Davies Construction
- Based in
- Pacifica
- On San Francisco permits
- Feb 2011 to Apr 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2013 | Completed final sign-off Jul 2013 | 2109 Steiner St | delete installation of one proposed skylight. remove spiral stairs to roof, udates to door and skylight schedule, confirm completion of work to remove structural list in violation #200451058/200557761.confirm of completion of replacement vinyl window with approved wood window under 200557761Details
delete installation of one proposed skylight. remove spiral stairs to roof, udates to door and skylight schedule, confirm completion of work to remove structural list in violation #200451058/200557761.confirm of completion of replacement vinyl window with approved wood window under 200557761 | $5,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2109 Steiner St | furnising all materials & equipment & preforming all labor for mixing, pumping & injection of ultrafine cement/permeation grout underpinning grouting to stabilize to the min sections as shown. ref pa #2011.04.11.3826.Details
furnising all materials & equipment & preforming all labor for mixing, pumping & injection of ultrafine cement/permeation grout underpinning grouting to stabilize to the min sections as shown. ref pa #2011.04.11.3826. | $5,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2109 Steiner St | revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island.Details
revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island. | $2,000 |
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2 Perine Pl | chemical/permeation grout underpinning, rer pa #2011.04.11.3826.Details
chemical/permeation grout underpinning, rer pa #2011.04.11.3826. | $5,000 |
| Aug 26, 2011 | Completed final sign-off Mar 2012 | 1314 Shotwell St | renovation of single family home includes kitchen replacement, addition of 1 window and removal of one door on the 1st level. on 2nd level reconfiguration of an extg bedroom. addition of 1 bathroom and laundry closet and addition of 2 skylights. replace 5 exg windows.Details
renovation of single family home includes kitchen replacement, addition of 1 window and removal of one door on the 1st level. on 2nd level reconfiguration of an extg bedroom. addition of 1 bathroom and laundry closet and addition of 2 skylights. replace 5 exg windows. | $110,000 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 250 10th St | revision to pa# 2011.02.09.9912 and 2011.03.21.2432. delete reception, lighting, kitchenete cabinets, urinal, and diaper change sink. replace urinal with toilet.Details
revision to pa# 2011.02.09.9912 and 2011.03.21.2432. delete reception, lighting, kitchenete cabinets, urinal, and diaper change sink. replace urinal with toilet. | |
| Mar 21, 2011 | Completed final sign-off Aug 2011 | 250 10th St | revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07Details
revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07 | $2,200 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 250 10th St | renovation of (e) preschool including the addition of accessible toilet rooms, children's toilet area, re-configuration of reception area, addition of 2 skiyligghts, enlargement of a office area, the replacement of finishes throughout the structure. all work to occur within (e) building footprintDetails
renovation of (e) preschool including the addition of accessible toilet rooms, children's toilet area, re-configuration of reception area, addition of 2 skiyligghts, enlargement of a office area, the replacement of finishes throughout the structure. all work to occur within (e) building footprint | $80,000 |