W. John Build-General Con
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Aug 2021 | 160 Parker Av | add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard.Details
add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard. | $235,000 |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 585 Eureka St | remodel kitchen. replace (e) cabinetry and appliances. emlarge (e) opening between kitchen & dining room. replace one previously approved (e) window with new code compliant 1-hour rated window of same size and location.Details
remodel kitchen. replace (e) cabinetry and appliances. emlarge (e) opening between kitchen & dining room. replace one previously approved (e) window with new code compliant 1-hour rated window of same size and location. | $50,000 |
| Feb 28, 2020 | Completed final sign-off May 2020 | 731 Chestnut St | apt b. in revision to : pa#202002114077 - 1 window replacement in kind in (e) 3rd floor bathroom, same size, same location, not visible from street.Details
apt b. in revision to : pa#202002114077 - 1 window replacement in kind in (e) 3rd floor bathroom, same size, same location, not visible from street. | $3,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 731 Chestnut St | apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change.Details
apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change. | $30,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2020 | 2200 Sacramento St | unit 705: remodel (e) ktichen & 2 bathrooms: add washer & dryer, new paint, flooring and closet.Details
unit 705: remodel (e) ktichen & 2 bathrooms: add washer & dryer, new paint, flooring and closet. | $100,000 |
| Feb 11, 2019 | Completed final sign-off Mar 2019 | 281 Monterey Bl | remodel existing bathroom, new tiles, sheetrock, paint, new lights, receptacles and plumbing fixtures.Details
remodel existing bathroom, new tiles, sheetrock, paint, new lights, receptacles and plumbing fixtures. | $17,000 |
| Dec 18, 2018 | Expired or cancelled cancelled Jan 2026 | 281 Monterey Bl | remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 storiesDetails
remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 stories | $20,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2019 | 2200 Sacramento St | remove (e) tub & tile, install (n) shower, (n) led lights, no other changes.Details
remove (e) tub & tile, install (n) shower, (n) led lights, no other changes. | $11,000 |
| May 10, 2018 | Completed final sign-off Aug 2018 | 3340 Clay St | bathroom and bedroom remodel. paint. replace vanity sink, toilet and showerDetails
bathroom and bedroom remodel. paint. replace vanity sink, toilet and shower | $44,000 |
| Apr 18, 2018 | Completed final sign-off Aug 2019 | 290 17th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $5,000 |
| Aug 16, 2017 | Completed final sign-off Aug 2017 | 144 25th Av | to obtain final inspection for work approved under pa#s: 201 3-02-22-0808 s-1, 2015-02-02-7225, 2015-02-13-8380. all work is completeDetails
to obtain final inspection for work approved under pa#s: 201 3-02-22-0808 s-1, 2015-02-02-7225, 2015-02-13-8380. all work is complete | |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 2200 Sacramento St | #1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13Details
#1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13 | $50,000 |
| Nov 14, 2016 | Completed final sign-off Mar 2017 | 3340 Clay St | master bathroom remodel, replace toilet & tub (n) shower, same location on all fixtures. (n) vanity & 2 sinks. (n) tile, rim & painting. no structural works. no walls to be altered.Details
master bathroom remodel, replace toilet & tub (n) shower, same location on all fixtures. (n) vanity & 2 sinks. (n) tile, rim & painting. no structural works. no walls to be altered. | $44,000 |
| Jul 5, 2016 | Completed final sign-off Aug 2017 | 48 Hill Point Av | horizontal extension. 48 sf expansion of exisitng office on 3/fl over existing deck.Details
horizontal extension. 48 sf expansion of exisitng office on 3/fl over existing deck. | $35,000 |
| Jun 24, 2015 | Never finaled issued Mar 2016, no final | 150 15th Av | expand family room @ 2nd fl, (n) 2nd fl exterior deck & stair @ rear. expand 1st fl space to (e) rear facade, (n) roof deck @ 3rd fl above expansion. note: scope of work not visible from street.Details
expand family room @ 2nd fl, (n) 2nd fl exterior deck & stair @ rear. expand 1st fl space to (e) rear facade, (n) roof deck @ 3rd fl above expansion. note: scope of work not visible from street. | $80,000 |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 411 Clayton St | expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'dDetails
expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'd | $85,000 |
| Feb 13, 2015 | Expired or cancelled expired Aug 2017 | 144 25th Av | revision to app#201502027225 to move washer and dryer and sink to another.Details
revision to app#201502027225 to move washer and dryer and sink to another. | |
| Feb 2, 2015 | Expired or cancelled expired Aug 2017 | 144 25th Av | create finished -storage space (642 s.f) in exisitng basement - add toilet & sink. no work other floors.Details
create finished -storage space (642 s.f) in exisitng basement - add toilet & sink. no work other floors. | $20,000 |
| Jan 13, 2014 | Never finaled issued Jan 2014, no final | 23 Winfield St | kitchen remodel new cabinets & counter, appliance & lights & flooring. no change to wall, no windows & no doors.Details
kitchen remodel new cabinets & counter, appliance & lights & flooring. no change to wall, no windows & no doors. | $15,000 |
| May 15, 2013 | Completed final sign-off Jun 2013 | 716 05th Av | remodel existing bathroom, new shower, vanity, toilet, tile & fixtures, no structural change on 2nd flrDetails
remodel existing bathroom, new shower, vanity, toilet, tile & fixtures, no structural change on 2nd flr | $15,000 |
| Mar 26, 2013 | Completed final sign-off Aug 2013 | 151 Alice B Toklas Pl | replace tub 2 vanity sinks, cabinet new tile , painting and ad 2 lights, lighting will comply wi/title 24Details
replace tub 2 vanity sinks, cabinet new tile , painting and ad 2 lights, lighting will comply wi/title 24 | $25,000 |
| Feb 22, 2013 | Expired or cancelled expired Aug 2017 | 144 25th Av | 125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch.Details
125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch. | $120,000 |
| Jun 30, 2011 | Completed final sign-off Sep 2011 | 150 15th Av | revision to pa# 2001-0614-8052-add new skylights in master bathroomDetails
revision to pa# 2001-0614-8052-add new skylights in master bathroom | |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 150 15th Av | demo and remodel of e master and kids bath. push bath into e lightwell and adjacent bedroom. neighbor approval includedDetails
demo and remodel of e master and kids bath. push bath into e lightwell and adjacent bedroom. neighbor approval included | $48,000 |
| Nov 22, 2010 | Completed final sign-off Jan 2011 | 2030 Broadway | rewire (e) kitchen cab. & counter, rewire some (e) appliances; replace with (n) kitchen cab. counter, & same appliancesl painting, (n) light fixtgures and plumbing fixturess; no structural work. at least 50% high efficacy lighting ( by wattage)Details
rewire (e) kitchen cab. & counter, rewire some (e) appliances; replace with (n) kitchen cab. counter, & same appliancesl painting, (n) light fixtgures and plumbing fixturess; no structural work. at least 50% high efficacy lighting ( by wattage) | $34,000 |
| Oct 2, 2009 | Completed final sign-off Oct 2009 | 3340 Clay St | to obtain final inspection for work approved under pa #200712190829. all work has been completed.Details
to obtain final inspection for work approved under pa #200712190829. all work has been completed. | |
| Sep 10, 2009 | Completed final sign-off Dec 2009 | 3573 22nd St | renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rearDetails
renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rear | $83,000 |
| Jan 29, 2009 | Expired or cancelled expired Oct 2011 | 1378 23rd Av | renew pa# 2005/05/09/1911 to obtain final inspection. all work has been completed.Details
renew pa# 2005/05/09/1911 to obtain final inspection. all work has been completed. | |
| Jan 29, 2009 | Expired or cancelled expired Oct 2011 | 1378 23rd Av | renew pa# 2006/01/30/3337 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/30/3337 to obtain final inspection. all work has been completed. | |
| Jan 26, 2009 | Completed final sign-off Apr 2009 | 4037 23rd St | unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit.Details
unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit. | $47,000 |
| Sep 9, 2008 | Completed final sign-off Sep 2008 | 67 Bernard St | repair staircase stringers less than 50% of stairs to be repair.Details
repair staircase stringers less than 50% of stairs to be repair. | $8,000 |
| Apr 8, 2008 | Completed final sign-off May 2008 | 1844 Kirkham St | remove & repair front portion of exterior stucco & rear fence & replace 5 windows. (dry rot) report# 49994. work is on the kirham side of house. replace in kind.Details
remove & repair front portion of exterior stucco & rear fence & replace 5 windows. (dry rot) report# 49994. work is on the kirham side of house. replace in kind. | $8,000 |
| Mar 11, 2008 | Completed final sign-off May 2008 | 319 Arkansas St | existing bathroom remodel, new toilet, vanity, and shower. no structural work. replace exiting electrical fixtures.Details
existing bathroom remodel, new toilet, vanity, and shower. no structural work. replace exiting electrical fixtures. | $15,000 |
| Mar 5, 2008 | Completed final sign-off Aug 2008 | 73 06th Av | re-surface existing bathroom on 1st floor. tile shower surround & floor (bathrm). replace faucets & wall band base.Details
re-surface existing bathroom on 1st floor. tile shower surround & floor (bathrm). replace faucets & wall band base. | $3,000 |
| Dec 24, 2007 | Expired or cancelled expired Jun 2009 | 2200 Sacramento St | 1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescentDetails
1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescent | $60,000 |
| Dec 19, 2007 | Expired or cancelled expired Oct 2009 | 3340 Clay St | remodel of (e) 4th floor playroom, relocate bedroom to rear & reconfigure to provide for additional bedroom, reconfigure bath, new dormers & skylights, replace (e) single glazed windows (4) to dual glazed @ rear.Details
remodel of (e) 4th floor playroom, relocate bedroom to rear & reconfigure to provide for additional bedroom, reconfigure bath, new dormers & skylights, replace (e) single glazed windows (4) to dual glazed @ rear. | $150,000 |
| Jan 30, 2006 | Expired or cancelled expired Feb 2009 | 1378 23rd Av | removing extg stair case/grouting under north and south property line/work under permit #200505091911,200601252986,200601252984 for referance/all grout to be within drop lines of 1378 23rd aveDetails
removing extg stair case/grouting under north and south property line/work under permit #200505091911,200601252986,200601252984 for referance/all grout to be within drop lines of 1378 23rd ave | $5,000 |
| Sep 9, 2004 | Completed final sign-off Nov 2004 | 1101 Green St | kitchen remodel, new cabinets, applances, plumbing fixtures & flooringDetails
kitchen remodel, new cabinets, applances, plumbing fixtures & flooring | $35,000 |
| Aug 16, 2004 | Completed final sign-off Aug 2004 | 281 Monterey Bl | install 10 sheets of type 5/8 x sheetrock between garage and playroom change one door to 20 minuteDetails
install 10 sheets of type 5/8 x sheetrock between garage and playroom change one door to 20 minute | $4,000 |
| Jul 21, 2004 | Completed final sign-off Sep 2004 | 162 Parker Av | kitchen remodel on 2nd floor, no strcutural workDetails
kitchen remodel on 2nd floor, no strcutural work | $25,000 |
| May 18, 2004 | Completed final sign-off Oct 2005 | 1371 06th Av | 120 s.f. second story horizontal addition over existing kitchen prev. permitted work app # 8802133.Details
120 s.f. second story horizontal addition over existing kitchen prev. permitted work app # 8802133. | $25,000 |
| Feb 17, 2004 | Completed final sign-off Apr 2004 | 2744 Fulton St | kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural changeDetails
kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural change | $44,000 |
| Jan 20, 2004 | Expired or cancelled expired Dec 2006 | 53 Elizabeth St | move 2nd unit from 2nd fl to ground fl according to plans, extend 1st dwelling unit for 1st fl to asDetails
move 2nd unit from 2nd fl to ground fl according to plans, extend 1st dwelling unit for 1st fl to as | $1,000 |
| Aug 18, 2003 | Expired or cancelled expired Dec 2006 | 53 Elizabeth St | renovate 1st flr according to plans drawn by don robb date 8/13/03. remodel bathrm, expand & remodelDetails
renovate 1st flr according to plans drawn by don robb date 8/13/03. remodel bathrm, expand & remodel | $35,000 |
| Aug 18, 2003 | Never finaled issued Aug 2003, no final | 53 Elizabeth St | renovate ground flr according to plans drawn by don robb, dated 8/13/03Details
renovate ground flr according to plans drawn by don robb, dated 8/13/03 | $20,000 |
| Aug 18, 2003 | Never finaled issued Aug 2003, no final | 53 Elizabeth St | renovate 2nd flr according to plans drawn by don robb dated 8/13/03-no exterior workDetails
renovate 2nd flr according to plans drawn by don robb dated 8/13/03-no exterior work | $30,000 |
| Feb 10, 2003 | Completed final sign-off Apr 2004 | 2680 Diamond St | 2nd story addition above garage for home office guest room 2nd story addition above bath and pantryDetails
2nd story addition above garage for home office guest room 2nd story addition above bath and pantry | $110,000 |
| Oct 17, 2002 | Completed final sign-off Dec 2002 | 316 Marietta Dr | title 24 rev. only to "duct location" to eliminate inspection requirement per previous reportDetails
title 24 rev. only to "duct location" to eliminate inspection requirement per previous report | $500 |
| Nov 15, 2001 | Never finaled issued Nov 2001, no final | 999 Green St | remodel:kitchen & bathrm remodel, new tiles & doors, painting no structural workDetails
remodel:kitchen & bathrm remodel, new tiles & doors, painting no structural work | $120,000 |
| Sep 22, 2000 | Completed final sign-off Apr 2001 | 4373 21st St | remove asbestos siding, remove interior floor and wall finishes on 2nd fl, ext. walls, roof & windowDetails
remove asbestos siding, remove interior floor and wall finishes on 2nd fl, ext. walls, roof & window | $1,000 |
| Sep 12, 2000 | Completed final sign-off Oct 2000 | 67 Bernard St | revision to pa 200006223356 replace plywood sheatihing 200 sq ft. of roof deck deckDetails
revision to pa 200006223356 replace plywood sheatihing 200 sq ft. of roof deck deck | $10,000 |
| May 12, 2000 | Completed final sign-off Sep 2001 | 4373 21st St | remove (e) pitched roof & 2nd floor, walls and windows reinforce footings & framingDetails
remove (e) pitched roof & 2nd floor, walls and windows reinforce footings & framing | $80,000 |
| Feb 4, 2000 | Completed final sign-off Aug 2000 | 999 Green St | remdoel kitchen, replace w/new doors,wood flooring,lighting,cabients,counterDetails
remdoel kitchen, replace w/new doors,wood flooring,lighting,cabients,counter |