Pacific Craftsmen
- Based in
- Half Moon Bay
- On San Francisco permits
- Oct 2006 to Oct 2021
- Last 24 months
- 0 permits filed
23 permits since 2000: 14 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2021 | Expired or cancelled withdrawn Dec 2023 | 1579 Wallace Av | to complete permitted work under bpa#201603232855 & add contiguous unit to use as c02 storage tank and additional cultivation. structural plans included for 2/f and mechanical plans for new/(e) hvac & c02 enriched rooms.Details
to complete permitted work under bpa#201603232855 & add contiguous unit to use as c02 storage tank and additional cultivation. structural plans included for 2/f and mechanical plans for new/(e) hvac & c02 enriched rooms. | $300,000 |
| Mar 23, 2016 | Completed final sign-off Mar 2024 | 1579 Wallace Av | change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher naDetails
change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher na | $120,000 |
| Jan 28, 2016 | Completed final sign-off Feb 2017 | 508 14th St | to obtain final inspection for work approved under pa#200804180104. all work is complete.Details
to obtain final inspection for work approved under pa#200804180104. all work is complete. | |
| Jan 28, 2016 | Completed final sign-off Feb 2017 | 508 14th St | to obtain final inspection for work approved under pa#200804028590. all work is complete.Details
to obtain final inspection for work approved under pa#200804028590. all work is complete. | |
| Feb 26, 2015 | Expired or cancelled cancelled Jan 2016 | 1579 Wallace Av | change of use from ware house to non retail nursery. mep and structural plans to be added with addendum. add partition walls, non structural interior only.Details
change of use from ware house to non retail nursery. mep and structural plans to be added with addendum. add partition walls, non structural interior only. | $27,000 |
| Dec 21, 2009 | Completed final sign-off Mar 2010 | 336 Kearny St | install (n) wall in (e) restaurant space & remove (e) seating for take-out only, remodel. provide (n) ada compliant lavatory in (e) toilet room.Details
install (n) wall in (e) restaurant space & remove (e) seating for take-out only, remodel. provide (n) ada compliant lavatory in (e) toilet room. | $6,000 |
| Oct 26, 2009 | Completed final sign-off Nov 2009 | 1290 09th Av | replace floor of restaurant with poly resin cement. patch & repair. sheetrock.Details
replace floor of restaurant with poly resin cement. patch & repair. sheetrock. | $10,000 |
| Mar 6, 2009 | Expired or cancelled expired Dec 2013 | 1249 09th Av | to obtain final inspection for work approved under pa #200806023348; all work has been completedDetails
to obtain final inspection for work approved under pa #200806023348; all work has been completed | |
| Feb 23, 2009 | Completed final sign-off Nov 2009 | 1718 Larkin St | add grade level deck to rear of exist building. 17'x7'6 at approx 12" above grade with stairs to 1st level. less than 3' above grade. replace e window w n door at top of new stairs.Details
add grade level deck to rear of exist building. 17'x7'6 at approx 12" above grade with stairs to 1st level. less than 3' above grade. replace e window w n door at top of new stairs. | $10,000 |
| Jan 20, 2009 | Completed final sign-off Apr 2009 | 1283 09th Av | replace & repair vinyl siding with new siding (cement board). replace 4 existing windows with new double pane windows in existing opening, partial patch and repair stucco.Details
replace & repair vinyl siding with new siding (cement board). replace 4 existing windows with new double pane windows in existing opening, partial patch and repair stucco. | $10,000 |
| Dec 18, 2008 | Completed final sign-off Apr 2009 | 1283 09th Av | add structural notes, to existing permit for restaurant remodel app. # 200811136515, permit#1172802 issue 11/24/2008. replace and repair in kind to existing structural. compt 200342647-bid.Details
add structural notes, to existing permit for restaurant remodel app. # 200811136515, permit#1172802 issue 11/24/2008. replace and repair in kind to existing structural. compt 200342647-bid. | $45,000 |
| Nov 13, 2008 | Completed final sign-off Apr 2009 | 1281 09th Av | interior, non-structural remodel of existing restaurant. improvments made to kitchen and dining ada bathroom added.Details
interior, non-structural remodel of existing restaurant. improvments made to kitchen and dining ada bathroom added. | $105,000 |
| Nov 10, 2008 | Completed final sign-off Apr 2009 | 1281 09th Av | interior remodel of extg lower level full service restaurant kitchen and dinning room upgrade . demo permit onlyDetails
interior remodel of extg lower level full service restaurant kitchen and dinning room upgrade . demo permit only | $6,000 |
| Apr 18, 2008 | Never finaled issued Apr 2008, no final | 508 14th St | commercial t.i. of (e) commercial space including upgrade of (e) toilet room to ada compliance. upgrade of (e) storefront entry to ada compliance, removal of (e) non-structural partitions and construction of new interior non-structural partitions. mep & t-24 calcs deferred.Details
commercial t.i. of (e) commercial space including upgrade of (e) toilet room to ada compliance. upgrade of (e) storefront entry to ada compliance, removal of (e) non-structural partitions and construction of new interior non-structural partitions. mep & t-24 calcs deferred. | $30,000 |
| Apr 2, 2008 | Expired or cancelled expired Feb 2010 | 508 14th St | remove walls and doors for proposed plan. remove csework in bathroom and sink for 1st floor. interior demo only.ti to be done under seperate permitDetails
remove walls and doors for proposed plan. remove csework in bathroom and sink for 1st floor. interior demo only.ti to be done under seperate permit | $2,000 |
| Jan 16, 2008 | Never finaled issued Jan 2008, no final | 1007 Guerrero St | replace (e) 4" non structural slab in storage area 25ftx26ft approx. rebar # 4 @ 16" o.c. ea. way. 10 mil vapor barrier under.Details
replace (e) 4" non structural slab in storage area 25ftx26ft approx. rebar # 4 @ 16" o.c. ea. way. 10 mil vapor barrier under. | $3,000 |
| Sep 5, 2007 | Expired or cancelled expired Jun 2008 | 426 Vallejo St | (front building) comply with physical inspection report. 3r-4846Details
(front building) comply with physical inspection report. 3r-4846 | $800 |
| Sep 5, 2007 | Expired or cancelled expired Jun 2008 | 420 Vallejo St | (front building).comply with physical inspection report. 3r-4793Details
(front building).comply with physical inspection report. 3r-4793 | $800 |
| Sep 5, 2007 | Completed final sign-off Nov 2007 | 422 Vallejo St | (rear building).comply with physical inspection report. 3r-4847Details
(rear building).comply with physical inspection report. 3r-4847 | $1,500 |
| Jul 31, 2007 | Completed final sign-off Nov 2007 | 422 Vallejo St | rear bldg. - repair less than 50% of existing deck/egress for rear unit. this is to comply with 3r#4847 of existing structure at rear.Details
rear bldg. - repair less than 50% of existing deck/egress for rear unit. this is to comply with 3r#4847 of existing structure at rear. | $2,000 |
| Jun 14, 2007 | Never finaled issued Jun 2007, no final | 860 Waller St | repair less than 50% of wood framing under concrete stairs in frontof bldgDetails
repair less than 50% of wood framing under concrete stairs in frontof bldg | $600 |
| Apr 30, 2007 | Completed final sign-off Jun 2007 | 144 Laidley St | repair, existing stairs 16 steps, less than 50% of stairs if >50% field bldg inspector may require plans & city planning.Details
repair, existing stairs 16 steps, less than 50% of stairs if >50% field bldg inspector may require plans & city planning. | $2,000 |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 73 Montezuma St | remove lath & plaster add sheetrock in living room, dining room,& kitchen, kitchen cabinet replaced. one window replace in kitchen.Details
remove lath & plaster add sheetrock in living room, dining room,& kitchen, kitchen cabinet replaced. one window replace in kitchen. | $2,000 |