- May 2004 to Feb 2023
39 permits since 2000 (architect on 38 permits, authorized agent-others on 2 permits): 22 completed, 1 in progress, 5 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2023 | In progress issued Nov 2024 | 424 Texas St | Devlin/Mcnally Construction | 1 new adu per ordinance #95-17 associated with new construction of single family home filed under bpa#202205134264Details
1 new adu per ordinance #95-17 associated with new construction of single family home filed under bpa#202205134264 | $165,000 |
| Oct 27, 2022 | Completed final sign-off Jul 2023 | 3784 20th St | Fox Brothers Construction Inc | add window @ rear, replace other windows in-kind, remove wall at living room, repair fire damage. replace (e) fireplace. to comply w/bid nov#20229203 dated 6/15/2022Details
add window @ rear, replace other windows in-kind, remove wall at living room, repair fire damage. replace (e) fireplace. to comply w/bid nov#20229203 dated 6/15/2022 | $50,000 |
| Jan 3, 2022 | Expired or cancelled withdrawn Mar 2022 | 424 Texas St | Details
| $137,700 | |
| Jul 15, 2021 | Expired or cancelled expired May 2026 | 475 28th St | Perez Construction Llc., Blair Burke General Contractors Inc | basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Details
basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. | $420,000 |
| Jun 14, 2021 | Completed final sign-off Aug 2023 | 50 Whitney St | D3 Construction | add 1/2 bathroom and closet at 2nd fl. excavation of appromixatel 21 cu yds. voluntary foundation upgrade at rear crawl space.Details
add 1/2 bathroom and closet at 2nd fl. excavation of appromixatel 21 cu yds. voluntary foundation upgrade at rear crawl space. | $30,000 |
| Apr 16, 2021 | Expired or cancelled withdrawn Jan 2022 | 424 Texas St | addition of basement, 2nd, & 3rd levels with roof deck. addition includes garage, 4 bedrooms, kitchen, 3.5 baths, living/dining office, laundry room, & sun room. full seismic upgrade.Details
addition of basement, 2nd, & 3rd levels with roof deck. addition includes garage, 4 bedrooms, kitchen, 3.5 baths, living/dining office, laundry room, & sun room. full seismic upgrade. | $100,000 | |
| Nov 9, 2020 | Completed final sign-off Jul 2021 | 1315 Polk St | Blair Burke General Contractors Inc | 1/f: tenant improvement: relocate 2 offices to rear of building, upgrade lounge with new reception desk and ceiling.Details
1/f: tenant improvement: relocate 2 offices to rear of building, upgrade lounge with new reception desk and ceiling. | $92,000 |
| Sep 25, 2020 | Expired or cancelled withdrawn Feb 2021 | 50 Whitney St | basement & 1st floor addition. seismic upgrade @ garage level. add new exterior stair from basemnet to rear yard. kitchen remodel new windows. deck. closets @ 2nd floor. add power room.Details
basement & 1st floor addition. seismic upgrade @ garage level. add new exterior stair from basemnet to rear yard. kitchen remodel new windows. deck. closets @ 2nd floor. add power room. | $485,000 | |
| Dec 19, 2019 | Expired or cancelled withdrawn May 2020 | 147 04th Av | Blair Burke General Contractors Inc | (n) deck to replace (e) (but smaller footprint). (n) fire wallDetails
(n) deck to replace (e) (but smaller footprint). (n) fire wall | $72,000 |
| Nov 1, 2019 | Completed final sign-off Sep 2020 | 147 04th Av | Blair Burke General Contractors Inc, Bradford Construction | foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existingDetails
foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existing | $122,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 930 Ashbury St | Bradford Construction | voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl.Details
voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl. | $150,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | Blair Burke General Contractors Inc, Planart Construction Corp | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Apr 29, 2019 | Completed final sign-off Sep 2019 | 4228 Geary Bl | Foothill Fire Protection Inc. | install new fire sprinkler system in e building no e sprinklers presentDetails
install new fire sprinkler system in e building no e sprinklers present | $56,000 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 40 Pond St | replace (e) roof shingles. replace all windows at front facade with double hung + 1 window @ rear,replace 1 window with 3 panel accordian door at kitchne add rear landing steps, repalce (e) guard rail & fence at frontDetails
replace (e) roof shingles. replace all windows at front facade with double hung + 1 window @ rear,replace 1 window with 3 panel accordian door at kitchne add rear landing steps, repalce (e) guard rail & fence at front | $21,500 | |
| Jan 23, 2019 | Completed final sign-off Jul 2022 | 4228 Geary Bl | Devlin/Mcnally Construction | change of use of extg retail space into preschool facility with 6 classrooms, reception, warming kitchen, 2 toilet rooms, office and storage. seismic upgrade under seperate permit #201901099918. fire alarm & sprinkler under seperate permit.Details
change of use of extg retail space into preschool facility with 6 classrooms, reception, warming kitchen, 2 toilet rooms, office and storage. seismic upgrade under seperate permit #201901099918. fire alarm & sprinkler under seperate permit. | $238,000 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 4228 Geary Bl | Meylan Construction | demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framingDetails
demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framing | $28,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2021 | 111 Holly Park Cr | Blair Burke General Contractors Inc, Muddyorange Fabrication | legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair.Details
legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair. | $138,000 |
| Jun 9, 2017 | Completed final sign-off Aug 2018 | 487 29th St | Blair Burke General Contractors Inc | excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting noteDetails
excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting note | $478,000 |
| Aug 31, 2016 | Expired or cancelled cancelled Jan 2026 | 40 Clifford Tr | Devlin/Mcnally Construction | rear bldg: expand extent of demolition to remove dry rot in existing members,no change in exterior envelope/appearance, revision to permit 201603303433.Details
rear bldg: expand extent of demolition to remove dry rot in existing members,no change in exterior envelope/appearance, revision to permit 201603303433. | |
| May 3, 2016 | Completed final sign-off Jun 2017 | 487 29th St | Blair Burke General Contractors Inc | addition of a 2-story rear deck and patio at rear yard, 2 windows to be removed and replaced with doors, to access decks. existing stair and door on west side to be removed.Details
addition of a 2-story rear deck and patio at rear yard, 2 windows to be removed and replaced with doors, to access decks. existing stair and door on west side to be removed. | $67,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2017 | 40 Clifford Tr | Devlin/Mcnally Construction | rear accessory bldg-(block 2618a/lot 027) renovate of (e) detached garage at rear to a multipurpose rec. room space w/powder room. work includes reinforcing/replacing (e) finishes, slab & framing to meet code, add insulation, skylight & replace roof. new windows/doors & a sunken patio with planters.Details
rear accessory bldg-(block 2618a/lot 027) renovate of (e) detached garage at rear to a multipurpose rec. room space w/powder room. work includes reinforcing/replacing (e) finishes, slab & framing to meet code, add insulation, skylight & replace roof. new windows/doors & a sunken patio with planters. | $135,000 |
| Feb 25, 2015 | Expired or cancelled withdrawn Aug 2015 | 922 Treat Av | Blair Burke General Contractors Inc | conversion of 2-dwelling unit into a 1-dwelling (unit merger). interior renovation/reconfigure, including kitchen, living area, bedrms & bathrms. remove 2 skylights & add 4 skylights. replace/reconifgure all windows/doors.Details
conversion of 2-dwelling unit into a 1-dwelling (unit merger). interior renovation/reconfigure, including kitchen, living area, bedrms & bathrms. remove 2 skylights & add 4 skylights. replace/reconifgure all windows/doors. | $375,000 |
| Oct 28, 2014 | Expired or cancelled cancelled Sep 2019 | 4229 26th St | Vonnegut Thoreau Construction | 4th floor vertical & 3rd story horizontal addition to (e) 3 story sfh. 9'-5" high vertical addition will be set back 15'-0" from front face of (e) bldg. horizontal addition will extend 12'-0" beyond (e) rear facade. front facade will be altered to replace frence door with 3 victorian style windows.Details
4th floor vertical & 3rd story horizontal addition to (e) 3 story sfh. 9'-5" high vertical addition will be set back 15'-0" from front face of (e) bldg. horizontal addition will extend 12'-0" beyond (e) rear facade. front facade will be altered to replace frence door with 3 victorian style windows. | $675,000 |
| Mar 3, 2014 | Expired or cancelled expired Oct 2023 | 40 Pond St | Hirano Construction Inc. | convert existing unfinished basement into bathroom, storage, hall & laundry area. replace existing window in kind. project adds 377 sq ft of conditioned space. shall comply with sf green building code table 4.Details
convert existing unfinished basement into bathroom, storage, hall & laundry area. replace existing window in kind. project adds 377 sq ft of conditioned space. shall comply with sf green building code table 4. | $107,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 3945 25th St | Blair Burke General Contractors Inc | revision to appl #2013.01.04.7214 - delete balcony, set back luandry room, change garage door to wood, add lighting & modify stairs & bathroom at 1st floor.Details
revision to appl #2013.01.04.7214 - delete balcony, set back luandry room, change garage door to wood, add lighting & modify stairs & bathroom at 1st floor. | $2,400 |
| Jan 4, 2013 | Completed final sign-off Oct 2014 | 3945 25th St | Blair Burke General Contractors Inc | 3rd flr addition to an (e) 2 story single family home. the 12' high addition will be set back 27'-1" from the front property line. 2 new skylights in the (e) gabled roof and 3 new skylights in the addition. the footprint of the addition falls within the (e) building footprint, except for 20.8 sf atDetails
3rd flr addition to an (e) 2 story single family home. the 12' high addition will be set back 27'-1" from the front property line. 2 new skylights in the (e) gabled roof and 3 new skylights in the addition. the footprint of the addition falls within the (e) building footprint, except for 20.8 sf at | $315,000 |
| Jun 6, 2012 | Completed final sign-off Jun 2012 | 900 North Point St | Hachman Properties Inc | removeal of 1 non structural partition, addition of 1 non structural partition & a door between the 2 (e) spaces. refer pa# 2007-0730-8180Details
removeal of 1 non structural partition, addition of 1 non structural partition & a door between the 2 (e) spaces. refer pa# 2007-0730-8180 | $4,200 |
| May 15, 2012 | Never finaled issued Jul 2012, no final | 900 North Point St | suite f 100:change of use only retail/office to educational. ref: 200707308180Details
suite f 100:change of use only retail/office to educational. ref: 200707308180 | ||
| Jun 3, 2011 | Completed final sign-off Sep 2013 | 4273 25th St | new garage, horizontal rear addition, depress & remodel 1st floor.Details
new garage, horizontal rear addition, depress & remodel 1st floor. | $200,000 | |
| Mar 21, 2011 | Completed final sign-off Aug 2011 | 250 10th St | Davies Construction | revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07Details
revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07 | $2,200 |
| May 24, 2010 | Completed final sign-off Jun 2011 | 3224 Market St | Grand American Construction Co | new 409 sq. ft. addition to accomodate a new master bedroom & bath at south west corner of the house. add 2 new skylights, new rooftop patio & rail, with new access door, removal & addition of windows & doors & add 1 wall in hall of (e) building.Details
new 409 sq. ft. addition to accomodate a new master bedroom & bath at south west corner of the house. add 2 new skylights, new rooftop patio & rail, with new access door, removal & addition of windows & doors & add 1 wall in hall of (e) building. | $96,000 |
| Sep 24, 2009 | Expired or cancelled cancelled Jan 2026 | 3829 Cesar Chavez St | renovate existing attice office and add bathroom into existing closet area. enlarge closet, replace existing windows, add 3 skylightsDetails
renovate existing attice office and add bathroom into existing closet area. enlarge closet, replace existing windows, add 3 skylights | $46,000 | |
| May 7, 2009 | Completed final sign-off Feb 2010 | 1180 Greenwich St | Davies Construction | revision to pa# 2008/04/25/0622 - move skylight to new location, eliminate built-in bench, change material of stair to glass, add wood decking over aluminum grating.Details
revision to pa# 2008/04/25/0622 - move skylight to new location, eliminate built-in bench, change material of stair to glass, add wood decking over aluminum grating. | $3,700 |
| Jan 26, 2009 | Completed final sign-off Apr 2009 | 4037 23rd St | W. John Build-General Con | unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit.Details
unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit. | $47,000 |
| Apr 25, 2008 | Completed final sign-off Feb 2010 | 1178 Greenwich St | addition of roof deck including built in planters, benches and 36" high glass rails. add 30" parapet around building. add spiral stairs in courtyard to access new roof deckDetails
addition of roof deck including built in planters, benches and 36" high glass rails. add 30" parapet around building. add spiral stairs in courtyard to access new roof deck | $87,000 | |
| Apr 25, 2008 | Completed final sign-off Feb 2010 | 1180 Greenwich St | addition of a roof deck including built in planters and benches. walkable skylights, 36" high glass rails. add 30" parapet around building. add sunken stairs to access new roof deckDetails
addition of a roof deck including built in planters and benches. walkable skylights, 36" high glass rails. add 30" parapet around building. add sunken stairs to access new roof deck | $123,000 | |
| Mar 29, 2005 | Expired or cancelled expired Jan 2010 | 442 Mangels Av | renovate 2 bathrooms on 2/fl, remove 2 non-bearing walls, replace 2 skylights, sink & toilet on g/f.Details
renovate 2 bathrooms on 2/fl, remove 2 non-bearing walls, replace 2 skylights, sink & toilet on g/f. | $23,000 | |
| Feb 15, 2005 | Completed final sign-off May 2006 | 124 Linda St | kitchen + bathroom renovation in all 3 units, addition of 2 skylights in 3rd floor unit.Details
kitchen + bathroom renovation in all 3 units, addition of 2 skylights in 3rd floor unit. | $98,000 | |
| May 12, 2004 | Completed final sign-off Oct 2006 | 833 Douglass St | new garage at basement. new garden room +bath at basement curbcut,ramp. replace back stairs (per varDetails
new garage at basement. new garden room +bath at basement curbcut,ramp. replace back stairs (per var | $90,000 |