William Bondy
- Listed as
- architect, authorized agent-others
- Firm
- Starkweatherbondy Arch Llp
- Based in
- Oakland
- On San Francisco permits
- Jan 2003 to Jun 2026
60 permits since 2000 (architect on 59 permits, authorized agent-others on 1 permit): 44 completed, 4 in progress, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2026 | In progress issued Jun 2026 | 655 Brotherhood Wy | Singular Builders | grading & ground improvement for outdoor play yard to make ready site for future build back currently under pa# 202602105607, no structural work under this permit.Details
grading & ground improvement for outdoor play yard to make ready site for future build back currently under pa# 202602105607, no structural work under this permit. | $221,400 |
| Jun 1, 2026 | In progress issued Jul 2026 | 655 Brotherhood Wy | Singular Builders | shoring and underpinning at demolished exterior stairs to make ready site for future build back under bpa 202602105607. stair demo under bpa 202605181443.Details
shoring and underpinning at demolished exterior stairs to make ready site for future build back under bpa 202602105607. stair demo under bpa 202605181443. | $104,000 |
| May 15, 2026 | Expired or cancelled withdrawn May 2026 | 655 Brotherhood Wy | Singular Builders | grading and ground improvement for outdoor play yards to make ready site for future build back currently under bpa#: 202602105607Details
grading and ground improvement for outdoor play yards to make ready site for future build back currently under bpa#: 202602105607 | $221,400 |
| Mar 26, 2026 | Completed final sign-off Aug 2026 | 1639 Oak St | Eric F Anderson Incorporated | tenant improvement on the second floor of the building at 1639 oak street on the campus of the urban school of sf to convert two classrooms and an office into a fitness center space and an office. project scope, affecting 1,455 sf of (e) interior space, includes: new interior partitions, new..Details
tenant improvement on the second floor of the building at 1639 oak street on the campus of the urban school of sf to convert two classrooms and an office into a fitness center space and an office. project scope, affecting 1,455 sf of (e) interior space, includes: new interior partitions, new.. | $465,000 |
| Mar 6, 2026 | In progress issued Jul 2026 | 655 Brotherhood Wy | Singular Builders | construction of 101sf gatehouse. addition to basement story of (e) clssrm bldg.site improvemvent of 2 (e) outdoor playyards.renovation of classrooom space on g/f of (e) gym into full kitchen,renov faculty lounge space of basement of gym bldg of admin space for kitchen staff, including kitchen strg.Details
construction of 101sf gatehouse. addition to basement story of (e) clssrm bldg.site improvemvent of 2 (e) outdoor playyards.renovation of classrooom space on g/f of (e) gym into full kitchen,renov faculty lounge space of basement of gym bldg of admin space for kitchen staff, including kitchen strg. | $5,000,000 |
| Apr 9, 2025 | Completed final sign-off Aug 2025 | 1563 Page St | Eric F Anderson Incorporated | ti of g/f "gumption bldg" on urban school of sf to convert music rehearsal classroom into typical academic instruction affecting 1079 sq ft: new storage & work surface casework, icluding new accessible sink, new teaching wall infrastructure & new finishes.(e) mechaical system to remainDetails
ti of g/f "gumption bldg" on urban school of sf to convert music rehearsal classroom into typical academic instruction affecting 1079 sq ft: new storage & work surface casework, icluding new accessible sink, new teaching wall infrastructure & new finishes.(e) mechaical system to remain | $70,000 |
| Apr 9, 2025 | Completed final sign-off Aug 2025 | 1563 Page St | Eric F Anderson Incorporated | ti of 2/f "middle/library building" of the urban school of sf. project includes finishes upgrades for 698 sq ft of (e) space.Details
ti of 2/f "middle/library building" of the urban school of sf. project includes finishes upgrades for 698 sq ft of (e) space. | $30,000 |
| Mar 21, 2025 | Completed final sign-off Aug 2025 | 1563 Page St | Eric F Anderson Incorporated | tenant improvement of multipurpose performance space on the ground floor of the gumption building on the campus of urban school of s.f project scope, affecting 1595 sf of existing space, includes: installation of a manually operated folding acoustic partition reinforcement of existing heavy timberDetails
tenant improvement of multipurpose performance space on the ground floor of the gumption building on the campus of urban school of s.f project scope, affecting 1595 sf of existing space, includes: installation of a manually operated folding acoustic partition reinforcement of existing heavy timber | $125,000 |
| Feb 1, 2024 | In progress issued Feb 2024 | 1530 Page St | Cahill Contractors Llc. | removal of glazing & damaged intermediate mullions & damaged perimeter framing (as required) of 6 (e) non-fire-rated steel windows on e+w sides of bldg. installation of new non-fire rated steel frame windows with new insulated glazing lites to meet current energy code. lites window 10 vert of egressDetails
removal of glazing & damaged intermediate mullions & damaged perimeter framing (as required) of 6 (e) non-fire-rated steel windows on e+w sides of bldg. installation of new non-fire rated steel frame windows with new insulated glazing lites to meet current energy code. lites window 10 vert of egress | $150,000 |
| Dec 29, 2022 | Expired or cancelled expired Nov 2025 | 1025 Masonic Av | Cahill Contractors Llc. | new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg.Details
new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg. | $50,000 |
| Dec 23, 2022 | Completed final sign-off May 2025 | 1639 Oak St | Cahill Contractors Llc. | scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planterDetails
scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planter | $75,000 |
| Dec 29, 2021 | Completed final sign-off Dec 2025 | 1530 Page St | Cahill Contractors Llc., Granite Excavation & Demolition Inc | renovate to transform st agnes gymnasium main assembly space into a fixed-seated, theatrical hall for performing arts programs, assemblies, & lectures. excavate bsmt area to create an access. music classrm, practice & recording rms, & faculty office. provide mech & strut upgrades & provisions of...Details
renovate to transform st agnes gymnasium main assembly space into a fixed-seated, theatrical hall for performing arts programs, assemblies, & lectures. excavate bsmt area to create an access. music classrm, practice & recording rms, & faculty office. provide mech & strut upgrades & provisions of... | $11,300,000 |
| May 27, 2020 | Never finaled issued Jun 2020, no final | 3065 Jackson St | Truebeck Construction | exploratory investigation including removal of non-structural partitions, windows and doors to prep for t.i. under p.a.# 202006068210.Details
exploratory investigation including removal of non-structural partitions, windows and doors to prep for t.i. under p.a.# 202006068210. | $35,000 |
| Aug 25, 2017 | Completed final sign-off Nov 2017 | 1415 Howard St | Meylan Construction | revision to pa #201608114810 - modification oto two basement restrooms for kindergarden use in lieu of toddler use including deletion of two toilets, deletion of one sink, & addition of two toilet partitions. restroom windows deleted. n/a maher ordinanceDetails
revision to pa #201608114810 - modification oto two basement restrooms for kindergarden use in lieu of toddler use including deletion of two toilets, deletion of one sink, & addition of two toilet partitions. restroom windows deleted. n/a maher ordinance | |
| Aug 11, 2017 | Completed final sign-off Nov 2017 | 1415 Howard St | Wells Electrical, Inc | title-24 lighting. ref pa #201608114810. maher naDetails
title-24 lighting. ref pa #201608114810. maher na | $60,000 |
| Aug 11, 2016 | Completed final sign-off Jan 2018 | 1415 Howard St | Meylan Construction | change of use from rectory to school and tenant improvements. (seismic retrofit under seperate permit). ** maher: n/a **Details
change of use from rectory to school and tenant improvements. (seismic retrofit under seperate permit). ** maher: n/a ** | $986,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 493 Broadway | Kaufman Construction | minor revision to pa #201212176374: addition of two walls & door on 2nd floor to enclose conference room. m.e.p. & fire sprinklers/alarms under separate permit.Details
minor revision to pa #201212176374: addition of two walls & door on 2nd floor to enclose conference room. m.e.p. & fire sprinklers/alarms under separate permit. | $8,600 |
| Jan 12, 2016 | Never finaled issued Feb 2016, no final | 3150 California St | Meylan Construction | 2nd floor t. i. of an (e) offic ebldg including reconfiguring of interior walls & doors. upgrade accessible path of travel to area of work.Details
2nd floor t. i. of an (e) offic ebldg including reconfiguring of interior walls & doors. upgrade accessible path of travel to area of work. | $125,000 |
| Jun 19, 2015 | Completed final sign-off May 2016 | 4195 26th St | Lanier Construction | add new bathroom & cap foundation @ 1st floor bottom unit.Details
add new bathroom & cap foundation @ 1st floor bottom unit. | $30,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2018 | 1170 Market St | Fresh Paint | t.i. remove non-bearing walls add non-bearing walls to accomodate additional offices, relocate light fixtures.Details
t.i. remove non-bearing walls add non-bearing walls to accomodate additional offices, relocate light fixtures. | $20,000 |
| Apr 1, 2014 | Completed final sign-off Feb 2015 | 260 10th St | Plant Construction Company Lp | interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not requiredDetails
interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not required | $200,000 |
| Mar 14, 2014 | Expired or cancelled withdrawn Jun 2015 | 1715 Octavia St | to comply with nov #201120721. change of occupancy from r-3 to b occupancy. office and storage purposes for school use. administrative permit only. no construction work under this permit.Details
to comply with nov #201120721. change of occupancy from r-3 to b occupancy. office and storage purposes for school use. administrative permit only. no construction work under this permit. | ||
| Feb 4, 2014 | Completed final sign-off Feb 2015 | 260 10th St | Plant Construction Company Lp | revision to pa# 201309257723 and 201306189889. revised structural details to accommodate existing conditions, revised construction type from 5a to 5b. compliance with ordinance #155-13 not required.Details
revision to pa# 201309257723 and 201306189889. revised structural details to accommodate existing conditions, revised construction type from 5a to 5b. compliance with ordinance #155-13 not required. | $150,000 |
| May 29, 2012 | Completed final sign-off Dec 2012 | 2222 Broadway | Meylan Construction | remodel 1st floor entry for accessibility. project includes ada compliant ramp, hardware modifications to extg door and minor landscaping.Details
remodel 1st floor entry for accessibility. project includes ada compliant ramp, hardware modifications to extg door and minor landscaping. | $30,000 |
| May 10, 2012 | Completed final sign-off Oct 2012 | 2222 Broadway | Meylan Construction | revision 201202274935. new 2 hour rated shaft wall for ventless dishwasher. type ii hood under separate permitDetails
revision 201202274935. new 2 hour rated shaft wall for ventless dishwasher. type ii hood under separate permit | $5,000 |
| Mar 30, 2012 | Completed final sign-off Sep 2012 | 300 Gaven St | renovation of existing 2 story classroom building. new exterior wal and interior finishesDetails
renovation of existing 2 story classroom building. new exterior wal and interior finishes | $75,000 | |
| Feb 27, 2012 | Completed final sign-off Oct 2012 | 2222 Broadway | Meylan Construction | interior remodel to (e) kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.(n) exterior loovers at lower level.Details
interior remodel to (e) kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.(n) exterior loovers at lower level. | $326,771 |
| Nov 22, 2011 | Completed final sign-off May 2013 | 300 Gaven St | Plant Construction Co, Lp | demolish (e) 1 story, wood framed structure & replace with 2 story horizontal addition plus mezzanine type 5b fully sprinklered. fire sprinkler & alarm under separate permit.Details
demolish (e) 1 story, wood framed structure & replace with 2 story horizontal addition plus mezzanine type 5b fully sprinklered. fire sprinkler & alarm under separate permit. | $3,250,000 |
| Oct 6, 2011 | Completed final sign-off Sep 2012 | 151 Westgate Dr | Lanier Construction | repair & restore (e) entry stair to original configuration.Details
repair & restore (e) entry stair to original configuration. | $2,500 |
| Jun 9, 2010 | Completed final sign-off Oct 2010 | 655 Brotherhood Wy | rev. to pa# 2009.1203.2543. delete proposed baywindow in classroom. new demising wall at office 107Details
rev. to pa# 2009.1203.2543. delete proposed baywindow in classroom. new demising wall at office 107 | $25,000 | |
| Feb 12, 2010 | Completed final sign-off Aug 2010 | 3065 Jackson St | Herrero Builders Incorporated | 2nd floor-remodel (e) kitchen & student dining areaDetails
2nd floor-remodel (e) kitchen & student dining area | $170,000 |
| Dec 3, 2009 | Never finaled issued Dec 2009, no final | 655 Brotherhood Wy | convert existing art classroom to science classroom, remove (2) interior columns & replace with new glu0lam beam. new movable partitions & case work, new bay window at rear of classroom (not visable from street).Details
convert existing art classroom to science classroom, remove (2) interior columns & replace with new glu0lam beam. new movable partitions & case work, new bay window at rear of classroom (not visable from street). | $50,000 | |
| Dec 3, 2009 | Completed final sign-off Nov 2010 | 655 Brotherhood Wy | new elevator in gym building to provide disabled access to classrooms at lower level. new accessible bathrooms & voluntary structural strengthening.Details
new elevator in gym building to provide disabled access to classrooms at lower level. new accessible bathrooms & voluntary structural strengthening. | $250,000 | |
| Apr 30, 2009 | Completed final sign-off Aug 2009 | 655 Brotherhood Wy | modification to existing classroom, demolish existing non-bearing wall, paint and carpet. all non-structural work.Details
modification to existing classroom, demolish existing non-bearing wall, paint and carpet. all non-structural work. | $10,000 | |
| Feb 4, 2009 | Completed final sign-off Feb 2009 | 4338 Fulton St | Lanier Construction | remove wall, install beam at 2nd floorDetails
remove wall, install beam at 2nd floor | $1,200 |
| Sep 26, 2008 | Expired or cancelled expired Nov 2018 | 1210 Scott St | Plant Construction Co, Lp | erect a 3 stories schoolDetails
erect a 3 stories school | $6,000,000 |
| May 14, 2008 | Completed final sign-off Aug 2008 | 1835 Ellis St | minor modifications to (e) classrooms and offices. upgrade facility breakroom to full ada compliance.Details
minor modifications to (e) classrooms and offices. upgrade facility breakroom to full ada compliance. | $50,000 | |
| Apr 22, 2008 | Completed final sign-off Aug 2009 | 2252 Broadway | revision to approved app 200702023269, value engineering structural revisions.Details
revision to approved app 200702023269, value engineering structural revisions. | $20,000 | |
| Apr 7, 2008 | Completed final sign-off Aug 2009 | 2252 Broadway | replace (e) chainlink fence with ornamental front fence and gate. new ornamental fence above new concrete planter.Details
replace (e) chainlink fence with ornamental front fence and gate. new ornamental fence above new concrete planter. | $10,000 | |
| Apr 2, 2008 | Completed final sign-off Jun 2008 | 1055 Church St | Lanier Construction | to comply w/n.o.v. #200736201 dated 12/20/07 - remove & replace front stair in kind.Details
to comply w/n.o.v. #200736201 dated 12/20/07 - remove & replace front stair in kind. | $1,500 |
| Dec 21, 2007 | Completed final sign-off Aug 2008 | 1555 Mariposa St | remodel 1 classroom on 2nd floor and office areas on 2nd and 3rd floors, mep sprinkler and fire alarm under seperate permit.Details
remodel 1 classroom on 2nd floor and office areas on 2nd and 3rd floors, mep sprinkler and fire alarm under seperate permit. | $19,500 | |
| Dec 20, 2007 | Never finaled issued Dec 2008, no final | 655 Brotherhood Wy | to erect gym / performing arts center.Details
to erect gym / performing arts center. | $4,000,000 | |
| Dec 20, 2007 | Completed final sign-off Oct 2008 | 3065 Jackson St | new front entrance and two accessable restrooms on 1st floor. modify (e) facade at entrance.Details
new front entrance and two accessable restrooms on 1st floor. modify (e) facade at entrance. | $250,000 | |
| Oct 30, 2007 | Completed final sign-off Aug 2009 | 2252 Broadway | demolition of exterior ramps and sport court fence. new exterior stairs and ramps, utility enclosure and new sport court exterior fence. building remodel done under applications 200703055434 and 200702023269.Details
demolition of exterior ramps and sport court fence. new exterior stairs and ramps, utility enclosure and new sport court exterior fence. building remodel done under applications 200703055434 and 200702023269. | $300,000 | |
| May 23, 2007 | Expired or cancelled expired Aug 2010 | 3065 Jackson St | interior non ctructura soft demo onlyDetails
interior non ctructura soft demo only | $5,000 | |
| May 23, 2007 | Never finaled issued May 2007, no final | 1555 Mariposa St | enclose third floor library mezzanine for media class room construction tech office i existing 3rd fl.class room space, no exterior work. mep under separate permit.Details
enclose third floor library mezzanine for media class room construction tech office i existing 3rd fl.class room space, no exterior work. mep under separate permit. | $50,000 | |
| Mar 23, 2007 | Completed final sign-off Jun 2008 | 2252 Broadway | Herrero Builders Incorporated | demolition of interiors-final seismic upgrade drowings can be completed by civil & stuctural engineers for construciton. no exterior alteration. soft demolision and no structural work. removal building to be vacant-under this permit. architectual and fire l/s on sep. permit.Details
demolition of interiors-final seismic upgrade drowings can be completed by civil & stuctural engineers for construciton. no exterior alteration. soft demolision and no structural work. removal building to be vacant-under this permit. architectual and fire l/s on sep. permit. | $65,000 |
| Nov 21, 2006 | Completed final sign-off Feb 2008 | 576 Sacramento St | historic bldg per planning code art 11. remove old roofed skylight in back of 1st floor and install ventilated windw wall and deck for light and air, and upgrade per 20% rule for bathroom serving same space and partial along path of travel to same spaceDetails
historic bldg per planning code art 11. remove old roofed skylight in back of 1st floor and install ventilated windw wall and deck for light and air, and upgrade per 20% rule for bathroom serving same space and partial along path of travel to same space | $90,000 | |
| Nov 13, 2006 | Expired or cancelled expired Jan 2013 | 3973 25th St | Lanier Construction, S F Garage Company Inc. | demo 2 story addition at rear of (e) house. build new 2 story addition containing new kitchen, dining room, master bathroom, downstairs laundry and wood deck at rear of new addition.Details
demo 2 story addition at rear of (e) house. build new 2 story addition containing new kitchen, dining room, master bathroom, downstairs laundry and wood deck at rear of new addition. | $155,000 |
| Jul 24, 2006 | Completed final sign-off May 2007 | 3185 Washington St | revision to pa# 2006/03/23/7358 new retractable basketball backboard. no other work under this permit.Details
revision to pa# 2006/03/23/7358 new retractable basketball backboard. no other work under this permit. | $7,500 | |
| Jul 18, 2006 | Expired or cancelled expired Feb 2008 | 1210 Scott St | interior non structural soft demolition of high school assembly area and adjacent restroom and storage roomDetails
interior non structural soft demolition of high school assembly area and adjacent restroom and storage room | $8,500 | |
| Jun 6, 2006 | Completed final sign-off Dec 2006 | 3185 Washington St | interior non-structural demolition of 1st & 2nd floor & basement. soft demo only. maintain fire & life safety systems during & after demolition work.Details
interior non-structural demolition of 1st & 2nd floor & basement. soft demo only. maintain fire & life safety systems during & after demolition work. | $25,000 | |
| May 16, 2006 | Completed final sign-off Nov 2006 | 3220 Sacramento St | Herrero Builders Incorporated | rebuild (e) elevator vestibule on 3rd floor near sacramento street. no change to window configuration or elevation.Details
rebuild (e) elevator vestibule on 3rd floor near sacramento street. no change to window configuration or elevation. | $9,000 |
| May 15, 2006 | Completed final sign-off May 2007 | 1555 Mariposa St | lighting, mechanical. 200603086274. fire alarm under sep permitDetails
lighting, mechanical. 200603086274. fire alarm under sep permit | $34,000 | |
| Mar 23, 2006 | Completed final sign-off May 2007 | 3185 Washington St | interior renovation of high school building. new classrooms and exercise areas. new exterior gas meter alcove at entry recess front entry door.Details
interior renovation of high school building. new classrooms and exercise areas. new exterior gas meter alcove at entry recess front entry door. | $1,500,000 | |
| Mar 8, 2006 | Completed final sign-off May 2007 | 1555 Mariposa St | interior improvement for school gymnasium.Details
interior improvement for school gymnasium. | $180,000 | |
| Mar 1, 2006 | Completed final sign-off May 2007 | 3185 Washington St | barrier removal permit,new accessible elevator and ramp at entry hall.Details
barrier removal permit,new accessible elevator and ramp at entry hall. | $92,000 | |
| Oct 24, 2005 | Completed final sign-off Dec 2006 | 1001 Franklin St | voluntary exterior seismic upgrade. accessibility upgrade to publicly accessible space in the 13 story residential tower.Details
voluntary exterior seismic upgrade. accessibility upgrade to publicly accessible space in the 13 story residential tower. | $500,000 | |
| Apr 14, 2005 | Completed final sign-off Dec 2005 | 3065 Jackson St | remodel of library on 3rd /fl. new mechanical and lighting (alteration of existing space)Details
remodel of library on 3rd /fl. new mechanical and lighting (alteration of existing space) | $875,000 | |
| Jan 28, 2003 | Completed final sign-off Jul 2004 | 1668 Alabama St | demolish e bedroom,bath and construct new 2nd flr bdrm and bath over n bath and expanded living rm.Details
demolish e bedroom,bath and construct new 2nd flr bdrm and bath over n bath and expanded living rm. | $125,000 |