Muddyorange Fabrication
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Jan 2022
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2022 | Completed final sign-off Nov 2022 | 227 Ashbury St | remodel 1 kitchen and bath in kind.Details
remodel 1 kitchen and bath in kind. | $20,000 |
| May 11, 2020 | Never finaled issued May 2020, no final | 111 Holly Park Cr | street space-renew 201804247146Details
street space-renew 201804247146 | |
| Feb 14, 2020 | Never finaled issued Feb 2020, no final | 114 Monticello St | kitchen remodel - replace cabinets, appliances, countertops. add peninsula, new lighting, outlets. new sink & faucet.Details
kitchen remodel - replace cabinets, appliances, countertops. add peninsula, new lighting, outlets. new sink & faucet. | $22,000 |
| Jul 26, 2019 | Completed final sign-off Dec 2019 | 40 Piedmont St | add half bath (toilet and vanity) to 1st flrDetails
add half bath (toilet and vanity) to 1st flr | $12,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2019 | 260 College Av | 1st floor: new fixtures and finishes in powder room, new interior doors, new furnace.Details
1st floor: new fixtures and finishes in powder room, new interior doors, new furnace. | $28,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2021 | 111 Holly Park Cr | legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair.Details
legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair. | $138,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 435 Magellan Av | bathroom remodel - replace toilet, vanity, shower; install new tile, recessed lighting, storage cabinet; replace shower valve & fixtures, install glass shower surround, vanity mirror; paint. no structural work, no wall modification.Details
bathroom remodel - replace toilet, vanity, shower; install new tile, recessed lighting, storage cabinet; replace shower valve & fixtures, install glass shower surround, vanity mirror; paint. no structural work, no wall modification. | $15,000 |
| Dec 9, 2016 | Completed final sign-off Dec 2016 | 670 Commercial St | ref. 2016-0701-1472; update set with hand written notes made during plan review, and showing fire escape omitted from original plans.Details
ref. 2016-0701-1472; update set with hand written notes made during plan review, and showing fire escape omitted from original plans. | |
| Nov 8, 2016 | Completed final sign-off Jul 2017 | 435 Magellan Av | kitchen remodel, remove wall between kitchen & family room, add beam.Details
kitchen remodel, remove wall between kitchen & family room, add beam. | $25,000 |
| Sep 19, 2016 | Completed final sign-off Jan 2017 | 670 Commercial St | install lg lsn307hv3 fan coil and heat pump unit ref#2016-0701-1472Details
install lg lsn307hv3 fan coil and heat pump unit ref#2016-0701-1472 | |
| Jul 1, 2016 | Completed final sign-off Jan 2017 | 670 Commercial St | 1st floor: no change of use/ no exterior work. demo of extg non-load bearing walls. refinish floors. patch and paint walls.Details
1st floor: no change of use/ no exterior work. demo of extg non-load bearing walls. refinish floors. patch and paint walls. | $4,000 |
| Mar 2, 2015 | Completed final sign-off Jul 2015 | 40 Piedmont St | 3rd flr - bathroom remodel - no additional fixtures. room division: 1 large room into 2 seperate bedrooms. window replacement (9) in (e) window locations.Details
3rd flr - bathroom remodel - no additional fixtures. room division: 1 large room into 2 seperate bedrooms. window replacement (9) in (e) window locations. | $20,000 |
| Aug 1, 2014 | Completed final sign-off Oct 2014 | 670 Commercial St | revision to permit 201405075115; add ventilation fan in bathroom, add louvers above entry door and in bathroom door.Details
revision to permit 201405075115; add ventilation fan in bathroom, add louvers above entry door and in bathroom door. | $1,000 |
| May 27, 2014 | Completed final sign-off Dec 2014 | 498 14th St | install 2 ada restrooms and office in future salon spaceDetails
install 2 ada restrooms and office in future salon space | $59,000 |
| May 7, 2014 | Completed final sign-off Nov 2014 | 670 Commercial St | remodel of 1 story commercial space. change use from office to cafe. restroom upgrades, new kitchen, sinks, flooring. no exterior work. deferred submittal for electrical and plumbingDetails
remodel of 1 story commercial space. change use from office to cafe. restroom upgrades, new kitchen, sinks, flooring. no exterior work. deferred submittal for electrical and plumbing | $30,000 |