Meylan Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2004 to Apr 2025
- Last 24 months
- 1 permit filed
57 permits since 2000: 42 completed, 1 in progress, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2025 | In progress issued Oct 2025 | 1370 Wallace Av | to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f.Details
to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f. | $117,372 |
| Jul 9, 2024 | Completed final sign-off Nov 2024 | 2255 03rd St | ceiling and lighting improvements to existing interior lower fl (basement) space. area of work apprx 2395 sfDetails
ceiling and lighting improvements to existing interior lower fl (basement) space. area of work apprx 2395 sf | $50,260 |
| Nov 1, 2023 | Completed final sign-off Jan 2024 | 1166 Geneva Av | build canopy outdoors to house walk-in cooler. installtion of walk-in coolerDetails
build canopy outdoors to house walk-in cooler. installtion of walk-in cooler | $5,000 |
| Sep 5, 2023 | Never finaled issued Sep 2023, no final | 1166 Geneva Av | adding floor drain. upgrading electrical panel.Details
adding floor drain. upgrading electrical panel. | $100,000 |
| Feb 25, 2022 | Never finaled filed Feb 2022, never issued | 2255 03rd St | change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed.Details
change of use type b occ to type e for 2-8 school. new accessible women's restroom @ lower level. remodel (e) restroom, (n) plumbing fixtures, drinking fountain/bottle filler. relocate kitchenette. mech/fire life safety system will be modified as needed. | $150,000 |
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 200 Green St | revision to permit #202106243158. install new ada automatic door opener system at suite 200 main entrance.Details
revision to permit #202106243158. install new ada automatic door opener system at suite 200 main entrance. | $1,500 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 200 Green St | interior work only, add interior non bearing partitoins on 1st fl and cleaned up finishesDetails
interior work only, add interior non bearing partitoins on 1st fl and cleaned up finishes | $48,000 |
| Aug 27, 2019 | Never finaled issued Dec 2019, no final | 1830 Polk St | ti - new partitions, toilet facilities. ele/lighting. plm. mech modifications; change from retail to fitness exercise studio.Details
ti - new partitions, toilet facilities. ele/lighting. plm. mech modifications; change from retail to fitness exercise studio. | $230,000 |
| Jul 11, 2019 | Completed final sign-off Sep 2019 | 1798 Bryant St | revision to app# 201904258938. remove all car parking -remove marking, striping , signage, from scope. n/a for maherDetails
revision to app# 201904258938. remove all car parking -remove marking, striping , signage, from scope. n/a for maher | |
| Apr 25, 2019 | Completed final sign-off Sep 2019 | 1798 Bryant St | revision to permit 2018-0814-7261 r2. new concrete landing and ramp at secondary exit. change in parking striping and van accessible parking location.Details
revision to permit 2018-0814-7261 r2. new concrete landing and ramp at secondary exit. change in parking striping and van accessible parking location. | |
| Jan 9, 2019 | Completed final sign-off Sep 2019 | 4228 Geary Bl | voluntary seismic upgrade. add 3 ada toilets and automatic door openerDetails
voluntary seismic upgrade. add 3 ada toilets and automatic door opener | $150,000 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 4228 Geary Bl | demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framingDetails
demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framing | $28,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 1798 Bryant St | demo some walls, plumbing fixtures. demo of non-structural walls to be replaced w/ structural shear walls. ti including, design showroom, customer & design construction rooms, design workspace, office, conference, support spaces & storage. re-roof to meet t-24 needs (n) exterior glazing in place ofDetails
demo some walls, plumbing fixtures. demo of non-structural walls to be replaced w/ structural shear walls. ti including, design showroom, customer & design construction rooms, design workspace, office, conference, support spaces & storage. re-roof to meet t-24 needs (n) exterior glazing in place of | $500,000 |
| Aug 25, 2017 | Completed final sign-off Nov 2017 | 1415 Howard St | revision to pa #201608114810 - modification oto two basement restrooms for kindergarden use in lieu of toddler use including deletion of two toilets, deletion of one sink, & addition of two toilet partitions. restroom windows deleted. n/a maher ordinanceDetails
revision to pa #201608114810 - modification oto two basement restrooms for kindergarden use in lieu of toddler use including deletion of two toilets, deletion of one sink, & addition of two toilet partitions. restroom windows deleted. n/a maher ordinance | |
| Sep 12, 2016 | Completed final sign-off Sep 2017 | 1415 Howard St | demo of extg non-load bearing interior partitions.Details
demo of extg non-load bearing interior partitions. | $25,000 |
| Sep 12, 2016 | Completed final sign-off Sep 2017 | 1415 Howard St | retaining wall, lagging wall, soldier piers at west property lineDetails
retaining wall, lagging wall, soldier piers at west property line | $100,000 |
| Aug 11, 2016 | Completed final sign-off Nov 2017 | 1415 Howard St | seismic retrofit only. t.i. app#201608114810. n/a for maherDetails
seismic retrofit only. t.i. app#201608114810. n/a for maher | $125,000 |
| Aug 11, 2016 | Completed final sign-off Jan 2018 | 1415 Howard St | change of use from rectory to school and tenant improvements. (seismic retrofit under seperate permit). ** maher: n/a **Details
change of use from rectory to school and tenant improvements. (seismic retrofit under seperate permit). ** maher: n/a ** | $986,000 |
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 981 Mission St | ti- for ground floor, basement, mezzanie work includes new partitions, doors, new enclosed cafe, reception counter, mep. exterior work consists of one (n) window along minna st.Details
ti- for ground floor, basement, mezzanie work includes new partitions, doors, new enclosed cafe, reception counter, mep. exterior work consists of one (n) window along minna st. | $320,000 |
| Jan 12, 2016 | Never finaled issued Feb 2016, no final | 3150 California St | 2nd floor t. i. of an (e) offic ebldg including reconfiguring of interior walls & doors. upgrade accessible path of travel to area of work.Details
2nd floor t. i. of an (e) offic ebldg including reconfiguring of interior walls & doors. upgrade accessible path of travel to area of work. | $125,000 |
| Jul 8, 2015 | Completed final sign-off Oct 2015 | 3620 17th St | to comply with nov#201527481 - replace facing brick stairway with like kind; new brick stairway and new wood under carriage. n/a maher ordinanceDetails
to comply with nov#201527481 - replace facing brick stairway with like kind; new brick stairway and new wood under carriage. n/a maher ordinance | $20,000 |
| May 12, 2015 | Completed final sign-off Sep 2015 | 2222 Broadway | barrier removal, install (n) handrail & guardrail at (e) stair.Details
barrier removal, install (n) handrail & guardrail at (e) stair. | $208,561 |
| Jul 10, 2014 | Completed final sign-off Nov 2014 | 1715 Octavia St | interior renovation of an extg library.Details
interior renovation of an extg library. | $387,000 |
| Jun 12, 2014 | Completed final sign-off Mar 2015 | 2222 Broadway | modification to extg class room including new flooring, lighting and radiant heater.Details
modification to extg class room including new flooring, lighting and radiant heater. | $74,500 |
| Apr 1, 2014 | Completed final sign-off Jan 2015 | 2222 Broadway | barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, extg elevator and equipment modernization engineering under separate permits by design build contractors.Details
barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, extg elevator and equipment modernization engineering under separate permits by design build contractors. | $227,400 |
| Apr 11, 2013 | Completed final sign-off Mar 2014 | 1 Daniel Burnham Ct | #365 - divide existing reception into 3 exam rooms @ existing medical office. adjust existing mech & elec, alarms & fire sprinklers under separate permits.Details
#365 - divide existing reception into 3 exam rooms @ existing medical office. adjust existing mech & elec, alarms & fire sprinklers under separate permits. | $45,000 |
| Jan 7, 2013 | Completed final sign-off Oct 2013 | 1 Daniel Burnham Ct | 4th floor-renovations to (e) vacant commercial office space-create 3 new demising spaces. administration offices to medical offices. adjust (e) m.e.p, fire sprinklers & other life safetyDetails
4th floor-renovations to (e) vacant commercial office space-create 3 new demising spaces. administration offices to medical offices. adjust (e) m.e.p, fire sprinklers & other life safety | $55,000 |
| May 29, 2012 | Completed final sign-off Dec 2012 | 2222 Broadway | remodel 1st floor entry for accessibility. project includes ada compliant ramp, hardware modifications to extg door and minor landscaping.Details
remodel 1st floor entry for accessibility. project includes ada compliant ramp, hardware modifications to extg door and minor landscaping. | $30,000 |
| May 18, 2012 | Completed final sign-off Sep 2012 | 2222 Broadway | mechanical work for kitchen remodel permit approved under pa# 2012-0227-4935Details
mechanical work for kitchen remodel permit approved under pa# 2012-0227-4935 | $38,000 |
| May 10, 2012 | Completed final sign-off Oct 2012 | 2222 Broadway | revision 201202274935. new 2 hour rated shaft wall for ventless dishwasher. type ii hood under separate permitDetails
revision 201202274935. new 2 hour rated shaft wall for ventless dishwasher. type ii hood under separate permit | $5,000 |
| Feb 27, 2012 | Completed final sign-off Oct 2012 | 2222 Broadway | interior remodel to (e) kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.(n) exterior loovers at lower level.Details
interior remodel to (e) kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.(n) exterior loovers at lower level. | $326,771 |
| Jun 6, 2011 | Completed final sign-off Feb 2013 | 1314 16th Av | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openingsDetails
owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openings | $5,500 |
| Jun 6, 2011 | Completed final sign-off Feb 2013 | 1322 16th Av | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openingsDetails
owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openings | $5,500 |
| May 16, 2011 | Never finaled issued May 2011, no final | 244 California St | 6th floor suite 600 - one new interior wall to subdivide existing room into 2 private offices. replace existing interior office doors. lighting under seperate permit.Details
6th floor suite 600 - one new interior wall to subdivide existing room into 2 private offices. replace existing interior office doors. lighting under seperate permit. | $9,800 |
| Feb 16, 2011 | Never finaled issued Apr 2011, no final | 244 California St | revision to pa# 2011.02.09.9877 to rotate conference room iin suite 204Details
revision to pa# 2011.02.09.9877 to rotate conference room iin suite 204 | |
| Feb 9, 2011 | Never finaled issued Feb 2011, no final | 244 California St | scope of work includes 1 new conference room in suite 204. room is approx 150 sf. also includes new light fixture and repainting exiting ceilingDetails
scope of work includes 1 new conference room in suite 204. room is approx 150 sf. also includes new light fixture and repainting exiting ceiling | $9,500 |
| Nov 10, 2010 | Completed final sign-off Mar 2011 | 55 Green St | 2nd floor-new partitions, doors, frames & painting. minor changes to lighting & electrical. relocation of hvac diffusersDetails
2nd floor-new partitions, doors, frames & painting. minor changes to lighting & electrical. relocation of hvac diffusers | $21,317 |
| Jan 19, 2010 | Completed final sign-off Feb 2010 | 3654 Sacramento St | commercial tenant improvement at ground floor: minor remodel of (e) space, minor demolition of (e) non-load bearing walls. construction of (n) non-load bearing partitions and minor ada upgrades to (e) restroom.Details
commercial tenant improvement at ground floor: minor remodel of (e) space, minor demolition of (e) non-load bearing walls. construction of (n) non-load bearing partitions and minor ada upgrades to (e) restroom. | $12,000 |
| Aug 13, 2009 | Completed final sign-off Dec 2009 | 625 Brotherhood Wy | revision to pa# 2009/03/12/3991 to redesign new ceiling in social hall & relocate ada entry door. field verify if life safety is required under separate permits.Details
revision to pa# 2009/03/12/3991 to redesign new ceiling in social hall & relocate ada entry door. field verify if life safety is required under separate permits. | |
| Mar 12, 2009 | Completed final sign-off Dec 2009 | 625 Brotherhood Wy | social hall referbishment. new interior wall (finish only), floor and ceiling finishes only, new lighting, replace five extg doors. must obtain seperate p-142 assembly permit from fire hq's.Details
social hall referbishment. new interior wall (finish only), floor and ceiling finishes only, new lighting, replace five extg doors. must obtain seperate p-142 assembly permit from fire hq's. | $95,700 |
| Sep 4, 2008 | Completed final sign-off Sep 2008 | 753 Davis St | renew for final inspection 2003504243016.Details
renew for final inspection 2003504243016. | |
| May 23, 2007 | Completed final sign-off Sep 2007 | 1025 Battery St | front door permit seperated form 200610054339 and 200605312825.Details
front door permit seperated form 200610054339 and 200605312825. | |
| Mar 22, 2007 | Completed final sign-off Mar 2007 | 240 Powell St | renew 200605232297 for final inspectionDetails
renew 200605232297 for final inspection | |
| Feb 28, 2007 | Completed final sign-off Aug 2007 | 631 Howard St | oti-1 3rd floor el, l/sDetails
oti-1 3rd floor el, l/s | $46,000 |
| Feb 27, 2007 | Completed final sign-off Mar 2007 | 240 Powell St | renew pa# 2006/02/17/4909 for final inspection.Details
renew pa# 2006/02/17/4909 for final inspection. | |
| Dec 8, 2006 | Completed final sign-off Mar 2007 | 2186 Geary Bl | work @ unit# 311 only. reconfigure existing mechanical system.Details
work @ unit# 311 only. reconfigure existing mechanical system. | $12,500 |
| Oct 5, 2006 | Completed final sign-off May 2007 | 1025 Battery St | minor rev. to previously approved pa#2006/05/31/2825: demo (e) floor slab on grade & replace w/ new concrete slab. provide second accessible entrance on battery st. side. improvements to (e) mezzanine structural systemDetails
minor rev. to previously approved pa#2006/05/31/2825: demo (e) floor slab on grade & replace w/ new concrete slab. provide second accessible entrance on battery st. side. improvements to (e) mezzanine structural system | $20,000 |
| Jul 13, 2006 | Never finaled issued Jul 2006, no final | 170 Columbus Av | oti-1 3fl el,sp suite 310Details
oti-1 3fl el,sp suite 310 | $16,000 |
| May 23, 2006 | Expired or cancelled expired Mar 2007 | 240 Powell St | hvac work to support pa#2006/02/17/4909 - new a/c & furnace & ductworkDetails
hvac work to support pa#2006/02/17/4909 - new a/c & furnace & ductwork | $15,000 |
| Nov 22, 2005 | Never finaled issued Nov 2005, no final | 753 Davis St | renew appl#200304243016 for final inspectionDetails
renew appl#200304243016 for final inspection | |
| Nov 1, 2005 | Completed final sign-off Dec 2005 | 170 Columbus Av | oti-1 3/f ls, spDetails
oti-1 3/f ls, sp | $55,000 |
| Aug 16, 2005 | Completed final sign-off Jan 2006 | 1760 Cesar Chavez St | install electrical material storage racks. minor interior modifications for ada compliance-bathroomDetails
install electrical material storage racks. minor interior modifications for ada compliance-bathroom | $65,000 |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 170 Columbus Av | oti-1 3rd/fl-el, ls, sp.Details
oti-1 3rd/fl-el, ls, sp. | $90,000 |
| Jul 8, 2005 | Completed final sign-off Dec 2005 | 55 Hawthorne St | oti-1, 6th floor, ls, el, me, sp.Details
oti-1, 6th floor, ls, el, me, sp. | $120,000 |
| Jun 28, 2005 | Completed final sign-off Jul 2005 | 1760 Cesar Chavez St | demolation of interior partition walls.Details
demolation of interior partition walls. | $60,000 |
| Dec 22, 2004 | Expired or cancelled expired Mar 2007 | 367 09th St | replace furnace and ductwork - 1st floor, modify gas piping, new exhaust fanDetails
replace furnace and ductwork - 1st floor, modify gas piping, new exhaust fan | $13,500 |
| Jun 4, 2004 | Completed final sign-off Dec 2005 | 612 Howard St | make a 3'o x 7'o opening in existing wall, frame, add header, finish new surfaces with mdf or similaDetails
make a 3'o x 7'o opening in existing wall, frame, add header, finish new surfaces with mdf or simila | $1,200 |