Benjamin Anderson
- Listed as
- architect
- Firm
- Anderson Studio For Arch.
- Based in
- Oakland
- On San Francisco permits
- Oct 2008 to Apr 2026
34 permits since 2000 (architect on 34 permits): 23 completed, 2 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | In progress issued May 2026 | 1370 Wallace Av | Wilko Builders Llc. | provide a revision to (e) permit# 202503132201. adding deferred electrical. revising a number of interior partitions & restrooms.Details
provide a revision to (e) permit# 202503132201. adding deferred electrical. revising a number of interior partitions & restrooms. | $117,372 |
| Aug 28, 2025 | Completed final sign-off Sep 2025 | 1579 Wallace Av | Bejarano Construction 9inc | comply with nov #2025040479. removing (e) door and reinstate the wall opening.Details
comply with nov #2025040479. removing (e) door and reinstate the wall opening. | $300 |
| Apr 23, 2025 | In progress issued Oct 2025 | 1370 Wallace Av | Wilko Builders Llc., Gerson Construction Inc., Meylan Construction | to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f.Details
to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f. | $117,372 |
| Sep 16, 2024 | Completed final sign-off Nov 2025 | 2938 Pierce St | Hearth Corporation | kitchen remodel including the removal of some wall as shown on plans. new stair to basement/ lower level of unit, (1) new bathroom and remodel of (1) (e) bathroom. provide (n) deck at rear, less than 36" high and (n) 6' fence and (n) windows and doors at rear.Details
kitchen remodel including the removal of some wall as shown on plans. new stair to basement/ lower level of unit, (1) new bathroom and remodel of (1) (e) bathroom. provide (n) deck at rear, less than 36" high and (n) 6' fence and (n) windows and doors at rear. | $600,000 |
| Aug 27, 2024 | Completed final sign-off Mar 2026 | 1817 California St | Saarman Construction,Ltd. | to comply w/ nov# 202200515, items #4 & #3, replacement of an (e) common egress stair, located in an open-air lobby/ courtyard.Details
to comply w/ nov# 202200515, items #4 & #3, replacement of an (e) common egress stair, located in an open-air lobby/ courtyard. | $380,000 |
| Apr 14, 2023 | Completed final sign-off Mar 2024 | 1579 Wallace Av | Apex Builders Llc | mep for 201603232855 (1536 yosemite) w/ co2 enrichment system & monitoring; co2 system will alarm in the event of co2 gas leak; surna cooling system; dehumid and humidifier for code.install ducting per code for venting.install new exhaust fans on schedule for o2 purse exhaust; etc.Details
mep for 201603232855 (1536 yosemite) w/ co2 enrichment system & monitoring; co2 system will alarm in the event of co2 gas leak; surna cooling system; dehumid and humidifier for code.install ducting per code for venting.install new exhaust fans on schedule for o2 purse exhaust; etc. | $10,000 |
| Oct 28, 2021 | Expired or cancelled withdrawn Dec 2023 | 1579 Wallace Av | Pacific Craftsmen | to complete permitted work under bpa#201603232855 & add contiguous unit to use as c02 storage tank and additional cultivation. structural plans included for 2/f and mechanical plans for new/(e) hvac & c02 enriched rooms.Details
to complete permitted work under bpa#201603232855 & add contiguous unit to use as c02 storage tank and additional cultivation. structural plans included for 2/f and mechanical plans for new/(e) hvac & c02 enriched rooms. | $300,000 |
| Apr 1, 2019 | Never finaled issued Feb 2023, no final | 993 Mission St | Kieran Collins Construction | expansion of (e) restaurant annex adjacent fire damaged retail space. ti - are to include 3 new single accomodation toilet rooms. no expansion of conditioned floor area maher naDetails
expansion of (e) restaurant annex adjacent fire damaged retail space. ti - are to include 3 new single accomodation toilet rooms. no expansion of conditioned floor area maher na | $180,000 |
| May 11, 2017 | Expired or cancelled expired Feb 2020 | 321 Garfield St | Turley Construction | lightwell in-fill on property line and new sky light.Details
lightwell in-fill on property line and new sky light. | $12,000 |
| May 11, 2017 | Completed final sign-off Dec 2018 | 993 Mission St | Kieran Collins Construction | expansion of (e) bar/night club at 101 6th st to convert an (e)pawn shop. change of use to restaurant under 50 occupants. will include interior demo & construction, ada upgrades. work includes ground flr. dining/kit & kit/stor @ basement. 993 mission st as separate address forDetails
expansion of (e) bar/night club at 101 6th st to convert an (e)pawn shop. change of use to restaurant under 50 occupants. will include interior demo & construction, ada upgrades. work includes ground flr. dining/kit & kit/stor @ basement. 993 mission st as separate address for | $75,000 |
| Nov 8, 2016 | Never finaled issued Feb 2021, no final | 1559 Howard St | change of use from industrial to non retail greenhouse.Details
change of use from industrial to non retail greenhouse. | $1,000 | |
| Sep 20, 2016 | Completed final sign-off May 2019 | 468 Tehama St | Grats Decor Interior Design & Build Inc | to comply with complaint 201582711: legalization three walls as reconfigured storage rooms from (e) storage rooms. add one sprinlker head for hall way. maher naDetails
to comply with complaint 201582711: legalization three walls as reconfigured storage rooms from (e) storage rooms. add one sprinlker head for hall way. maher na | $15,000 |
| May 13, 2016 | Completed final sign-off Oct 2020 | 52 Landers St | Seths Crew | rear bldg. convert (e) basement (level 1) to new 1 bedroom unit, 2 new windows & modify window to allow for bedroom egress/rescueDetails
rear bldg. convert (e) basement (level 1) to new 1 bedroom unit, 2 new windows & modify window to allow for bedroom egress/rescue | $150,000 |
| Mar 23, 2016 | Completed final sign-off Mar 2024 | 1579 Wallace Av | Pacific Craftsmen | change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher naDetails
change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher na | $120,000 |
| Jan 21, 2016 | Expired or cancelled cancelled Mar 2023 | 686 Arkansas St | construct new roof deck (less than 500 sq ft), new glass guardrail at street facing side, a new steel guardrail & spiral stair for roof access. 1 unit has access onlyDetails
construct new roof deck (less than 500 sq ft), new glass guardrail at street facing side, a new steel guardrail & spiral stair for roof access. 1 unit has access only | $60,000 | |
| Aug 12, 2015 | Completed final sign-off Apr 2017 | 1892 Green St | Bergquist Builders, Travis General Contractors | remove extg glass windscreen and replace with new frameless safety glass windscreen. provide new deck surface waterproofing and new pedestal paversDetails
remove extg glass windscreen and replace with new frameless safety glass windscreen. provide new deck surface waterproofing and new pedestal pavers | $50,000 |
| Dec 15, 2014 | Completed final sign-off Jan 2015 | 298 11th St | Speedy Construction ****See Note | repair & replace drywall type, flooring with new finishes as needed due to dry rot, including new wall coverings, upgrade entry to full compliance. to include baths to full compliance. n/a ordinance #155-13. obtain an expired operational place of assembly permit for 281 persons. no structural work.Details
repair & replace drywall type, flooring with new finishes as needed due to dry rot, including new wall coverings, upgrade entry to full compliance. to include baths to full compliance. n/a ordinance #155-13. obtain an expired operational place of assembly permit for 281 persons. no structural work. | $55,000 |
| Dec 15, 2014 | Completed final sign-off May 2021 | 2635 18th St | construction of a 543 sq.ft. wood deck with deck surface 11'-6" above (e) grade, in rear yard. ** maher: compliance with ordinance no# 155-13 not required **Details
construction of a 543 sq.ft. wood deck with deck surface 11'-6" above (e) grade, in rear yard. ** maher: compliance with ordinance no# 155-13 not required ** | $18,500 | |
| Aug 14, 2014 | Completed final sign-off Mar 2015 | 609 Precita Av | rev. to pa#201408073318 for removal of (e) aluminium inserts @ precita ave. windows and install (n) wood double hung windows into (e) openings. replace garage door in (e) opening w/new wood garage door.Details
rev. to pa#201408073318 for removal of (e) aluminium inserts @ precita ave. windows and install (n) wood double hung windows into (e) openings. replace garage door in (e) opening w/new wood garage door. | $7,000 | |
| Jul 7, 2014 | Completed final sign-off Mar 2018 | 101 06th St | Anchored Oak | annex (e) 496 s.f. comm'l retail space which (e) w/in same bldg on the same property into an (e) bar/nightclub. (n) power assist entry door.(ada)(compliance with mahner ordinance extended 155-13 not required). comply with nov # 201769481 & 1704-0212 (fire). basement rm change from storage to officeDetails
annex (e) 496 s.f. comm'l retail space which (e) w/in same bldg on the same property into an (e) bar/nightclub. (n) power assist entry door.(ada)(compliance with mahner ordinance extended 155-13 not required). comply with nov # 201769481 & 1704-0212 (fire). basement rm change from storage to office | $30,000 |
| May 15, 2014 | Never finaled issued Jun 2014, no final | 224 Avila St | Travis General Contractors | removal of a (e) fire escape installed at the rear of house under pa #2004.1115.9167. installation of a new galvanized steel pre-fabricated spiral stair over new footing in it's place. n/a maher ordinance #155-13.Details
removal of a (e) fire escape installed at the rear of house under pa #2004.1115.9167. installation of a new galvanized steel pre-fabricated spiral stair over new footing in it's place. n/a maher ordinance #155-13. | $5,000 |
| Mar 31, 2014 | Expired or cancelled cancelled Jan 2026 | 224 Avila St | remove fire escape from rear of building. compliance with ordinance #155-13 not requiredDetails
remove fire escape from rear of building. compliance with ordinance #155-13 not required | $3,000 | |
| Nov 8, 2013 | Completed final sign-off Aug 2014 | 556 Mangels Av | Almac Construction | to comply with nov 201327953 --revision to pa# 2013-1104-1066-documentation of previously approved level 1 residential space (document (e) as 2 story bldg). remodel (e) level1 bathroom, convert (e) family room into bedroom. replace (e) windows & doors at level 1 rear yardDetails
to comply with nov 201327953 --revision to pa# 2013-1104-1066-documentation of previously approved level 1 residential space (document (e) as 2 story bldg). remodel (e) level1 bathroom, convert (e) family room into bedroom. replace (e) windows & doors at level 1 rear yard | $10,000 |
| Jun 4, 2012 | Completed final sign-off May 2018 | 1234 31st Av | modification to street facing facade & entry stair including new garage door, new entry stair & repair as requiredDetails
modification to street facing facade & entry stair including new garage door, new entry stair & repair as required | $30,000 | |
| May 18, 2012 | Completed final sign-off Oct 2013 | 1151 Dolores St | replace and repair damaged and/or rotting framing, add new simpson hardware and strengthen as needed to existing stair and deck at rear yard. provide 1 hr fire wall at property lineDetails
replace and repair damaged and/or rotting framing, add new simpson hardware and strengthen as needed to existing stair and deck at rear yard. provide 1 hr fire wall at property line | $10,000 | |
| Jun 14, 2011 | Completed final sign-off Aug 2011 | 4086 18th St | utilize fire sprinklers (installed under pa #2011.02.16.0381) throughout a-2 occupancy & supporting second means of egress (exit passageway) for an increase in allowable max occupancy from 97 to 1151. ref pa #200904136110.Details
utilize fire sprinklers (installed under pa #2011.02.16.0381) throughout a-2 occupancy & supporting second means of egress (exit passageway) for an increase in allowable max occupancy from 97 to 1151. ref pa #200904136110. | ||
| May 11, 2011 | Completed final sign-off Oct 2011 | 25 San Anselmo Av | Travis General Contractors | remove 6 south facing windows. repair dry rot and prep new rough opening. provide new flashing. install new window. repair cement plaster.Details
remove 6 south facing windows. repair dry rot and prep new rough opening. provide new flashing. install new window. repair cement plaster. | $6,000 |
| Apr 26, 2011 | Completed final sign-off Oct 2011 | 25 San Anselmo Av | Travis General Contractors | structural modifications including: removal of existing bearing wall between kitchen & dining. installation of new post & beam structural system with simpson hardward, fastened to existing footings.Details
structural modifications including: removal of existing bearing wall between kitchen & dining. installation of new post & beam structural system with simpson hardward, fastened to existing footings. | $5,000 |
| Feb 17, 2011 | Completed final sign-off May 2011 | 3333 Clay St | Travis General Contractors | revision to 201102089801. creating 6' opening in existing non structural partition wall currently separating kitchen from living roomDetails
revision to 201102089801. creating 6' opening in existing non structural partition wall currently separating kitchen from living room | $2,500 |
| Feb 2, 2010 | Expired or cancelled cancelled Feb 2012 | 336 Kearny St | replace an (e) awning with a new awning. sign on awning under separate permitDetails
replace an (e) awning with a new awning. sign on awning under separate permit | $1,300 | |
| Feb 2, 2010 | Expired or cancelled cancelled Nov 2011 | 336 Kearny St | painted sign on awning ( awning under separate permit)Details
painted sign on awning ( awning under separate permit) | $200 | |
| Apr 13, 2009 | Completed final sign-off Sep 2009 | 4086 18th St | change occupancy from b to a-2, install additional toilet facilities to meet sfbc 2007, occupancy change from 49 to 97, provide/coordinate req existing upgrades. comp 200988310/bid.Details
change occupancy from b to a-2, install additional toilet facilities to meet sfbc 2007, occupancy change from 49 to 97, provide/coordinate req existing upgrades. comp 200988310/bid. | $6,200 | |
| Dec 23, 2008 | Completed final sign-off Aug 2009 | 1445 Vallejo St | the addition of a stair & stair landing at the rear of property leading from level 2 down 1 level to rear yard. replace widnow with access door to new stair. life safety under seperate permit.Details
the addition of a stair & stair landing at the rear of property leading from level 2 down 1 level to rear yard. replace widnow with access door to new stair. life safety under seperate permit. | $25,000 | |
| Oct 28, 2008 | Completed final sign-off Mar 2009 | 4084 18th St | provide 1 hr. exit passageway @ existing corridor by adding gyp.bd per assembly requirements (u.l.) & adding 60 min doors.Details
provide 1 hr. exit passageway @ existing corridor by adding gyp.bd per assembly requirements (u.l.) & adding 60 min doors. | $5,000 |