Ana Quezada
- Listed as
- architect, authorized agent-others, designer
- Firm
- Quezada Architecture Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2021 to Aug 2026
34 permits since 2000 (architect on 32 permits, authorized agent-others on 1 permit, designer on 1 permit): 16 completed, 16 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | Peacock Construction | 26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes.Details
26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes. | $185,000 |
| Aug 11, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | Peacock Construction | 28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures.Details
28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures. | $185,000 |
| Mar 25, 2026 | In progress issued Apr 2026 | 988 Market St | Swinerton Builders | revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors.Details
revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors. | $14,580 |
| Mar 17, 2026 | Completed final sign-off Sep 2026 | 235 02nd St | Premier Structures Inc | ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork and plumbing fixturesDetails
ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork and plumbing fixtures | $525,000 |
| Dec 30, 2025 | In progress issued Apr 2026 | 988 Market St | 9/f: provide new ceilings and new lighting. no change in occupancy/use. no additional plumbing fixtures required.Details
9/f: provide new ceilings and new lighting. no change in occupancy/use. no additional plumbing fixtures required. | $100,000 | |
| Nov 12, 2025 | In progress issued Dec 2025 | 235 02nd St | Premier Structures Inc | 5/f: new rated doors at passenger elevator lobby, card readers, and a door release button.Details
5/f: new rated doors at passenger elevator lobby, card readers, and a door release button. | $40,000 |
| Jun 18, 2025 | In progress issued Jul 2025 | 34 Woodward St | Birmingham Builders, Inc | work is to remove 3 (e) windows. prepare (e) walls for 3 (n) windows openings and install (n) windows into the framed portion of of (e) building on the street facing wall on level 2.Details
work is to remove 3 (e) windows. prepare (e) walls for 3 (n) windows openings and install (n) windows into the framed portion of of (e) building on the street facing wall on level 2. | $34,000 |
| Apr 25, 2025 | Completed final sign-off Jul 2026 | 235 02nd St | Premier Structures Inc | 6th/f:t.i. non structural partitions demo, ceilimg, flooring finishes demo. new non-structural partitions, new furnitures, finishes. revisions to main restrooms, new all gender restroom, new mother's room, new pantry, revision to breaks room, new conference & huddle rooms.Details
6th/f:t.i. non structural partitions demo, ceilimg, flooring finishes demo. new non-structural partitions, new furnitures, finishes. revisions to main restrooms, new all gender restroom, new mother's room, new pantry, revision to breaks room, new conference & huddle rooms. | $195,000 |
| Apr 2, 2025 | Expired or cancelled expired Sep 2026 | 235 02nd St | Premier Structures Inc | change of use from storage/loading dock to general office. total area of change is 3,482 gross sq ft. infill of existing roll-down garage door, non structural demo of loading dock door & new curtainwall infill of same, per planning commission motion 21168. loading dock area will become b-officeDetails
change of use from storage/loading dock to general office. total area of change is 3,482 gross sq ft. infill of existing roll-down garage door, non structural demo of loading dock door & new curtainwall infill of same, per planning commission motion 21168. loading dock area will become b-office | $40,000 |
| Mar 28, 2025 | In progress issued Jul 2025 | 988 Market St | 7th fl:units 601 and 602: scope includes non structural demo, non structural partitions and new millwork. (e) lighting and restrooms to remain. mep & life safety under a separate permitDetails
7th fl:units 601 and 602: scope includes non structural demo, non structural partitions and new millwork. (e) lighting and restrooms to remain. mep & life safety under a separate permit | $125,550 | |
| Mar 27, 2025 | In progress issued Jul 2025 | 988 Market St | 8th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restroomsDetails
8th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restrooms | $125,500 | |
| Mar 27, 2025 | In progress issued Jul 2025 | 988 Market St | 9th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restrooms, egress system, rated walls to remain. deferred mep & fire. common areaDetails
9th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restrooms, egress system, rated walls to remain. deferred mep & fire. common area | $250,500 | |
| Mar 20, 2025 | In progress issued Mar 2025 | 235 02nd St | Premier Structures Inc | 6th fl-minor interior demo of a single story within 6 story building, scope includes non-structural partitions demolition, ceiling demolition, & flooring, finishes demolition. existing egress systems, fire rated wall systems, elevators, structural, sprinklers & existing use to remain. per ab-017,Details
6th fl-minor interior demo of a single story within 6 story building, scope includes non-structural partitions demolition, ceiling demolition, & flooring, finishes demolition. existing egress systems, fire rated wall systems, elevators, structural, sprinklers & existing use to remain. per ab-017, | $75,000 |
| Dec 23, 2024 | Completed final sign-off Oct 2025 | 235 02nd St | Premier Structures Inc | 5th floor; revision to pa#: 202407035769. new scope includes revisions main restrooms, all-gender restroom and the parents/mother room. mep deferred.Details
5th floor; revision to pa#: 202407035769. new scope includes revisions main restrooms, all-gender restroom and the parents/mother room. mep deferred. | $249,000 |
| Oct 31, 2024 | In progress issued Nov 2024 | 235 02nd St | Premier Structures Inc | ground floor- minor ti of a 6 story building to includes non structural demo, non structrual partitions and new millwork . (e) lighting, restroom fixtures, egress systems, fire rated wall systems , elevators, structure, and (e) use are to remain. mep deferredDetails
ground floor- minor ti of a 6 story building to includes non structural demo, non structrual partitions and new millwork . (e) lighting, restroom fixtures, egress systems, fire rated wall systems , elevators, structure, and (e) use are to remain. mep deferred | $75,000 |
| Sep 19, 2024 | In progress issued Sep 2024 | 414 Brannan St | Principal Builders Inc. | revision of 202306230779 and 202307182406 to clarify smoke curtain requirement at elevator shaft openingDetails
revision of 202306230779 and 202307182406 to clarify smoke curtain requirement at elevator shaft opening | |
| Jul 8, 2024 | In progress issued Jul 2024 | 147 Winfield St | Birmingham Builders, Inc | addition of (n) bathroom at lower level. convert (e) family room into office. office not to be used for sleeping purposes.Details
addition of (n) bathroom at lower level. convert (e) family room into office. office not to be used for sleeping purposes. | $50,000 |
| Jul 3, 2024 | Completed final sign-off Oct 2025 | 235 02nd St | Premier Structures Inc | 5th floor - office ti for minor improvement of a single story within a 6 story building. project scope includes non structrucal demo, non structural partitions, and new furniture and finishes thorughout. (e) restroom fixtures, egress, systems, fire rated wall system, elevators, structure & existingDetails
5th floor - office ti for minor improvement of a single story within a 6 story building. project scope includes non structrucal demo, non structural partitions, and new furniture and finishes thorughout. (e) restroom fixtures, egress, systems, fire rated wall system, elevators, structure & existing | $200,000 |
| Apr 11, 2024 | Completed final sign-off Nov 2024 | 680 Folsom St | Skyline Construction | 14/f: revision to pa# 2023-1010-8347 no work to be done. increase occupant load of 61 in two open collaboration area per plan.Details
14/f: revision to pa# 2023-1010-8347 no work to be done. increase occupant load of 61 in two open collaboration area per plan. | |
| Mar 14, 2024 | In progress issued Mar 2024 | 680 Folsom St | Skyline Construction | fire only permit for evacuation signs on 14th flr under previously approved permit#202310102347Details
fire only permit for evacuation signs on 14th flr under previously approved permit#202310102347 | $750 |
| Jan 16, 2024 | Completed final sign-off Nov 2024 | 680 Folsom St | Skyline Construction | 14/f: revision to previously approved permit# 202310108347: modify mdf room #1451 and ceiling work in room # 1465.Details
14/f: revision to previously approved permit# 202310108347: modify mdf room #1451 and ceiling work in room # 1465. | $3,500 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 921 Front St | Birmingham Builders, Inc | addition of accessible restroom in existing gr fl tenant suiteDetails
addition of accessible restroom in existing gr fl tenant suite | $42,000 |
| Jul 18, 2023 | In progress issued Jul 2024 | 414 Brannan St | Principal Builders Inc. | change of use from office to church. interior remodel new interior partitions, accesible resrtooms, pantry & upgrade to secondary ritch st. entrance, mep deffered. separate & additional work to 202305238442 and 202306230779Details
change of use from office to church. interior remodel new interior partitions, accesible resrtooms, pantry & upgrade to secondary ritch st. entrance, mep deffered. separate & additional work to 202305238442 and 202306230779 | $3,000,000 |
| Jun 23, 2023 | In progress issued Mar 2024 | 414 Brannan St | Principal Builders Inc. | seismic retrofit of 3-story + basement, commercial building. interior remodel including restroom, elevator & path of travel upgrades. no exterior workDetails
seismic retrofit of 3-story + basement, commercial building. interior remodel including restroom, elevator & path of travel upgrades. no exterior work | $1,125,000 |
| May 23, 2023 | Expired or cancelled withdrawn Nov 2023 | 414 Brannan St | Principal Builders Inc. | minor interior remodel including limited interior partition demo on lvl 1 & 2, addition of mn ada elevator, upgrades to brannan street entrance and restroom upgrades on lvl2. no exterior work.Details
minor interior remodel including limited interior partition demo on lvl 1 & 2, addition of mn ada elevator, upgrades to brannan street entrance and restroom upgrades on lvl2. no exterior work. | $750,000 |
| Nov 21, 2022 | Completed final sign-off Apr 2024 | 600 Battery St | Bcci Construction Company | priority process ab-004: tenant improvement: demo of non-structural interior partitions, finishes & associated mep. addition of new non-structural interior partitions, finishes & associated mep. upgrade existing restrooms to comply with new occupancy/plumbing calcs.Details
priority process ab-004: tenant improvement: demo of non-structural interior partitions, finishes & associated mep. addition of new non-structural interior partitions, finishes & associated mep. upgrade existing restrooms to comply with new occupancy/plumbing calcs. | $14,250,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2024 | 564 Pacific Av | Peacock Construction | interior tenant improvement of ground floor and partial basement. demo extg partitions. new work to include non structural partitions, ceiling, doors, and millwork.Details
interior tenant improvement of ground floor and partial basement. demo extg partitions. new work to include non structural partitions, ceiling, doors, and millwork. | $825,000 |
| Apr 5, 2022 | Completed final sign-off Jan 2023 | 140 New Montgomery St | Richlen Construction | 2/f: revision to pa202112104164. missing sheet rr02.1 to show accessibilty upgrades to restroom.Details
2/f: revision to pa202112104164. missing sheet rr02.1 to show accessibilty upgrades to restroom. | |
| Mar 11, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 4/f: deferred structural submittal in support of approved fire door installation under permit 202112104161.Details
4/f: deferred structural submittal in support of approved fire door installation under permit 202112104161. | $38,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 3/f: install new 3 hour fire rated door and 2 hour fire rated enclosure.Details
3/f: install new 3 hour fire rated door and 2 hour fire rated enclosure. | $126,000 |
| Dec 10, 2021 | Completed final sign-off Jul 2022 | 140 New Montgomery St | Richlen Construction | 3rd fl, ste 300 - demo of (e) non-structural partitions, electrical & finishes. no ceiling work.Details
3rd fl, ste 300 - demo of (e) non-structural partitions, electrical & finishes. no ceiling work. | $10,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 2/f: new interior non-structural partitions, finishes and electrical for 1 hr rated corridor. a new demising partition for 2 separate vacant suites. women's toilet relocated. mep deferred.Details
2/f: new interior non-structural partitions, finishes and electrical for 1 hr rated corridor. a new demising partition for 2 separate vacant suites. women's toilet relocated. mep deferred. | $162,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 4/f: demo non-structural partitions, electrical and finishes to accommodate elevator lobby upgrades. a new finishes, millwork and lighting in existing vacant full floor tenant suite. relocate toilet.Details
4/f: demo non-structural partitions, electrical and finishes to accommodate elevator lobby upgrades. a new finishes, millwork and lighting in existing vacant full floor tenant suite. relocate toilet. | $500,000 |
| Jun 30, 2021 | Completed final sign-off May 2022 | 300 California St | Gci, Inc | #600: new conferance rooms, pantry and reception, millwork, nw plumbing, lighting, power data, mechanical and partitions.Details
#600: new conferance rooms, pantry and reception, millwork, nw plumbing, lighting, power data, mechanical and partitions. | $385,000 |