick Stto respond to nov 201139322. no construction proposed. verify extg deck as approved per app#9009756 and 8504468
Details
Permit
201203196361
Status
cancelled
Filed
Mar 19, 2012
Address
2655 Broderick St

to respond to nov 201139322. no construction proposed. verify extg deck as approved per app#9009756 and 8504468

Open the permit page

Jan 13, 2012Completed
final sign-off Dec 2013
460 Bryant StPlant Construction Company Lpproceed with partial soft demolition of non fire rated/non structural interior partitions on 1st,2nd, & 3rd floors including subsurface investigation. demo is in advance of future permit application for core/shell/tenant improvement applicaiton. hote ab-17.bldg vacant on all floors.
Details
Permit
201201132210
Status
complete
Filed
Jan 13, 2012
Permit issued
Jan 13, 2012
Final sign-off
Dec 31, 2013
Declared cost
$30,000
Address
460 Bryant St

proceed with partial soft demolition of non fire rated/non structural interior partitions on 1st,2nd, & 3rd floors including subsurface investigation. demo is in advance of future permit application for core/shell/tenant improvement applicaiton. hote ab-17.bldg vacant on all floors.

Open the permit page

$30,000
Jan 3, 2011Completed
final sign-off Feb 2012
1840 Washington StJames E Roberts-Obayashi Corporationconvert unoccupied areas on floor 2-8 to owners' individual storage spaces. each area will have access doors, electrical and fire sprinklers installed. revision to #200604149027. addendum#3. fire sprinkler and life safety mep under seperate permit.
Details
Permit
201101037777
Status
complete
Filed
Jan 3, 2011
Permit issued
Jan 25, 2011
Final sign-off
Feb 16, 2012
Declared cost
$15,000
Address
1840 Washington St

convert unoccupied areas on floor 2-8 to owners' individual storage spaces. each area will have access doors, electrical and fire sprinklers installed. revision to #200604149027. addendum#3. fire sprinkler and life safety mep under seperate permit.

Open the permit page

$15,000
Jul 20, 2010Never finaled
issued Jul 2010, no final
1 Kearny StGci, Incdemolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017.
Details
Permit
201007207009
Status
issued
Filed
Jul 20, 2010
Permit issued
Jul 20, 2010
Declared cost
$10,000
Address
1 Kearny St

demolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017.

Open the permit page

$10,000
Feb 4, 2010Completed
final sign-off Feb 2012
1840 Washington Strevisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittal
Details
Permit
201002045949
Status
complete
Filed
Feb 4, 2010
Permit issued
Jun 30, 2010
Final sign-off
Feb 27, 2012
Address
1840 Washington St

revisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittal

Open the permit page

Dec 9, 2009Completed
final sign-off Feb 2012
1840 Washington Stexpansion of living & dining areas in units #801 & 802 only approx 135 sq ft each
Details
Permit
200912092950
Status
complete
Filed
Dec 9, 2009
Permit issued
Feb 22, 2010
Final sign-off
Feb 28, 2012
Declared cost
$67,500
Address
1840 Washington St

expansion of living & dining areas in units #801 & 802 only approx 135 sq ft each

Open the permit page

$67,500
Aug 10, 2009Expired or cancelled
cancelled Jan 2026
710 Market Stvoid- per charles bloszies aia request on 12/18/09. j.v.
Details
Permit
200908104459
Status
cancelled
Filed
Aug 10, 2009
Address
710 Market St

void- per charles bloszies aia request on 12/18/09. j.v.

Open the permit page

Aug 10, 2009Completed
final sign-off Mar 2011
710 Market StPremier Structures Incconstruction of office bldg lobby, interior construction, mechanical, electrical & plumbing. flooring, wall finishes, ceiling. also installation of public art in lobby. work included in 200607136416. fire sprinkler & fire alarm under separate appl
Details
Permit
200908104460
Status
complete
Filed
Aug 10, 2009
Permit issued
Dec 24, 2009
Final sign-off
Mar 1, 2011
Declared cost
$300,000
Address
710 Market St

construction of office bldg lobby, interior construction, mechanical, electrical & plumbing. flooring, wall finishes, ceiling. also installation of public art in lobby. work included in 200607136416. fire sprinkler & fire alarm under separate appl

Open the permit page

$300,000
Mar 13, 2009Completed
final sign-off Mar 2009
660 03rd StCci Com'l Constr & Improv**See 985808***revision to appl.#2008/1216/8633 showing structural support for non-load bearing flr. mounted glass partition that is being installed as part of a previously approved tenant improvement project.
Details
Permit
200903134131
Status
complete
Filed
Mar 13, 2009
Permit issued
Mar 16, 2009
Final sign-off
Mar 19, 2009
Address
660 03rd St

revision to appl.#2008/1216/8633 showing structural support for non-load bearing flr. mounted glass partition that is being installed as part of a previously approved tenant improvement project.

Open the permit page

Mar 3, 2009Never finaled
issued Mar 2009, no final
660 03rd StIncom Mechanical Inc1st floor-remove 2 (e) pendants to accomodate full height walls, add 6 new uprights, add 12 new pendants
Details
Permit
200903033252
Status
issued
Filed
Mar 3, 2009
Permit issued
Mar 3, 2009
Declared cost
$4,050
Address
660 03rd St

1st floor-remove 2 (e) pendants to accomodate full height walls, add 6 new uprights, add 12 new pendants

Open the permit page

$4,050
Dec 30, 2008Completed
final sign-off Feb 2011
710 Market StDpr Construction Incinstallation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3
Details
Permit
200812309329
Status
complete
Filed
Dec 30, 2008
Permit issued
Aug 5, 2009
Final sign-off
Feb 22, 2011
Declared cost
$75,000
Address
710 Market St

installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3

Open the permit page

$75,000
Dec 16, 2008Completed
final sign-off Mar 2009
660 03rd Stt.i. for ground floor - new floor finishes, elec, lighting & mech, new acoustical enclosure at new shop, new workspace & project rooms. (all mep under separate permit).
Details
Permit
200812168633
Status
complete
Filed
Dec 16, 2008
Permit issued
Dec 18, 2008
Final sign-off
Mar 19, 2009
Declared cost
$120,000
Address
660 03rd St

t.i. for ground floor - new floor finishes, elec, lighting & mech, new acoustical enclosure at new shop, new workspace & project rooms. (all mep under separate permit).

Open the permit page

$120,000
Dec 1, 2008Completed
final sign-off Oct 2009
942 Market Streplace e wood fixed windows on market st and mason st facades and lightwell with new operable windows
Details
Permit
200812017498
Status
complete
Filed
Dec 1, 2008
Permit issued
Apr 6, 2009
Final sign-off
Oct 22, 2009
Declared cost
$42,000
Address
942 Market St

replace e wood fixed windows on market st and mason st facades and lightwell with new operable windows

Open the permit page

$42,000
Sep 15, 2008Never finaled
issued Sep 2008, no final
690 Market St5th floor employees break room, relocate walls around room 509 adding door, relocate plum,bing & electrical.
Details
Permit
200809151601
Status
issued
Filed
Sep 15, 2008
Permit issued
Sep 15, 2008
Declared cost
$20,000
Address
690 Market St

5th floor employees break room, relocate walls around room 509 adding door, relocate plum,bing & electrical.

Open the permit page

$20,000
Aug 27, 2008Never finaled
issued Aug 2008, no final
660 Market Strenew pa# 2007/05/17/1584 to complete work. (remove skylights from elevator penthouse & in fill with 2 hours construction)
Details
Permit
200808270182
Status
issued
Filed
Aug 27, 2008
Permit issued
Aug 27, 2008
Declared cost
$4,000
Address
660 Market St

renew pa# 2007/05/17/1584 to complete work. (remove skylights from elevator penthouse & in fill with 2 hours construction)

Open the permit page

$4,000
May 8, 2008Completed
final sign-off Mar 2009
660 03rd Stground floor improvements, work includes new floor finishes & lighting; new rated enclosures at existing freight elevator shafts; new rear exit; reconfigured rear loading dock; and new space for tenant bicycle storage; new accessible restrooms. m.e.p. under separate permit.
Details
Permit
200805081575
Status
complete
Filed
May 8, 2008
Permit issued
Jul 31, 2008
Final sign-off
Mar 19, 2009
Declared cost
$90,000
Address
660 03rd St

ground floor improvements, work includes new floor finishes & lighting; new rated enclosures at existing freight elevator shafts; new rear exit; reconfigured rear loading dock; and new space for tenant bicycle storage; new accessible restrooms. m.e.p. under separate permit.

Open the permit page

$90,000
Mar 10, 2008Completed
final sign-off Feb 2011
710 Market StDpr Construction Inctower crane drawings to site permit application 200607136416.
Details
Permit
200803106736
Status
complete
Filed
Mar 10, 2008
Permit issued
Mar 12, 2008
Final sign-off
Feb 18, 2011
Address
710 Market St

tower crane drawings to site permit application 200607136416.

Open the permit page

Oct 25, 2007Completed
final sign-off Feb 2011
710 Market StDpr Construction Incsidewalk shoring and excavation reference to site permit # 200607136416 and demo permit #200705252255
Details
Permit
200710256497
Status
complete
Filed
Oct 25, 2007
Permit issued
May 11, 2009
Final sign-off
Feb 18, 2011
Declared cost
$150,000
Address
710 Market St

sidewalk shoring and excavation reference to site permit # 200607136416 and demo permit #200705252255

Open the permit page

$150,000
Aug 29, 2007Expired or cancelled
expired Jun 2008
88 Kearny Straise access to existing water tank in basement to increase tank capacity. no work to life safety system. no mechanical/plumbing/electrical.
Details
Permit
200708291242
Status
expired
Filed
Aug 29, 2007
Permit issued
Aug 30, 2007
Declared cost
$9,000
Address
88 Kearny St

raise access to existing water tank in basement to increase tank capacity. no work to life safety system. no mechanical/plumbing/electrical.

Open the permit page

$9,000
Feb 12, 2007Expired or cancelled
expired Jun 2008
690 Market Strevision to pa# 200308051235s2-the scope of this work is to clarify the doors that required 18 stirke edge clearence and other disable access items.
Details
Permit
200702123951
Status
expired
Filed
Feb 12, 2007
Permit issued
Mar 6, 2007
Address
690 Market St

revision to pa# 200308051235s2-the scope of this work is to clarify the doors that required 18 stirke edge clearence and other disable access items.

Open the permit page

Jan 30, 2007Expired or cancelled
withdrawn May 2007
250 Brannan Strenovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain.
Details
Permit
200701302920
Status
withdrawn
Filed
Jan 30, 2007
Declared cost
$12,000,000
Address
250 Brannan St

renovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain.

Open the permit page

$12,000,000
Dec 2, 2004Completed
final sign-off Jun 2005
228 Grant Avtenant improvement of 6th floor. provide mirror at back of elevator cab for upgrade.
Details
Permit
200412020518
Status
complete
Filed
Dec 2, 2004
Permit issued
Dec 2, 2004
Final sign-off
Jun 8, 2005
Declared cost
$85,000
Address
228 Grant Av

tenant improvement of 6th floor. provide mirror at back of elevator cab for upgrade.

Open the permit page

$85,000
Aug 5, 2003Never finaled
issued May 2007, no final
942 Market Stconversion of existing office to residential, new seismic upgrade, fire protection, new
Details
Permit
200308051236
Status
issued
Filed
Aug 5, 2003
Permit issued
May 3, 2007
Declared cost
$4,000,000
Address
942 Market St

conversion of existing office to residential, new seismic upgrade, fire protection, new

Open the permit page

$4,000,000
Dec 28, 2001Completed
final sign-off Mar 2002
2 Embarcadero Centernew flr, partitions to be constructed within existing tenant shell. repair existing gypsum board cei
Details
Permit
200112286041
Status
complete
Filed
Dec 28, 2001
Permit issued
Dec 28, 2001
Final sign-off
Mar 20, 2002
Declared cost
$30,000
Address
2 Embarcadero Center

new flr, partitions to be constructed within existing tenant shell. repair existing gypsum board cei

Open the permit page

$30,000