Cci Com'l Constr & Improv**See 985808***
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2016
- Last 24 months
- 0 permits filed
204 permits since 2000: 150 completed, 32 never finaled, 22 expired or cancelled.
Of the 32 never-finaled permits, 32 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 204.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2016 | Completed final sign-off May 2017 | 30 03rd St | ab-010 complaiance fdor extg communicating openings related to app#201503050030(26 3rd street) revision to pa 201503050030 for communicating opening to 703 marketDetails
ab-010 complaiance fdor extg communicating openings related to app#201503050030(26 3rd street) revision to pa 201503050030 for communicating opening to 703 market | $5,555 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 424 09th St | roof top : hvac support plus hvac mechanical vertical shaft to 1st floor. plus basement transformers vault enclosure. mech under sep permit. maher naDetails
roof top : hvac support plus hvac mechanical vertical shaft to 1st floor. plus basement transformers vault enclosure. mech under sep permit. maher na | $65,000 |
| Aug 21, 2015 | Completed final sign-off Jan 2016 | 424 09th St | voluntary structural seismic upgrade to the (e) bld, including 2 new braced frames at the front and rear of the blg. maher naDetails
voluntary structural seismic upgrade to the (e) bld, including 2 new braced frames at the front and rear of the blg. maher na | $385,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 1453 Mission St | install hvac heat pump system with air distribution. n/a for the maher.Details
install hvac heat pump system with air distribution. n/a for the maher. | $18,000 |
| Mar 30, 2015 | Completed final sign-off Oct 2015 | 1263 Mission St | b-3 flors: interior mech & plum system upgrade . ref pa# 2015 0323 1540 maher - not req'dDetails
b-3 flors: interior mech & plum system upgrade . ref pa# 2015 0323 1540 maher - not req'd | $85,800 |
| Mar 23, 2015 | Completed final sign-off Mar 2016 | 1263 Mission St | 3rd flr: add connecting stair from mezz. to 3rd flr, add 2 hr rated mech shaft, add kitchen in basement, add new walls add skylight. maher - not req'dDetails
3rd flr: add connecting stair from mezz. to 3rd flr, add 2 hr rated mech shaft, add kitchen in basement, add new walls add skylight. maher - not req'd | $75,800 |
| Jan 14, 2015 | Completed final sign-off Oct 2016 | 55 Music Concourse Dr | level b1: remodel of (e) kitchen and dining room, non structural demolition. new non-structural partitions, lighting, ceiling and finishes; maher n/aDetails
level b1: remodel of (e) kitchen and dining room, non structural demolition. new non-structural partitions, lighting, ceiling and finishes; maher n/a | $165,000 |
| Dec 29, 2014 | Expired or cancelled cancelled Jan 2026 | 55 Music Concourse Dr | scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/aDetails
scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/a | $20,000 |
| Sep 15, 2014 | Completed final sign-off Mar 2016 | 1263 Mission St | revision to appl #2014.0219.8856: revisoin to tenant interior 1st floor mezzanine. also revision to appl #2013.1108.1487: removal of showers on the 2nd & 3rd floor. n/a maher ordinanceDetails
revision to appl #2014.0219.8856: revisoin to tenant interior 1st floor mezzanine. also revision to appl #2013.1108.1487: removal of showers on the 2nd & 3rd floor. n/a maher ordinance | |
| Jul 25, 2014 | Completed final sign-off May 2016 | 1 Montgomery St | 1st floor: ada upgrade of egress doors, remove and replace door/hardware. remove extg office space:new furniture and finishes. no work , no mechanical work or no lighting work to fire alarm/life safety.Details
1st floor: ada upgrade of egress doors, remove and replace door/hardware. remove extg office space:new furniture and finishes. no work , no mechanical work or no lighting work to fire alarm/life safety. | $55,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 1420 Sutter St | new structural framing for future roof top mechanical uints. mechanical permit to be submitted separatelyDetails
new structural framing for future roof top mechanical uints. mechanical permit to be submitted separately | $5,000 |
| Apr 15, 2014 | Expired or cancelled expired Mar 2018 | 644 Broadway | revision app#201312204760 to change location of the bathroom on a2.2 and mech shafter #2/minor mechanical changesDetails
revision app#201312204760 to change location of the bathroom on a2.2 and mech shafter #2/minor mechanical changes | |
| Mar 6, 2014 | Completed final sign-off Mar 2014 | 1420 Sutter St | merchanical only, ref. to to pa#201308214879, new ducting from (e) unit, new heating unit.Details
merchanical only, ref. to to pa#201308214879, new ducting from (e) unit, new heating unit. | $25,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 1686 Union St | to obtain final inspection for work approved under pa # 201009231460. all work is complete.Details
to obtain final inspection for work approved under pa # 201009231460. all work is complete. | |
| Feb 19, 2014 | Completed final sign-off Jan 2017 | 1263 Mission St | revision to app#201309237483. revision to t.i. work to basement and 1st floor, including new ada bathroom location, smaller mezzanine, reduced exterior work at front and rear facade.n/a for the maher ordinance #155-13 & n/a for the interim controls #428-13Details
revision to app#201309237483. revision to t.i. work to basement and 1st floor, including new ada bathroom location, smaller mezzanine, reduced exterior work at front and rear facade.n/a for the maher ordinance #155-13 & n/a for the interim controls #428-13 | |
| Jan 15, 2014 | Completed final sign-off Feb 2014 | 101 Henry Adams St | #272- commercial tenant improvement at 2/f suite of existing showroom bldg., construct new display partitions, break area and new storefront window, all work within suite. compliance with ordinance no. 155-13 not required.Details
#272- commercial tenant improvement at 2/f suite of existing showroom bldg., construct new display partitions, break area and new storefront window, all work within suite. compliance with ordinance no. 155-13 not required. | $80,000 |
| Jan 15, 2014 | Completed final sign-off Feb 2014 | 101 Henry Adams St | #101- commercial tenant improvement at 1/f suite of existing showroom bldg., construct new display partitions, office and storage room within existing showroom suite, compliance with ordinance no. 155-13 not required.Details
#101- commercial tenant improvement at 1/f suite of existing showroom bldg., construct new display partitions, office and storage room within existing showroom suite, compliance with ordinance no. 155-13 not required. | $120,000 |
| Dec 20, 2013 | Expired or cancelled expired Mar 2018 | 644 Broadway | core & shell improvements to (e) 4 story bldg, with improvements to 1st thru 4 floors includiing new restrooms on floors 3 & 4 only. new air conditioning & lighting. all floors are (e) shell spaces. no work to the (e) basement theater.Details
core & shell improvements to (e) 4 story bldg, with improvements to 1st thru 4 floors includiing new restrooms on floors 3 & 4 only. new air conditioning & lighting. all floors are (e) shell spaces. no work to the (e) basement theater. | $935,427 |
| Dec 13, 2013 | Never finaled issued Jan 2014, no final | 55 Music Concourse Dr | renovation of basement bi level storage room - installation of walls + glass walls for animal display.Details
renovation of basement bi level storage room - installation of walls + glass walls for animal display. | $50,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 461 Bush St | soft demo of non-structural walls, remove ventillation system, remove (e) lights, j-box, conduits, outlets, etc. demolition on basement and ground floor per ab017.Details
soft demo of non-structural walls, remove ventillation system, remove (e) lights, j-box, conduits, outlets, etc. demolition on basement and ground floor per ab017. | $5,000 |
| Dec 2, 2013 | Completed final sign-off May 2014 | 600 California St | 9th fl. barrier removal only. upgrades to (e) toilet rooms for accessibility.Details
9th fl. barrier removal only. upgrades to (e) toilet rooms for accessibility. | $35,000 |
| Nov 18, 2013 | Completed final sign-off Mar 2016 | 424 09th St | (n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permitDetails
(n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permit | $85,300 |
| Oct 25, 2013 | Completed final sign-off Dec 2013 | 2 Henry Adams St | switch doors and window positions as well as remove and relocate extg window in west room. all work to take place on second floor.Details
switch doors and window positions as well as remove and relocate extg window in west room. all work to take place on second floor. | $5,000 |
| Oct 15, 2013 | Never finaled issued Jan 2014, no final | 200 Kansas St | demolition of inteior structural wall, construct demising walls, new tenant exterior opening and glazing. compliance with ordinance #155-13 not required.Details
demolition of inteior structural wall, construct demising walls, new tenant exterior opening and glazing. compliance with ordinance #155-13 not required. | $110,000 |
| Oct 10, 2013 | Completed final sign-off Jan 2014 | 3201 California St | interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permitDetails
interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permit | $350,000 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 2 Henry Adams St | to obtain title -24. ref app#201306210218Details
to obtain title -24. ref app#201306210218 | $1,000 |
| Oct 4, 2013 | Completed final sign-off Mar 2016 | 424 09th St | 1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permitDetails
1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permit | $336,500 |
| Oct 3, 2013 | Expired or cancelled expired Mar 2018 | 644 Broadway | 1st & 2nd floors-demolition of extg restaurant spaces. scope of work includes removal of extg partitions, suspended ceiling system, floor finishes, lighting fixtures and kitchen equipment. ti under separate permit, and ab-017 applies.Details
1st & 2nd floors-demolition of extg restaurant spaces. scope of work includes removal of extg partitions, suspended ceiling system, floor finishes, lighting fixtures and kitchen equipment. ti under separate permit, and ab-017 applies. | $10,000 |
| Sep 26, 2013 | Completed final sign-off Oct 2013 | 221 Main St | 9th floor - demolitoin of all interior partitoins, flooring & ceiling grid & tiles & light fixtures. architectural, mechanical electrical, life safety & sprinkler system modification are deferred submittal. path of travel not required per ab-017Details
9th floor - demolitoin of all interior partitoins, flooring & ceiling grid & tiles & light fixtures. architectural, mechanical electrical, life safety & sprinkler system modification are deferred submittal. path of travel not required per ab-017 | $20,000 |
| Sep 23, 2013 | Completed final sign-off Mar 2016 | 1263 Mission St | tenant improvement to basement & first floors, including new interior light wells to basement, replacement ada bathrooms, ada bulding access and new first floor mezzanine. front & rear facade revision (n) (replaced storefront), (n) rear (minna) entry & restored winds under separate permit.Details
tenant improvement to basement & first floors, including new interior light wells to basement, replacement ada bathrooms, ada bulding access and new first floor mezzanine. front & rear facade revision (n) (replaced storefront), (n) rear (minna) entry & restored winds under separate permit. | $85,300 |
| Sep 19, 2013 | Completed final sign-off Oct 2013 | 200 Potrero Av | t-24 energy compliance, ref #2013-0813-4150Details
t-24 energy compliance, ref #2013-0813-4150 | $3,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 731 Sansome St | new non-load bearing walls, doors & glazing. relocated lights & new outlets, new unisex restroom. all mep work to be design/build under separate permit.Details
new non-load bearing walls, doors & glazing. relocated lights & new outlets, new unisex restroom. all mep work to be design/build under separate permit. | $58,000 |
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 444 Spear St | reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permitDetails
reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permit | $100,000 |
| Aug 23, 2013 | Never finaled issued Sep 2013, no final | 1145 Market St | 4th floor: mechanical, electrical and plumbing. ref. to pa# 201308083898Details
4th floor: mechanical, electrical and plumbing. ref. to pa# 201308083898 | $125,000 |
| Aug 21, 2013 | Completed final sign-off Mar 2014 | 1420 Sutter St | change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permitDetails
change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permit | $350,000 |
| Aug 19, 2013 | Completed final sign-off Apr 2016 | 644 Broadway | 3rd floor:demolition of extg commercial office commercial office space. scope of work includes removal of extg partitions, suspended ceiling systems, floor finishes, lighting fixtures and plumbing fixtures.Details
3rd floor:demolition of extg commercial office commercial office space. scope of work includes removal of extg partitions, suspended ceiling systems, floor finishes, lighting fixtures and plumbing fixtures. | $22,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 200 Potrero Av | add non load bearing partitions (67'-0") linear ft x 16'-0" tall, new tile wainscot, new vinyl floor & rubber wall base. repl fitting & fixtures at (e) accessible toilet rooms. repl (e) main entry door (accessibility upgrades). provide (n) power assist at main entry door.Details
add non load bearing partitions (67'-0") linear ft x 16'-0" tall, new tile wainscot, new vinyl floor & rubber wall base. repl fitting & fixtures at (e) accessible toilet rooms. repl (e) main entry door (accessibility upgrades). provide (n) power assist at main entry door. | $20,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 1145 Market St | 4th floor-t.i includes demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately, building is fully sprinkleredDetails
4th floor-t.i includes demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately, building is fully sprinklered | $450,000 |
| Jul 31, 2013 | Expired or cancelled expired Oct 2016 | 1244 Sutter St | revision to app#201307192283 to show temporary kitchen and showers.Details
revision to app#201307192283 to show temporary kitchen and showers. | $70,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 221 Main St | 2nd floor-demo of partitons, millwork, electrical, plumbing & ceiling work. architectural, mechanical, sprinkler & life safety are under seperate permits, per ab-017Details
2nd floor-demo of partitons, millwork, electrical, plumbing & ceiling work. architectural, mechanical, sprinkler & life safety are under seperate permits, per ab-017 | $27,500 |
| Jul 25, 2013 | Expired or cancelled expired Mar 2018 | 644 Broadway | demolition of extg commercial office space. scope of work includes removal of extg partitions, suspended ceiling systems, floor finishes, lighting fixtures and plmg fixtures.Details
demolition of extg commercial office space. scope of work includes removal of extg partitions, suspended ceiling systems, floor finishes, lighting fixtures and plmg fixtures. | $10,000 |
| Jul 19, 2013 | Expired or cancelled expired Oct 2016 | 1244 Sutter St | construct temporary partition walls and plumbing fixtures for realityDetails
construct temporary partition walls and plumbing fixtures for reality | $5,000 |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 1145 Market St | 4th floor structural upgrade: (n) 3/8" bottom flange cover pl at selected (e) steel beams (8total) to accomodate (n) fixed shelving. shelving & tenant improvement under future separate permit.Details
4th floor structural upgrade: (n) 3/8" bottom flange cover pl at selected (e) steel beams (8total) to accomodate (n) fixed shelving. shelving & tenant improvement under future separate permit. | $20,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 1145 Market St | 4th fl. demo only consisting of removal of non rated non structural partitions. all new construction will be submitted separately. building is fully sprinklered. ab-17Details
4th fl. demo only consisting of removal of non rated non structural partitions. all new construction will be submitted separately. building is fully sprinklered. ab-17 | $15,000 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 2770 Taylor St | installation of new heat pump on roof top and new duct work. ref app#201302271093Details
installation of new heat pump on roof top and new duct work. ref app#201302271093 | $10,000 |
| May 24, 2013 | Never finaled issued May 2013, no final | 55 Music Concourse Dr | remodel of display area at existing lower floor including 7'-0" high wood panel sliding security partition. millwork by others.Details
remodel of display area at existing lower floor including 7'-0" high wood panel sliding security partition. millwork by others. | $10,000 |
| May 16, 2013 | Never finaled issued May 2013, no final | 2770 Taylor St | structural permit for sign. ref app#201304255421Details
structural permit for sign. ref app#201304255421 | $40,000 |
| Apr 23, 2013 | Never finaled issued Apr 2013, no final | 22 04th St | 7th floor-install new wall & millworkDetails
7th floor-install new wall & millwork | $125,000 |
| Apr 16, 2013 | Never finaled issued Jun 2013, no final | 1 Beach St | tenant improvement of school. 2xwall removal. 1xdoor relocation. 1xpartial wall addition. 1x door removal; no changes to (e) lighting and hvacDetails
tenant improvement of school. 2xwall removal. 1xdoor relocation. 1xpartial wall addition. 1x door removal; no changes to (e) lighting and hvac | $55,000 |
| Apr 12, 2013 | Completed final sign-off Oct 2013 | 200 Kansas St | 1st & 2nd floors-non-structural demo only - of 2 unoccupied floors, no build back. no accessibility work per ab-017. no change in occupancy, use, area.Details
1st & 2nd floors-non-structural demo only - of 2 unoccupied floors, no build back. no accessibility work per ab-017. no change in occupancy, use, area. | $348,000 |
| Apr 11, 2013 | Completed final sign-off May 2013 | 22 04th St | construct 3 new non rated partitions to subdivide (e) office and 6 (n) offices, add 2 clerestory windows within (e) partition on the 6th fl. mechanical, sprinklers, elctrical and fire alrm separte permits.Details
construct 3 new non rated partitions to subdivide (e) office and 6 (n) offices, add 2 clerestory windows within (e) partition on the 6th fl. mechanical, sprinklers, elctrical and fire alrm separte permits. | $20,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 300 Brannan St | barrier removal to expand extg unisex bathroom on 3rd floor to upgrade to ada standards, removal and relocation of one concrete wall opening to create an acussible path to bathrooms finishes and lighting placement, addtion of exit signs. mep under separate permit.Details
barrier removal to expand extg unisex bathroom on 3rd floor to upgrade to ada standards, removal and relocation of one concrete wall opening to create an acussible path to bathrooms finishes and lighting placement, addtion of exit signs. mep under separate permit. | $59,360 |
| Mar 21, 2013 | Never finaled issued Mar 2013, no final | 12 Mint Pz | ada access improvements and tenant improvement in an existing credit union occupied space infill e opening and sawcut concrete wall. fully sprinkleredDetails
ada access improvements and tenant improvement in an existing credit union occupied space infill e opening and sawcut concrete wall. fully sprinklered | $200,000 |
| Mar 18, 2013 | Completed final sign-off Jan 2014 | 55 Grant Av | replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lightsDetails
replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lights | $70,000 |
| Mar 12, 2013 | Completed final sign-off May 2013 | 600 Townsend St | suite #100-non bearing wall extention to (e) wall indicated by dash line. new pantry, new lighting. ada accessibility under pa# 2008-0225-5475Details
suite #100-non bearing wall extention to (e) wall indicated by dash line. new pantry, new lighting. ada accessibility under pa# 2008-0225-5475 | $50,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible constructionDetails
revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible construction | $70,000 |
| Feb 19, 2013 | Completed final sign-off Oct 2013 | 2 Henry Adams St | demolition non structual. reopen an reinforce previously in filled wall opening . see structural drawing. t.i. under seperate permit.Details
demolition non structual. reopen an reinforce previously in filled wall opening . see structural drawing. t.i. under seperate permit. | $5,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 185 Berry St | the project consists only demolition work to be performed in suite 4800, a vacant space on 4th fl of (e) wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include anyDetails
the project consists only demolition work to be performed in suite 4800, a vacant space on 4th fl of (e) wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include any | $46,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 185 Berry St | the consists only demolition work to be performed in suite 3150, a vacant space on 3rd fl of existing wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include anyDetails
the consists only demolition work to be performed in suite 3150, a vacant space on 3rd fl of existing wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include any | $8,000 |
| Jan 28, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | floor leveling in basement and ground floor. reinforce mezzanine floor at ground floor. modify mezzanine in basement. add/reconfigure corridor at ground floor. misc shell and core mep work.Details
floor leveling in basement and ground floor. reinforce mezzanine floor at ground floor. modify mezzanine in basement. add/reconfigure corridor at ground floor. misc shell and core mep work. | $400,000 |
| Dec 26, 2012 | Completed final sign-off Jul 2016 | 55 Music Concourse Dr | t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permitsDetails
t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permits | $2,000,000 |
| Dec 13, 2012 | Completed final sign-off Jun 2013 | 2300 16th St | demolish (e) interior finishes. construct (n) interior demising wall. remodel (e) storefront. demo exterior trellis over stair. mep shall be deferred design-build submittal. shell work only.Details
demolish (e) interior finishes. construct (n) interior demising wall. remodel (e) storefront. demo exterior trellis over stair. mep shall be deferred design-build submittal. shell work only. | $38,000 |
| Dec 3, 2012 | Never finaled issued Apr 2013, no final | 654 Mission St | install security door and frame and new audible alarm at (e) opening locate on ground level at ambrose bierce alley. revision to compy with cbc 1008.1.9.7Details
install security door and frame and new audible alarm at (e) opening locate on ground level at ambrose bierce alley. revision to compy with cbc 1008.1.9.7 | $7,500 |
| Nov 30, 2012 | Completed final sign-off Jan 2013 | 1 Montgomery St | 2/f - ada toilet upgrade, barrier removal project.Details
2/f - ada toilet upgrade, barrier removal project. | $50,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 440 Pacific Av | upgrade e non compliant building entry by installing an accessible lift for access to the 1st flDetails
upgrade e non compliant building entry by installing an accessible lift for access to the 1st fl | $10,000 |
| Aug 20, 2012 | Completed final sign-off Dec 2012 | 151 10th St | new offices, minor modification to mep/fls under separate permit, interior finish upgrades.Details
new offices, minor modification to mep/fls under separate permit, interior finish upgrades. | $130,000 |
| Aug 15, 2012 | Completed final sign-off Nov 2012 | 1550 Bryant St | 2nd floor, suite 200. ti, demolishing of non-structural partitions and building (n) non-structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design-build and submitted separately. bldg is fully sprinklered.Details
2nd floor, suite 200. ti, demolishing of non-structural partitions and building (n) non-structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design-build and submitted separately. bldg is fully sprinklered. | $120,000 |
| Aug 9, 2012 | Completed final sign-off Sep 2012 | 101 Henry Adams St | 4th floor:revisiion to app#201206051827.scope of work: 1) new demising wall, extg doors, corridor in extg space. 2) demising wall in tenant space as called out.Details
4th floor:revisiion to app#201206051827.scope of work: 1) new demising wall, extg doors, corridor in extg space. 2) demising wall in tenant space as called out. | $1,000 |
| Aug 1, 2012 | Completed final sign-off Sep 2012 | 1550 Bryant St | 9th floor-t.i includes bldg out full height non structural partitions, new doors/frames. interior glazing relocation of light fixtures & selected new lighting. all new or revised/modified hvac, electrical, plumbing & life safety work will be design build & submitted seperatlyDetails
9th floor-t.i includes bldg out full height non structural partitions, new doors/frames. interior glazing relocation of light fixtures & selected new lighting. all new or revised/modified hvac, electrical, plumbing & life safety work will be design build & submitted seperatly | $150,000 |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 2 Henry Adams St | construction new tile display walls for extg showroom. if required, sprinkler under separate permit.Details
construction new tile display walls for extg showroom. if required, sprinkler under separate permit. | $40,000 |
| Jun 21, 2012 | Completed final sign-off Aug 2012 | 1550 Bryant St | 7th fl: suite 738,739,740. build out full height non structural partitions, new doors/frames, interior glazing demo existing ceiling, relocate light fixtures. all new or modified hvac, electrical, plumbing , life safety work will be design build, submitted separately.Details
7th fl: suite 738,739,740. build out full height non structural partitions, new doors/frames, interior glazing demo existing ceiling, relocate light fixtures. all new or modified hvac, electrical, plumbing , life safety work will be design build, submitted separately. | $150,000 |
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 1550 Bryant St | 3rd fl, suite 310 ti: build out full height and low height non structural partitions. all new or revised hvac, electrical, plumbing and life safety will be design build on separate permitDetails
3rd fl, suite 310 ti: build out full height and low height non structural partitions. all new or revised hvac, electrical, plumbing and life safety will be design build on separate permit | $40,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 444 Spear St | ti for suite 210 on 2nd floor including non structural partitions, doors, sidelites, finishes, light fixtures. no change in area, occpancy or use. mep drawings, fire alarms, sprinklers will be submitted under separate permitDetails
ti for suite 210 on 2nd floor including non structural partitions, doors, sidelites, finishes, light fixtures. no change in area, occpancy or use. mep drawings, fire alarms, sprinklers will be submitted under separate permit | $65,000 |
| Jun 5, 2012 | Completed final sign-off Sep 2012 | 101 Henry Adams St | 4th floor-new demising wall, exiting doors & corridor in (e) spaceDetails
4th floor-new demising wall, exiting doors & corridor in (e) space | $50,000 |
| May 25, 2012 | Completed final sign-off Oct 2012 | 1453 Mission St | erect 2 projecting double faced non illuminated new sign (banners)Details
erect 2 projecting double faced non illuminated new sign (banners) | $4,000 |
| May 23, 2012 | Never finaled issued May 2012, no final | 1453 Mission St | project consists of renovation of approx 2998 sq ft of (e) office space on the 5th floor into an open office & office space for the california institute of integeral studies. life safety under separate permitsDetails
project consists of renovation of approx 2998 sq ft of (e) office space on the 5th floor into an open office & office space for the california institute of integeral studies. life safety under separate permits | $85,000 |
| Apr 27, 2012 | Completed final sign-off Jun 2012 | 55 Concourse Dr | extend north concrete site wall & south concrete curb. extend bicycle parking pad. install new bicycle parking racks embedded into new bicycle parking pad. add concrete ramp from sidewalk to new bicycle pad.Details
extend north concrete site wall & south concrete curb. extend bicycle parking pad. install new bicycle parking racks embedded into new bicycle parking pad. add concrete ramp from sidewalk to new bicycle pad. | $35,000 |
| Apr 11, 2012 | Completed final sign-off Oct 2012 | 312 Sutter St | tenant improvement at suites #510 work includes construction of new non-load bearing partitions, interior finish upgrades, minor ceiling & lighting. electrical, plumbing retrofits & accessibility upgrades. mech, elec & plumbing udner separate permits.Details
tenant improvement at suites #510 work includes construction of new non-load bearing partitions, interior finish upgrades, minor ceiling & lighting. electrical, plumbing retrofits & accessibility upgrades. mech, elec & plumbing udner separate permits. | $28,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 2 Henry Adams St | demo work to include e tbar grid and tiles in low ceiling area, removal of new drywall partitions, removal of all e carpet flooring and demo of e corridor wall for new roll up doorDetails
demo work to include e tbar grid and tiles in low ceiling area, removal of new drywall partitions, removal of all e carpet flooring and demo of e corridor wall for new roll up door | $18,000 |
| Mar 27, 2012 | Completed final sign-off Oct 2012 | 312 Sutter St | tenant improvement at suites #401. work includes demo (e) non-load bearing partitoins & construction of new non-load bearing partitions, interior finish upgrades, ceiling & lighting retrofit. mech, elec, lighting, plumbing under sep permitDetails
tenant improvement at suites #401. work includes demo (e) non-load bearing partitoins & construction of new non-load bearing partitions, interior finish upgrades, ceiling & lighting retrofit. mech, elec, lighting, plumbing under sep permit | $45,000 |
| Mar 7, 2012 | Completed final sign-off Dec 2012 | 151 10th St | to obtain final inspection for work approved under pa # 200703287540. all work is complete.Details
to obtain final inspection for work approved under pa # 200703287540. all work is complete. | |
| Feb 27, 2012 | Completed final sign-off Nov 2015 | 660 03rd St | 2nd fl ti: remodel e restrooms and relocate breakroom. add new restroom and conference room. mep under separate permit.Details
2nd fl ti: remodel e restrooms and relocate breakroom. add new restroom and conference room. mep under separate permit. | $65,000 |
| Feb 15, 2012 | Completed final sign-off May 2012 | 208 Utah St | modify e masonry wall with 3 new openings. add new design build fiber wrap reinforcing, new steel jambs, headers, and new continuous bolted steel collector angle. al work on the 4th floorDetails
modify e masonry wall with 3 new openings. add new design build fiber wrap reinforcing, new steel jambs, headers, and new continuous bolted steel collector angle. al work on the 4th floor | $30,000 |
| Feb 14, 2012 | Completed final sign-off May 2012 | 208 Utah St | 4th floor - commercial interior tenant improvement. demolition and construction of interior walls, doors, and glazing. mep & structural work under speparate permits.Details
4th floor - commercial interior tenant improvement. demolition and construction of interior walls, doors, and glazing. mep & structural work under speparate permits. | $200,000 |
| Jan 24, 2012 | Expired or cancelled cancelled Nov 2024 | 1155 Battery St | revision to appl #2011.10.19.7119 - revise new exit from two to one (occupant load verification). project manager debra lehtone (293.7135) dlehtone@bararch.comDetails
revision to appl #2011.10.19.7119 - revise new exit from two to one (occupant load verification). project manager debra lehtone (293.7135) dlehtone@bararch.com | |
| Jan 24, 2012 | Completed final sign-off Apr 2012 | 1155 Battery St | revision to appl #2011.10.19.7123 - elimate welded connection, bolted connections used for bus shelter.Details
revision to appl #2011.10.19.7123 - elimate welded connection, bolted connections used for bus shelter. | |
| Dec 16, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | revision to appl #201104053530 & #201106148108: store fronts on utah & potrero street formerly to be replaced are to remain. revision shown at grid lines 5a & 6a detail 4 a02.00, at grid lines 6 & 7 detail 12 a02.00Details
revision to appl #201104053530 & #201106148108: store fronts on utah & potrero street formerly to be replaced are to remain. revision shown at grid lines 5a & 6a detail 4 a02.00, at grid lines 6 & 7 detail 12 a02.00 | |
| Dec 12, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | relocate duct work, grilles install, relocate three thermostats. 3rd. & 4th. flr.Details
relocate duct work, grilles install, relocate three thermostats. 3rd. & 4th. flr. | $30,000 |
| Nov 17, 2011 | Completed final sign-off Mar 2012 | 151 10th St | structural support for mechanical unit & new skylight on roof. new landing support & new staircase.Details
structural support for mechanical unit & new skylight on roof. new landing support & new staircase. | $7,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | interior improvement 1st, 3rd, and 4th. new interior non structural partitoiins, new mep distribution, new and relocate lighting, relocate doors and hardwareDetails
interior improvement 1st, 3rd, and 4th. new interior non structural partitoiins, new mep distribution, new and relocate lighting, relocate doors and hardware | $125,000 |
| Nov 9, 2011 | Expired or cancelled expired Oct 2021 | 420 Taylor St | mechanical t-24 per permit app#201110146831Details
mechanical t-24 per permit app#201110146831 | $30,000 |
| Nov 8, 2011 | Completed final sign-off Jan 2012 | 586 Castro St | tenant improvement. revision to app#201104073679. addition of remodeled ada toilet room to scope of work, reconfiguration of waiting room and exam room #3 from original permit.Details
tenant improvement. revision to app#201104073679. addition of remodeled ada toilet room to scope of work, reconfiguration of waiting room and exam room #3 from original permit. | $12,500 |
| Nov 4, 2011 | Completed final sign-off Dec 2011 | 731 Sansome St | demoliton of base cabinets, installation of new equipment in break room, new non load bearing walls, new doors, and power supply. mep under seperate permit.Details
demoliton of base cabinets, installation of new equipment in break room, new non load bearing walls, new doors, and power supply. mep under seperate permit. | $33,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | to erect electric wall signDetails
to erect electric wall sign | $21,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | to erect electric ground signDetails
to erect electric ground sign | $5,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | to erect electric ground signDetails
to erect electric ground sign | $5,000 |
| Oct 19, 2011 | Completed final sign-off Jul 2012 | 1155 Battery St | reclassification of lobby to a-3 occupancy. add 2 new exit. provide occupant load calculatin for sffd assembly permit.Details
reclassification of lobby to a-3 occupancy. add 2 new exit. provide occupant load calculatin for sffd assembly permit. | $20,000 |
| Oct 19, 2011 | Completed final sign-off Apr 2012 | 1155 Battery St | remodel 2 each private bus sheltersDetails
remodel 2 each private bus shelters | $61,345 |
| Oct 14, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | tenant improvement on 2nd floor, new interior non structural partitions. mep under seperate permit.Details
tenant improvement on 2nd floor, new interior non structural partitions. mep under seperate permit. | $250,000 |
| Oct 12, 2011 | Completed final sign-off Feb 2012 | 1388 Sutter St | demolition of extg walls, portion of ceiling, power and finishes. construction of new offices, ceiling and lights, elect. data and new finishes. design build mep project mep sprinklers, life safety to be submitted under separate permit.Details
demolition of extg walls, portion of ceiling, power and finishes. construction of new offices, ceiling and lights, elect. data and new finishes. design build mep project mep sprinklers, life safety to be submitted under separate permit. | $107,190 |